Space Launch System (SLS) Universal Stage Adapter (USA) Federal contract opportunity
Solicitation number
NNC16ZMX004R
Issued by
National Aeronautics and Space Administration Glenn Research Center

View the file

Other files for this federal contract opportunity

Other files attached to Space Launch System (SLS) Universal Stage Adapter (USA), newest first.
File Type Posted
SLS_USA_SSS.pdf PDF
Q A__6.pdf PDF
Amendment__3.pdf PDF
Q A__5.pdf PDF
13_of_19_RFP_Att_J.2-4_SLS_USA_Cost_Summary_Template_-_Amended.xlsx XLSX spreadsheet
Q A__4.pdf PDF
Amendment__2.pdf PDF
14_of_19_RFP_Att_J.2-5_SLS_USA_Price_Summary_Template_-_Amended.xlsx XLSX spreadsheet
Amendment__1.pdf PDF
Q A__2.pdf PDF
Q A__1.pdf PDF
SLS_USA_Final_RFP.zip ZIP file
3_RFP_files_to_post_to_FBO.zip ZIP file
list_of_reports_available.zip ZIP file
USA_Industry_Day_Master_Final.pdf PDF
Amendment_1_-_Additional_question.docx DOCX document
05_of_19_DRFP_Att_J.1-B_Data_Procurement_Document.docx DOCX document
03_of_19_DRFP_Sections_B__M.docx DOCX document
15_of_19_DRFP_Att_J.2-6_Cognizant_Audit_Office_Template.xlsx XLSX spreadsheet
18_of_19_DRFP_Att_J_2-9_Request_for_Technical_Data.docx DOCX document
13_of_19_DRFP_Att_J.2-4_SLS_USA_Cost_Summary_Template.xlsx XLSX spreadsheet
19_of_19_DRFP_Att_J.2-10_USA_Industry_Day_Information.docx DOCX document
11_of_19_DRFP_Att_J.2-2_Master_Schedule.docx DOCX document
01_of_19_DRFP_Introduction.pdf PDF
16_of_19_DRFP_Att_J.2-7_Standard_Labor_Categories.docx DOCX document
07_of_19_DRFP_Att_J.1-D_Deliverable_Items_List.docx DOCX document
08_of_19_DRFP_Att_J.1-E_Government_Furnished_Property _Information_and_Facilities_List.docx DOCX document
06_of_19_DRFP_Att_J.1-C_Applicable_Documents_List.docx DOCX document
09_of_19_DRFP_Att_J.1-F_Performance_Evaluation_Plan.docx DOCX document
12_of_19_DRFP_Att_J.2-3_Business_Systems_Reviews_and_Status_Info.xlsx XLSX spreadsheet
10_of_19_DRFP_Att_J.2-1_Past_Performance_Questionnaire.docx DOCX document
04_of_19_DRFP_Att_J.1-A_Statement_of_Work.docx DOCX document
02_of_19_DRFP_Cover_Page.pdf PDF
17_of_19_DRFP_Att_J.2-8_Government_Task_Agreement_Instructions.docx DOCX document
14_of_19_DRFP_Att_J.2-5_SLS_USA_Price_Summary_Template.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals

Questions and Answers #3

NNC16ZMX004R

1) Question - A request for additional technical data has been submitted. SLS-SPEC-044-10, Cross-Program Vehicle Design Environments Volume 10: Block 1B Vehicle Acoustics, has been requested. Will this document be made available?

Answer – No.

2) Question - A request for additional technical data has been submitted. SLS-SPEC-044-03, Cross-Program Vehicle Design Environments Volume 3: Interface and Shared Compartment

Thermal, has been requested. Will this document be made available?

Answer - Yes. If you would like to receive this document, please send your request to the contacts listed on the “Request for Technical Data” attachment (attachment 18 of 19) of the

Final RFP.

3) Question - K.11 and K.13 are the same in content. K.11 would be the preferred use as the

FAR number 1852.209-76 is called out in the title.

Answer – K.11 and K.13 are the same in content. Because of this redundancy and the fact that K.11 is an official NASA FAR Supplement provision, only K.11 should be utilized and an amendment to this Solicitation will be posted deleting the content of K.13.

4) Question - Will NASA consider changing the font restriction identified in Section L.15 for graphics and tables from Times New Roman 11 point type to Times New Roman 10 point type or Arial 9 point type?

Answer – Yes. An Amendment to this Solicitation will be posted specifying that text in diagrams and/or any other object must NOT be smaller than the Times New Roman 10 point type.

5) Question - Integrated Master Schedule (IMS), “03 of 19 - RFP Sections B – M”, Section

L.23 – According to the table located on page 107 of 142, the Integrated Master Schedule is not included (N/A) in the Volume I Mission Suitability 100 Page limit. On 112 of 142, MA2.1 “A SLS USA Integrated Master Schedule, including milestones, to accomplish all

SLS USA requirements including phasing of the base and option periods” implies that the

Integrated Master Schedule is included in the Mission Suitability Volume and would therefore be included in that volume’s 100 page limit. Please clarify.

Answer – The Integrated Master Schedule is included in the Mission Suitability Volume.

However, the Integrated Master Schedule is excluded from the Mission Suitability Volume page count of 100 pages. The Integrated Master Schedule has its own page limit of 15 pages.