Final_Review_of_Exh_GPM_Exhibits_2-12_All_IDIQ_by_CY-1.pdf

PDF 197 KB Posted

Attached to
OMNIBUS MULTIDISCIPLINE ENGINEERING SERVICES II
Solicitation number
NNG16549116R
Issued by

About this file

GPM Exhibits 2-12

View the file

Other files

File Type Posted
Final_Amendment__2.pdf PDF
Final_Questions_and_Answers__3.pdf PDF
RFP_Amendment.pdf PDF
Final_Questions_and_Answers__2.pdf PDF
Questions_and_Answers.pdf PDF
Final_RFP_(B-M).pdf PDF
Enclosure_BB_2--SSCO_RTO_finalRFP.pdf PDF
Attachment_H _Small_Business_Subcontracting_Plan.pdf PDF
Attachment_M _DD_254.pdf PDF
Attachment_L _IT_Security_Management_Plan.pdf PDF
Attachment_A _Final_Draft_OMES-II_SOW.pdf PDF
Enclosure_AA _Government_QA_Plan.pdf PDF
ENCLOSURE_DD_-_Incumbent_Direct_Labor_Rates.pdf PDF
RFP_Cover_letter.pdf PDF
Attachment_G _Safety_and_Health_Plan.pdf PDF
Encosure_BB__1--JPSS_RTO_finalRFP.pdf PDF
Attachment_E _List_of_GFP.pdf PDF
Attachment_I _Contract_Historical_Data.pdf PDF
Attachment_B _IDIQ_Cost-Type_Rate_Matrix--All_IDIQ_Contract.pdf PDF
Attachment_N _Quality_Assurance_Plan.pdf PDF
Copy_of_Final_Review_of_Exh_GPM_Exhibits_2-12_All_IDIQ_by_CY-1.pdf PDF
Exhibit_13 _Past_Performance_Questionnaire.pdf PDF
Attachment_C _533_Attach_All_IDIQ--Both_Onsite_and_Offsite.pdf PDF
Attachment_K _IT_Security_Applicable_Documents_List.pdf PDF
Enclosure_CC _FINAL_GPM-Specified_Non-Mgmt_DL_Categories_DL_Hours_and_PDs_Enclosure.pdf PDF
SF_33.pdf PDF
Attachment_J _OCI_Avoidance_Plan.pdf PDF
Attachment_F _PIV_Attachment.pdf PDF
Attachment_D _List_of_IAGP.pdf PDF
Copy_of_Final_Review_Exh_GPM_Exhibits_1A-1C_All_IDIQ_with_GPM-Specified_ODCs_by_CY-1_(2).pdf PDF
ENCLOSURE_DD_-_Incumbent_Direct_Labor_Rates.pdf PDF
Attachment_J _OCI_Avoidance_Plan.pdf PDF
Attachment_G _Safety_and_Health_Plan.pdf PDF
Attachment_D _List_of_IAGP.pdf PDF
Attachment_K _IT_Security_Applicable_Documents_List.pdf PDF
Attachment_H _Small_Business_Subcontracting_Plan.pdf PDF
Attachment_E _List_of_GFP.pdf PDF
Attachment_M _DD_254.pdf PDF
Enclosure_BB--_1_SSCO_RTO.pdf PDF
Enclosure_DD _Incumbent_Direct_Labor_Rates.pdf PDF
SF_33.pdf PDF
Enclosure_CC _FINAL_GPM-Specified_Non-Mgmt_DL_Categories_DL_Hours_and_PDs_Enclosure.pdf PDF
Attachment_C _533_Attach_All_IDIQ--Both_Onsite_and_Offsite.pdf PDF
Attachment_F _PIV_Attachment.pdf PDF
Enclosure_AA _Government_QA_Plan.pdf PDF
Attachment_N _Quality_Assurance_Plan.pdf PDF
Attachment_B _IDIQ_Cost-Type_Rate_Matrix--All_IDIQ_Contract.pdf PDF
Enclosure_BB--_2_JPSS_RTO.pdf PDF
Signed_RFP_letter.pdf PDF
Final_Draft_RFP.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offeror Direct Labor (DL) Category(s)* Fee Loaded to GPM Overhead $ Other** $ G&A $ Amount GPM

