N6945022R0002_J_1502000_11_05_STI Inspection Report.pdf
PDF 2 MB Posted
- Solicitation number
- N6945022R0002
About this file
This document is an inspection report for annual tank inspections conducted at Naval Construction Battalion Center (NCBC) Gulfport in March 2021. Fifty-four aboveground storage tanks were inspected for integrity and compliance by Seres Engineering & Services. Key findings included water present in the interstices of several tanks, substandard emergency vents on some tanks, level gauges requiring calibration or repair, and minor corrosion issues observed on various tanks that will require remediation. No major deficiencies were identified that would require any tanks to be taken out of service. Individual inspection reports should be reviewed for tank-specific details. All noted conditions are recommended to be addressed in a timely manner.
This solicitation is for Base Operations Support services at NCBC Gulfport, Mississippi and various outlying areas to be provided under several Annexes, including Facility Management, Facility Investment, Custodial Services, Grounds Maintenance and Landscaping, and Wastewater. The period of performance and response date are not specified. The Naval Facilities Engineering Command is the contracting agency. The scope of services required and locations covered are described in the attached Request for Proposal and associated documents.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Naval Construction Battalion Center
NCBC GULFPORT
2 0 2 1
S T I I N S P E C T I O N S
Inspections conducted March 2021 by Seres Engineering & Services
669 Marina Drive, Charleston, SC 29492
(843) 388-5785
Tanks Inspected for 2021 STI Project
1 18-01 28 400-10
2 32-02 29 400-11
3 32-03 30 400-12
4 163-01 31 400-13
5 164-01 32 400-14
6 165-01 33 400-15
7 182-01 34 400-16
8 184-01 35 400-17
9 185-02 36 400-18
10 186-01 37 400-19
11 188-02 38 416-01
12 203-01 39 417-01
13 217-01 40 435-02
14 241-01 41 447-01
15 274-01 42 447-03
16 276-01 43 449-01
17 321-01 44 451-01
18 322-01 45 452-01
19 324-01 46 463-01
20 329-01 47 465-01
21 343-01 48 465-02
22 361-01 49 465-03
23 361-02 50 470-01
24 385-01 51 470-02
25 397-01 52 470-03
26 398-03 53 470-04
27 400-09 54 470-05
N C B C G u l f p o r t
Tank ID Tank ID
NCBC Gulfport STI Site Conditions List 2021
Below are the observations found during the recent 2021 STI Inspections conducted at NCBC Gulfport on 22 - 25 March 2021. This is not an all-inclusive list but a synopsis of the most notable problems. Individual STI reports must be reviewed to get the most accurate condition of each tank.
In summary, there were no major findings associated with the 2021 annual STI
SP001 inspections, and it is Seres’ technical opinion that all tanks can remain in-service. Please review the following annual inspection forms for any noted problems observed during the performance of the inspections. It is suggested the installation address all noted site conditions in a timely manner.
Water in Interstice - 186-01, 241-01, 385-01, 400-14
Sub-standard emergency vents (non-UL) – 18-01, 32-03, 203-01, 217-01, 321-01, 329-01, 343-01, 361-01, 361-02, 435-02, 447-01, 449-01, 451-01, 452-01, 463-01, 465-01, 470-05
Tank bulging/dented – 185-02, 400-13
Level gauge
a) Inaccurate – 276-01, 385-01, 400-12, 400-13, 400-17, 451-01
Interstice leak detection-
a) Not installed (port available) – 182-01, 217-01, 241-01, 274-01, 276-01, 385-01, 397-01, 400-14, 400-15, 400-16, 400-18, 400-19, 416-01, 465-02
b) Probe not connected – 322-01, 417-01, 435-02, 451-01
c) Alarm Light Inoperable – 18-01, 203-01, 329-01, 343-01, 447-03, 449-01, 452-01, 470-05
d) Indicator rod too short – 465-03
Moderate/Major corrosion- 18-01, 32-03, 182-01, 343-01, 361-02, 400-15, 435-02, 447-01, 465-01, 470-05
No OPV installed(Room to install) – 274-01, 416-01, 465-01
Miscellaneous deficiencies (Signage, grounding, etc.) - see individual reports
STI SP001 Annual Inspection Checklist General Inspection Information:
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
03/22/21 02/03/20 03/22/24
18-01 (Building 18 Warehouse) NCBC Gulfport
N/A
David Massie
3 �
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
■ Moderate surface corrosion on top of tank
2 each 4" (M) EV's not UL approved.
Alarm at generator control panel. Audible alarm works but light is out.
18-01 (Building 18 Warehouse) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Additional Comments:
Tank is equipped with overfill prevention valve.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/03/20 3/23/24
32-02 (Building 32 Commissary) NCBC Gulfport
NA
■ Grass clippings cover pad, trap moisture under tank, remove
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
■ See #2
None installed
■ Minor surface corrosion on tank vertical supports
Alarm at generator control panel
32-02 (Building 32 Commissary) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/03/20 3/23/24
32-03 (Building 32 Commissary) NCBC Gulfport
NA
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
■ Moderate to severe corrosion around ports and welds on top of tank.
2 each 5" (M) EV's not UL approved.
Alarm at generator control panel
32-03 (Building 32 Commissary) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/04/20 3/23/24
163-01 (Building 163 Lift Station) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
No fire diamond
Morrison leak indicator 724 (visual). Interstice dry. Corrosion bubbling on weld seam in secondary
163-01 (Building 163 Lift Station) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Tank is equipped with overfill prevention valve.
Pine needles on top of tank and around tank supports. Remove. Adds moist environment to tank surface.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/04/20 3/23/24
164-01 (Building 164 Pinewood Lift Station) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
Needs fire diamond and contents
Morrison leak indicator 724 (visual). Interstice was dry.
164-01 (Building 164 Pinewood Lift Station) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Pine needles were observed on top of belly tank. Remove periodically because provides moist environment for tank.
Has OPV and high level alarm
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
03/22/21 02/04/20 03/22/24
165-01 (Lift Station) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
No fire diamond
Morrison leak indicator 724 (visual). Interstice is dry.
165-01 (Lift Station) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Fill port has overfill prevention valve.
Has overfill alarm.
Has 2 electric dial gauges for fuel level, both read 1/2 full.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
03/22/21 02/04/20 03/22/24
182-01 (Building 182 Water Well) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
Inherently grounded to generator pannel
■ Corrosion recently painted over
None installed, 1-in. port available, plug severely corroded.
182-01 (Building 182 Water Well) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Corrosion recently painted over
Tank has overfill prevention valve.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/04/20 3/23/24
184-01 (Building 184 Lift Station) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
Needs contents. Fire diamond peeling. Replace soon.
Morrison leak indicator 724 (visual). Interstice was dry.
184-01 (Building 184 Lift Station) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Tank is equipped with overfill prevention valve and alarm
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/04/20 3/23/24
185-02 (Building 185 Lift Station) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
■ Bulge near EV's in center of tank.
Sign of previous standing water on top of tank, north end.
Probe wired to generator control panel.
185-02 (Building 185 Lift Station) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Tank is equipped with 2 overfill prevention valves. OPV in bucket has male threaded connection and no cam lock.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/04/20 3/23/24
186-01 (Building 186 Lift Station) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
Fire diamond starting to peel off. Needs contents.
Morrison leak indicator 724 (visual).
Water in interstice.
186-01 (Building 186 Lift Station) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Tank is equipped with overfill prevention valve and alarm
Debris (vegetation - pine needles) on top of belly tank. This moist material is in contact with metal. Remove regularly.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
03/22/21 02/04/20 03/22/24
188-02 ( Lift Station ) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
No fire diamond or No Smoking sign.
Interstice probe wired to generator control panel.
188-02 ( Lift Station ) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Level gauge installed
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
03/22/21 02/04/20 03/22/24
203-01 (Building 203 CBC/MWR/NMCI) NCBC Gulfport
NA
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
■ Some minor corrosion on tank top within housing.
Needs contents
2 each 4" (M) EV's not UL approved.
Alarm at generator control panel. Audible alarm works, however, red light is broken.
203-01 (Building 203 CBC/MWR/NMCI) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
03/22/21 02/04/20 03/22/24
217-01 (Building 217 MCOOC Warehouse) NCBC Gulfport
NA
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
■ Minor surface corrosion on tank.
2 each 3" (M) EV's not UL approved.
No sensor installed on basin drain. 1" port available.
217-01 (Building 217 MCOOC Warehouse) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
See #15
Tank has overfill prevention valve.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
03/22/21 02/04/20 03/22/24
241-01 (Building 241 NCG2) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
■ Minor corrosion. See comments.
None installed, 2" port available. Interstice had about 2 1/2" of water in interstice
241-01 (Building 241 NCG2) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
#6 - Spots of corrosion on north side (front). Also, corrosion spots on south side, and corrosion along roof line on all sides.
PVC plug (4-in.) was present in port on tank. Replace with metal plug.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/03/20 3/23/24
274-01 (Building 274 Public Works) NCBC Gulfport
N/A
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
■ Concrete containment system with locked drain valve.
None installed
■ Minor corrosion on tank top and vertical supports.
2" fill with 1 1/4" NV necked up to 2"
No leak sensor, 1" port available.
274-01 (Building 274 Public Works) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
� ���8��� □Yes □No □N/A �
20 �����
���������������8� □Yes □No □N/A �
21 $�������"
����8� □Yes □No □N/A �
Tank / Piping Release Detection
22 ���
���8�
□Yes □No □N/A �
23 �������
���8� □Yes □No □N/A �
Other Equipment
24 )������� �
��8� □Yes □No □N/A �
| �� | ���� | |
| ��� | ||
| ����� | �� | |
| ������ | ������ | |
| ��� | ||
| �������� | �� | ��� |
����8�
□Yes □No □N/A �
Tank not equipped with overfill prevention valve.
Double-wall tank inside concrete containment berm.
Inspection Guidance:
| � | ������������� | |
| �� | ||
| ��� | ����* | ��� |
| ����� | |||
| ���� | �� | ��� | ��� ��� |
��� �0�������
| ������ | &� | |
| ����� | � | ���� |
| ��������� �� | |
| �� ��������� | ���������' |
| ��1�)�%�++��%� |
| ��&�+�� | ���� |
| ���+��� | ���� |
| �������������� | ||
| ���� | �� | �� |
����-2�+$��../ 3����3��"�� � �� 4��5�������
| ���� | � |
| � | ��� |
| ����#� |
| � | �����'���' |
| ����� | ��� |
| ��� | ��������� |
�� �4� �� ������5�������
| �� | ��������� | ��������� |
| � | ������ | |
| ��� | ||
| � | �67���� | �� �� |
| �� +����� | �� | � |
�� �� ����'������� ���5���������� �� Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.�
Tank Foundation/Supports�
1 $�������
���� 8� □Yes □No �
2 +����� ��� ��8�
□Yes □No □N/A �
3/23/21 02/03/20 3/23/24
276-01 (Building 276 Haz Waste Storage) NCBC Gulfport
N/A
■ In asphalt parking lot
��8� □Yes □No □N/A �
4 ���'
| ��� | |
| ���� | ���� |
��������� ���������8� □Yes □No □N/A �
| 5 ��� | ��������� | |
| ���� | � | |
| ���� | '���� | ��� |
��8�
□Yes □No □N/A �
Tank Shell, Heads and Roof
6 $�������"
����8� □Yes □No �
7 $��������� ��8� □Yes □No �
8 $�������� ����������8� □Yes □No □N/A �
9 )��� ���8� □Yes □No �
Tank Manways, Piping, and Equipment
10 $�
| ������ | �� |
| �� | � |
��8� □Yes □No □N/A �
Tank Equipment
11 4��� ���8� □Yes □No �
12 4���
| ��"�� | ���� |
| ����� | �� |
�����"�� 8�
□Yes □No □N/A �
13 )����� ��8� □Yes □No □N/A �
� ����8��+����� �
| � | ����,����#� |
| ����� | � ��9�� |
| ��� | � |
| � | |
| �������� | �� |
�������5��� �
□Yes □No □N/A �
��8��)���' �8��)���
| � | 8������#� |
| ���� | �� |
��8:�
□Yes □No □N/A �
None installed
Tank labels are fading barely readable.
None installed, 2" port available. Open top diked tank in enclosure.
Interstice dry
276-01 (Building 276 Haz Waste Storage) NCBC Gulfport
��8�$����'��
| � | �����,� |
| �� | ��� |
| � | �� | |
| ������� | ����� | |
| ��� �+����� | ��� |
5� ;�1*�
;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()� ;=����;4�� ;4()�
17 )���� �
��8� □Yes □No □N/A �
Insulated Tanks
��8�
��8�
| ������� | �� | ��������' | |
| ��� | |||
| � | ��� |
��8�
□Yes □No □N/A �
19 �����
This is the start of the file's text. The full file is on GovTribe.