N6945022R0002_J-0200000-14_ELINs_Amend0006.xlsx
XLSX spreadsheet 600 KB Posted
- Solicitation number
- N6945022R0002
About this file
This is a request for proposal for base operations support services at Naval Construction Battalion Center Gulfport, Mississippi and surrounding areas. The solicitation seeks services for facility management, facility investment, custodial, grounds maintenance and landscaping, and wastewater management across multiple annexes and sub-annexes. Services include facility-related control systems, locksmithing, emergency/urgent/routine service orders, HVAC, boilers, vertical transportation, automatic doors, fuel systems, tanks, microgrids, water testing and treatment, and more. The contractor must provide labor, materials, and equipment to complete both recurring and non-recurring work. Non-recurring work unit prices cover tasks such as cleaning, landscaping, tree/shrub removal and planting, sodding, fencing installation and removal. The period of performance consists of a base year plus four option years. The Navy is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 - Base RW
| Attachment J-0200000-14 | |
| Exhibit Line Item Numbers | |
| Solicitation No: N69450-22-R-0002 | |
| Amendment 6 | |
| Recurring Work Price - Base Period | |
| Line Item 0001 | |
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |
| ELINs A001 through A018 |
| Funding Activity | Sub-Annex Name | Sub-Annex | ELIN | Sub-ELIN | Spec Item | Service Description | Quantity | Unit | Unit Price | Total Price |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Management | 1501000 | A001 | A001AA | 3.1 | Facility Related Control Systems (FRCS) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1501000 | A001 | A001AB | 3.2 | Locksmith Management Services | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AC | 3.1.1 | Emergency Service Orders | 53 | EA | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AD | 3.1.2 | Urgent Service Orders | 1,082 | EA | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AE | 3.1.3 | Routine Service Orders | 139 | EA | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AF | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AG | 3.2.2 | Boilers and Unfired Pressure Vessels (UPVs) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AH | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AJ | 3.2.4 | Automatic Door Systems | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AK | 3.2.5 | NEX Fuel System Maintenance | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AL | 3.2.6 | Tank Maint and Repair | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AM | 3.2.7 | Facility Related Control Systems (FRCS) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AN | 3.2.8 | Micro-Grid | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AP | 3.3.1 | Boilers and UPVs | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AQ | 3.3.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AR | 3.3.3 | NEX Fuel System Maintenance | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AS | 3.4.1 | HVAC Water Testing and Treatment Services | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AT | 3.4.3 | Boiler Water Testing and Treatment Services | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | A001 | A001AU | 3.4.4 | High Security Locks | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Custodial | 1503010 | A001 | A001AV | 3.1 | Scheduled Services | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Custodial | 1503010 | A001 | A001AW | 3.2 | Custodial Service Orders | 25 | EA | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Grounds Maintenance and Landscaping | 1503050 | A001 | A001AX | 3.1 | Improved Grounds | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Grounds Maintenance and Landscaping | 1503050 | A001 | A001AY | 3.2 | Operational Areas | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Grounds Maintenance and Landscaping | 1503050 | A001 | A001AZ | 3.3 | Storm Drainage Systems | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Wastewater | 1604000 | A001 | A001BA | 3.1 | Wet Wells | 12 | MO | $- | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AA | 3.1.1 | Emergency Service Orders | 5 | EA | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AB | 3.1.2 | Urgent Service Orders | 30 | EA | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AC | 3.1.3 | Routine Service Orders | 10 | EA | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AD | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AE | 3.2.2 | Boilers and Unfired Pressure Vessels (UPVs) | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AF | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AG | 3.2.4 | Automatic Door Systems | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AH | 3.3.1 | Boilers and UPVs | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AJ | 3.3.