Enclosure_BB--_1_SSCO_RTO.pdf

PDF 315 KB Posted

Attached to
OMNIBUS MULTIDISCIPLINE ENGINEERING SERVICES II
Solicitation number
NNG16549116R
Issued by

About this file

Enclosure BB RTO 1

View the file

Other files

File Type Posted
Final_Amendment__2.pdf PDF
Final_Questions_and_Answers__3.pdf PDF
RFP_Amendment.pdf PDF
Final_Questions_and_Answers__2.pdf PDF
Questions_and_Answers.pdf PDF
Copy_of_Final_Review_of_Exh_GPM_Exhibits_2-12_All_IDIQ_by_CY-1.pdf PDF
Attachment_M _DD_254.pdf PDF
Final_RFP_(B-M).pdf PDF
Enclosure_AA _Government_QA_Plan.pdf PDF
ENCLOSURE_DD_-_Incumbent_Direct_Labor_Rates.pdf PDF
RFP_Cover_letter.pdf PDF
Attachment_N _Quality_Assurance_Plan.pdf PDF
Attachment_B _IDIQ_Cost-Type_Rate_Matrix--All_IDIQ_Contract.pdf PDF
Exhibit_13 _Past_Performance_Questionnaire.pdf PDF
Attachment_C _533_Attach_All_IDIQ--Both_Onsite_and_Offsite.pdf PDF
Attachment_K _IT_Security_Applicable_Documents_List.pdf PDF
Enclosure_CC _FINAL_GPM-Specified_Non-Mgmt_DL_Categories_DL_Hours_and_PDs_Enclosure.pdf PDF
Attachment_H _Small_Business_Subcontracting_Plan.pdf PDF
Attachment_L _IT_Security_Management_Plan.pdf PDF
Attachment_A _Final_Draft_OMES-II_SOW.pdf PDF
Attachment_G _Safety_and_Health_Plan.pdf PDF
Encosure_BB__1--JPSS_RTO_finalRFP.pdf PDF
Attachment_E _List_of_GFP.pdf PDF
Attachment_I _Contract_Historical_Data.pdf PDF
Copy_of_Final_Review_Exh_GPM_Exhibits_1A-1C_All_IDIQ_with_GPM-Specified_ODCs_by_CY-1_(2).pdf PDF
Attachment_F _PIV_Attachment.pdf PDF
Attachment_D _List_of_IAGP.pdf PDF
Attachment_J _OCI_Avoidance_Plan.pdf PDF
SF_33.pdf PDF
ENCLOSURE_DD_-_Incumbent_Direct_Labor_Rates.pdf PDF
Attachment_H _Small_Business_Subcontracting_Plan.pdf PDF
Attachment_E _List_of_GFP.pdf PDF
SF_33.pdf PDF
Enclosure_DD _Incumbent_Direct_Labor_Rates.pdf PDF
Enclosure_AA _Government_QA_Plan.pdf PDF
Attachment_N _Quality_Assurance_Plan.pdf PDF
Final_Draft_RFP.pdf PDF
Attachment_M _DD_254.pdf PDF
Attachment_F _PIV_Attachment.pdf PDF
Attachment_B _IDIQ_Cost-Type_Rate_Matrix--All_IDIQ_Contract.pdf PDF
Signed_RFP_letter.pdf PDF
Enclosure_BB--_2_JPSS_RTO.pdf PDF
Exhibit_13 _Past_Performance_Questionnaire.pdf PDF
Attachment_D _List_of_IAGP.pdf PDF
Attachment_C _533_Attach_All_IDIQ--Both_Onsite_and_Offsite.pdf PDF
Enclosure_CC _FINAL_GPM-Specified_Non-Mgmt_DL_Categories_DL_Hours_and_PDs_Enclosure.pdf PDF
Attachment_A _Final_Draft_OMES-II_SOW.pdf PDF
Final_Review_Exh_GPM_Exhibits_1A-1C_All_IDIQ_with_GPM-Specified_ODCs_by_CY-1.pdf PDF
Attachment_L _IT_Security_Management_Plan.pdf PDF
Attachment_I _Contract_Historical_Data.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELIMINARY

OMES SSCO Robotic Servicing

Background

The Satellite Servicing Capabilities Office (SSCO) has a dual strategy to enable a future U.S. industry for the servicing of satellites:

1 Advance the state of robotic servicing technology to enable the routine servicing of satellites that were not designed with servicing in mind.

2 Position the U.S. to be the global leader in in-space repair, maintenance and satellite disposal.

This RTO will focus on the capabilities and skills required to perform on-orbit servicing for a well-known GSFC satellite case, Global Precipitation Mission (GPM).

The Offeror shall demonstrate competencies for service scenarios including:

1. Proximity operations

2. Rendezvous and capture

3. Examine and inspect for probable causes for failures; and repair with existing robot servicer, sustain in mode for follow-on robot servicer or de-orbit decision (in communication with customer)

4. Refueling

5. De-orbit for demise with controlled re-entry

Task Description

Design and develop a mission that captures the Global Precipitation Measurement (GPM) spacecraft with an option to refuel or de-orbit with a controlled re-entry to non-populated regions of Earth. The following URL contains relevant info for GPM.

http://www.nasa.gov/sites/default/files/files/GPM_Mission_Brochure.pdf https://directory.eoportal.org/web/eoportal/satellite-missions/g/gpm

Design the following mission components:

1. Concept-level design of a flight module that captures GPM satellite (assume cooperative, i.e. target is under control and all instruments are safed)

a. Include list of trade studies with recommended solutions for approaches and hardware to accomplish this task.

b. Identify single-point failures and rationale for redundancy or no redundancy http://www.nasa.gov/sites/default/files/files/GPM_Mission_Brochure.pdf https://directory.eoportal.org/web/eoportal/satellite-missions/g/gpm

2. Develop a proximity operations plan with focus on GN&C sub-system definition and capture operations plan with focus on robotic system definition. Also, describe any operational constraints on GPM

3. Describe ground operations concept for telemetry, tracking and control

4. Identify key enabling technologies for this mission and its development plan to i) Complete the task and/or ii) Make the existing approaches more efficient and/or iii) Minimize significant risks to GPM

Deliverables

1. High level mission requirements

2. Flight module design concept

3. Mission concept document, at a minimum include

a. Operations concept

b. Mission timeline

c. Proximity operations plan

d. Capture operations plan

e. Refuel Plan

f. Ground control options

g. Other

4. Technology development plan

Assumptions

1. The SSCO mission risk classification shall be a CLASS C, as per NPR 8705.4 Risk Classification for NASA Payloads.

2. The SSCO mission shall be capable of performing a controlled reentry, per the requirements of NASA-STD-8719.14 Process for Limiting Orbital Debris, from the mission orbit anytime up to 10 years from launch, when initiated by ground procedures.

3. Other

File details come from the government source that posted it. Updated .