NSAM3 RFP Sec J Attachment 21 Rapid Response and Special Projects Guidance REV E OCT22.docx

DOCX document 42 KB Posted

Attached to
Manufacturing Technology (ManTech) Naval Shipbuilding and Advanced Manufacturing 3 (NSAM 3)
Solicitation number
N0001424R0002
Issued by

About this file

This document provides details for a draft request for proposal for operation of the Naval Shipbuilding and Advanced Manufacturing Center of Excellence III under the Navy Manufacturing Technology Program. The Department of the Navy, Secretary of the Navy Office of Naval Research intends to issue a full and open competitive solicitation as a cost plus fixed fee indefinite delivery/indefinite quantity contract for a base period of two years and three optional one-year periods, with an additional optional six month extension. Services required include identifying, developing, and facilitating advanced manufacturing technologies for transfer to U.S. shipyards and other industrial facilities producing naval platforms to help reduce costs and time for building and sustaining key vessels. Technology areas of focus include design for producibility/manufacturability, model-based digital tools, build strategies, structural fabrication processes, automation and robotics, supply chain improvements, modeling and simulation, outfitting operations, and welding and quality inspection. No response is required for this draft, with the final solicitation to be issued on or around March 29, 2024 under number N0001424R0002.

View the file

Other files

File Type Posted
NSAM3 RFP Sec J Attachment 10 Expenditure Estimate Spreadsheet and Monthly Expenditure Report Guidance REV K Feb 2024.docx DOCX document
NSAM3 RFP Sec J Attachment 18 Project Book Guidance REV L MAY22.docx DOCX document
NSAM3 RFP Sec J Attachment 16 Affordability Assessment Guidance REV L AUG22.docx DOCX document
NSAM3 RFP CDRL ENCLOSURE NUMBER 1.docx DOCX document
NSAM3 RFP Sec J Attachment 13 Project Quad Chart Guidance REV I OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 8 Data Call Chart REV O APR22.xlsx XLSX spreadsheet
NSAM3 RFP Sec J Attachment 26 Annual_Review_Project_Briefing_Template_REV_D_JAN23.pptx PPTX presentation
NSAM3 RFP Sec J Attachment 23 Proposal Pipeline and ONR Contracts Actions Spreadsheet Guidance REV C OCT21.docx DOCX document
NSAM3 RFP Exhibit A COE CDRLS 02.27.2024.docx DOCX document
NSAM3 RFP Sec J Attachment 6 CE Summary.xlsx XLSX spreadsheet
NSAM3 RFP Sec J Attachment 5 Price Information.docx DOCX document
NSAM3 RFP Sec J Attachment 25 Navy ManTech Code 33 Monthly Report Guidance REV E OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 9 Funding Allocation Spreadsheet Guidance REV J OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 22 Return on Investment Calculation Guidance REV E OCT21.docx DOCX document
NSAM3 RFP Sec J Attachment 14 Technology Transition Plan Guidance REV N OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 4 Q and A Template.xlsx XLSX spreadsheet
NSAM3 RFP Sec J Attachment 10 Expenditure Estimate Spreadsheet and Monthly Expenditure Report Guidance REV K Feb 2024.docx DOCX document
NSAM3 RFP Sec J Attachment 24 Public Release Request Tool Guidance REV G OCT22 draft.docx DOCX document
NSAM3 RFP Sec J Attachment 12 Final Report Guidance REV J OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 1 SOW Feb 28 2024.docx DOCX document
NSAM3 RFP Sec J Attachment 17 COE Transition Implementation Guidance - REV F OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 11 Quarterly Report Guidance REV J OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 28 Review Form Instructions - Portfolio Review.pptx PPTX presentation
NSAM3 RFP Sec J Attachment 7 Annual Data Call REV L OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 2 Key Personnel.docx DOCX document
NSAM3 RFP Sec J Attachment 20 Implementation Risk Assessment Guidance REV H OCT22.docx DOCX document
N0001424R0002 2.29.2024 DRAFT RFP.pdf PDF
NSAM3 RFP Sec J Attachment 19 Project Briefing Guidance REV I OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 27 Annual Portfolio Review Form REV B JAN23.xlsx XLSX spreadsheet
NSAM3 RFP Exhibit B Project CDRLS 02.27.2024.docx DOCX document
NSAM3 RFP Sec J Attachment 15 Success Story Guidance REV M OCT22.docx DOCX document
NSAM3 RFP Sec K ONR Reps Certs Feb 2024.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navy ManTech Program

