PRELIMINARY
OMES SSCO Robotic Servicing
Period of Performance: January 1, 2017 – December 31, 2017
Background
The Satellite Servicing Capabilities Office (SSCO) has a dual strategy to enable a future U.S. industry for the servicing of satellites:
1 Advance the state of robotic servicing technology to enable the routine servicing of satellites that were not designed with servicing in mind.
2 Position the U.S. to be the global leader in in-space repair, maintenance and satellite disposal.
This RTO will focus on the capabilities and skills required to perform on-orbit servicing for a well-known GSFC satellite case, Global Precipitation Mission (GPM).
For this RTO the spacecraft performing the on-orbit servicing shall be called Servicer 1. The Offeror shall demonstrate competencies for service scenarios including:
1. Proximity operations
2. Rendezvous and capture
3. Examine and inspect for probable causes for failures; and repair with
Servicer 1, sustain in mode for follow-on robot servicer or de-orbit decision (in communication with customer)
4. Refueling
5. De-orbit for demise with controlled re-entry
Task Description
Design and develop a mission, Servicer 1, which captures the Global Precipitation Measurement (GPM) spacecraft with an option to repair, refuel or de-orbit with a controlled re-entry to non-populated regions of Earth. The following URL contains relevant information for GPM.
http://www.nasa.gov/sites/default/files/files/GPM_Mission_Brochure.pdf https://directory.eoportal.org/web/eoportal/satellite-missions/g/gpm
Design the following mission components:
1. High level mission requirements
2. Concept-level design of a flight module that captures GPM satellite
(assume cooperative, i.e. target is under control and all instruments are http://www.nasa.gov/sites/default/files/files/GPM_Mission_Brochure.pdf https://directory.eoportal.org/web/eoportal/satellite-missions/g/gpm safed) The flight module is defined as the components of Servicer 1 used to perform on-orbit servicing and does not include the Servicer 1 bus or the satellite being serviced.
a. Include list of trade studies with recommended solutions for approaches and hardware to accomplish this task.
b. Identify single-point failures and rationale for redundancy or no redundancy
3. Mission Operations Concept
a. Include a mission timeline
b. Develop a proximity operations plan with focus on GN&C sub-system definition
c. Develop a rendezvous and capture operations plan with focus on robotic system definition. Also, describe any operational constraints on GPM
d. Develop a refueling plan
e. Develop a plan to examine and inspect GPM for probable causes of failures. Develop a plan to repair with Servicer 1, sustain in mode for follow-on robot servicer or de-orbit decision
f. Develop ground operations concept for telemetry, tracking and control
4. Identify key enabling technologies for this mission and its development plan to i) Complete the task and/or ii) Make the existing approaches more efficient and/or iii) Minimize significant risks to GPM
Deliverables
Deliverable Due Date
1. High level mission requirements 04/28/2017
2. Flight module design concept 09/01/2017
3. Mission Con-Ops document, at a minimum to include
a. Mission timeline
b. Proximity operations plan
c. Capture operations plan
d. Refuel plan
e. Failure causes inspection plan & repair or de-orbit plan
f. Ground control options
12/29/2017
4. Technology development plan 09/01/2017
Assumptions
1. The SSCO mission risk classification shall be a CLASS C, as per NPR 8705.4 Risk Classification for NASA Payloads.
2. The SSCO mission shall be capable of performing a controlled reentry, per the requirements of NASA-STD-8719.14 Process for Limiting Orbital Debris, from the mission orbit anytime up to 10 years from launch, when initiated by ground procedures.