This specification document provides comprehensive construction requirements for the North ARFF Fire Station Kitchen Remodel project issued by the Kenton County Airport Board at Cincinnati/Northern Kentucky International Airport, located in Boone County, Kentucky. The project encompasses selective demolition and renovation of interior spaces including kitchen facilities, with work scope defined across multiple construction divisions: general requirements, existing conditions, wood and composite materials, thermal and moisture protection, openings, finishes, furnishings, fire protection, plumbing, electrical systems, and electronic safety systems. The specifications detail requirements for plastic-laminate-faced architectural cabinets, joint sealants, aluminum-framed entrances, door hardware, glazing, and various finishing materials. A pre-bid meeting and site visit is scheduled for Thursday, July 30, 2026 at 10:00 am at North ARFF Station 2, 81 Clay Drive, Hebron, Kentucky 41048. Questions must be submitted by 11:59 pm on Monday, August 10, 2026, with answers posted by Thursday, August 13, 2026. Bids are due by Thursday, August 20, 2026 at 2:00 pm. The project will be constructed under a single prime contract using the Owner's Standard Construction Contract, with the contractor required to submit a comprehensive construction schedule within thirty days of Notice of Award.
The contractor shall obtain and pay for the local building permit and all other necessary permits and governmental fees required for project completion. Work is restricted to Monday through Saturday, 7:00 am to 5:00 pm, with owner occupancy of the site during the entire construction period requiring coordination to minimize conflicts with airfield operations. The contractor must establish and enforce a comprehensive Code of Conduct for all workers including requirements for appropriate attire, prohibition of smoking, alcohol, firearms, and profanity, and restrictions on fraternization with airport personnel. Environmental controls include strict dust control measures using concurrent water application at no additional cost to the owner, maintenance of 96-inch minimum headroom in occupied spaces, and protection of all interior spaces to remain dry throughout construction. One alternate bid (Alternate Bid No. 1) is included for paint drywall ceilings and replacement of lighting and suspended acoustical panel ceiling in three specified areas. Special warranties are provided: a two-year installer warranty and five-year manufacturer's warranty for joint sealants, and a ten-year special warranty for aluminum-framed entrances and storefronts covering structural failures, water penetration, and operational failures.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kenton County Airport Board Cincinnati/Northern KY International Airport
Kitchen Remodel
North ARFF Fire Station
Issued for Bidding: July 2026 TOC - 1/2 Table of Contents
Table of Contents
General Requirements
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY 8
012300 ALTERNATES 2
Architectural
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION 6
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
064116 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS 5
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
079200 JOINT SEALANTS 8
DIVISION 08 - OPENINGS
084113 ALUMINUM FRAMED ENTRANCES 9
087100 DOOR HARDWARE 9
080000 GLAZING 10
DIVISION 09 - FINISHES
092216 NON-STRUCTURAL METAL FRAMING 5
092900 GYPSUM BOARD 6
093013 CERAMIC TILING 9
095123 ACOUSTICAL TILE CEILINGS 7
096813 TILE CARPETING 5
099123 INTERIOR PAINTING 7
DIVISION 12 - FURNISHINGS
123661.16 SOLID SURFACING COUNTERTOPS 3
DIVISION 21 – FIRE PROTECTION
210500- COMMON WORK RESULTS FOR FIRE SUPPRESSION
210501- SCOPE OF THE FIRE SUPPRESSION WORK
210502- SHOP DRAWINGS FIRE SUPPRESSION
211000- FIRE PROTECTION
DIVISION 22 – Plumbing
220170- OPERATION AND MAINTENANCE OF PLUMBING SYSTEMS
220501- COMMON WORK RESULT FOR PLUMBING
220503- SUBMITTALS FOR PLUMBING
220505- EXISTING CONDITIONS AND DEMOLITION
220517- SLEEVES AND SEALS FOR PLUMBING PIPING
220518- ESCUTCHEONS FOR PLUMBING PIPING
220523- GENERAL DUTY VALVES FOR PLUMBING PIPING
220529- HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220553- IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220593- TESTING, ADJUSTING AND BALANCING FOR PLUMBING SYSTEMS
220719- PLUMBING SYSTEMS INSULATION
