Copy_of_Final_Review_Exh_GPM_Exhibits_1A-1C_All_IDIQ_with_GPM-Specified_ODCs_by_CY-1_(2).pdf
PDF 160 KB Posted
- Attached to
- OMNIBUS MULTIDISCIPLINE ENGINEERING SERVICES II
- Solicitation number
- NNG16549116R
About this file
Exhibits 1
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prime Loaded
Onsite Rate*
Percent of Effort
Subcont Loaded Onsite Rate**
Subcont Loaded
Onsite Rate w/Prime
Loading***
Percent of Effort
Subcont Loaded Onsite Rate**
Subcont Loaded Onsite Rate w/Pr me
Loading***
Percent of Effort
Subcont Loaded Onsite Rate**
Subcont Loaded
Onsite Rate w/Prime
Loading***
Percent of Effort
Contract (Prime/Sub) Non
Management Loaded Onsite
Rate
Percent of Effort
(Insert DL Categories from Enclosure CC)~ 100%
100%
100%
100%
100%
100%
100%
100%
100%
Offsite Rate
Percent of Effort
Subcont Loaded Offsite Rate
Subcont Loaded
Offs te Rate w/Prime
Loading
Percent of Effort
Subcont Loaded Offsite Rate
Subcont Loaded Offsite Rate w/Pr me Load ng
Percent of Effort
Subcont Loaded Offsite Rate
Subcont Loaded
Offsite Rate w/Prime
Loading
Percent of Effort
Contract (Prime/Sub) Non
Management Loaded Offsite
Rate
Percent of Effort
(Insert DL Categories from Enclosure CC)~ 100%
100%
100%
100%
100%
100%
100%
100%
Offsite Rate
Percent of Effort
Subcont Loaded
Offsite Rate
Subcont Loaded
Offs te Rate w/Prime
Loading ###
Percent of Effort
Subcont Loaded
Offsite Rate
Subcont Loaded Offsite Rate w/Pr me Loading ###
Percent of Effort
Subcont Loaded
Offsite Rate
Subcont Loaded
Offsite Rate w/Prime
Loading ###
Percent of Effort
Contract (Prime/Sub) Non
Management Loaded Offsite
Rate
Percent of Effort
(Insert DL Categories from Enclosure CC)~ 100%
100%
100%
100%
100%
100%
100%
100%
Rate^
Percent of Effort
Subcont Loaded Rate^
Subcont Loaded Rate w/Prime Loading
Percent of Effort
Subcont Loaded Rate^
Subcont Loaded Rate w/Prime Load ng
Percent of Effort
Subcont Loaded Rate^
Subcont Loaded Rate w/Prime Loading
Percent of Effort
Contract (Prime/Sub)
Management Loaded Rate
Percent of Effort
100%
100%
100%
100%
100%
100%
100%
100%
Indirect Loadings
Fee
ESTIMATED
HOURS
LABOR COSTS
GOVERNMENT PRICING MODEL (GPM)
RFP# NNG16549116R
Proposing Entity:
EXHIBIT 1A
PRIME OFFEROR
Contract Year ____
Identify Prime Offeror Loadings Applied to Subcontractor Loaded Bid Rates: [Insert Element(s) of Cost and Rate(s)]
ONSITE
GPM Specified Non Management Direct Labor
Categories
Prime Offeror Subcontractor (Insert Name) Subcontractor (Insert Name) Subcontractor (Insert Name) TOTAL COMPOSITE GPM Estimated
Non Mgmt
ONSITE Direct Labor Hours
Total GPM Non Mgmt.
ONSITE Direct Labor Costs
Subtotal GPM-Specified Non-Management ONSITE Direct Labor Hours/Costs
OFFSITE
GPM Specified Non Management Direct Labor
Categories
Prime Offeror Subcontractor (Insert Name) Subcontractor (Insert Name) Subcontractor (Insert Name) TOTAL COMPOSITE GPM Estimated
Non Mgmt
OFFSITE
Direct Labor
Hours
Total GPM Non Mgmt.
