N6945022R0002_SectionF_Amend0001.pdf
PDF 302 KB Posted
- Solicitation number
- N6945022R0002
About this file
This document outlines the deliverables required under a solicitation for Base Operations Support (BOS) services at Naval Construction Battalion Center (NCBC) Gulfport, Mississippi and surrounding areas. The solicitation seeks services across five annexes, including facility management, facility investment, custodial services, grounds maintenance and landscaping, and wastewater. Key deliverables include quality management, safety, and environmental plans due before and after contract award; recurring reports like preventative maintenance schedules and inspection results due monthly; and ad hoc requests for items like permits, licenses, and non-recurring work proposals. Response times for deliverables range from immediate notifications to 15 days for items like certifications and 30 days for initial management plans. The Naval Facilities Engineering Command is the contracting agency seeking these BOS services at NCBC Gulfport.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – Annex 0200000
Management and Administration
N69450-22-R0002
Amendment 1
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.2.1.2 N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes for
Review and
Comments
Within two working days
KO, COR
and all attendees
1 As
Required
2.3.1 N/A Sign-in Sheets and
Minutes Final
Revision
Within two working days
KO, COR
and all attendees
1 As
Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.5 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.3.10 N/A Phase-In Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As specified
2.3.10 N/A Phase-Out Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As specified
2.6.1 N/A Plans of Action
and Milestones
(POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command
Security
Manager
1 As required
N69450-22-R0002
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by
0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command
Security
Manager
1 As required
2.6.4 N/A Scheduling and
Work Status
Updates
Weekly, within
30 minutes of the inquiry during regular working hours, and by
08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As
Specified
2.6.4 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
2.6.5 N/A Notification of any
Difficulty in
Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
required
N69450-22-R0002
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.8.2 N/A Pipe Delimited
Flat-File
By the end of each workday
KO or a representat ive designated by the KO
1 Daily
2.6.8.2 N/A Sample Pipe
Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representat ive designated by the KO
1 As required to demonstrat e the ability to properly format the flat-file
2.6.8.2 N/A Asset and
Specification Data
When an asset is repaired, replaced, installed, or otherwise affected
KO or a representat ive designated by the KO
1 As required
2.6.8.3 N/A List of personnel
requiring access to
Government’s
Maximo
Within 30 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.9.3 N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
1 Monthly
2.6.10 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and
Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
specified
N69450-22-R0002
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.2.6 N/A Proof of United
States of America
Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As required
2.8.8 N/A OF-306
Declaration for
Federal
Employment and
Digital
Fingerprints
Prior to commencement of work
KO, COR,
and
Security
Manager
1 As required
2.8.9 N/A List of personnel
requiring access to and the justification for their access to
Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security
Manager
1 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4 N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4.7 N/A Control of
Hazardous Energy
(lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
N69450-22-R0002
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.9.6 J-0200000-03 NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-03 Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-03 Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
2.9.9 N/A OSHA Citations
and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.9.10 N/A Safety Inspection
and Monitoring
Report
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.10 N/A EMS Goals and
Policy
Measurement
Information
Upon request. KO and
COR
1 As required
2.10.1.1 N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
1 As specified
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.2.1 N/A Sampling Plan Prior to Sampling KO and
COR
1 As required
2.10.2.1 N/A Laboratory
Analysis
Upon Request KO and
COR
1 As specified
2.10.2.2 N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
1 As required
N69450-22-R0002
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.2.3 J-0200000-03 Solid Waste
Management and
Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
2.10.2.3 J-0200000-03 Summary Solid
Waste
Management and
Recycling Report
By October 10th KO and
COR
1 Annually
2.10.2.5 N/A Waste Stream
Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
Within 15 minutes of discovery
Regional
Dispatch
Center
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill report
Within 48 hours of discovery
KO and
COR
1 As required
2.10.2.8 N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.8 J-0200000-12 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.12 N/A Asbestos
Containing
Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written
Notification within 24 hours
KO and
COR
N69450-22-R0002
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.2.13 N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of
160 to 200 calendar days
KO, COR,
Installation
Environme ntal
Division, City, State, and EPA
1 Semi-annually
2.10.2.13 N/A Hazardous Air
Pollutants Monthly
Data
First workday of each month.
KO, COR,
Installation
Environme ntal
Division
1 Monthly
2.10.3 N/A Sustainable
Procurement and
Practices Plan
Within 15 calendar days prior to contract start and within
15 calendar days after exercised option periods.