Issued for Bidding: July 2026 TOC - 2/2 Table of Contents
221116- DOMESTIC WATER PIPING
221119- DOMESTIC WATER PIPING SPECIALTIES
221123- DOMESTIC WATER PUMPS
221123.13- DOMESTIC WATER PACKAGED BOOSTER PUMPS
221316- DRAIN, WASTE, AND VENT PIPING
221319- DRAIN, WASTE, AND VENT SPECIALTIES
224000- PLUMBING FIXTURES
DIVISION 26 – Electrical
260010- GENERAL REQUIREMENTS FOR ELECTRICAL SYSTEMS
260500- COMMON WORK RESULTS FOR ELECTRICAL SYSTEMS
260505- SELECTIVE DEMOLITION FOR ELECTRICAL
260519- LOW-VOLTAGE ELECTRICAL POWER, CONDUCTORS, AND CABLES
260526- GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260533- RACEWAYS AND FITTINGS FOR ELECTRICAL SYSTEMS
260553- IDENTIFICATIONS FOR ELECTRICAL SYSTEMS
260923- LIGHTING CONTROL DEVICES
262416- PANELBOARDS
262726- WIRING DEVICES
265119- LED INTERIOR LIGHTING
Division 28 – Electronic Safety and Security
284613- ADDRESSABLE FIRE ALARM SYSTEMS
END OF TABLE OF CONTENTS
Issued for Bidding: July 2026 011000 - 1/8 Summary
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Schedule and Submittals
4. Work by Owner.
5. Work under separate contracts.
6. Coordination with occupants.
7. Work restrictions.
8. Specification and drawing conventions.
9. Permits and Fees.
10. Safety and Protection.
1.3 PROJECT INFORMATION
A. Project Identification: Kitchen Remodel North ARFF Fire Station
1. Project Location: Boone County, Kentucky.
B. Owner: CINCINNATI / NORTHERN KENTUCKY INTERNATIONAL AIRPORT P.O. Box 752000 Cincinnati, OH
45275-2000.
1.4 WORK COVERED BY CONTRACT DOCUMENTS
A. The Scope of Work is defined by the Contract Documents and consists of the following:
1. The demolition and renovation of interior spaces and miscellaneous exterior work.
2. Coordination and execution of all demolition/renovation activities including:
a. Removal and legal disposal of demolished material.
b. Salvaging items for reuse or storage by Owner.
c. Conformance and implementation of all requirements dictated by federal, state and local authorities having jurisdiction.
B. Type of Contract:
1. Project will be constructed under a single prime contract using Owners Standard Construction
Contract.
1.5 SCHEDULES AND PLAN SUBMITTALS
A. Construction Schedule submitted prior to the commencement of work.
Issued for Bidding: July 2026 011000 - 2/8 Summary
1. Contractor shall submit a comprehensive, fully developed, horizontal, Gantt-chart-type, Contractor's construction schedule within 30 days of the Notice of Award. Base schedule on the
Owner’s startup construction schedule and all additional information received pre and post bid due date.
2. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.
3. For construction activities that require three months or longer to complete, indicate an estimated completion percentage in 10 percent increments within time bar.
B. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.
1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.
2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.
C. As the Work progresses, indicate final completion percentage for each activity
1.6 WORK BY OWNER
A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.
B. Preceding Work: Owner shall remove and salvage furniture, casework, equipment, devices, materials deemed of value. Those operations are scheduled to be substantially complete before work under this
Contract begins.
1.7 WORK UNDER SEPARATE CONTRACTS
A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other contracts. Coordinate the Work of this Contract with work performed under separate contracts.
1.8 COORDINATION WITH OCCUPANTS
A. Partial Owner Occupancy: Owner will occupy the site and maintain airfield operations during the entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.
2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.
1.9 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
Issued for Bidding: July 2026 011000 - 3/8 Summary
B. On-Site Work Hours: Working hours Monday through Saturday shall not 7:00 AM – 5:00 PM.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify Owner and Project Coordinator not less than two days in advance of proposed utility interruptions.
2. Obtain Project Coordinator’s written permission before proceeding with utility interruptions.
D. Noise, Vibration, Odors and Dust: Coordinate operations that may result in high levels of noise and vibration, odors, dust or other disruption to Owner occupancy with Owner.