OFFSITE Direct Labor Costs
Subtotal GPM-Specified Non-Management OFFSITE Direct Labor Hours/Costs
MANUFACTURING (MFG) SITE
GPM Specified Non Management Direct Labor
Categories
Prime Offeror Subcontractor (Insert Name) Subcontractor (Insert Name) Subcontractor (Insert Name) TOTAL COMPOSITE GPM Estimated
Non Mgmt
MFG SITE
Direct Labor
Hours
Total GPM Non Mgmt. MFG
SITE Direct Labor Costs
Subtotal GPM-Specified Non-Management MANUFACTURING SITE Direct Labor Hours/Costs
Offeror Management and Administrative Labor Categories and/or Labor oriented Recurring Other Direct Costs (ODCs)/Cost Estimating
Relationships (CERs)
Prime Offeror Subcontractor (Insert Name) Subcontractor (Insert Name) Subcontractor (Insert Name) TOTAL COMPOSITE Offeror Estimated
Mgmt/Admin Hours and/or
CERs
Total Offeror Management/ Administrative Labor Costs
Subtotal Offeror Management and Administrative Hours/Costs
Offeror Non Labor Recurring Other Direct Costs (ODCs)/Cost Estimating Relationships
(CERs) Costs
Offeror Rate ^^ Appplication ^^ Cost ^^ Loadings ^^^ Cross
Reference to Exhibit 7
Total Offeror Non Labor
ODC/CER Costs Indicate Prime or Name of Significant Subcontractor
+++ Subcontractor's Loaded OFFSITE Bid Rate burdened with the Prime Offeror's loadings (e.g. costs indirect rates and/or fee)
Subtotal Offeror Non-labor Recurring ODCs and/or Cost Estimating Relationship Costs
GRAND TOTAL GOVERNMENT PRICING MODEL - BID RATES
GRAND TOTAL GPM-
SPECIFIED AND OFFEROR
~ Insert GPM-Specified Direct Labor Categories from Enclosure entitled GPM-Specified Non-Management Direct Labor Categories Direct Labor Hours and Position Descriptions and adjust rows as necessary.
* Prime Loaded ONSITE Bid Rate must match the Non-Management Direct Labor Prime Loaded ONSITE Bid Rate derived in Exhibit 2A
** Subcontractor Loaded ONSITE Bid Rate must match the Non-Management Direct Labor Subcontractor Loaded ONSITE Bid Rate derived in Exhibit 2A or 2C
*** Subcontractor's Loaded ONSITE Bid Rate burdened with the Prime Offeror's loadings (e.g. costs indirect rates and/or fee)
+ Prime Loaded OFFSITE Bid Rate must match the Non-Management Direct Prime Labor Prime Loaded OFFSITE Bid Rate derived in Exhibit A124
++ Subcontractor Loaded OFFSITE Bid Rate must match the Non-Management Direct Labor Subcontractor Loaded OFFSITE Bid Rate derived in Exhibit 2A or 2C
This exhibit contains Source Selection Information. See FAR 3.104.
# Prime Loaded MANUFACTURING SITE Bid Rate must match the Non-Management Direct Prime Labor Prime Loaded MANUFACTURING SITE Bid Rate derived in Exhibit 2A
## Subcontractor Loaded MANUFACTURING SITE Bid Rate must match the Non-Management Direct Labor Subcontractor Loaded MANUFACTURING SITE Bid Rate derived in Exhibit 2A or 2C
### Subcontractor's Loaded MANUFACTURING SITE Bid Rate burdened with the Prime Offeror's loadings (e.g. costs indirect rates and/or fee)
^ Loaded Bid Rate must match the Offeror Management and Administrative Direct Labor Loaded Bid Rates derived in Exhibit 2B or 2D
^^ Adjust columns and formatting as necessary
^^^ Apply all applicable loadings (Prime and Subcontractor) and fee
LOADINGS ON GPM-SPECIFIED OTHER DIRECT COSTS
Rate:_____% Rate:_____% Rate:_____% Rate:_____%
Travel (by Prime) -$
Misc. Purchases (Purchased by Prime) -$
TOTAL LOADED ODC COSTS -$
Proposing Entity:
EXHIBIT 1B
PRIME OFFEROR
RFP# NNG16549116R
Contract Year ____
This exhibit contains Source Selection Information. See FAR 3.104
Other Direct Costs Unburdened ODC
Cost
CY Indirect Bid Rates/Expenses Fee Prime Offeror
Loaded ODC Costs
*List each applicable Indirect Rate (e.g., G&A, Procurement Burden, Material Handling, etc.) and provide percentage. Add additional rows if needed.
File details come from the government source that posted it. Updated .