Enclosure_BB_2--SSCO_RTO_finalRFP.pdf

PDF 307 KB Posted

Attached to
OMNIBUS MULTIDISCIPLINE ENGINEERING SERVICES II
Solicitation number
NNG16549116R
Issued by

About this file

Enclosure BB- 2

View the file

Other files

File Type Posted
Final_Amendment__2.pdf PDF
Final_Questions_and_Answers__3.pdf PDF
RFP_Amendment.pdf PDF
Final_Questions_and_Answers__2.pdf PDF
Questions_and_Answers.pdf PDF
Enclosure_AA _Government_QA_Plan.pdf PDF
ENCLOSURE_DD_-_Incumbent_Direct_Labor_Rates.pdf PDF
RFP_Cover_letter.pdf PDF
Attachment_N _Quality_Assurance_Plan.pdf PDF
Attachment_B _IDIQ_Cost-Type_Rate_Matrix--All_IDIQ_Contract.pdf PDF
Exhibit_13 _Past_Performance_Questionnaire.pdf PDF
Attachment_C _533_Attach_All_IDIQ--Both_Onsite_and_Offsite.pdf PDF
Attachment_K _IT_Security_Applicable_Documents_List.pdf PDF
Enclosure_CC _FINAL_GPM-Specified_Non-Mgmt_DL_Categories_DL_Hours_and_PDs_Enclosure.pdf PDF
Attachment_H _Small_Business_Subcontracting_Plan.pdf PDF
Copy_of_Final_Review_of_Exh_GPM_Exhibits_2-12_All_IDIQ_by_CY-1.pdf PDF
Attachment_M _DD_254.pdf PDF
Final_RFP_(B-M).pdf PDF
Copy_of_Final_Review_Exh_GPM_Exhibits_1A-1C_All_IDIQ_with_GPM-Specified_ODCs_by_CY-1_(2).pdf PDF
Attachment_F _PIV_Attachment.pdf PDF
Attachment_D _List_of_IAGP.pdf PDF
Attachment_J _OCI_Avoidance_Plan.pdf PDF
SF_33.pdf PDF
Attachment_L _IT_Security_Management_Plan.pdf PDF
Attachment_A _Final_Draft_OMES-II_SOW.pdf PDF
Attachment_G _Safety_and_Health_Plan.pdf PDF
Encosure_BB__1--JPSS_RTO_finalRFP.pdf PDF
Attachment_E _List_of_GFP.pdf PDF
ENCLOSURE_DD_-_Incumbent_Direct_Labor_Rates.pdf PDF
Attachment_M _DD_254.pdf PDF
Attachment_F _PIV_Attachment.pdf PDF
Attachment_B _IDIQ_Cost-Type_Rate_Matrix--All_IDIQ_Contract.pdf PDF
Signed_RFP_letter.pdf PDF
Enclosure_BB--_2_JPSS_RTO.pdf PDF
Exhibit_13 _Past_Performance_Questionnaire.pdf PDF
Attachment_D _List_of_IAGP.pdf PDF
Attachment_H _Small_Business_Subcontracting_Plan.pdf PDF
Attachment_E _List_of_GFP.pdf PDF
SF_33.pdf PDF
Enclosure_DD _Incumbent_Direct_Labor_Rates.pdf PDF
Enclosure_AA _Government_QA_Plan.pdf PDF
Attachment_N _Quality_Assurance_Plan.pdf PDF
Final_Draft_RFP.pdf PDF
Attachment_L _IT_Security_Management_Plan.pdf PDF
Attachment_I _Contract_Historical_Data.pdf PDF
Attachment_J _OCI_Avoidance_Plan.pdf PDF
Attachment_G _Safety_and_Health_Plan.pdf PDF
Final_Review_of_Exh_GPM_Exhibits_2-12_All_IDIQ_by_CY-1.pdf PDF
Attachment_K _IT_Security_Applicable_Documents_List.pdf PDF
Enclosure_BB--_1_SSCO_RTO.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELIMINARY

OMES SSCO Robotic Servicing

Period of Performance: January 1, 2017 – December 31, 2017

Background

The Satellite Servicing Capabilities Office (SSCO) has a dual strategy to enable a future U.S. industry for the servicing of satellites:

1 Advance the state of robotic servicing technology to enable the routine servicing of satellites that were not designed with servicing in mind.

2 Position the U.S. to be the global leader in in-space repair, maintenance and satellite disposal.

This RTO will focus on the capabilities and skills required to perform on-orbit servicing for a well-known GSFC satellite case, Global Precipitation Mission (GPM).

For this RTO the spacecraft performing the on-orbit servicing shall be called Servicer 1. The Offeror shall demonstrate competencies for service scenarios including:

1. Proximity operations

2. Rendezvous and capture

3. Examine and inspect for probable causes for failures; and repair with

Servicer 1, sustain in mode for follow-on robot servicer or de-orbit decision (in communication with customer)

4. Refueling

5. De-orbit for demise with controlled re-entry

Task Description

Design and develop a mission, Servicer 1, which captures the Global Precipitation Measurement (GPM) spacecraft with an option to repair, refuel or de-orbit with a controlled re-entry to non-populated regions of Earth. The following URL contains relevant information for GPM.

http://www.nasa.gov/sites/default/files/files/GPM_Mission_Brochure.pdf https://directory.eoportal.org/web/eoportal/satellite-missions/g/gpm

Design the following mission components:

1. High level mission requirements

2. Concept-level design of a flight module that captures GPM satellite

(assume cooperative, i.e. target is under control and all instruments are http://www.nasa.gov/sites/default/files/files/GPM_Mission_Brochure.pdf https://directory.eoportal.org/web/eoportal/satellite-missions/g/gpm safed) The flight module is defined as the components of Servicer 1 used to perform on-orbit servicing and does not include the Servicer 1 bus or the satellite being serviced.

a. Include list of trade studies with recommended solutions for approaches and hardware to accomplish this task.

b. Identify single-point failures and rationale for redundancy or no redundancy

3. Mission Operations Concept

a. Include a mission timeline

b. Develop a proximity operations plan with focus on GN&C sub-system definition

c. Develop a rendezvous and capture operations plan with focus on robotic system definition. Also, describe any operational constraints on GPM

d. Develop a refueling plan

e. Develop a plan to examine and inspect GPM for probable causes of failures. Develop a plan to repair with Servicer 1, sustain in mode for follow-on robot servicer or de-orbit decision

f. Develop ground operations concept for telemetry, tracking and control

4. Identify key enabling technologies for this mission and its development plan to i) Complete the task and/or ii) Make the existing approaches more efficient and/or iii) Minimize significant risks to GPM

Deliverables

Deliverable Due Date

1. High level mission requirements 04/28/2017

2. Flight module design concept 09/01/2017

3. Mission Con-Ops document, at a minimum to include

a. Mission timeline

b. Proximity operations plan

c. Capture operations plan

d. Refuel plan

e. Failure causes inspection plan & repair or de-orbit plan

f. Ground control options

12/29/2017

4. Technology development plan 09/01/2017

Assumptions

1. The SSCO mission risk classification shall be a CLASS C, as per NPR 8705.4 Risk Classification for NASA Payloads.

2. The SSCO mission shall be capable of performing a controlled reentry, per the requirements of NASA-STD-8719.14 Process for Limiting Orbital Debris, from the mission orbit anytime up to 10 years from launch, when initiated by ground procedures.

File details come from the government source that posted it. Updated .