1. Notify Owner and Project Coordinator not less than two days in advance of proposed disruptive operations.
2. Obtain Project Coordinator’s written permission before proceeding with disruptive operations.
3. Dust control shall include the concurrent application of water to control the creation and movement of dust clouds. NO additional compensation shall be made for water dust control requirements of the Owner or Engineer.
E. Code of Conduct: The contractor shall establish and enforce a CODE OF CONDUCT for all individuals working on the airport grounds. The Owner is the sole arbiters of what constitutes a violation resulting in immediate and permanent removal from the project.
1. All workers are required to wear shirts.
2. Smoking and tobacco use of any kind is prohibited.
3. Alcohol consumption and illicit drug use is prohibited.
4. Firearms and switchblades are prohibited.
5. Profanity and any other foul language or phrases are prohibited.
6. Fraternizing with airport personal is prohibited.
7. Radios, CD players and tape players are prohibited.
1.10 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words
"shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:)
is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. General Requirements: Requirements of all the Kenton County Airport Board contract documents and
Sections in Division 01 apply to the Work of ALL Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations published as part of the
U.S. National CAD Standard.
Issued for Bidding: July 2026 011000 - 4/8 Summary
3. Keynoting: Materials and products are identified by keynotes and by association to respective
Specification Sections.
1.11 PERMITS AND FEES
A. The Contractor shall obtain and pay for the local building permit. The original upon receipt shall be kept on display at the site and a copy will be furnished to the Owner. The contractor and or subcontractors shall obtain and pay for all other necessary permits, governmental fees, licenses and inspections required for the proper execution and completion of the scope of work requiring additional permits and/or fees.
1. Contractor shall schedule and include costs for inspections and testing in order to prevent delays.
Multiple tests or comebacks as may be required for this coordination shall be included.
1.12 SAFETY AND PROTECTION
A. The Architect’s and Engineer’s on site observations of the work are not intended to include review of the adequacy of the Contractor’s safety measures on or near the site. Compliance with all regulations pertaining to safety and health is the complete responsibility of the Contractor. Contractor shall be solely responsible for safety and protective measures in order to protect persons and property.
B. Contractor shall comply with all OSHA regulations and shall submit to Owner the required Material
Safety Data Sheets for any hazardous material they may use or bring on the site in the performance of their work. Contractors are to submit site-specific MSDS sheets, organized in a binder. If a catalog is submitted, it shall be properly tabbed with job site-specific items identifying each hazardous chemical on the work place.
C. This is a 100% eye protected project. Any contractor employee that doesn’t have the required eye protection shall be required to leave the site until such eye protection is obtained.
D. Safety measures shall include barricades and trench boxes at all open excavations. All Sub-Contractors prior to the start of work must execute an affidavit verifying compliance.
1. Contractor and Subcontractors are to provide to the Owner a written safety plan to be utilized in the execution of the work.
2. All doorways affected by construction need to be maintained for life safety. All individuals are required to keep their materials, equipment, tools and supplies away from all exterior doors in the construction area. These doors will be used as emergency egress only and shall not to be blocked or barricaded for any reason.
PART 2 - PRODUCTS
2.1 PRODUCT SELECTION DEFINITIONS
A. Where Specifications include the phrase "as selected from manufacturer's colors, patterns, and textures" or a similar phrase, select a product that complies with other specified requirements.
1. Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Architect will select color, pattern, density, or texture from manufacturer's product line that does not include premium items.
2. Full Range: Where Specifications include the phrase "full range of colors, patterns, textures" or similar phrase, Architect will select color, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.
Issued for Bidding: July 2026 011000 - 5/8 Summary
PART 3 - EXECUTION
3.1 GENERAL REQUIREMENTS
A. The General Contractor shall be responsible for and have control over all construction means, methods, manners, techniques, sequences and procedures for all portions of the Work and shall be responsible for any injury or damage which may result from improper construction, installation, maintenance or operation to the fullest extent permitted by law.
1. Providing submittals including product data, material certificates and meeting quality assurance items including testing standards and preinstallation conferences are the sole responsibility of the Contractor. Failure of the Contractor to provide information requested or proof of quality standards established for this project does not absolve the Contractor in meeting all industry standards and quality required in the execution of the work as defined in the contract documents and agreement between Owner and Contractor.
