NSAM3 RFP Sec J Attachment 19 Project Briefing Guidance REV I OCT22.docx

DOCX document 584 KB Posted

Attached to
Manufacturing Technology (ManTech) Naval Shipbuilding and Advanced Manufacturing 3 (NSAM 3)
Solicitation number
N0001424R0002
Issued by

About this file

This document provides details for a draft request for proposal for operation of the Naval Shipbuilding and Advanced Manufacturing Center of Excellence III. The Department of the Navy, Secretary of the Navy Office of Naval Research intends to award a single indefinite-delivery indefinite-quantity cost-plus-fixed-fee contract for a base period of two years and three option periods of one year each, with an additional option to extend six months. The contractor will operate and manage the Naval Shipbuilding and Advanced Manufacturing Center of Excellence III to identify, develop, and facilitate deployment of advanced manufacturing technologies to U.S. shipyards and other industrial facilities producing and supporting naval platforms. This includes technologies related to design for producibility, model-based tools, build strategies, structural fabrication processes, automation and robotics, supply chain improvements, modeling and simulation, and inspection and quality control. The final request for proposal is expected to be released on or around March 29, 2024 under solicitation number N0001424R0002.

View the file

Other files

File Type Posted
NSAM3 RFP Sec J Attachment 10 Expenditure Estimate Spreadsheet and Monthly Expenditure Report Guidance REV K Feb 2024.docx DOCX document
NSAM3 RFP Sec J Attachment 18 Project Book Guidance REV L MAY22.docx DOCX document
NSAM3 RFP Sec J Attachment 16 Affordability Assessment Guidance REV L AUG22.docx DOCX document
NSAM3 RFP CDRL ENCLOSURE NUMBER 1.docx DOCX document
NSAM3 RFP Sec J Attachment 13 Project Quad Chart Guidance REV I OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 8 Data Call Chart REV O APR22.xlsx XLSX spreadsheet
NSAM3 RFP Sec J Attachment 26 Annual_Review_Project_Briefing_Template_REV_D_JAN23.pptx PPTX presentation
NSAM3 RFP Sec J Attachment 23 Proposal Pipeline and ONR Contracts Actions Spreadsheet Guidance REV C OCT21.docx DOCX document
NSAM3 RFP Exhibit A COE CDRLS 02.27.2024.docx DOCX document
NSAM3 RFP Sec J Attachment 6 CE Summary.xlsx XLSX spreadsheet
NSAM3 RFP Sec J Attachment 5 Price Information.docx DOCX document
NSAM3 RFP Sec J Attachment 25 Navy ManTech Code 33 Monthly Report Guidance REV E OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 9 Funding Allocation Spreadsheet Guidance REV J OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 21 Rapid Response and Special Projects Guidance REV E OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 22 Return on Investment Calculation Guidance REV E OCT21.docx DOCX document
NSAM3 RFP Sec J Attachment 14 Technology Transition Plan Guidance REV N OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 4 Q and A Template.xlsx XLSX spreadsheet
NSAM3 RFP Sec J Attachment 10 Expenditure Estimate Spreadsheet and Monthly Expenditure Report Guidance REV K Feb 2024.docx DOCX document
NSAM3 RFP Sec J Attachment 24 Public Release Request Tool Guidance REV G OCT22 draft.docx DOCX document
NSAM3 RFP Sec J Attachment 12 Final Report Guidance REV J OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 1 SOW Feb 28 2024.docx DOCX document
NSAM3 RFP Sec J Attachment 17 COE Transition Implementation Guidance - REV F OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 11 Quarterly Report Guidance REV J OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 28 Review Form Instructions - Portfolio Review.pptx PPTX presentation
NSAM3 RFP Sec J Attachment 7 Annual Data Call REV L OCT22.docx DOCX document
NSAM3 RFP Sec J Attachment 2 Key Personnel.docx DOCX document
NSAM3 RFP Sec J Attachment 20 Implementation Risk Assessment Guidance REV H OCT22.docx DOCX document
N0001424R0002 2.29.2024 DRAFT RFP.pdf PDF
NSAM3 RFP Sec J Attachment 27 Annual Portfolio Review Form REV B JAN23.xlsx XLSX spreadsheet
NSAM3 RFP Exhibit B Project CDRLS 02.27.2024.docx DOCX document
NSAM3 RFP Sec J Attachment 15 Success Story Guidance REV M OCT22.docx DOCX document
NSAM3 RFP Sec K ONR Reps Certs Feb 2024.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Briefing Guidance October 2022