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AK | 3.4.1 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | A002 | A002AL | 3.4.3 | Boiler Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Custodial | 1503010 | A002 | A002AM | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Custodial | 1503010 | A002 | A002AN | 3.2 | Unscheduled Services | 6 | EA | $ - 0 | |
| Defense Health Agency (DHA) | Grounds Maintenance and Landscaping | 1503050 | A002 | A002AP | 3.1 | Improved Grounds | 12 | MO | $ - 0 | |
| Navy Exchange (NEX) | Custodial | 1503010 | A003 | A003AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Navy Exchange (NEX) | Custodial | 1503010 | A003 | A003AB | 3.2 | Unscheduled Services | 6 | EA | $ - 0 | |
| Defense Logistics Agency (DLA) | Facility Investment | 1502000 | A004 | A004AA | 3.1.1 | Emergency Service Orders | 1 | EA | $ - 0 | |
| Defense Logistics Agency (DLA) | Facility Investment | 1502000 | A004 | A004AB | 3.1.2 | Urgent Service Orders | 1 | EA | $ - 0 | |
| Defense Logistics Agency (DLA) | Facility Investment | 1502000 | A004 | A004AC | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Department of Homeland Security (DHS) | Custodial | 1503010 | A005 | A005AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Department of Homeland Security (DHS) | Custodial | 1503010 | A005 | A005AB | 3.2 | Unscheduled Services | 2 | EA | $ - 0 | |
| U.S. Army | Facility Investment | 1502000 | A006 | A006AA | 3.1.2 | Urgent Service Orders | 4 | EA | $ - 0 | |
| U.S. Army | Facility Investment | 1502000 | A006 | A006AB | 3.1.3 | Routine Service Orders | 4 | EA | $ - 0 | |
| U.S. Army | Facility Investment | 1502000 | A006 | A006AC | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| U.S. Army | Custodial | 1503010 | A006 | A006AD | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| U.S. Army | Custodial | 1503010 | A006 | A006AE | 3.2 | Unscheduled Services | 3 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AA | 3.1.1 | Emergency Service Orders | 5 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AB | 3.1.2 | Urgent Service Orders | 200 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AC | 3.1.3 | Routine Service Orders | 20 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AD | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AE | 3.2.2 | Boilers and Unfired Pressure Vessels (UPVs) | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AF | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AG | 3.2.6 | Tank Maint and Repair | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AH | 3.3.1 | Boilers and UPVs | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AJ | 3.3.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AK | 3.4.1 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | A007 | A007AL | 3.4.3 | Boiler Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (SBT-22) | Custodial | 1503010 | A008 | A008AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (SBT-22) | Custodial | 1503010 | A008 | A008AB | 3.2 | Unscheduled Services | 5 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (SBT-22) | Grounds Maintenance and Landscaping | 1503050 | A008 | A008AC | 3.1 | Improved Grounds | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (SBT-22) | Grounds Maintenance and Landscaping | 1503050 | A008 | A008AD | 3.2 | Operational Areas | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVSCIATTS) | Custodial | 1503010 | A009 | A009AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVSCIATTS) | Custodial | 1503010 | A009 | A009AB | 3.2 | Unscheduled Services | 5 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVSCIATTS) | Grounds Maintenance and Landscaping | 1503050 | A009 | A009AC | 3.1 | Improved