B. The Contractor shall perform all related work shown on the Contract Documents other than those items specifically indicated to be excluded.
1. The Scope of Work takes precedence over the drawings and specifications in the event of a conflict in trade assignment or responsibility.
2. Where drawings or specifications exceed code requirements, the drawings and specifications shall govern. Install no work contrary to minimum legal standards
3. Quantities of materials if noted on the drawings are for information only.
C. Conflicts between Industry/trade standards and manufacturer’s written recommendations shall be immediately brought to the attention of the Project Coordinator. Contactor shall assume all responsibility for installation of systems and materials that do not meet BOTH Industry/trade standards and manufacturer’s written recommendations or are known, suspected, or proven to distort, crack, or fail in any way without written notice to the Architect and Owner.
3.2 SUBMITTALS, SHOP DRAWINGS, AND COLOR SUBMISSIONS
A. Providing the various submittals requested throughout the contract documents shall be the sole responsibility of the contractor. Submissions intentionally or un-intentionally not provided do not relieve the Contractor of providing materials and installations as specified in the contract documents acceptable to the Architect and Owner.
B. The Contractor shall review and approve all submittals including shop drawings and samples prior to submitting to the Architect for review for completeness including required samples for finish and color selections. The architect’s review of shop drawings does not relieve the contractor from providing all material and work shown and described on the contract documents. The architect’s approval of shop drawings is limited to conformance with the design intent implied through the contract documents.
1. Pictures or facsimiles that do not guarantee color accuracy of the material or finish are not acceptable submittals.
2. The contractor shall verify all dimensions and locations and be responsible for coordination drawings of items furnished by their supplier and sub-contractors, when modified, adjusted or relocated from what was shown or described on the contract documents. Coordination drawings shall be submitted with respective shop drawings. Review of shop drawings and coordination drawings by the Architect or their consultants does not relieve the contractor from verifying and accepting responsibility for all measurements and dimensions.
3. SHOP DRAWINGS AND COORDINATION DRAWINGS ARE NOT CONTRACT DOCUMENTS. They are instruments prepared and used by the contractor, suppliers, sub-contractors and others as
Issued for Bidding: July 2026 011000 - 6/8 Summary directed by the contractor to facilitate in the execution of the work and as such cannot and shall not be used to reduce or change the scope of work defined by the contract documents.
3.3 COORDINATION AND SUBSTITUTION OF WORK FOR CONTRACTOR CONVENIENCE
A. Coordination Drawings shall be prepared and submitted, according to requirements in individual
Sections, and additionally where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity. Coordination of the work between the various trades is critical in accomplishing the design intent expressed by the contract documents. The Contractor is expected to complete well-developed coordination drawings and provide vigilant supervision to ensure the installations of the various trades and building systems are in accordance with the contract documents.
B. The Owner shall not be charged for work or adjustments to the work due to deficient coordination drawings, a lack of coordination between subcontractors, or lack of vigilant field supervision by the
Contractor.
C. The Owner reserves the right to be fairly compensated for the acceptance of work substituted for convenience by the contractor due to deficient coordination drawings, a lack of coordination between subcontractors, or lack of vigilant field supervision by the Contractor.
D. The Owner reserves the right to be fairly compensated when accepting work, of no added value to the
Owner that is substituted for convenience or because of a construction or dimensional error by the contractor and is a cost benefit to the Contractor.
3.4 MOISTURE CONTROL PLAN
A. The following Moisture Control Plan is intended for buildings to remain and is intended to be an additional source of information, and at times, a clarification to the Construction Drawings and
Specifications. The Contractor shall perform all related work shown on the Contract Documents
(Construction Drawings, Specifications, Scopes of Work) other than those items specifically indicated below to be excluded.
1. The following Moisture Control procedure related to buildings shall be implemented throughout the course of the work:
a. Take all precautions necessary to maintain all interior spaces in a dry condition. The
Contractor shall remove all standing water or ice throughout the building, in slab recesses, pits, etc., immediately following rains or snow. This Contractor shall take precautions to minimize major water infiltration until such time as the building is enclosed.
b. When a water spill or piping leak occurs in partially or fully enclosed building areas, the
Contractor shall immediately take measures to clean up the area affected, stop the water infiltration, and remove any saturated materials (i.e. drywall, carpet, insulation, etc.)
within 24-hours of the occurrence. The General Contractor shall assist the Owner in the investigation of the leak/spill.