GPM-Specified Non-Management DL Category Rate % % % % DL Rate***

Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*

$0.00

$0.00

Labor Category 1~ 0% $0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

$0.00

$0.00

Labor Category 2~ 0% $0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

$0.00

$0.00

Labor Category 3~ 0% $0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

$0.00

$0.00

Labor Category 4~ 0% $0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

$0.00

$0.00

Labor Category 5~ 0% $0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

$0.00

$0.00

Labor Category 6~ 0% $0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.

This exhibit contains Source Selection Information. See FAR 3.104.

* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category

** If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)

*** If this is a Prime Offeror Exhibit - Loaded Non-Management ONSITE, OFFSITE or MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Prime Loaded Non-Management Bid Rate in Exhibit 1A

*** If this is a Significant Subcontractor Exhibit - Loaded Non-Management ONSITE, OFFSITE OR MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Significant Subcontractor Loaded Non-Management Direct Labor Bid Rate in

Exhibit 1A

(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)

ONSITE, OFFSITE, or MANUFACTURING SITE

Contract Year _____

Place of Performance: [ ] Onsite or [ ] Offsite or [ ] Manufacturing Site

RFP# NNG16549116R

Proposing Entity:

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 2A

NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION

Unburdened Direct Labor Rate CY Indirect Bid Rates

Offeror Rate Portion %

Offeror Management Unburdened Fee Loaded and/or Administrative Direct Labor Overhead $ Other** $ G&A $ Amount Direct Labor

Direct Labor Categories* Rate % % % % Rate***

This exhibit contains Source Selection Information. See FAR 3.104.

*Add additional rows if needed.

***If this is a Prime Offeror Exhibit - Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Prime Loaded OFFSITE M&A Direct Labor Bid

Rate in Exhibit 1A

***If this is a Significant Subcontractor Exhibit - Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Significant Subcontractor Loaded

M&A Direct Labor Bid Rate in Exhibit 1A

**If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)

OFFSITE Place of Performance

CY Indirect Bid Rates

Contract Year _____

RFP# NNG16549116R

Proposing Entity:

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 2B

OFFEROR MANAGEMENT AND ADMINISTRATIVE LABOR

Offeror Direct Labor (DL) Category(s)* Fee Loaded to Offeror Portion GPM Overhead $ Other** $ G&A $ Amount GPM

GPM-Specified Non-Management DL Category Rate % Rate 110.00% NA 25.00% 8.00% DL Rate***

Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*

Position AB $20.00 50% $10.00

Position ABC $26.00 50% $13.00

CAD/Draftsman 100% $23.00 $25.30 $12.08 $4.83 $65.21

Position 12 $26.00 30% $7.80

Position 123 $28.50 35% $9.98

Position 45 $32.00 35% $11.20

Communications System Engineer 100% $28.98 $31.87 $15.21 $6.08 $82.14

Position X $48.00 100% $48.00

Configuration Management Specialist 100% $48.00 $52.80 $25.20 $10.08 $136.08

$0.00

$0.00

Labor Category 4~ 0% $0.00 $0.00 #VALUE! #VALUE! #VALUE! #VALUE!

$0.00

$0.00

Labor Category 5~ 0% $0.00 $0.00 #VALUE! #VALUE! #VALUE! #VALUE!

$0.00

$0.00

Labor Category 6~ 0% $0.00 $0.00 #VALUE! #VALUE! #VALUE! #VALUE!

~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.

NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION

RFP# NNG16549116R

Proposing Entity: XYC, Inc.

