NSAM3 RFP Exhibit A COE CDRLS 02.27.2024.docx
DOCX document 103 KB Posted
- Attached to
- Manufacturing Technology (ManTech) Naval Shipbuilding and Advanced Manufacturing 3 (NSAM 3)
- Solicitation number
- N0001424R0002
About this file
This document provides details for a draft request for proposal for operation of the Naval Shipbuilding and Advanced Manufacturing Center of Excellence III. The Department of the Navy, Secretary of the Navy Office of Naval Research intends to award a single, indefinite-delivery/indefinite-quantity cost-plus-fixed-fee contract for a base period of two years and three optional one-year periods, with an additional optional six-month extension. The contract aims to identify, develop, and facilitate advanced manufacturing technologies to reduce cost and time for building and sustaining key naval platforms such as submarines, carriers, surface combatants, and the F-35 Joint Strike Fighter. The contractor will operate and manage the Naval Shipbuilding and Advanced Manufacturing Center of Excellence in developing naval platform technologies and transitioning them for use in U.S. shipyards and other industrial facilities. No response is required for this draft RFP; the final RFP is expected to be released on or around March 29, 2024 under solicitation number N0001424R0002.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
COE Quarterly Technical and Financial Status Report based on ManTech Guidance
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80912A and DI-MGMT-81117A
5. CONTRACT REFERENCE
Statement of Work
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
* Block 16
9. DIST STATEMENT
REQUIRED
# Dist. D
10. FREQUENCY
Quarterly
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
** Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
*** Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
* Block 7: The contractor shall submit COE Quarterly Technical and Financial Status Report based on ManTech Guidance
# Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (date of determination). Other requests shall be referred to the Office of Naval Research, Code 332, COR noted in the contract.
** Blocks 11 and 12: First report is due 20 days after completion of the first full quarter of the Task Order.
*** Block 13. Reports will be due every 90 days thereafter which will be the 20th of each month. If the 20th falls on a weekend or federal holiday, the report is due the next available business day.
Use of DI-FNCL-80912A and DI-MGMT-81117A will be discussed with ONR program officer upon contract award to finalize content according to ManTech Guidance.
See Enclosure 1
15. TOTAL
G. PREPARED BY
Paul Huang
H. DATE
Fill-in Date prepared
I. APPROVED BY
Paul Huang
J. DATE
(Fill-In Date Approved)
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 10 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
COE Quarterly Technical and Financial Status Report based on ManTech Guidance
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80912A and DI-MGMT-81117A
5. CONTRACT REFERENCE
Statement of Work
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
* Block 16
9. DIST STATEMENT
REQUIRED
# Dist. C
10. FREQUENCY
quarterly
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
*** Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
* Block 7: The contractor shall submit COE Quarterly Technical and Financial Status Report based on ManTech Guidance
# Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Critical Technology) (date of determination). Other requests shall be referred to the Office of Naval Research, Code 332, COR noted in the contract.
** Blocks 11 and 12: First report is due 20 days after completion of the first full quarter of the Task Order.
*** Block 13. Reports will be due every 90 days thereafter which will be the 20th of each month. If the 20th falls on a weekend or federal holiday, the report is due the next available business day.
Use of DI-FNCL-80912A and DI-MGMT-81117A will be discussed with ONR program officer upon contract award to finalize content according to ManTech Guidance.
See Enclosure 1
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Paul Huang
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 10 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
COE Quarterly Technical and Financial Status Report based on ManTech Guidance
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80912A and DI-MGMT-81117A
5. CONTRACT REFERENCE
Statement of Work
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
* Block 16
9. DIST STATEMENT
REQUIRED
# Dist. C
10. FREQUENCY
quarterly
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
*** Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
* Block 7: The contractor shall submit COE Quarterly Technical and Financial Status Report based on ManTech Guidance
# Block 9: DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.
** Blocks 11 and 12: First report is due 20 days after completion of the first full quarter of the Task Order.
*** Block 13. Reports will be due every 90 days thereafter which will be the 20th of each month. If the 20th falls on a weekend or federal holiday, the report is due the next available business day.