2. Contractor shall take special precautions to maintain all interior spaces in a dry condition. Prior to the start of any “wet” work such as core drilling or testing of piping where water must be introduced into a dry space, the Contractor and/or their Subcontractors performing the work shall control/contain water and ultimately eliminate the water and humidity. Protect all surrounding finishes. Spills are to be cleaned up immediately, and adjacent materials that become wet and are susceptible to mold growth shall be removed and replaced at the
Contractor’s expense.
Issued for Bidding: July 2026 011000 - 7/8 Summary
3. Contractor shall report any incidents involving water infiltration into interior spaces.
3.5 INSTALLATION
A. Layout of the Work.
1. The Contractor shall make all necessary field measurements to insure correct fitting. Field verify locations and conditions. Coordinate work with all trades to avoid conflicts or delay.
2. The Contractor shall take measurements at the site and be responsible for same before ordering materials or doing work which is dependent on proper size or installation or coordination with the building.
B. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.
4. Maintain minimum headroom clearance of 96 inches in occupied spaces and 90 inchesin unoccupied spaces.
C. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
D. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.
E. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
F. Sequence the Work and allow adequate clearances to accommodate movement of construction items on site and placement in permanent locations.
G. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.
H. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.
I. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.
2. Allow for building movement, including thermal expansion and contraction.
3. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.
Issued for Bidding: July 2026 011000 - 8/8 Summary
J. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
K. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
3.6 PROGRESS CLEANING
A. General: Clean Project site and work areas.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Coordinate progress cleaning for joint-use areas where Contractor and other contractors are working concurrently.
B. Limiting Exposures: Supervise construction operations to assure that no part of the construction completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
C. Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.
END OF SECTION 011000
Issued for Bidding: July 2026 012300 - 1/2 Alternates
SECTION 012300 - ALTERNATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
1.4 PROCEDURES
A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
D. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
PART 2 - PRODUCTS (Not Used)
Issued for Bidding: July 2026 012300 - 2/2 Alternates
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate Bid No. 1: Paint drywall ceilings, replace lighting and suspended acoustical panel ceiling in
Vestibule 100, Corridor 107, and Vestibule 131 as noted on the drawings.
END OF SECTION 012300
Issued for Bidding: July 2026 024119 - 1/6 Selective Demolition
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
B. Related Requirements:
1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and store on site as directed by the Owner.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.5 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
Issued for Bidding: July 2026 024119 - 2/6 Selective Demolition
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
1.6 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's representative on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Coordination of Owner's continuing occupancy of portions of existing building and of Owner's partial occupancy of completed Work.
C. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
1.7 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
1.8 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before selective demolition, Owner will remove the following items:
a. Computers and TV’s.
b. Furniture.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: Hazardous materials may be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials with the exception of lead paint containing materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
Issued for Bidding: July 2026 024119 - 3/6 Selective Demolition
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.9 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect.
E. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
1. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to
40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
Issued for Bidding: July 2026 024119 - 4/6 Selective Demolition
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Arrange to shut off utilities with utility companies.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Equipment to Be Removed: Disconnect and cap services and remove equipment.
c. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
d. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
e. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
3.4 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
C. Remove temporary barricades and protections where hazards no longer exist.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
Issued for Bidding: July 2026 024119 - 5/6 Selective Demolition
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 4 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Transport items to Owner's storage area on-site designated by Owner.
2. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Protect items from damage during transport and storage.
3. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.
Issued for Bidding: July 2026 024119 - 6/6 Selective Demolition
B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
C. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
D. Resilient Floor Coverings (not containing hazardous materials): Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient
Floor Coverings."
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn demolished materials.
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
Issued for Bidding: July 2026 064116 - 1/5 Plastic-Laminate-Faced Architectural
Cabinets
SECTION 064116 - PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Plastic-laminate-faced architectural cabinets.