Gounds | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NSWC) | Custodial | 1503010 | A010 | A010AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NSWC) | Custodial | 1503010 | A010 | A010AB | 3.2 | Unscheduled Services | 2 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (NSWC) | Grounds Maintenance and Landscaping | 1503050 | A010 | A010AC | 3.1 | Improved Grounds | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NSWG4) | Custodial | 1503010 | A011 | A011AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NSWG4) | Custodial | 1503010 | A011 | A011AB | 3.2 | Unscheduled Services | 2 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (NSWG4) | Grounds Maintenance and Landscaping | 1503050 | A011 | A011AC | 3.1 | Improved Grounds | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVO BOB) | Facility Investment | 1502000 | A012 | A012AA | 3.1.1 | Emergency Service Orders | 1 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVO BOB) | Facility Investment | 1502000 | A012 | A012AB | 3.1.2 | Urgent Service Orders | 2 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVO BOB) | Facility Investment | 1502000 | A012 | A012AC | 3.1.3 | Routine Service Orders | 1 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVO BOB) | Facility Investment | 1502000 | A012 | A012AD | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVO BOB) | Facility Investment | 1502000 | A012 | A012AE | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVO BOB) | Facility Investment | 1502000 | A012 | A012AF | 3.3.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVO BOB) | Custodial | 1503010 | A012 | A012AG | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (NAVO BOB) | Custodial | 1503010 | A012 | A012AH | 3.2 | Unscheduled Services | 1 | EA | $ - 0 | |
| Camp Keller (Woolmarket), Biloxi, MS (NCG-2) | Grounds Maintenance and Landscaping | 1503050 | A013 | A013AA | 3.1 | Improved Grounds | 12 | MO | $ - 0 | |
| Camp Keller (Woolmarket), Biloxi, MS (CNRSE) | Facility Investment | 1502000 | A014 | A014AA | 3.1.1 | Emergency Service Orders | 3 | EA | $ - 0 | |
| Camp Keller (Woolmarket), Biloxi, MS (CNRSE) | Facility Investment | 1502000 | A014 | A014AB | 3.1.2 | Urgent Service Orders | 15 | EA | $ - 0 | |
| Camp Keller (Woolmarket), Biloxi, MS (CNRSE) | Facility Investment | 1502000 | A014 | A014AC | 3.1.3 | Routine Service Orders | 3 | EA | $ - 0 | |
| Camp Keller (Woolmarket), Biloxi, MS (CNRSE) | Facility Investment | 1502000 | A014 | A014AD | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Camp Keller (Woolmarket), Biloxi, MS (CNRSE) | Custodial | 1503010 | A014 | A014AE | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Camp Keller (Woolmarket), Biloxi, MS (CNRSE) | Custodial | 1503010 | A014 | A014AF | 3.2 | Unscheduled Services | 2 | EA | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AA | 3.1.1 | Emergency Service Orders | 10 | EA | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AB | 3.1.2 | Urgent Service Orders | 100 | EA | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AC | 3.1.3 | Routine Service Orders | 10 | EA | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AD | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AE | 3.2.2 | Boilers and Unfired Pressure Vessels (UPVs) | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AF | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AG | 3.2.4 | Automatic Door Systems | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AH | 3.2.6 | Tank Maint and Repair | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AJ | 3.3.1 | Boilers and UPVs | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AK | 3.3.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AL | 3.4.1 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Facility Investment | 1502000 | A015 | A015AM | 3.4.3 | Boiler Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Lakeside Barracks Pascagoula, MS | Grounds Maintenance and Landscaping | 1503050 | A015 | A015AN | 3.1 | Improved Grounds | 12 | MO | $ - 0 | |
| Navy Gateway Inns and Suites (NGIS) | Facility Investment | 1502000 | A016 | A016AA | 3.1.1 | Emergency Service Orders | 3 | EA | $ - 0 | |
| Navy Gateway Inns and Suites (NGIS) | Facility Investment | 1502000 | A016 | A016AB | 3.1.2 | Urgent Service Orders | 50 | EA | $ - 0 | |