[ ] Prime Offeror OR [ X ] Significant Subcontractor

SAMPLE - EXHIBIT 2A - SAMPLE

(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)

ONSITE, OFFSITE, or MANUFACTURING SITE

Contract Year __1___

Place of Performance: [ X ] Onsite or [ ] Offsite or [ ] Manufacturing Site

This exhibit contains Source Selection Information. See FAR 3.104.

* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified DL Category

** If applicable, insert and identify any "Other" indirect rates used to calculate loaded direct labor rates in accordance with your current accounting system (e.g., a separate fringe benefits rate)

*** If this is a Prime Offeror Exhibit - Loaded Non-Management ONSITE, OFFSITE or MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Prime Loaded Non-Management Direct Labor Bid Rate in Exhibit 1A

*** If this is a Significant Subcontractor Exhibit - Loaded Non-Management ONSITE, OFFSITE OR MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Significant Subcontractor Loaded Non-Management Direct Labor Bid Rate in

Exhibit 1A

Unburdened Direct Labor Rate CY Indirect Bid Rates

NOTE: For purposes of this sample, Offeror Data/Rate Fill-ins are highlighted in yellow. Loaded GPM DL Rate conversion is highlighted in blue.

Offeror Direct Labor (DL) Category(s)* to Offeror Loaded Portion Loaded GPM

GPM-Specified Non-Management DL Category DL Rate % DL Rate**

Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*

$0.00

$0.00

Labor Category 1~ 0% $0.00

$0.00

$0.00

Labor Category 2~ 0% $0.00

$0.00

$0.00

Labor Category 3~ 0% $0.00

$0.00

$0.00

Labor Category 4~ 0% $0.00

$0.00

$0.00

Labor Category 5~ 0% $0.00

$0.00

$0.00

Labor Category 6~ 0% $0.00

~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and

Position Descriptions, and adjust rows as necessary.

** The Non-Significant Subcontractor Loaded Non-Management ONSITE, OFFSITE or MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Non-Significant Subcontractor Loaded Non-Management Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

NON-SIGNIFICANT SUBCONTRACTOR

* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category

Burdened Direct Labor Rate

Place of Performance: [ ] Onsite or [ ] Offsite or [ ] Manufacturing Site

(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)

ONSITE, OFFSITE, or MANUFACTURING SITE

Contract Year _____

RFP# NNG16549116R

Proposing Entity:

EXHIBIT 2C

NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION

RFP# NNG16549116R

Proposing Entity:

EXHIBIT 2D

NON-SIGNIFICANT SUBCONTRACTOR

OFFEROR MANAGEMENT AND ADMINISTRATIVE LABOR

OFFSITE Place of Performance

Contract Year _____

OFFSITE Loaded OFFSITE

Offeror Management and/or Administrative Direct Labor

Direct Labor Categories* Rate**

*Add additional rows if needed.

This exhibit contains Source Selection Information. See FAR 3.104.

**Loaded OFFSITE Management and/or Administrative (M&A) Direct Labor Bid Rate MUST match the corresponding Subcontractor Loaded OFFSITE M&A Bid Rate in Exhibit 1A

Proposing Entity: ABC Company

SAMPLE - EXHIBIT 2C - SAMPLE

NON-MANAGEMENT DIRECT LABOR CATEGORY CONVERSION

(OFFEROR DIRECT LABOR CATEGORY(S) TO GPM-SPECIFIED DIRECT LABOR CATEGORY)