2. Cabinet hardware and accessories.
B. Related Requirements:
1. Section 061000 "Rough Carpentry" for wood furring, blocking, shims, and hanging strips required for installing cabinets that are concealed within other construction before cabinet installation.
1.3 ACTION SUBMITTALS
A. Shop Drawings: Show location of each item, dimensioned plans and elevations, large-scale details, attachment devices, and other components.
B. Samples for Initial Selection:
1. Plastic laminates.
1.4 QUALITY ASSURANCE
A. Fabricator Qualifications: Shop that employs skilled workers who custom fabricate products similar to those required for this Project and whose products have a record of successful in-service performance.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Do not deliver cabinets until painting and similar operations that could damage woodwork have been completed in installation areas. If cabinets must be stored in other than installation areas, store only in areas where environmental conditions comply with requirements specified in "Field Conditions" Article.
1.6 FIELD CONDITIONS
A. Environmental Limitations: Do not deliver or install cabinets until building is enclosed, wet work is complete, and HVAC system is operating and maintaining temperature between 60 and 90 deg F and relative humidity between 25 and 55 percent during the remainder of the construction period.
B. Field Measurements: Where cabinets are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication, and indicate measurements on Shop
Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work.
Issued for Bidding: July 2026 064116 - 2/5 Plastic-Laminate-Faced Architectural
1. Locate concealed framing, blocking, and reinforcements that support cabinets by field measurements before being enclosed, and indicate measurements on Shop Drawings.
C. Established Dimensions: Where cabinets are indicated to fit to other construction, establish dimensions for areas where cabinets are to fit. Provide allowance for trimming at site, and coordinate construction to ensure that actual dimensions correspond to established dimensions.
1.7 COORDINATION
A. Coordinate sizes and locations of framing, blocking, furring, reinforcements, and other related units of
Work specified in other Sections to ensure that cabinets can be supported and installed as indicated.
PART 2 - PRODUCTS
2.1 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
A. Grade: Premium.
B. Type of Construction: Frameless.
C. Cabinet, Door, and Drawer Front Interface Style: Reveal overlay.
D. Reveal Dimension: 1/2 inch.
E. High-Pressure Decorative Laminate: NEMA LD 3, grades as indicated or if not indicated, as required by woodwork quality standard.
F. Laminate Cladding for Exposed Surfaces:
1. Horizontal Surfaces: Grade HGS.
2. Vertical Surfaces: Grade HGS.
3. Sink base: Grade VGS inside
4. Edges: PVC edge banding, 0.12 inch thick, matching laminate in color, pattern, and finish.
G. Materials for Semi-exposed Surfaces:
1. Surfaces Other Than Drawer Bodies: High-pressure decorative laminate, NEMA LD 3, Grade VGS.
a. Edges of Plastic-Laminate Shelves: PVC edge banding, 0.12 inch thick, matching laminate in color, pattern, and finish.
b. For semi-exposed backs of panels with exposed plastic-laminate surfaces, provide surface of high-pressure decorative laminate, NEMA LD 3, Grade VGS.
2. Drawer Sides and Backs: Solid-hardwood lumber.
3. Drawer Bottoms: Hardwood plywood.
H. Dust Panels: 1/4-inch plywood or tempered hardboard above compartments and drawers unless located directly under tops.
Issued for Bidding: July 2026 064116 - 3/5 Plastic-Laminate-Faced Architectural
I. Concealed Backs of Panels with Exposed Plastic-Laminate Surfaces: High-pressure decorative laminate, NEMA LD 3, Grade BKL.
J. Drawer Construction: Fabricate with exposed fronts fastened to subfront with mounting screws from interior of body.
1. Join subfronts, backs, and sides with glued rabbeted joints supplemented by mechanical fasteners or glued dovetail joints.
K. Colors, Patterns, and Finishes: Provide materials and products that result in colors and textures of exposed laminate surfaces complying with the following requirements:
1. As indicated by laminate manufacturer's designations.
2. As selected by Architect from laminate manufacturer's full range in the following categories:
a. Solid colors, matte finish.
b. Patterns, matte finish.
2.2 WOOD MATERIALS
A. Wood Products: Provide materials that comply with requirements of referenced quality standard for each type of woodwork and quality grade specified unless otherwise indicated.