| Navy Gateway Inns and Suites (NGIS) | Facility Investment | 1502000 | A016 | A016AC | 3.1.3 | Routine Service Orders | 5 | EA | $ - 0 | |
| Navy Gateway Inns and Suites (NGIS) | Facility Investment | 1502000 | A016 | A016AD | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Navy Gateway Inns and Suites (NGIS) | Facility Investment | 1502000 | A016 | A016AE | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Navy Gateway Inns and Suites (NGIS) | Facility Investment | 1502000 | A016 | A016AF | 3.3.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Navy Gateway Inns and Suites (NGIS) | Facility Investment | 1502000 | A016 | A016AG | 3.4.1 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| U.S. Marine Corps | Custodial | 1503010 | A017 | A017AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| U.S. Marine Corps | Custodial | 1503010 | A017 | A017AB | 3.2 | Unscheduled Services | 6 | EA | $ - 0 | |
| U.S. Marine Corps | Facility Investment | 1502000 | A017 | A017AC | 3.1.2 | Urgent Service Orders | 2 | EA | $ - 0 | |
| U.S. Marine Corps | Facility Investment | 1502000 | A017 | A017AD | 3.1.3 | Routine Service Orders | 1 | EA | $ - 0 | |
| U.S. Marine Corps | Facility Investment | 1502000 | A017 | A017AE | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| EXWC | Custodial | 1503010 | A018 | A018AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| EXWC | Custodial | 1503010 | A018 | A018AB | 3.2 | Unscheduled Services | 2 | EA | $ - 0 | |
| EXWC | Facility Investment | 1502000 | A018 | A018AC | 3.1.1 | Emergency Service Orders | 3 | EA | $ - 0 | |
| EXWC | Facility Investment | 1502000 | A018 | A018AD | 3.1.2 | Urgent Service Orders | 30 | EA | $ - 0 | |
| EXWC | Facility Investment | 1502000 | A018 | A018AE | 3.1.3 | Routine Service Orders | 5 | EA | $ - 0 | |
| EXWC | Facility Investment | 1502000 | A018 | A018AF | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| EXWC | Facility Investment | 1502000 | A018 | A018AG | 3.2.2 | Boilers and Unfired Pressure Vessels (UPVs) | 12 | MO | $ - 0 | |
| EXWC | Facility Investment | 1502000 | A018 | A018AH | 3.3.1 | Boilers and UPVs | 12 | MO | $ - 0 | |
| EXWC | Facility Investment | 1502000 | A018 | A018AJ | 3.4.1 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| EXWC | Facility Investment | 1502000 | A018 | A018AK | 3.4.3 | Boiler Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Total |
&"Times New Roman,Regular"N69450-12-D-7586 &"Times New Roman,Regular"Page &P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
CLIN 0002 - Base N-RW
| Attachment J-0200000-14 | Attachment J-0200000-XX | Attachment J-0200000-XX | Attachment J-0200000-XX | Attachment J-0200000-XX | Attachment J-0200000-XX | Attachment J-0200000-XX |
| Exhibit Line Item Numbers | Exhibit Line Item Numbers | Exhibit Line Item Numbers | Exhibit Line Item Numbers | Exhibit Line Item Numbers | Exhibit Line Item Numbers | Exhibit Line Item Numbers |
| Solicitation No: N69450-22-R-0002 | Solicitatioin No: N69450-22-R-XXXX | Solicitatioin No: N69450-22-R-XXXX | Solicitatioin No: N69450-22-R-XXXX | Solicitatioin No: N69450-22-R-XXXX | Solicitatioin No: N69450-22-R-XXXX | Solicitatioin No: N69450-22-R-XXXX |
| Amendment 6 | Request for Proposals | Request for Proposals | Request for Proposals | Request for Proposals | Request for Proposals | Request for Proposals |
| Non-Recurring Work Price - Base Period | ||||||
| Line Item 0002 | Line Item 0001 | Line Item 0001 | Line Item 0001 | Line Item 0001 | Line Item 0001 | Line Item 0001 |
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 |
| ELINs A700 through A735 | ELINs A001 through A014 | ELINs A001 through A014 | ELINs A001 through A014 | ELINs A001 through A014 | ELINs A001 through A014 | ELINs A001 through A014 |
| ELIN |
freda.reilly: Catalog No.
Contains the line item number (CLIN/SLIN/ELIN).
Product Name Description Extended Estimated Quantity freda.reilly: Estimated Quantity
Contains estimated quantities to be used for the contract period as seen in all ELIN Schedules when the Contractor submits their bid/proposal. Estimated Quantities are not shown in contract catalogs in DOD EMALL. The Estimated Quantity column is shown here for Bidding/Proposal purposes only. DELETE this column after award prior to submitting Catalog for upload to DOD EMALL.