Use of DI-FNCL-80912A and DI-MGMT-81117A will be discussed with ONR program officer upon contract award to finalize content according to ManTech Guidance.
See Enclosure 1
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Paul Huang
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 10 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
COE Final Report
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81864A
5. CONTRACT REFERENCE
Statement of Work
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
* Block 16
9. DIST STATEMENT
REQUIRED
# Dist. D
10. FREQUENCY
Once
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
* Block 7: The contractor shall submit COE Final Report in accordance with the SOW and the annual ManTech Guidance
# Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (date of determination). Other requests shall be referred to the Office of Naval Research, Code 332, COR noted in the contract.
** Blocks 11 and 12: First report is due within 30 days after end of contract period of performance
Use of DI-MGMT-81864A will be discussed with ONR program officer upon contract award to finalize content according to ManTech Guidance.
See Enclosure 1
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Paul Huang
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 10 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
COE Final Report
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81864A
5. CONTRACT REFERENCE
Statement of Work
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
* Block 16
9. DIST STATEMENT
REQUIRED
# Dist. C
10. FREQUENCY
Once
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
** Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
* Block 7: The contractor shall submit COE Final Report in accordance with the SOW and the annual ManTech Guidance
# Block 9: DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Critical Technology) (date of determination). Other requests shall be referred to the Office of Naval Research, Code 332, COR noted in the contract.
Use of DI-MGMT-81864A will be discussed with ONR program officer upon contract award to finalize content according to ManTech Guidance.
See Enclosure 1
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Paul Huang
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 10 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
COE Final Report
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81864A
5. CONTRACT REFERENCE
Statement of Work
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
* Block 16
9. DIST STATEMENT
REQUIRED
Dist. A
10. FREQUENCY
Annual
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
* Block 7: The contractor shall submit COE Final Report in accordance with the SOW and the annual ManTech Guidance
# Block 9: DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.
Use of DI-MGMT-81864A will be discussed with ONR program officer upon contract award to finalize content according to ManTech Guidance.
See Enclosure 1
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Paul Huang
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 6 of 10 Pages
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Trip Report
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81943
5. CONTRACT REFERENCE
Statement of Work
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
* Block 16
9. DIST STATEMENT
REQUIRED
# Dist. D
10. FREQUENCY
As needed
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
* Block 7: The contractor shall submit trip report within 15 days of completion
# Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (date of determination). Other requests shall be referred to the Office of Naval Research, Code 332, COR noted in the contract.
** Blocks 11 and 12: Within 15 days of completions of trip/event where travel was authorized by the Program Officer.
Use of DI-FNCL-80912A and DI-MGMT-81117A will be discussed with ONR program officer upon contract award to finalize content according to ManTech Guidance.
See Enclosure 1
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Paul Huang
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 7 of 10 Pages
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Naval Advisory Documentation
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711
5. CONTRACT REFERENCE
Statement of Work
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
* Block 16
9. DIST STATEMENT
REQUIRED
# Dist. D
10. FREQUENCY
As needed
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. Remarks:
* Block 7: The contractor shall submit Naval Advisory Documentation in accordance with the SOW and specific guidance specified by the program officer
# Block 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (date of determination). Other requests shall be referred to the Office of Naval Research, Code 332, COR noted in the contract.
** Blocks 11 and 12: Within 15 days of completions of period of performance or date provided by the Program Officer.
See Enclosure 1
15. TOTAL
G. PREPARED BY
H. DATE
Fill-in Date prepared
I. APPROVED BY
Paul Huang
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 8 of 10 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Quarterly Contract Management Review (QCMR) Briefing Slides
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
N/A
5. CONTRACT REFERENCE
Section H
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
XX
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
QTRLY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: The PowerPoint slides, in contractor format, will address the following items:
General:
• List of personnel attending the meeting
• Status of contract deliverables/tasks (updates since last meeting). Deliverables include hardware, reports, CDRLs.