ONSITE, OFFSITE, or MANUFACTURING SITE

Contract Year __1___

Place of Performance: [ X ] Onsite or [ ] Offsite or [ ] Manufacturing Site

Offeror Direct Labor (DL) Category(s)* to Offeror Loaded Portion Loaded GPM

GPM-Specified Non-Management DL Category DL Rate % DL Rate**

Fill-in Offeror DL category(s) by title that comprise GPM-Specified DL Category*

CAD Level 1 $95.00 50% $47.50

Draftsman Level 1 $98.00 50% $49.00

CAD/Draftsman 100% $96.50

Jr. System Engineer $97.00 30% $29.10

System Engineer $103.00 35% $36.05

Lead System Engineer $107.00 35% $37.45

Communications System Engineer 100% $102.60

CM Level 3 $152.00 100% $152.00

Configuration Management Specialist 100% $152.00

$0.00

$0.00

Labor Category 4~ 0% $0.00

$0.00

$0.00

Labor Category 5~ 0% $0.00

$0.00

$0.00

Labor Category 6~ 0% $0.00

NON-SIGNIFICANT SUBCONTRACTOR

** The Non-Significant Subcontractor Loaded Non-Management ONSITE, OFFSITE or MANUFACTURING SITE Direct Labor Bid Rate MUST match the corresponding site Non-Significant Subcontractor Loaded Non-Management Bid Rate in Exhibit 1A

This exhibit contains Source Selection Information. See FAR 3.104.

NOTE: For purposes of this sample, Offeror Data/Rate Fill-ins are highlighted in yellow. Loaded GPM DL

Rate conversion is highlighted in blue.

Burdened Direct Labor Rate

~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled, GPM-Specified Non-Management Direct Labor Categories, Direct Labor Hours and Position Descriptions, and adjust rows as necessary.

* Add additional rows if more than two Offeror DL Categories are used to calculate GPM-Specified Non-Management DL Category

[ X ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 3

SUMMARY BY ELEMENTS OF COST

Elements of Cost Contract Year 1 Contract Year 2 Contract Year 3 Contract Year 4 Contract Year 5 Grand Total

DIRECT LABOR HOURS

DIRECT LABOR COST

OVERHEAD

OTHER DIRECT COSTS (ODCs):

(LIST)

TOTAL ODCs

SUBTOTAL COSTS

G&A

TOTAL ESTIMATED COST

[MAXIMUM AVAILABLE AWARD or FIXED] FEE

TOTAL COST PLUS [AWARD or FIXED] FEE

Offerors may adjust elements of cost to be consistent with your current accounting system.

This exhibit contains Source Selection Information. See FAR 3.104.

GOVERNMENT PRICING MODEL

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 4

SOURCE OF PERSONNEL CHART

(FIRST GPM CONTRACT YEAR ONLY)

Total Number of Staff Labor Category/Position Title

Labor

Category

Code*

Personnel Available

Within Company

Personnel to be

Obtained from

Incumbent Outside Hired Staff

TOTAL

* Code each Labor Cateogry: S=SALARIED; H=HOURLY; U=UNION; E=EXEMPT; NE=NON-EXEMPT DOL/WD DETERMINATION;

I=INCUMBENT; SU=SUBCONTRACTOR

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 5

SUMMARY OF INDIRECT RATES

Overhead Onsite Overhead Offsite Manufacturing G&A Expense Other (Identify)**

Rate Rate Overhead Rate Rate Rate

Contract Year 1

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 3 Composite

Contract Year 4

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 5 Composite

Contract Year 6

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 6 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED

AGAINST (Specific Base)***

* Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates

** If Multiple "Other" Indirect Rates - Add additional columns and specify each individually

*** Explanation of Base of Application

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 6A

OVERHEAD EXPENSE POOL (Composition of Burden Pool)

Overhead or Service Center Pool = _______________

(Specify Type of Overhead Burden, e.g. Labor, Onsite, Offsite, Manufacturing, Engineering, Procurement, Service Center(s), etc. - See Section L - Cost Volume Instructions)

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor

Cost Elements within Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year the Overhead Burden Pool Prior Yr 3 Prior Yr 2 Prior Yr 1 _________ _________ _________ _________ _________ _________

Total Overhead Pool Expenses

Base of Distribution (identify) Dollars:

Existing Base

Forecasted Base*

Contractor FY Rate (%)

Proposed Overhead Bid Rate by CY

If more than one Overhead Pool is proposed, submit a separate Exhibit 6A for each Pool.

