Copy_of_Final_Review_Exh_GPM_Exhibits_1A-1C_All_IDIQ_with_GPM-Specified_ODCs_by_CY-1_(2).pdf

PDF 160 KB Posted

Attached to
OMNIBUS MULTIDISCIPLINE ENGINEERING SERVICES II
Solicitation number
NNG16549116R
Issued by

About this file

Exhibits 1

View the file

Other files

File Type Posted
Final_Amendment__2.pdf PDF
Final_Questions_and_Answers__3.pdf PDF
RFP_Amendment.pdf PDF
Final_Questions_and_Answers__2.pdf PDF
Questions_and_Answers.pdf PDF
Final_RFP_(B-M).pdf PDF
Enclosure_BB_2--SSCO_RTO_finalRFP.pdf PDF
Attachment_H _Small_Business_Subcontracting_Plan.pdf PDF
Attachment_M _DD_254.pdf PDF
Attachment_L _IT_Security_Management_Plan.pdf PDF
Attachment_A _Final_Draft_OMES-II_SOW.pdf PDF
Enclosure_AA _Government_QA_Plan.pdf PDF
ENCLOSURE_DD_-_Incumbent_Direct_Labor_Rates.pdf PDF
RFP_Cover_letter.pdf PDF
Attachment_G _Safety_and_Health_Plan.pdf PDF
Encosure_BB__1--JPSS_RTO_finalRFP.pdf PDF
Attachment_E _List_of_GFP.pdf PDF
Attachment_I _Contract_Historical_Data.pdf PDF
Attachment_B _IDIQ_Cost-Type_Rate_Matrix--All_IDIQ_Contract.pdf PDF
Attachment_N _Quality_Assurance_Plan.pdf PDF
Copy_of_Final_Review_of_Exh_GPM_Exhibits_2-12_All_IDIQ_by_CY-1.pdf PDF
Exhibit_13 _Past_Performance_Questionnaire.pdf PDF
Attachment_C _533_Attach_All_IDIQ--Both_Onsite_and_Offsite.pdf PDF
Attachment_K _IT_Security_Applicable_Documents_List.pdf PDF
Enclosure_CC _FINAL_GPM-Specified_Non-Mgmt_DL_Categories_DL_Hours_and_PDs_Enclosure.pdf PDF
SF_33.pdf PDF
Attachment_J _OCI_Avoidance_Plan.pdf PDF
Attachment_F _PIV_Attachment.pdf PDF
Attachment_D _List_of_IAGP.pdf PDF
ENCLOSURE_DD_-_Incumbent_Direct_Labor_Rates.pdf PDF
Attachment_J _OCI_Avoidance_Plan.pdf PDF
Attachment_G _Safety_and_Health_Plan.pdf PDF
Final_Review_of_Exh_GPM_Exhibits_2-12_All_IDIQ_by_CY-1.pdf PDF
Attachment_D _List_of_IAGP.pdf PDF
Attachment_K _IT_Security_Applicable_Documents_List.pdf PDF
Attachment_H _Small_Business_Subcontracting_Plan.pdf PDF
Attachment_E _List_of_GFP.pdf PDF
Attachment_M _DD_254.pdf PDF
Enclosure_BB--_1_SSCO_RTO.pdf PDF
Enclosure_DD _Incumbent_Direct_Labor_Rates.pdf PDF
SF_33.pdf PDF
Enclosure_CC _FINAL_GPM-Specified_Non-Mgmt_DL_Categories_DL_Hours_and_PDs_Enclosure.pdf PDF
Attachment_C _533_Attach_All_IDIQ--Both_Onsite_and_Offsite.pdf PDF
Attachment_F _PIV_Attachment.pdf PDF
Enclosure_AA _Government_QA_Plan.pdf PDF
Attachment_N _Quality_Assurance_Plan.pdf PDF
Attachment_B _IDIQ_Cost-Type_Rate_Matrix--All_IDIQ_Contract.pdf PDF
Enclosure_BB--_2_JPSS_RTO.pdf PDF
Signed_RFP_letter.pdf PDF
Final_Draft_RFP.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prime Loaded