NOTE: DELETE this column after award and prior to submitting Catalog for upload to DOD EMALL.
Unit of Issue freda.reilly: Unit of Issue
Indicates the Unit of Issue for each product or service, such as square feet (SF). Unit of Issue must conform to DOD EMALL's available Units of Measure (UOMs).
NOTE: See EXCEL Tab below labeled - "NAVFAC UOMs"for complete listing. For example: Vertical Linear Feet (V/LF) is not on the list of acceptable UOMs. Resolution: In the "Description Extended" column state that the "LF" Unit of Issue represents "Vertical Linear Feet".
Unit Price freda.reilly: Unit Price
Contains the unit price per Unit of Issue. This field is limited to a maximum of 16 digits, with up to four decimal places.
NOTE: DELETE Special Note to Bidder/Offerors after award and prior to submitting Catalog for upload to DOD EMALL.
Extended Price freda.reilly: Extended Price
Contains total price for each ELIN (Estimated Quantity x Price x Unit Price = Extended Price). Extended Prices are not seen on DOD EMALL in our Catalogs. DELETE this column after award prior to submitting for upload to DOD EMALL. The Extended Price column is shown here for Bidding/Proposal purposes only.
| A700 | Composite Labor Hours except for Controls Specialist (Service Act Wage) - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. |
| 1,000 | HR | |
| A701 | Controls Specialist Labor Hours (Service Contract Wages) - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. |
| 500 | HR | |
| A702 | Composite Labor Hours except for Controls Specialist (Davis-Bacon Wage Rates) MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis-Bacon Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. |
| 2,000 | HR | |
| A703 | Controls Specialist Labor Hours (Davis-Bacon Wage Rates) - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis-Bacon Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. |
| 1,000 | HR | |
| A704 | Material/Equipment Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor. |
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.
| The estitmate quantity (in dollars) is provided. A fully burdened rate shall be entered in the Unit Price column. Burden rate shall include factors for shipping and handling. For example, if a 5% markup is proposed the unit price should be $1.05 and the extended price should be $525,000.00. During administration, if the vendor's invoice on material is $1,000.00 and the unit price is $1.05, the cost of the material to the government will be $1,050.00. (DO - Dollars) | 500,000 | DO |
| A705 | High Area Cleaning |
available on FEDMALL High Area dusting above 7 feet may be performed with extension tools or step ladders. All dust and debris shall be removed. Surfaces below the work shall be protected from dust and debris.
| Work shall be completed within 3 calendar days. | 100,000 | SF |
| A706 | Cleaning Light Fixtures |
available on FEDMALL Globes, reflectors, covers, diffusers, and plastic side panels shall be removed and washed. After cleaning and reassembling, light fixtures shall be free of bugs, dirt, dust, streaks, grease, and other foreign matter.
| Work shall be completed within 3 calendar days. | 5,000 | EA |
| A707 | Interior Window Cleaning |
available on FEDMALL The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas.
| Work shall be completed within 3 calendar days. | 100,000 | SF |
| A708 | Exterior Window Cleaning |
available on FEDMALL The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Where storm windows exist, the Contractor cleans both sides of the storm window and the outside of the inner glass.
| Work shall be completed within 3 calendar days. | 75,000 | SF |
| A709 | Window Blind Cleaning |
| available on FEDMALL | Blinds shall cleaned. If removed for cleaning, blinds are returned to their original location within 3 calendar days. | 2,500 | EA |
| A710 | Stripping, Coating, and Buffing - 4 Coats |
available on FEDMALL The Contractor shall strip and rewax floors to ensure that floors are clean and sightly. Floors are cleaned, free of previously applied wax, and have a uniform gloss finish. Four Coats provides for approximately 3.5 months of wear.
| Work shall be completed within 3 calendar days. | 50,000 | SF |
| A711 | Carpet and Rug Deep Cleaning |
available on FEDMALL Prior to shampooing by the water extraction method, the Contractor vacuums rugs and carpets free of all loose soil and debris. The Contractor shampoos carpets and rugs free of streaks, spots, and stains, and restores the carpet to a bright, uniform color. After carpet or rug dries, the Contractor returns furniture or other equipment moved for shampooing to their original positions.