* Provide details of the forecasted base.

This exhibit contains Source Selection Information. See FAR 3.104.

CY 6

Conversion of Contractor FY Overhead Rate to Contract Year Composite Rates

CY 1 CY 2 CY 3 CY 4 CY 5

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 6B

GENERAL AND ADMINISTRATIVE (G&A) EXPENSE POOL (Composition of Burden Pool)

OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.

Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor

Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year

Prior Yr 3 Prior Yr 2 Prior Yr 1 _________ _________ _________ _________ _________ _________

Labor:

Labor Related Cost:

B&P

IR&D

Corporate Allocations:

Other (Specify):

Total G&A Pool Expenses

Base of Distribution (identify) Dollars:

Existing Base

Forecasted Base*

Contractor FY Rate (%)

Proposed G&A Bid Rate by CY

If more than one G&A Pool is proposed, submit a separate Exhibit 6B for each Pool.

* Provide details of the forecasted base.

This exhibit contains Source Selection Information. See FAR 3.104.

CY 5 CY 6

Cost Elements Within the G&A Expense Pool

Conversion of Contractor FY Overhead Rate to Contract Year Composite Rates

CY 1 CY 2 CY 3 CY 4

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 7

SUMMARY OF RECURRING OTHER DIRECT COSTS (ODCs) / COST ESTIMATING RELATIONSHIPS (CERs)

Specify ODC* Specify ODC* Specify ODC* Specify ODC*

Percentage/Rate/Amount** Percentage/Rate/Amount** Percentage/Rate/Amount** Percentage/Rate/Amount**

Contract Year 1

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 1 Composite

Contract Year 2

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 2 Composite

Contract Year 3

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 3 Composite

Contract Year 4

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 4 Composite

Contract Year 5

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 5 Composite

Contract Year 6

*Portion of Contractor FY From:________to________

*Portion of Contractor FY From:________to________

Contract Year 6 Composite

BASE OF APPLICATION - INDIRECT RATE APPLIED

AGAINST (Specific Base)***

* Explain Basis of Allocation of Contractor FY Rates to Obtain Contract Year Composite Rates

** If Multiple "Other" Indirect Rates - Add additional columns and specify each individually

*** Explanation of Base of Application

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 8

PHASE-IN COSTS

Proposed

Costs

DIRECT LABOR HOURS (Derived from Exhibit 8-A)

DIRECT LABOR COST (Derived from Exhibit 8-A)

OVERHEAD

OTHER DIRECT COSTS:

Relocation

Training

Subcontracts

Travel

Other (detail)

TOTAL ODCS

SUBTOTAL COSTS

G&A

TOTAL COSTS

PROFIT

TOTAL FIRM FIXED PRICE

Elements of Cost

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 8A

DIRECT LABOR PHASE-IN COSTS

Direct Labor Categories Hours Proposed Rates Proposed Costs

TOTAL PHASE-IN DIRECT LABOR

COSTS

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 9

PRODUCTIVE WORK YEAR CALCULATION

Contract Year

Contract Year

Contract Year

Contract Year

Contract Year

Contract

Year 6

Total Possible Hours in Year

Less:

Vacation in Hours

Holidays in Hours

Sick Leave in Hours

Miscellaneous in Hours

(specifically identify)

This exhibit contains Source Selection Information. See FAR 3.104.

PRODUCTIVE WORK YEAR in Hours

(Hours Actually Worked)

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 10A

FRINGE BENEFITS (FB)

(Total Compensation Plan)

Exempt Employees

Company Or Division Name:

Employer Location(s):

Effective:

Insurance Plans

Health

Life

Dental

Disability

Other (List)

Sick Leave

Employee Savings

Severance Pay

Vacation

Holidays

Other (List)

Total Cost of FB

This exhibit contains Source Selection Information. See FAR 3.104.