Onsite Rate*

Percent of Effort

Subcont Loaded Onsite Rate**

Subcont Loaded

Onsite Rate w/Prime

Loading***

Percent of Effort

Subcont Loaded Onsite Rate**

Subcont Loaded Onsite Rate w/Pr me

Loading***

Percent of Effort

Subcont Loaded Onsite Rate**

Subcont Loaded

Onsite Rate w/Prime

Loading***

Percent of Effort

Contract (Prime/Sub) Non

Management Loaded Onsite

Rate

Percent of Effort

(Insert DL Categories from Enclosure CC)~ 100%

100%

100%

100%

100%

100%

100%

100%

100%

Offsite Rate

Percent of Effort

Subcont Loaded Offsite Rate

Subcont Loaded

Offs te Rate w/Prime

Loading

Percent of Effort

Subcont Loaded Offsite Rate

Subcont Loaded Offsite Rate w/Pr me Load ng

Percent of Effort

Subcont Loaded Offsite Rate

Subcont Loaded

Offsite Rate w/Prime

Loading

Percent of Effort

Contract (Prime/Sub) Non

Management Loaded Offsite

Rate

Percent of Effort

(Insert DL Categories from Enclosure CC)~ 100%

100%

100%

100%

100%

100%

100%

100%

Offsite Rate

Percent of Effort

Subcont Loaded

Offsite Rate

Subcont Loaded

Offs te Rate w/Prime

Loading ###

Percent of Effort

Subcont Loaded

Offsite Rate

Subcont Loaded Offsite Rate w/Pr me Loading ###

Percent of Effort

Subcont Loaded

Offsite Rate

Subcont Loaded

Offsite Rate w/Prime

Loading ###

Percent of Effort

Contract (Prime/Sub) Non

Management Loaded Offsite

Rate

Percent of Effort

(Insert DL Categories from Enclosure CC)~ 100%

100%

100%

100%

100%

100%

100%

100%

Rate^

Percent of Effort

Subcont Loaded Rate^

Subcont Loaded Rate w/Prime Loading

Percent of Effort

Subcont Loaded Rate^

Subcont Loaded Rate w/Prime Load ng

Percent of Effort

Subcont Loaded Rate^

Subcont Loaded Rate w/Prime Loading

Percent of Effort

Contract (Prime/Sub)

Management Loaded Rate

Percent of Effort

100%

100%

100%

100%

100%

100%

100%

100%

Indirect Loadings

Fee

ESTIMATED

HOURS

LABOR COSTS

GOVERNMENT PRICING MODEL (GPM)

RFP# NNG16549116R

Proposing Entity:

EXHIBIT 1A

PRIME OFFEROR

Contract Year ____

Identify Prime Offeror Loadings Applied to Subcontractor Loaded Bid Rates: [Insert Element(s) of Cost and Rate(s)]

ONSITE

GPM Specified Non Management Direct Labor

Categories

Prime Offeror Subcontractor (Insert Name) Subcontractor (Insert Name) Subcontractor (Insert Name) TOTAL COMPOSITE GPM Estimated

Non Mgmt

ONSITE Direct Labor Hours

Total GPM Non Mgmt.

ONSITE Direct Labor Costs

Subtotal GPM-Specified Non-Management ONSITE Direct Labor Hours/Costs

OFFSITE

GPM Specified Non Management Direct Labor

Categories

Prime Offeror Subcontractor (Insert Name) Subcontractor (Insert Name) Subcontractor (Insert Name) TOTAL COMPOSITE GPM Estimated

Non Mgmt

OFFSITE

Direct Labor

Hours

Total GPM Non Mgmt.