| Work shall be completed within 3 calendar days. | 100,000 | SF |
| A712 | Restroom Cleaning and Servicing |
| available on FEDMALL | Restrooms are clean, sanitary and sightly. All restroom surfaces are cleaned, sanitized and deodorized. Restroom supplies are completely restocked and all dispenser are in working condition. | |
| 15,000 | SF | |
| A713 | Special Event Grass Cutting |
available on FEDMALL Grass shall be mowed and trimmed to a uniform height of 2 inches. All clippings and debris shall be removed.
| Work shall be completed within 3 calendar days. | 50 | AC |
| A714 | Special Event Edging |
| available on FEDMALL | Edging to provide a uniform edged cut. All clippings shall be removed. Work shall be completed within 3 calendar days. | 10,000 | LF |
| A715 | Special Event Raking |
available on FEDMALL This work includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris shall be removed the same day as raked.
| Work shall be completed within 3 calendar days. | 30 | AC |
| A716 | Tree and Stump Removal |
Large 18.1” DBH and above Tree and Stump Removal available on FEDMALL Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | 25 | EA |
| A717 | Tree and Stump Removal |
Medium 6.1" DBH up to 18" Tree and Stump Removal available on FEDMALL Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | 25 | EA |
| A718 | Tree and Stump Removal |
Small up to 6" Tree and Stump Removal available on FEDMALL Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | 25 | EA |
| A719 | Shrub and Stump Removal |
Large 15-gallon and above, 48.1” and above Shrub and Stump Removal available on FEDMALL Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 50 | EA |
| A720 | Shrub and Stump Removal |
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal available on FEDMALL Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | 50 | EA |
| A721 | Shrub and Stump Removal |
Small Up to 5-gallon, up to 18” Shrub and Stump Removal available on FEDMALL Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | 50 | EA |
| A722 | Complete Tree Pruning |
Small - below and including 15' Complete Tree Pruning available on FEDMALL The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
| Work shall be completed within 5 calendar day. | 50 | EA |
| A723 | Complete Tree Pruning |
Large - above 15' Complete Tree Pruning available on FEDMALL The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
| Work shall be completed within 5 calendar days. | 50 | EA |
| A724 | Grassing |
available on FEDMALL Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government.
Seed species will be identified in the task order.
Work shall be completed within 10 calendar days.
| 2 | AC |
| A725 | Tree Planting |
available on FEDMALL All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government.
| Work shall be completed within 5 calendar days. | 30 | EA |
| A726 | Shrub Planting (1-gallon) |
available on FEDMALL All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government.
| Work shall be completed within 5 calendar days. | 10 | EA |
| A727 | Shrub Planting (5-gallon) |
available on FEDMALL All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 40 | EA |
| A728 | Bedding/Ornamental Plants (4" pot size) |
available on FEDMALL All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government.
| Work shall be completed within 5 calendar days. | 100 | EA |
| A729 | Sodding |
available on FEDMALL Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
| Work shall be completed within 10 calendar days. | 500 | SY |
| A730 | Shrub Pruning (Stand-alone plants) |
available on FEDMALL The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
| Work shall be completed within 3 calendar days. | 50 | EA |
| A731 | Hedge Pruning (Continuous Hedging) |
available on FEDMALL The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
| Work shall be completed within 3 calendar days. | 100 | EA |
| A732 | Control Undesired Vegetation by Herbicide |
available on FEDMALL Remove vegetation along fence lines and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
| Work shall be completed within 10 calendar days. | 10,000 | LF |
| A733 | Debris Removal |
available on FEDMALL Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris.
| Work shall be completed within 10 calendar days. | 50 | AC |
| A734 | Plant Bed Maintenance |
available on FEDMALL Dead, broken, damaged or diseased areas shall be removed and properly disposed. Plants and beds shall be fertilized, edged, weeded, and mulched as appropriate.