KO and
COR
1 Annually
2.10.3 N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
2.10.3.2 N/A Recovered
Material
Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.11 N/A Mission Essential
Contractor
Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As
Required
2.11 N/A Mission
Critical/Mission
Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
N69450-22-R0002
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.14.1 N/A Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
2.14.2 N/A Notification to the
Government for
Work Above the
Recurring Work
Limitations and
Rough Order of
Magnitude
Within two hours of identification
KO and
COR
1 As required
2.15.1.1 N/A Non-Recurring
Work Quantities
Ordered via
FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
Section F – Annex 1502000
Facility Investment
N69450-22-R0003
Annex/
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original
/ Copies
Number of
Copies
(including original)
1502000/
2.2.1
N/A Certification and
Licenses
Within 15 days after award or as requested by the
KO
KO 1 Once for initial submittal, then as requested
1502000/
3.1
N/A Service Order
Summary Report
First work day of each month
KO 2 Monthly
1502000/
3.2
N/A Preventive
Maintenance
Program Plan
30 calendar days after contract award
KO 2 Annually
1502000/
3.2
N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO 1 Monthly
1502000/
3.4
N/A Inspection, Testing, and Certification
Program Summary
Report
First work day of each month
KO 2 Monthly
1502000/
3.4
N/A Inspection, Testing and Certification
Schedule and
Equipment
Certifications
First work day of each month
KO 2 Monthly
1502000/
3.4.2
N/A Certification of
Load Test and
Condition
Inspection Form
First work day of each month
KO 2 Monthly
1502000/
3.4.5
N/A Inspection and Test
Report for Vertical
Transportation
Equipment
First work day of each month
KO 2 Monthly
1502000/
3.4.6
N/A Inspection and Test
Report for Engine
Test Facilities
First work day of each month
KO 2 Monthly
1502000/
3.5
N/A Other Recurring
Services Program
Summary Report
First work day of each month
KO 2 Monthly
Section F – Annex 1503010
Custodial Services
Annex/
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1503010/
2.2.1
N/A Pathogen
Training
Certificates
Upon request KO/COR 1 Upon request
1503010/
3.1
N/A Annual Work
Schedule
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule
1503010/
3.1
N/A Monthly Work
Plan
First work day of each month and five calendar days prior to implementing any changes to the schedule
KO/COR 2 Monthly
1503010/
3.2
N/A Custodial Service
Order Report
First work day of each month
KO/COR 2 Monthly
Section F – Annex 1503050
Grounds Maintenance and Landscaping
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.2.1 N/A Certification, Training, and
Licensing
Within 15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO/COR 2 Annually and as required by
Section H –
Special Contract
Requirements, FAC 5252.237-
9301 Substitutions of Key Personnel
(JUN 1994)
2.3.1.1 N/A Business
Licensing
Within 15 calendar days prior to contract start.
Copies of renewed licenses shall also be submitted.
KO/COR 2 As required
2.3.1.4 N/A Planned
Pesticide/
Herbicide Use
Sheets including
Pesticide/
Herbicide
Labels and
Safety Data
Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO,
COR,
PPMC
3 Annually for each pesticide/herbicide, as required.
2.3.1.5 N/A Pest
Management
Operations
Report
Electronically by the 15th of the following month
(Example:
July data must be submitted by August 15) on the format approved by
PMC.
KO,
COR,
PPMC
2 Monthly
2.3.2 N/A Permits Within 15
calendar days prior to start of work.
KO/COR 2 As required
2.3.9.1 N/A Water
Conservation
Plan
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
Section F – Annex 1503050
Grounds Maintenance and Landscaping
N69450-22-R0002
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
3 N/A Weight
Tickets
With Invoice KO/COR 2 As Specified
3 J-1503050-09 Recycling
Reporting
Form
As specified KO/COR 2 With each invoice
3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch
Prior to bringing on-board installation and prior to use
KO/COR 2 As Required
3 N/A Contractor
Work
Schedules
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule
3.1.1.3 N/A Soil Analysis Within 15
days after receipt of the test results by the Contractor
KO/COR 2 As Required
3.1.1.3 N/A Top Dressing
and Over
Seeding Seed
Type
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
3.4 N/A Grounds
Maintenance
Service Order
Summary of
Completion
Report
By the fifth day of each month
KO/COR 2 Monthly
Section F – Annex 16040000
Wastewater
Annex/Spec
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
1604000 / 3.2.3 N/A Pre-repair and
Post-repair
Reports on Wet
Wells
3 days after the end of the month during which work is performed
KO 4 Monthly
1604000 / 3.4.3 N/A Wet Well
Photographs and Reports
15 days after performance of the work
KO 4 As required
1604000/3.1.1 N/A Wet Well
Sediment Waste
Stream
Determination for TCLP
Metals
Prior to first cleaning of wet wells
KO 2 Prior to first cleaning of wet wells
1604000/3.5.2 N/A Schedule of
Wet Well
Services
15 days after award
KO 4 Annually and any time a change is made.
1604000/3.5.2.1 N/A Wet Well
Volume Report
10 days after the end of each fiscal year.
KO 2 Annually
1604000/3.5.2.2 N/A Wet Well
Cleaning
Report
15 days after performance of the work
KO 4 As required
File details come from the government source that posted it. Updated .