OFFSITE Direct Labor Costs

Subtotal GPM-Specified Non-Management OFFSITE Direct Labor Hours/Costs

MANUFACTURING (MFG) SITE

GPM Specified Non Management Direct Labor

Categories

Prime Offeror Subcontractor (Insert Name) Subcontractor (Insert Name) Subcontractor (Insert Name) TOTAL COMPOSITE GPM Estimated

Non Mgmt

MFG SITE

Direct Labor

Hours

Total GPM Non Mgmt. MFG

SITE Direct Labor Costs

Subtotal GPM-Specified Non-Management MANUFACTURING SITE Direct Labor Hours/Costs

Offeror Management and Administrative Labor Categories and/or Labor oriented Recurring Other Direct Costs (ODCs)/Cost Estimating

Relationships (CERs)

Prime Offeror Subcontractor (Insert Name) Subcontractor (Insert Name) Subcontractor (Insert Name) TOTAL COMPOSITE Offeror Estimated

Mgmt/Admin Hours and/or

CERs

Total Offeror Management/ Administrative Labor Costs

Subtotal Offeror Management and Administrative Hours/Costs

Offeror Non Labor Recurring Other Direct Costs (ODCs)/Cost Estimating Relationships

(CERs) Costs

Offeror Rate ^^ Appplication ^^ Cost ^^ Loadings ^^^ Cross

Reference to Exhibit 7

Total Offeror Non Labor

ODC/CER Costs Indicate Prime or Name of Significant Subcontractor

+++ Subcontractor's Loaded OFFSITE Bid Rate burdened with the Prime Offeror's loadings (e.g. costs indirect rates and/or fee)

Subtotal Offeror Non-labor Recurring ODCs and/or Cost Estimating Relationship Costs

GRAND TOTAL GOVERNMENT PRICING MODEL - BID RATES

GRAND TOTAL GPM-

SPECIFIED AND OFFEROR

~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled GPM-Specified Non-Management Direct Labor Categories Direct Labor Hours and Position Descriptions and adjust rows as necessary.

* Prime Loaded ONSITE Bid Rate must match the Non-Management Direct Labor Prime Loaded ONSITE Bid Rate derived in Exhibit 2A

** Subcontractor Loaded ONSITE Bid Rate must match the Non-Management Direct Labor Subcontractor Loaded ONSITE Bid Rate derived in Exhibit 2A or 2C

*** Subcontractor's Loaded ONSITE Bid Rate burdened with the Prime Offeror's loadings (e.g. costs indirect rates and/or fee)

+ Prime Loaded OFFSITE Bid Rate must match the Non-Management Direct Prime Labor Prime Loaded OFFSITE Bid Rate derived in Exhibit A124

++ Subcontractor Loaded OFFSITE Bid Rate must match the Non-Management Direct Labor Subcontractor Loaded OFFSITE Bid Rate derived in Exhibit 2A or 2C

This exhibit contains Source Selection Information. See FAR 3.104.

# Prime Loaded MANUFACTURING SITE Bid Rate must match the Non-Management Direct Prime Labor Prime Loaded MANUFACTURING SITE Bid Rate derived in Exhibit 2A

## Subcontractor Loaded MANUFACTURING SITE Bid Rate must match the Non-Management Direct Labor Subcontractor Loaded MANUFACTURING SITE Bid Rate derived in Exhibit 2A or 2C

### Subcontractor's Loaded MANUFACTURING SITE Bid Rate burdened with the Prime Offeror's loadings (e.g. costs indirect rates and/or fee)

^ Loaded Bid Rate must match the Offeror Management and Administrative Direct Labor Loaded Bid Rates derived in Exhibit 2B or 2D

^^ Adjust columns and formatting as necessary

^^^ Apply all applicable loadings (Prime and Subcontractor) and fee

LOADINGS ON GPM-SPECIFIED OTHER DIRECT COSTS

Rate:_____% Rate:_____% Rate:_____% Rate:_____%

Travel (by Prime) -$

Misc. Purchases (Purchased by Prime) -$

TOTAL LOADED ODC COSTS -$

Proposing Entity:

EXHIBIT 1B

PRIME OFFEROR

RFP# NNG16549116R

Contract Year ____

This exhibit contains Source Selection Information. See FAR 3.104

Other Direct Costs Unburdened ODC

Cost

CY Indirect Bid Rates/Expenses Fee Prime Offeror

Loaded ODC Costs

*List each applicable Indirect Rate (e.g., G&A, Procurement Burden, Material Handling, etc.) and provide percentage. Add additional rows if needed.

File details come from the government source that posted it. Updated .