| Work shall be completed within 3 calendar days. | 15,000 | SY |
| A735 | Fertilizing |
available on FEDMALL Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard.
| Work shall be completed within 2 calendar days. | 25,000 | SF |
| TOTAL NON-RECURRING PRICE BASE PERIOD |
&"Times New Roman,Regular"N69450-12-D-7586 &"Times New Roman,Regular"Page &P of &N
CLIN 0003 - 1st Option RW
| Attachment J-0200000-14 | |
| Exhibit Line Item Numbers | |
| Solicitation No: N69450-22-R-0002 | |
| Amendment 6 | |
| Recurring Work Price - First Option Period | |
| Line Item 0003 | |
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |
| ELINs B001 through B018 |
| Funding Activity | Sub-Annex Name | Sub-Annex | ELIN | Sub-ELIN | Spec Item | Service Description | Quantity | Unit | Unit Price | Total Price |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Management | 1501000 | B001 | B001AA | 3.1 | Facility Related Control Systems (FRCS) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1501000 | B001 | B001AB | 3.2 | Locksmith Management Services | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AC | 3.1.1 | Emergency Service Orders | 53 | EA | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AD | 3.1.2 | Urgent Service Orders | 1,082 | EA | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AE | 3.1.3 | Routine Service Orders | 139 | EA | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AF | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AG | 3.2.2 | Boilers and Unfired Pressure Vessels (UPVs) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AH | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AJ | 3.2.4 | Automatic Door Systems | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AK | 3.2.5 | NEX Fuel System Maintenance | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AL | 3.2.6 | Tank Maint and Repair | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AM | 3.2.7 | Facility Related Control Systems (FRCS) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AN | 3.2.8 | Micro-Grid | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AP | 3.3.1 | Boilers and UPVs | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AQ | 3.3.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AR | 3.3.3 | NEX Fuel System Maintenance | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AS | 3.4.1 | HVAC Water Testing and Treatment Services | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AT | 3.4.3 | Boiler Water Testing and Treatment Services | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Facility Investment | 1502000 | B001 | B001AU | 3.4.4 | High Security Locks | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Custodial | 1503010 | B001 | B001AV | 3.1 | Scheduled Services | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Custodial | 1503010 | B001 | B001AW | 3.2 | Custodial Service Orders | 25 | EA | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Grounds Maintenance and Landscaping | 1503050 | B001 | B001AX | 3.1 | Improved Grounds | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Grounds Maintenance and Landscaping | 1503050 | B001 | B001AY | 3.2 | Operational Areas | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Grounds Maintenance and Landscaping | 1503050 | B001 | B001AZ | 3.3 | Storm Drainage Systems | 12 | MO | $- | |
| Naval Construction Battalion Center, Gulfport MS (CNRSE) | Wastewater | 1604000 | B001 | B001BA | 3.1 | Wet Wells | 12 | MO | $- | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AA | 3.1.1 | Emergency Service Orders | 5 | EA | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AB | 3.1.2 | Urgent Service Orders | 30 | EA | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AC | 3.1.3 | Routine Service Orders | 10 | EA | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AD | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AE | 3.2.2 | Boilers and Unfired Pressure Vessels (UPVs) | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AF | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AG | 3.2.4 | Automatic Door Systems | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AH | 3.3.1 | Boilers and UPVs | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AJ | 3.3.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AK | 3.4.1 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Facility Investment | 1502000 | B002 | B002AL | 3.4.3 | Boiler Water Testing and Treatment Services | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Custodial | 1503010 | B002 | B002AM | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Defense Health Agency (DHA) | Custodial | 1503010 | B002 | B002AN | 3.2 | Unscheduled Services | 6 | EA | $ - 0 | |
| Defense Health Agency (DHA) | Grounds Maintenance and Landscaping | 1503050 | B002 | B002AP | 3.1 | Improved Grounds | 12 | MO | $ - 0 | |
| Navy Exchange (NEX) | