N6945022R0002_JL11_ GPI Responses_Amend0004.pdf
PDF 794 KB Posted
- Solicitation number
- N6945022R0002
About this file
This Request for Proposal (RFP) solicits Base Operations Support (BOS) services at Naval Construction Battalion Center (NCBC) Gulfport, Mississippi and outlying areas. The services include Facility Management, Facility Investment, Custodial, Grounds Maintenance and Landscaping, and Wastewater services at NCBC Gulfport, Lakeside Naval Support Facility, Pascagoula, Boat Operations Building, Pass Christian Harbor, Camp Keller Firing Range, Woolmarket, and Stennis Space Center. The RFP includes requirements for these Annexes/Sub-Annexes and associated attachments. Offerors must submit proposals by January 6th, 2023 for the award of a firm-fixed-price contract to begin on June 1, 2023. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6945022R0002 Gulfport BOS
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para.
11/5/2021
ELINs
Ref. Attachment J-0200000-14 ELINS for N-RW CLINs. Line X700- 702 references "Composite Labor Hours" - please define what the Government means in reference to these line items.
Composite labor hours are used to perform work that is to be defined upon issuing non-recurring work and therefore should be assumed to be an average of principle trades required in the recurring work portion of the contract.
11/5/2021
ElLINs
Ref. Attachment J-0200000-14 ELINS, N-RW CLINs. Lines X700- 703 referencs "Controls Specialist". There is no labor category in the CBA, SCA WDs or DBA WDs incorporated into the solicitation.
Please clarify this labor category.
The intent of Non-Recurring work ELINS X701 and X703, are for the contractor to pre-price labor for individuals who are qualified to perform Facility Related Control Systems (FRCS) service and construction work, respectively, that exceeds the scope of work specified in 1501000, spec item 3.1 and 1502000, spec item 3.2.7. ELINS X700 and X702 are intended to be used to price composite labor of all other trades except those who would be used to perform work under ELINS X701 and X703.
11/5/2021
ELINs
Ref. Attachment J-0200000-14 ELINS, N-RW CLINs. Is the offeror to insert unit prices based on their cost to provide the line item services, which will then be uploaded to FedMall for future ordering? Yes. Refer to Section H.2 of the RFP.
11/5/2021
ELINs
Ref. Attachment J-0200000-14 ELINS, N-RW CLINS. Are the prices for the listed services currently available in FedMall and are offerors expected to input those unit prices in the line items? If so, how are offerors without access to FedMall expected to obtain those prices?
No. The offeror is to propose their price for the work identified in the applicable ELIN.
Amend No.
REFERENCEQuestion No.
QUESTION GOVERNMENT RESPONSEDate Received
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/5/2021
ELINs
Ref. Attachment J-0200000-14 ELINS, N-RW CLINS. If offerors are to input unit prices based on the offeror's cost to provide the line item services, will there be an opportunity to update the pricing annually to conform to Wage Determination or CBA increases in wages?
Yes. Contractors will be entitled to update non-recurring ELINs for Wage Determination or CBA increases in wages.
11/5/2021
ELINs
Ref. J-0200000-14 ELINS, N-RW CLINS. Line items x721 and 722 reference "DoDeMal". Please confirm that the reference should be FedMall.
Yes they should reference FedMall. This will be corrected in an amendmendment. 0003
11/15/2021
2 100000 1.1
Under the Annexes listed in this paragraph, 1503020 Pest Control is listed as part of the requirement however, there is no reference to 1503020 in Section C, Section F, or Section J. Is 1503020 a part of this contract?
Sub-annex 1503020 Pest control is not included in this contract; this will be corrected in a forthcoming admendment. Herbicide requirements previously specified under pest control are now contained in Sub-annex 1503050 Grounds Maintenance and Landscaping. 0003
11/15/2021
ELINs A018
Under ELIN018 Sub-ELIN A018AG, A018AH, and A018AK there is no inventory listed in Attachment J-1502000-06 for Funding Activity EXWC. Please provide the inventory so offerors can determine manpower/costing for these sub-ELINs.
The NGIS boiler in B314 listed on Attachment J- 1502000-06-01 has been removed and is now provided in Attachment J-1502000-06-05. The EXWC boiler in B400 listed on Attachment J-1502000-06-01 has been removed and is now provided in Attachment J-1502000- 06-06. The table in Attachment J-1502000-06 has been updated accordingly. These changes will be provided in a forthcoming amendment. 0003
11/15/2021
J-1502000-04-05
In the inventory for Stennis Space Center, Kitchen Exhaust Hoods are included. Are there also grease traps associated with the kitchen facility? If so, is it the responsibility of the contractor to clean the grease traps? If so, What are the sizes of the grease traps and how often do they require pumping? Grease traps are not part of this contract.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/16/2021
18 C-020000 2.7.1.3
This paragraph states that the contractor must "Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO).
The paragraph goes on to state that the SSHO "shall have completed five years of satisfactory experience in preparing and enforcing safety programs ..."
Please clarify what is meant as "project site" in the context of this paragarph.
Also, please clarify what is meant as "Competent Person".