• Performance issues encountered or expected (e.g., potential delays)
• Invoice submission and payment status
• Required Government actions due to Contractor (e.g., delivery of Government Furnished Information and/or Property)
• Required Contractor actions due to the Government within the next 120 calendar days
• Compliance with staffing / key personnel requirements
• Compliance with meeting the Contractor’s Small Business Subcontracting Plan requirements and submission of the Contractor’s Individual Subcontracting Report
• Compliance with Government Furnished Property Clause FAR 52.245‐1
• Contractor performance against QASP metrics and corrective action(s)
Limitation of Funds Status:
• For cost CLINs, address funding status (FAR 52.232‐20, FAR 52.232‐22).
• For incrementally funded fixed price CLINs, address funding status (DFARS 252.232‐7007)
• Estimated submission of 75% cost incurred letter submissions to the contracting officer & COR (if applicable
Out of Scope Work/Claims – The contractor shall address:
• Existing and anticipated requests for out‐of‐scope work,
• Existing and anticipated requests for equitable adjustment,
• Existing and anticipated claims, and
• Existing and anticipated disputes
Other Discussion Items:
• Lessons learned from completed task orders or project phases (e.g., proposal development, performance, closeout, subcontractor management, invoicing)
• Continuous improvement ideas for current contract.
Block 9: Distribution Statement Required will read as follows:
Distribution Statement D: Distribution authorized to the Department of Defense and to U.S. DoD Contractors only (reason, date of determination). Other requests for this document shall be referred to the COR or Program Officer in Section F of the Office of Naval Research (ONR), One Liberty Center, 875 North Randolph Street 22203.
Blocks 12: The power point slides are due 5 days prior to scheduled QCMR meeting.
Block 13. Should any/all options be exercised, the power point slides are due no fewer than 5 days prior to all subsequent scheduled QCMR meetings
COR
Contracting Officer
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Ellen Reed
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 9 of 10 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP_____ TM ______ OTHER: R&D
D. SYSTEM/ITEM
TBD
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Quarterly Contract Management Review (QCMR) Meeting Minutes
3. SUBTITLE
COE Task Order 1
4. AUTHORITY (Data Acquisition Document No.)
N/A
5. CONTRACT REFERENCE
Section H
6. REQUIRING OFFICE
N00014
7. DD 250 REQ
XX
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
QTRLY/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: The QCMR meeting minutes, in contractor format, shall address the following items in Word format.
Meeting attendees Items discussed Action items for follow up
The QCMR briefing slides should be included as an attachment to the meeting minutes.
Block 9: Distribution Statement Required will read as follows:
Distribution Statement D: Distribution authorized to the Department of Defense and to U.S. DoD Contractors only (reason, date of determination). Other requests for this document shall be referred to the COR or Program Officer in Section F of the Office of Naval Research (ONR), One Liberty Center, 875 North Randolph Street 22203.
Blocks 12: The Contractor shall provide the QCMR meeting minutes to the Contracting Officer for review and approval no later than 30 days after the scheduled QCMR meeting. The Contracting Officer shall provide any comments on the QCMR meeting minutes in a timely manner and the contractor shall return any revisions within 3 business days. If the due date falls on a weekend or a holiday, the data item is due the following business day.
Block 13. Should any/all options be exercised, the Contactor shall provide the QCMR meeting minutes for review and approval no later than 30 days after the subsequent QCMR scheduled meetings. The COR shall provide any comments on the QCMR meeting minutes in a timely manner and the contractor shall return any revisions within 3 business days. If the due date falls on a weekend or a holiday, the data item is due the following business day.
COR
Contracting Officer
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
Ellen Reed
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 10 of 10 Pages