NOTE: This is a SAMPLE format only and reflects examples of fringe benefit items your company package may include. All costs should be shown in cents-per-hour (9 Holidays = $.185). It is recognized that such costs will be averages for the different employee categories involved (EXEMPT, UNION, etc.). Each benefit item should be briefly highlighted. EXAMPLE: Vacation – “2 weeks after one year, 3 after seven years, and 4 after fifteen years.” Only company costs should be shown, if a specific benefit item is contributory by the employee, explain separately.

RemarksBenefit Item Percentage AND Cost Per Hour of

Employee Contribution

Percentage AND Cost Per Hour of

Company Contribution Total Cost of FB per Hour

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 10B

FRINGE BENEFITS (FB)

(Total Compensation Plan)

Non-Exempt Employees

Company Or Division Name:

Employer Location(s):

Effective:

Insurance Plans

Health

Life

Dental

Disability

Other (List)

Sick Leave

Employee Savings

Severance Pay

Vacation

Holidays

Other (List)

Total Cost of FB

This exhibit contains Source Selection Information. See FAR 3.104.

NOTE: This is a SAMPLE format only and reflects examples of fringe benefit items your company package may include. All costs should be shown in cents-per-hour (9 Holidays = $.185). It is recognized that such costs will be averages for the different employee categories involved (EXEMPT, UNION, etc.). Each benefit item should be briefly highlighted. EXAMPLE: Vacation – “2 weeks after one year, 3 after seven years, and 4 after fifteen years.” Only company costs should be shown, if a specific benefit item is contributory by the employee, explain separately.

Total Cost of FB per Hour RemarksBenefit Item

Percentage AND Cost Per Hour of

Employee Contribution

Percentage AND Cost Per Hour of

Company Contribution

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 11A

Cognizant Defense Contract Audit Agency (DCAA) Office Information

DCAA Online Info http://www.dcaa.mil

Company Name: DCAA FAO:

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

DCAA Field Audit Office (FAO):Submitting Entity:

http://www.dcaa.mil/

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 11B

Cognizant Defense Contract Management Agency (DCMA) Office Information

DCMA Online Info http://www.dcma.mil

Company Name: DCMA Office

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Disclosures: Date Audit Report # Status

Contractor Estimating System Review (CESR)

Contractor Purchasing System Review (CPSR)

Contractor Billing System Review

Contractor Accounting System Review

Contractor Disclosure Statement Accuracy

Contractor Executive Compensation Review

Contractor Property Management System

Forward Pricing Rate Agreements

Earned Value Management System (EVMS)

Level of CAS applicability

Determination of Cost Accounting Standards (CAS) applicability

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

Submitting Entity: DCMA Cognizant Office:

http://www.dcma.mil/

[ ] Prime Offeror OR [ ] Significant Subcontractor

EXHIBIT 12

SMALL BUSINESS SUBCONTRACTING PLAN GOALS

Based on IDIQ Maximum Ordering Value

Dollar Amount* Percentage Dollar Amount* Percentage

Small Disadvantaged Business Concerns

Women-Owned Small Business Concerns

Historically Black Colleges and

Universities/Minority Serving Institutions

HUBZone Small Business Concerns

Veteran-Owned Small Business Concerns

Service-Disabled Veteran-Owned Small Business

Concerns

Other Small Business Concerns

TOTAL SMALL BUSINESS SUBCONTRACTING

Large Business Concerns

TOTAL SUBCONTRACTING

(SMALL & LARGE BUSINESS CONCERNS)

*Dollar Amount should be the same

This exhibit contains Source Selection Information. See FAR 3.104.

SMALL BUSINESS CATEGORY

PROPOSED GOALS BASED ON IDIQ

MAXIMUM ORDERING VALUE OF

$620M

PROPOSED GOALS BASED ON TOTAL

PLANNED SUBCONTRACTS OF $TBP

File details come from the government source that posted it. Updated .