Competent person is defined in the USACE publication EM-385. Site refers to the location where work is being performed including but not limited to NCBC Gulfport, Lakeside Barracks, Stennis Space Center, Woolmarket Range, and the Boat Operations Basin.
11/18/2021 1 RFP 1
To support the small business's proposing on this opportunity and in light of ongoing events as a result of COVID and the holiday season, will the Government extend the due date of this opportunity to January 15th or after?
The proposal due date has been extended to Thursday, January 6th. 0003
11/18/2021 66 & 70 L.2 & L.14 2
Will the Government allow for softcopy/digital submittals, in lieu of hardcopy proposal files, reducing the need for additional travel or shipping, and reducing any risk associated with COVID and multiple parties handling these documents?
The requirement remains unchanged. Hard copy proposals are required.
11/18/2021 N/A N/A N/A
Given the secure nature of the various work locations and in an effort to ensure the Government receives the highest overall value, will the Government provide a listing of current and approved vendors and/or subcontractors supporting this program with base access?
All current vendors and/or subcontractors supporting this program are managed by the BOS Contractor. This information will not be provided by the Government.
11/18/2021
40 C
2.14.1 - Recurring Work Preparation of
Proposals
Please verify that contractors shall price additions or deletions to the Recurring Work requirements post award using the unit prices bid for Non-Recurring Work Unit Priced Tasks (UPTs).
That's correct.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021
40 C
2.14.1 - Recurring Work Preparation of
Proposals
We recommend adding separate ELINs for contractors to provide unit prices for pricing additions and deletions to the recurring work requirements post award. For example, if a building is added to the contract that requires recurring custodial services, it would be easier for contractors to provide a unit price for the various COLs related to custodial services.
The ELIN structure remains unchanged.
11/18/2021
Mississippi sales tax levies a 3.5% contractor's tax on all construction, renovation or repair of non-residential, real property when the total contract price or compensation received exceeds $10,000. If the contract exceeds $75,000 in scope or if the contractor is from another state, the contractors tax must be paid before work begins. Please confirm this applies to all Recurring and Non-recurring work for this contract.
Yes, this applies to all Recurring and Non-Recurring work related to construction.
11/18/2021
I - Contract
Clauses Is 52.223-99, Ensuring Adequate COVID-19 Protocols for Federal Contractors applicable to this RFP?
DFARS 252.223-7999 Ensuring Adequate COVID-19 Protocols for Federal Contractors is included in the soliciation. However, due to the recent preliminary injunction addressed in Class Deviation 2021-O0009 Revision 2, this clause will be removed in a forthcoming amendment. 0004
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021
65 C
3.2.8 - Micro-grid Power Generation
Please verify that the micro-grid system is currently maintained under a separate contract from the BOS contract.
As stated in Section C, Annex 1502000, Spec Item 3.2.8, "The micro-grid system is presently maintained by Mississippi Power under a separate contract." The maintenance of the system was incidental to the warranty period following construction provided as part of an agreement for allowing MS Power to construct Solar Fields in Gulfport and Meridian, MS.
The government intends to continue maintenance under a follow-on MS Power or alternate contract until the new BOS contract has been awarded. At that time the BOS contractor will assume maintenance responsibilities for the MicroGrid system.
11/18/2021
64 C
3.2.7 - Facility Related Control Systems (FRCS) Is this a new requirement to the existing contract?
This work was previously covered under DDC requirements, but has been revised to incorporate additional cybersecurity, maintenance and operations requirements.
11/18/2021
J-0200000-
14_ELINS
Sub-Annex 1503050- Grounds Maintenance and Landscaping
Will the Government provide an ELIN/Sub-ELIN for Grounds Maintenance Service Orders unit price per Spec Item 3.4 in Section C?
There are no Grounds Maintenance Service Orders under this contract. Section C will be amended to delete this spec item. These services are covered under the non-recurring work ELINS. 0003
11/18/2021 J-1503010-07
Custodial Inventory
Work Areas column What is considered "All Admin Areas"?
A definition of all admin areas is provided at the bottom of the table in Attachment J-1503010-07.
Square footage listed in the J table coincides with these areas.
11/18/2021 J-1503010-07
Custodial Inventory
Work Areas column
What is the difference between "Entire Bldg" and "All Admin Areas"?
A definition of all admin areas is provided at the bottom of the table in Attachment J-1503010-07.
Square footage listed in the J table coincides with these areas.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021 ELINs A001 -
A018
Please provide total square feet as well as cleanable square feet for each building associated with this solicitation which either require facility investment or custodial services.
Applicable square footage for custodial is provided in the custodial inventory J-1503010-07. Facility Investment requirements are provided in the Section J inventories attachment.
11/18/2021
Section J-503050-
The maps provided in J-1503050-04 only identify mowing requirements by acreage. We respectfully request that the Government provide more detailed grounds and landscaping workload data to include items that mirror the actions found in the referenced attachment to include but not limited to linear footage for edging, quantity and size of xeriscape areas, quantity and size of plant beds, quantity of shrubs and hedges and quantity of ornamental trees.
Offerors should propose based on the maps and inventories provided.