REV E OCT22

Rapid Response and Special Projects Guidance October 2022

Attachments:

1. None.

A. PURPOSE

The purpose of the Rapid Response and Special Projects guidance is to establish a framework to address individual projects under the Office of Naval Research (ONR) Center of Excellence (COE) prime contracts that can be delivered within a shortened timeframe. Both Rapid Response and Special Projects efforts enable a problem to be addressed through access to existing expertise without expending the time and effort to initiate a separate contract action.

Of shorter duration and generally lower dollar value than standard ManTech projects, Rapid Response projects offer increased potential for rapid technology insertion to meet Department of Navy (DON) platform needs in accordance with Department of Defense (DoD) Directive 4200.15. With minimal time and funding, a COE should be able to resolve an issue in a timely manner. Special Projects are other short-term, low-dollar value efforts, not necessarily connected with an acquisition or repair Program Office, to further evaluate technical issues related to DON manufacturing.

B. CRITERIA

A Rapid Response effort should address unplanned manufacturing, sustainability, or repair issues from fleet or production programs that can benefit from the expertise of the COEs.

In general, a proposed Rapid Response project should satisfy the following criteria:

· Acknowledgement of the problem by the appropriate stakeholder

· Clearly defined statement of work

· Implementation strategy by the stakeholder if the project is successful

· Funding level of $200K or less

· Duration of 6 months or less

· The project should be coordinated with the applicable Program Executive Office or Program Office prior to authorization.

· Written authorization is required from the Program Officer (PO) / Contracting Officer Representative (COR) to the COE to pursue the issue of the project.

A Special Project should satisfy the following criteria:

· Clearly defined statement of work

· Address a legitimate manufacturing technology issue which will ultimately benefit the Navy but does not need to have a direct transition at this time

· Funding level of $200K or less

· Duration of 6 months or less

· Written authorization is required from the PO / COR to the COE to pursue the issue of the project.

· Examples include, but are not limited to, manufacturing trade studies, benchmarking activities, build strategy development, etc.

Rapid Response / Special Project funds should not be used to accomplish the initial phase of a typical or normal project, or be used for a normal project simply because it does not require a large budget. In addition, Rapid Response / Special Project funding is not intended to be a catch-all accounting line to be used for a variety of different charges.

C. RAPID RESPONSE / SPECIAL PROJECTS SUBMITTAL AND PROCESSING

The instructions below outline the submission requirements and process for a Navy ManTech Rapid Response or Special Project effort.

1. Technical Proposal:

· Background

· Objective

· Requirements and Timelines for Transition

· Statement of Work

· Contract Data Requirements List (CDRL)

· Project Schedule

· Project Specific Deliverables

· Statement on how the COE will ensure completion without an increase in scope, schedule, or cost

2. Cost Proposal:

· Cost Spreadsheets in the ONR format is required for prime and subcontractors (if utilized).

The COE will submit individual project proposals to the respective ONR PO / COR. The PO / COR will review the proposal, ensure that it meets the requirements to establish a Rapid Response or Special Project and validate that the scope, cost, and period of performance are within the requirements of the applicable Task Order statement of work. The PO / COR will email the documents to the CO and indicate his concurrence to initiate the Rapid Response or Special Project effort. It is expected that these efforts will have an appropriate award type (i.e., Firm Fixed Price, Cost Plus Fixed Fee, etc.). The CO will add the Rapid Response or Special Project to the appropriate Task Order via contract modification.

D. REPORTING

Rapid Response, Repair Technology Rapid Response, and Special Project efforts are to be tracked at a ManTech project level for reporting purposes. Projects should fulfill all applicable ManTech Data Call Requirements (e.g., Quad Charts, Final Reports, etc.) at an appropriate level for the level of effort and at the discretion of the PO / COR. Note that Rapid Response and Repair Technology Rapid Response projects do not require Technology Transition Plans or risk assessments.

N00014-24-R-0002 NSAM COE III Attachment 21 2