1. Wood Moisture Content: 5 to 10 percent.
B. Composite Wood and Agrifiber Products: Provide materials that comply with requirements of referenced quality standard for each type of woodwork and quality grade specified unless otherwise indicated.
1. Medium-Density Fiberboard: ANSI A208.2, Grade 130.
2. Particleboard: ANSI A208.1, Grade M-2-Exterior Glue.
3. Softwood Plywood: DOC PS 1, medium-density overlay.
4. Veneer-Faced Panel Products (Hardwood Plywood): HPVA HP-1.
5. Sink base cabinet to be made using plywood on all components with high-pressure decorative, NEMA LD 3, Grade VGS inside to match other cabinet interiors.
2.3 CABINET HARDWARE AND ACCESSORIES
A. General: Provide cabinet hardware and accessory materials associated with architectural cabinets except for items specified in Section 087111 "Door Hardware (Descriptive Specification)."
B. Hinges: Blum concealed self-closing hinges – NO SUBSTITUTION
C. Back-Mounted Pulls: BHMA A156.9, B02011.
D. Wire Pulls: Back mounted, solid metal, 5 inches long, 2-1/2 inches deep, and 5/16 inch in diameter.
E. Adjustable Shelf Standards and Supports: BHMA A156.9, B04071; with shelf rests, B04081.
F. Shelf Rests: BHMA A156.9, B04013; metal.
Issued for Bidding: July 2026 064116 - 4/5 Plastic-Laminate-Faced Architectural
G. Drawer Slides: BHMA A156.9.
1. Blue TANDEM plus full extension undermount slide with Blumotion – NO SUBSTITUTION
H. Door Locks: BHMA A156.11, E07121.
I. Drawer Locks: BHMA A156.11, E07041.
J. Door and Drawer Silencers: BHMA A156.16, L03011.
K. Exposed Hardware Finishes: For exposed hardware, provide finish that complies with BHMA A156.18 for
BHMA finish number indicated.
1. Satin Stainless Steel: BHMA 630.
L. For concealed hardware, provide manufacturer's standard finish that complies with product class requirements in BHMA A156.9.
2.4 MISCELLANEOUS MATERIALS
A. Anchors: Select material, type, size, and finish required for each substrate for secure anchorage. Provide metal expansion sleeves or expansion bolts for post-installed anchors. Use nonferrous-metal or hot-dip galvanized anchors and inserts at inside face of exterior walls and at floors.
B. Adhesive for Bonding Plastic Laminate: Contact cement.
2.5 FABRICATION
A. Fabricate cabinets to dimensions, profiles, and details indicated.
B. Complete fabrication, including assembly and hardware application, to maximum extent possible before shipment to Project site. Disassemble components only as necessary for shipment and installation.
Where necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting.
1. Notify Architect seven days in advance of the dates and times woodwork fabrication will be complete.
2. Trial fit assemblies at fabrication shop that cannot be shipped completely assembled. Install dowels, screws, bolted connectors, and other fastening devices that can be removed after trial fitting. Verify that various parts fit as intended and check measurements of assemblies against field measurements before disassembling for shipment.
C. Shop-cut openings to maximum extent possible to receive hardware, appliances, electrical work, and similar items. Locate openings accurately and use templates or roughing-in diagrams to produce accurately sized and shaped openings. Sand edges of cutouts to remove splinters and burrs.
Issued for Bidding: July 2026 064116 - 5/5 Plastic-Laminate-Faced Architectural
PART 3 - EXECUTION
3.1 PREPARATION
A. Before installation, condition cabinets to average prevailing humidity conditions in installation areas.
B. Before installing cabinets, examine shop-fabricated work for completion and complete work as required.
3.2 INSTALLATION
A. Grade: Install cabinets to comply with same grade as item to be installed.
B. Assemble cabinets and complete fabrication at Project site to the extent that it was not completed in the shop.
C. Install cabinets level, plumb, true, and straight. Shim as required with concealed shims. Install level and plumb to a tolerance of 1/8 inch in 96 inches.
D. Scribe and cut cabinets to fit adjoining work, refinish cut surfaces, and repair…
This is the start of the file's text. The full file is on GovTribe.