11/18/2021
Section C- 0100000 1.7
The paragraph states that "all facilities, systems and assets identified in this contract shall be accepted by the contractor in “AS-IS” condition. The contractor is fully responsible for all work up to and including the limits of liabilities specified”. How can any offeror other than the incumbent prepare an equitable proposal without know what the condition of systems are? Non-recurring work has a limit of liability of $2500 in direct material cost. Not knowing the status of systems puts offerors at a decided disadvantage while at the same time potentially allows the incumbent the ability to withhold repairs in order to save money. Respectfully request that repairs determined during a change on contractor allows for the incoming contractor to bill for work performed.
This is a firm-fixed-price contract and offerors should propose based on the specifications and relevant supporting attachements in the solicitation. Service order detail in attachment J-1502000-03-01 provides historical examples of types and durations of previous work; however, it may not be indicative of future work which is unknown at this time. The stated requirement does not change the Service Order LOL. The Contractor must use the information provided to perform their own risk assessment. All systems and equipment in need of operation and maintenance are in operating condition with install date listed in Section J inventory where applicable or available.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021
Section C- 0200000 2.3.2
How much new equipment is anticipated that may result in the training of contractor personnel? Should contractor personnel be taken off-line to train, there will be a required replacement necessary to keep up with work requirements.
Offerors should anticipate up to 2 training events per year not to exceed 4 hours each. The contractor is required to perform all requirements of the contract during each period of performance.
11/18/2021
Section C- 0200000 2.3.3.2
Please identify what “The Charter” partnership agreement includes.
The contents of the partnership agreement will be determined by the Government and contractor attendees during the partnering sessions.
11/18/2021
Section C- 0200000 2.4.2
The third paragraph states that Janitorial and refuse collection services for the facilities shall be provided by the contractor.
Does the contractor have to establish their own refuse collection agreement with a trash company to accommodate their offices?
Yes. This is a performance-based contract. Unless specifically stated, the contractor is responsible for determining means and methods for performance of all contract requirements.
11/18/2021
Section C- 0200000 2.4.4
Please clarify what exactly the contractor needs to provide to accommodate the statement that says" Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electrical lines"
If water or electrical service is required at a worksite location where outlets do not currently exist, the contractor shall provide and maintain, at its expense.
11/18/2021
Section C- 0200000 2.6.11
The paragraph references placing new bar codes on newly installed or replaced equipment. Is there Government furnished bar code equipment as we do not see any listed?
The Government will provide the bar codes, the Contractor will need to coordinate with the Government at the time of equipment installation
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021
Section C- 0200000 2.9.5
The second paragraph states that “written documentation of the last weight test of the crane and all related weight handling equipment shall be maintained on site.” This reads as if the contractor is responsible for owning a crane. If this was a rental unit, there is no guarantee that the same machine would be provided each time one was sent thereby not allowing for any continuity regarding the weight test paperwork. Please clarify.
Means and methods are at the contractor's descretion.
If a crane is required for performance of work under this contract, the contractor must have on site the specified documentation.
11/18/2021
Section C- 1502000 1.1
The building systems (including FRCS) section of this paragraph includes fire protection however, we do not see any fire protection equipment listed in the Section J Inventories Listings.
Are the fire alarm systems a part of this contract?
Fire Protection systems are not a part of this contract.
This will be corrected in a forthcoming admendment. 0003
11/18/2021
Section C- 1502000 2.3.2
Are there any Buildings and/or facilities that are designated as historical sites?
There are no historical facilities or sites on NCBC Gulfport or its Special Areas that are the responsibility of the Navy or in this contract.
11/18/2021
Section C- 1502000 3.2
Please clarify the difference between recurring work and preventative maintenance as they have different levels of liabilities.
Preventive maintenance is a subset of recurring work as are service orders. The limits of liability for PM actions are listed in Sub-Annex 1502000, Spec Item 3.2 whereas the limits of liability for service orders are listed in 1502000, Spec Item 3.1 service orders. In each case, the contractor is responsible for work up to the specified limits of liability under the applicable recurring work portion of the contract. Work above the specified limits of liability may be issued as non-recurring work with credit provided to the government up to the applicable limit of liability.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021
Section C- 1502000 3.1
This paragraph states that both recurring and non-recurring work have a liability limit of 32 direct hours or $2500. The examples that follow read as if the liability limit should be “32 direct hours and $2500” as both numbers come into play regarding a possible task order. Please clarify.
The answer is "or" as written in the spec. Either condition will trigger exceeding the limit of liability.
The examples were provided to illustrate each of these cases. If non-recurring work is issued to complete the task, credit will be given for both labor hours and material as applicable to the specific maintenance action.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021
Section C- 1502000 3.2.1
The paragraph states: “Once per year the Contract shall clean diffusers, grills, registers and other associated equipment as part of the PM program.” We do not see a listing that provide the associated quantities. Please clarify.
The contactor should assume that systems are installed per applicable building codes and quantities required.