Attachment:

1. Project Briefing Template

A. PURPOSE

The Navy ManTech Program has been having a real impact on the affordability of key investment platforms. In order to continue to fund projects that will implement and have an impact on affordability and capability acceleration, project briefings for program review meetings have been standardized. This guidance includes a presentation template and instructions regarding the desired content of presentations. Different content is requested depending on the maturity of the project. Early in the project, introductory project information, specific technical goals, technical approach, etc. should be emphasized. As the project matures, the emphasis should be on project status, identified risks and other issues, and risk mitigation plans. As the project nears completion, the emphasis should be on implementation. In all cases, the focus should be on transition / implementation noting the current status / progress that has taken place the last 6-12 months (especially changes since the last briefing); the risk assessment and management of any issues that need to be mitigated; and near-term plans (especially in terms of risk management) highlighted.

All projects have an inherent risk of not implementing. It is important that ManTech, the Centers of Excellence (COEs), industry, Program Offices, PEOs, etc. recognize the risk early, understand it, and develop plans to manage it throughout the project execution phase. The program review processes have been revised to emphasize the importance of implementation by recognizing project risks to implementation upfront and then assessing and managing these risks through project execution.

Note: Project briefings are not required for 6.2 Navy Manufacturing Applied Research projects.

B. REQUIRED TIMELINE

Briefings for program review meetings will be prepared in accordance with this guidance.

C. PROCESS / APPROVAL CYCLE

No Official Project Briefing Call: COEs will prepare briefings as required and specified in their respective contracts and upload them to the applicable folder of the Project tab of the Navy ManTech Projects Database (NMPD), if available.

If the NMPD is unavailable, COEs will use one of the acceptable submission methods shown below to submit the project briefing and the Navy ManTech Support Team will upload the brief to the database:

Acceptable Submission Methods:

· DoD Safe – https://safe.apps.mil/

· COE File-Sharing Site

· E-mail with encryption

D. FORMAT

As noted in Section A above, all Project Briefings should use the attached template. The template is divided into two sections, the main section (slides 1–10) and a backup section (slides 12–14). The slides to be included in a briefing and the slides to emphasize depend on the maturity of the project as detailed below. In all cases, transition / implementation and the risks associated with transition / implementation should be strongly emphasized and a project risk assessment must be included.

1. New projects that have either never been briefed or perhaps briefed just once should focus on a good overall description of the project, including project objective, goals, anticipated achievements, the importance to the platform, plans for transition / implementation, and the associated risk assessment. For these projects, slides 1–10 and 12–14 should all be briefed. Do not brief slide 11.

2. For a project that has been briefed more than once at earlier program reviews, the briefing should focus on project status and progress in the past 6–12 months, changes to project scope / approach, issues, and, most importantly, identified risks to implementation, and risk mitigation plans. When briefing slides 2–5, point out any changes since the previous review; these slides should not be briefed in detail after the first program review. The main emphasis should be on slides 6–10, focusing on what has occurred in the past 6–12 months, the overall status, and problems, if any. The risks should be clearly identified indicating what action has been or will be taken to mitigate each risk. Note that slides 12–14 should be included as backup in all briefings.

3. Partial implementations that have occurred during any stage of a project should be specifically highlighted in the briefing regardless of the maturity of the project.

Risks will be presented in each Project Briefing in accordance with the current version of the Implementation Risk Assessment Process Guidance. Refer to the current Risk Factor Definitions for “Red,” “Yellow,” and “Green” and a more in-depth understanding of the appropriate risk color designation.

All Risk Factors for a specific Project Category should be included. If a Risk Factor is not relevant to the project, it should be listed and the risk factor cell should be “grayed.”

NOTE: For all projects that have been assigned a “Red” rating during any previous program review, an extra slide must be included with details of the Risk Mitigation Plan as well as the progress against the steps in the plan.

E. REVISION REQUIREMENTS AND FILE NAME

1.Revision Requirements:
All Navy ManTech Project Briefings should include the official Navy ManTech project number, complete project title, and the specific meeting title and date in the left footer as shown in the template. All briefings should be prepared using Microsoft PowerPoint.

2. File name convention:

File names for Project Briefings should be in the following format: {COE acronym} PB {official project number} {complete official title of project} {MMMYY}.

· i.e., NMC PB S2397 Pipe Assembly Installation Improvement Methods AUG12.pptx

Navy ManTech Program

REV I OCT22

N00014-24-R-0002 NSAM COE III Attachment 19 16 Attachment 1: Project Briefing Template image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png