Diffusers are not individually listed but are included in the inventory description in attachment J-1502000-04 as follows. "The major components of each HVAC and Refrigeration System are provided below as a basis of estimate. As part of the FFP the Contractor shall develop and implement a PM for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the HVAC and Refrigeration Systems such as: compressors, condensers, evaporators, direct digital controls (DDC), reheat piping for Humidity control, conduits, starters, heaters, contacts, timing devices, relays, switches, control panels, thermostats, dehumidification systems, fuses, discs, sensors, filters, dryers, strainers, dampers, blowers, chillers, cooling towers, air handlers, ducts, registers, intakes, returns, distribution systems, fan motors, piping, valves, insulation, refrigeration boxes, monitoring and control systems, electrical disconnects, reheat pumps, covers, guards, sending units, tubing actuators, fittings, regulators, master and submaster controllers, etc."
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021
Section C- 1502000 3.2.3
The paragraph states “Inspection dates listed on Attachment J- 1502000-07 Inventory are the latest annual inspection dates.”
However, the last inspection dates listed in the document for all VTE show 6/20/2019 virtually 2.5 years ago. Please clarify either an error in the reported dates and/or a failure to comply with the PWS requirements.
The most recent certification of all elevators is June 2021, except the one at the BOB which is under repair.
The inspection dates have been updated in the attachment. 0003
11/18/2021
Section C- 1502000 3.2.3
The information provided in Attachment J-1502000-07 is insufficient to accurately price the required work. Please provide whether these systems are electric or hydraulic.
All VTE with the exception of wheelchair lifts at Buildings 446 and 60, and the Dumbwaiter at Building 314 are Hydraulic.
11/18/2021
Section C- 1502000 3.2.8
As this is a new requirement we respectfully request that the Government provide a copy of the PWS that Mississippi Power is working with in order to allow offerors a better understanding of what is involved with this type of system.
The contractor shall develop an independent maintenance plan based on OEM requirements for the components listed in Section J technical attachment J- 1502000-12.
11/18/2021
Section C- 1502000 3.3.2
This paragraph is somewhat confusing as it states that "the Contractor shall perform all inspections and tests for certification in the presence of a Government provided inspector." Are we correct that this does not prevent the contractor from having to have a certified/licensed elevator technician in place to perform the work. The second paragraph also makes it appear that the Government determines when this work is done. Please clarify.
The contractor shall ensure that all training and licensing requirements for all work requirements are met. Inspections and tests required for VTE certification shall be scheduled with the Government.
11/18/2021
Section C- 1502000 3.3.2
This section does not appear as detailed as paragraph 3.2.3.
Which section prevails?
Spec Item 3.2.3 details the preventive maintenance requirements for VTE, whereas Spec Item 3.3.2 details requirements for inspection, testing and certification of VTE. Both spec items are applicable.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/18/2021
Section C- 1503050
Request that the Government provide topographical maps that show the contours of the areas to be mowed around drainage easements and/or ponds and lakes as these areas may require specialized equipment.
The maps provided in the solicitation are the only ones that will be provided. Offerors are free at their own discretion to use any information that may be available from other sources such as USGS grid maps.
11/18/2021
Section C- 1503050 2.3.4
This paragraph states that “Use of powered equipment is prohibited in operational areas listed on Site Maps provided in J- 1503050-04.” We do not see on the referenced maps where these areas are identified. Please clarify.
Refer to the key or legend on the maps provided to determine operational areas.
11/18/2021
Section C- 1503050 3.2.2
The paragraph states that “The Contractor shall maintain a 30 feet clear zone on the inside of the fencing and where existing maintain a 20 feet clear zone on the outside of the fencing.” Can growth inhibitors be used to control the rate of growth within these areas?
Means and methods are at the contractor's descretion.
Any herbicide use must comply with the requirements stipulated in sub-annex 1503050.
45 11/18/2021 1 1 1
Will the Government provide a 30 day extension to allow bidders appropriate time to develop their solutions and provide accurate pricing to the high level of dtail required by this solicitation? Refer to GPI #11.
11/19/2021 N/A N/A N/A
Can additional time or another opportunity be provided to submit questions? Since the site visit concluded on 11/17/21 and the questions are due on 11/19/21, the government has not provided enough time to properly go over the mutliple files, site visit notes to develop questions that will clarify issues concerning the bid.
An extenstion was granted in Amendment 0002.
11/19/2021 N/A N/A N/A
Can the contractor store equipment (lawnmowers, blowers, supplies, etc) at the large storage shed (Bldg Z) located at the Lakeside property.?
There are no Government furnished facilities at Lakeside.
11/19/2021 N/A 3.2.8 150200-C N/A Is the contractor's limit of liability, per battery, or does the government intend to apply a single limit of liability for instances where multiple batteries require replacement?
The limit of liability appies individually to each PM action.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021 N/A N/A N/A What is the average occupancy rate at Lakeside on a monthly basis?
Lakeside has 458 beds and the occupancy varies widely based on the ship building schedule, there are normally at least 40 personnel residing at Lakeside, the average is roughly 230 personnel, but the facility can at times be completely full.
11/19/2021 N/A N/A N/A What are the current COL standard per location for grounds on the current contract?
The grounds maps provided in Section J provide the COL standards by area for this solicitation. They may vary in some instances from the current requirements, therefore the current COL levels will not be provided.
11/19/2021 N/A Sec C- 1503010 3.1.1.2 Please clarify that the contractor is responsible for having a third party service provider pick-up and remove recycling from exterior collection sites and moved to an offsite recycling center.
Contractor is responsible for removing recycled material from central collection areas within the facilities and placing the material in designated recycling dumpsters
11/19/2021 N/A ELIN Sheet and J-
1503050-04 Stennis Site Map
N/A
On Row 80 of the ELIN worksheet, grounds maintenance and landscaping for improved grounds is required at the WARCOM Range (Stennis Space Center). When you look at the Stennis Site Map, there in no reference made to theWARCOM Range. In addition, I beleive the WARCOM range is not even shown on the map.
The small arms range is not part of the grounds maintenance requirement in this contract. The ELINS have been revised from WARCOM Range to NSWC to align with the Stennis Site Map. 0003
11/19/2021 N/A J-1503050-04 Stennis Map
On the Stennis Site Map Legend, it show a light green color titled Lawn Care (COL 2) - 2 acres. But if you look at the map, the light green color is a lot more than 2 acres. Does the map and legend need to be corrected and reissued?
The Stennis Site Map Legend Acreage has been revised from 2 to 8.56 acrees and will be included in a forthcoming amendment. 0003
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021 10 Section C - 0200000
2.7.1.3
Per this section it states, "Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan ". Is there a requirment to provide a on-site SSHO at every outlying location associated with this contract? Or is having one (1) on-site SSHO on this contract sufficient?
The contractor is required to provide a single SSHO for the contract. Additionally, the contractor is required to have the SSHO or a competent person acting on his or her behalf on each site when work is being performed.
11/19/2021 48 Section C - 1501000
3.1 Does the current FRCS system(s) have dedicated laptop computers for monitoring and troubleshooting? If so, are they government owned or provided by the current contractor?
The contractor shall provide the required laptops.
11/19/2021 48 Section C - 1501000
3.1
If the current contractor is providing laptops to monitor the FRCS systems, will they remain in place if the contract is awarded to someone else? Leaving the current laptops in place makes sense since they have already meet all American Act and government cybersecurity requirements.
The contractor shall provide the required laptops.
11/19/2021
Attch J-200000-
17-2 FRCS
Cybersecurity R&R
Within this document colums C & D have the letters "S" and "L" in them. What do those letters mean? No legend was provided.
The letter "L" denotes Lead responsibility and "S" denotes supporting role. Attachment J-0200000-17-2 has been revised to include a key and will be provided in a forthcoming amendment. 0003
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021 79 of 83 RFQ M.3
Can the government please provide more guidance than what is provided in the RFQ for what is required in the BOE? Besides Attachment JL-1 Labor Hours worksheet, we are unclear what is to be provided in the BOE narrative. The JL-1 worksheet lays out all labor hours by ELIN and tech specification. We are unclear what further information is required. On past NAVFAC bids, only the JL-1 Labor Hours worksheet was required.
Section M, Factor 2, Solicitiation Submittal Requirements, part b, paragraphs 2 and 3 provide detailed information regarding the BOE narrative.
11/19/2021
J-1502000-06-03
Statement: The title of the attachment is BOILER AND UPV INVENTORY AND CERTIFICATION DATES (STENNIS & BOB). There is no ELIN for boilers and unfired Pressure vessels for Stennis Space Center, Stennis, MS (NAVO BOB).
Question: Are we to cost the work for this equipment in ALIN A007AE and A007AH?
There are no Boiler and UPV requirements at NAVO BOB. The Boiler Inventory Title has been revised to reflect this correction and will be provided in a forthcoming amendment. 0003
11/19/2021
J-1502000-06-04
Statement: The title of the attachment is BOILER AND UPV INVENTORY AND CERTIFICATION DATES (BUMED). There is no ELIN identified at specifically for BUMED.
Question: Under which ELIN(s) should this equipment be priced?
Navy BUMED requirements are now listed as Defense Health Agency (DHA). The invetory Title has been revised to reflect this change and will be provided in a forthcoming amendment. 0003
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021
J-1502000-04
Statement: Note 1 at the bottom of the sheet states, “Note 1:
The assets highlighted in green are shown for inventory purposes and/or are dummy assets that control the PM schedules on other assets, but do not require PM's of their own.” There is also a cell to the left of the note that is highlighted in green. There are two equipment lines that are highlighted in the same color green and several other lines highlighted in a different shade of green. In addition, there are several lines highlighted in yellow.
Questions: Are we to exclude all equipment highlighted in any color green from the pricing according to the note? Does the yellow highlight have some significance that could affect pricing?
All equipment highlighted in green is to be excluded.
The inventory has been revised to make the shading consistent. Yellow denotes changes from previous versions and has been removed. These changes will be provided in a forthcoming amendment. 0003
11/19/2021
48 C
3.1 How many existing devices are in alarms are programmed into the BAS?
The are currently no alarms recorded or present in the BAS. Note, the information provided is a snapshot taken on 30 Nov 2021, and these numbers may vary from day to day.
11/19/2021
48 C 3.1
How many devices are in manual or forced override?
41 devices in manual override. The information provided is a snapshot taken on 30 Nov 2021, and these numbers will vary.
11/19/2021
48 C
3.1
How many devices have communication loss?
Comm issues 645 out of 2669 devices. Note this number is due primarily to onging network repairs and is anticipated to drop significantly when contracted repairs are complete. The information provided is a snapshot taken on 30 Nov 2021, and these numbers will vary.
11/19/2021
C-1503050 and J-
020000-14 ELINS
3.4 Section C -1503050 Grounds Maintenance and Landscaping refers to Spec Item 3.4 Grounds Maintenance Service Orders.
There does not appear to be a place to price grounds maintenance service Orders
There are no Grounds Maintenance Service Orders under this contract. Section C will be amended to delete this spec item. These services are covered under the non-recurring work ELINS. 0003
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021
97 of
J-1503010 Custodial Inventory, Stennis Space Center and
Building 2608 Will the government please provide the estimated days when beds are to be made when classes are being held?
Historically, bedding has been changed and beds made on Thursdays when classes are in session, approximately 290 days per year. Please note that per the PWS, various sections, historical data and supporting information provided is intended to illustrate the volume and examples of work that has been performed in the past and is not to be construed as a limiting factor to services performed in the future.
11/19/2021
57 3.1
Section C, 1502000: The requirement lists a liability limit of 32 labor hours OR $2,500 material, but the 3 examples use 32 labor hours AND $2,500 material. Does the liability limit apply to 32 labor hours OR $2,500 material, or does the liability limit apply to 32 labor hours AND $2,500 material?
The limit of liability is 32 direct labor hours OR $2,500 in direct material cost. The examples are intended to show the application in each case.
11/19/2021
General Is there a laydown/storage area area for equipment? If so, where is it located?
There is a fenced area adjacent to B273 of approximately 290 SY and another adjacent to B275 of approximately 330 SY that may be made available for contractor use upon request.
11/19/2021
General Has the current Solicitation changed signifigntly from the current contract? If so, please describe the differences.
There have been changes to the requirements. A comparison of the requirements of this solicitation with the incumbent contract will not be provided. This is a performance-based contract. Offerors are responsible for proposing based on the current solicitation requirements.
11/19/2021
70 L.14 b.1.d Does the FAR/DFAR report need to be submitted with the proposal?
No. Only clauses that are applicable to this solicition that deviate or are not included in your SAM FAR/DFAR report need to be submitted.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021 51 1.1
PWS states KTR perform maintenance, repair, alteration, demolition & minor construction for the following: Roofing: does this include inspections of roofs & davits? If so, please provide last annual & 5-year roof inspection reports. Please provide annual third-party inspection for davits? Please provide number of davits [anchors] for each building; type & whether they are attached to roof or to a wall? What are the existing warranties?
The contractor is not responsible for roof maintenance or inspections, but may be issued a Task Order for repairs
11/19/2021 63 3.2.6 Please provide the date of the last 5-year inspection for each above ground storage tank? Please provide the last 5-year inspection reports for each above ground storage tank?
Last tank inspection was March 22 -25 2021. Refer to J- 150211-05 and 04 for the latesed inspection report.
See new attachments J-1502000-06-05 (NGIS) and J-
1502000-06-06 (EXWC). 0003
11/19/2021 65 3.2.8
The PWS states Contractor shall develop a preventive maintenance schedule and perform preventive maintenance on the Micro-Grid System. However, it then states the micro-grid system is presently maintained by Mississippi Power under a separate contract.
For clarification, what are the responsibilities of the Contractor to maintain the Micro-Grid System under this contract. The RFP states Mississippi Power has the responsibility to maintain the Micro-Grid system. What responsibilities does Mississippi Power have under this separate contract? Is the Contractor responsible for cleaning the Micro-Grid system. If so, how offten?
As stated in Section C, Annex 1502000, Spec Item 3.2.8, "The micro-grid system is presently maintained by Mississippi Power under a separate contract." The maintenance of the system was incidental to the warranty period following construction provided as an in kind service for allowing MS Power to construct Solar Fields in Gulfport and Meridian, MS. The government intends to continue maintenance under a follow-on MS Power or alternate contract until the new BOS contract has been awarded. At that time the BOS contractor will assume maintenance responsibilities and be required to maintain the equipment in the inventory provided in J-1502000-12 in accordance with OEM standards.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021 103 1.1
Is the Contractor responsible for disposal of waste offsite after cleaning of sewer lift stations? Or does the Contractor drop off waste at collection points onsite for Government disposal? If the contractor is responsible for disposal offsite, what is the monthly and/or yearly amount of estimated disposal (lbs or tons)?
Liquids removed prior to cleaning are released into the last manhole in the Navy system prior to the waste flowing into the City of Gulfport system. Any solids, specifically those from the cleaning process must be taken to an offsite disposal facility.
11/19/2021 76 3.1.1.2 Please provide attachment J-1503010-08 that lists the collection sites? Also, please provide the average monthly weight of each?
J-1503010-08 is provided in attachment N6945022R0002_SectionJ. The Government does not maintain average monthly weights at the collection site level; therefore this information cannot be provided.
11/19/2021 95 3.1.1.4 Is the irrigation system hooked directly to the city/county water?
Or is it a secondary storage tank? Is irrigation maintenance a part of this contract?
There is no installed irrigation system. This requirement pertains to any temporary irrigation that the contractor may need to perform.
11/19/2021 81 3.1.3
PWS states the Contractor shall inform the KO when dispensers, fixtures, and drinking fountains are damaged or missing. Will the Government replace or reimburse the Contractor for these identified damaged items?
The contractor is responsible notifying the KO and replacement fixtures may be ordered under a non-recurring work task order.
11/19/2021 93 3.1
Grounds:
1) Are parking lots included in the Common Output Levels at each site?
2) For clarification, berms are not included in the COLs at Woolmarket. Correct?
1) Grounds maintenance maps do not include any parking lots
2) The areas shown in green and identified in the legend as "COL 3 Fields" on attachment J-1503050-04- 04 Woolmarket Site Map are the only areas to be maintained at Woolmarket. Specifically, note there are two small triangular areas shown in green (as specified in the Map legend) in the corners of Bay 3 on the berms that are to be maintained under this contract.
11/19/2021 22 2.8.7
Are locksmiths required to have or obtain a DoD security clearance? If so, what level?
Yes, the security requirements will be added in the next amendment. 0003
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021 65 3.2.8
Referring to Micro Grid Power Generation System: Please clarify if the cleaning of Solar Panels is a part of Contractors resonsibility? If so, please provide quantities and current frequency per 12 months
The Solar Panels are not owned or maintained by the Government and are not a part of this contract.
11/19/2021 65 3.2.8 “The micro-grid system is presently maintained by Mississippi Power under a separate contract.” Please provide the contract number and contract value.
NAVFAC SE is currently in the process of issuing a short-term maintenance contract to cover the period between the expiration of the existing agreement/contract with MS Power and award/performance start of the new BOS contract.
The initial maintenance of the system was incidental to the warranty period following construction provided as an in kind service for allowing MS Power to construct Solar Fields in Gulfport and Meridian, MS. The government intends to continue maintenance under a follow-on MS Power or alternate contract until the new BOS contract has been awarded. At that time the BOS contractor will assume maintenance responsibilities for the MicroGrid system.
11/19/2021 N/A N/A
We respectfully request a 30-day extension to the proposal due date to permit all Contractors to enhance our solutions from a very well designed Gulfport Site Visit. This extension will give the USG more time to research and respond to industry questions and allow Contractors to integrate your responses into our proposals. Considering that we are all basically working remote due to the pandemic, it has been also a challenge getting the proposal team and teammates all in concert. The extension will also allow both the USG and all Contractors to have some precious time with families over the upcoming Holidays.
Refer to GPI #11.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021 3.1
Facility Related Control Systems (FRCS). How many laptop computers is the contractor required to provide? Please provide laptop specifications.
The contractor is required to provide laptops per the
PWS.
11/19/2021 3.1 Facility Related Control Systems (FRCS). Does the Government pay for software licenses associated with the FRCS systems?
The BOS contractor is responsible for costs associated with new software licenses. It is the Government's responsibility to ensure software is up-to-date on the date that the systyem is transfered to the BOS contractor. From that point forward the BOS contractor is responsible for maintenance which includes future software updates.
11/19/2021
N6945022R0002 _J-1502000-03-
01_Service+Orde r+Detail
Please provide hours per call. This should be available as a simple add to the report in Maximo.
The information requested is not available. The historical information provided is the most up to date information available to the Government at the time of contract solicitation. Any available updated information that becomes available will be provided in a future amendment. The Contractor must use the information provided to perform their own risk assessment. Historical data and supporting information provided is intended to illustrate the volume and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021
N6945022R0002 _J-1502000-03-
01_Service+Orde r+Detail
Please provide material cost per call. This should be available as a simple add to the report in Maximo.
The information requested is not available. The historical information provided is the most up to date information available to the Government at the time of contract solicitation. Any available updated Information that becomes available will be provided in a future amendment. The Contractor must use the information provided to perform their own risk assessment. Historical data and supporting information provided is intended to illustrate the volume and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.
11/19/2021 J-1503050- 04-01 & 02 N/A N/A
Do areas classified as "Bunkers" on each of these two site maps require grounds maintenance to be performed? If so, what Common Output Level Standard should be applied at each area?
Bunkers are listed as operational areas at the COL levels provided on the corresponding map and J-tables.
11/19/2021 106 of
J - 1503050-01 Definitions and Acronyms Irrigation System
Are there any existing automatic irrigation systems in place at each location included in this bid? If so, please provide a list of total irrigation controllers, valves or zones, etc. broken out by each site.
There is no installed irrigation system. This requirement pertains to any temporary irrigation that the contractor may need to perform.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021
108 of
J - 1503050-03 Common Output Level Standards
(COLS)
3.1.1.1 Mowing
& Trimming
Frequency is listed as "Once in 14 Days" for each of the categories. Can a specific number of services be provided for consistency in bidding? I.e. should each contract bid 26 visits per year? More? Less? It is further stated that the growing season is typically March through November and that, at minimum, the contract shall service at the frequency specified during these months. This would bring the total services visits to approximately 20 vists per year. Please clarify. Also, will any service visits above and beyond those specified by the answer to this question be provided as a separate work order item?
This is a performance-based contract. Unless specifically stated, the contractor is responsible for determining means and methods for performance of all contract requirements to meet the applicable performance standards. In this instance the minimum frequency is once every 14 days.
11/19/2021 108 of
J - 1503050-03 Common Output Level Standards
(COLS) N/A
Please clarify the meaning of the abbreviations as listed on this pages. Abbreviations are "A", "M", "Q" and "SA". Are these to be translated to "Annually (1x)", "Monthly (12x)", "Quarterly (4x)" and "Semi-Annually (2x)"? Or other?
Attachment J-0200000-01, page 4 defines the Frequencies of Service.
11/19/2021
91 of
C - 1503050 Grounds Maintenance and Landscaping 2.3.4 Equipment
It is stated here that the "Use of powered equipment is prohibited in operational areas listed on Site Maps provided in J- 1503050-04.". If grounds maintenance is required in these areas, will all powered equipment be prohibited or only fuel powered?
Would battery powered equipment be allowed? If no powered equipment will be allowed of any kind, can information be provided as to how the grounds maintenance is currently provided in these areas so that each contractor can plan to maintain these areas appropriately.
The use of powered equipment refers to motorized equipment that would potentially rut or damage the earth covering of magazines. Gas powered or battery powered weedeaters are acceptable alternatives and have both been used historically.
11/19/2021 94 of
C - 1503050 Grounds Maintenance and Landscaping
3.1 Improved
Grounds
It is stated here that the fertilizer type shall be determined by soil analysis tests performed by the Contractor. How many times per year will soil tests be required at each location? Also, how many separate soil tests will need to be perofrmed at each location?
Unless specifically stated, means and methods are at the contractor's descretion. This is a performance based solicitation. The contractor is responsible for meeting the specified performance objectives and standards.
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021 99 of
C - 1503050 Grounds Maintenance and Landscaping
3.4 Grounds
Maintenance Service Orders
On average, how many service orders for grounds maintenance services are expected on an annual basis at each individual location?
There are no Grounds Maintenance Service Orders under this contract. Section C will be amended to delete this spec item. These services are covered under the non-recurring work ELINS. 0003
11/19/2021 108 of
J - 1503050-03 Common Output Level Standards
(COLS)
3.1.1.3 Lawn
Services
Top Dress - What depth should top dressing be provided for?
Also, what type of sand should be used. Over Seed - What application rate should the over seed be applied at? Also, what type of seed should be used for over seeding?
Standard industry practices should be used in order to meet the specified performance standards. The only exception being that Installation Design Standards call for the use of Common Bermuda seed.
11/19/2021
97 of
C - 1503050 Grounds Maintenance and Landscaping
3.1.7 Vegetation
Control
It is stated here that "fence lines, fence fabric, brick, walls, curbs, gutters, aggregate areas, and paved surfaces including parking lots are free of all vegetation.". When referencing the site maps, none of the paved areas are highlighted as areas to be included in grounds maintenance. Please confirm whether all parkings lots and hard surfaces must receive weed control as stated above though they are not highlighted on the maps.
Only those areas indicated on the Grounds Maintenance maps are to be included
11/19/2021
97 of
C - 1503050 Grounds Maintenance and Landscaping
3.1.7 Vegetation
Control
In conjunction with the above question, will gravel areas along the various railroad tracks need to be maintained for weed control as well? It was noted at the site visit that the railroad tracks do not appear to have been maintained in some time.
There are also no specific sections within the bid documents that refer to the railroad tracks. Is any grounds maintenance service to be provided for railroad tracks at all?
The railroad tracks are herbicided by in-house Government workforce and are not a part of this contract.
11/19/2021
CLIN
0001 - Base RW Tab
J-0200000-
14_ELINS
Row 48 & 49 - Navy Exchange
(NEX)
Accoridng to this page, there will be no grounds maintenance provided at the NEX station. Please confirm this to be true. It was noted at the site visit that there are areas of mowing and bed maintenance that exist at this location but no line item for pricing of these services at this location.
Grounds maintenance in the vicinity of the NEX gas station is paid for by CNRSE, please refer to the legend on the Grounds Maintenance maps
GOVERNMENT PRE AWARD INQUIRY FORM
Page Section Para. No.No.
QUESTION GOVERNMENT RESPONSEDate Received
11/19/2021
99 of
C - 1503050 Grounds Maintenance and Landscaping
3.3 Storm
Drainage Systems
Is grounds maintenance services to be provided along all concrete storm ditches or only at inlets or drains? It was noted at the site visit that many of these ditches are fairly overgrown along the lengths of the total ditch and that maintenance may only exist for inlets, entrances, exits, etc.
Sub-annex 1503050, Spec Item 3.3 describes the storm drainage systems, and associated maintenance requirements and performance standards.
This is the start of the file's text. The full file is on GovTribe.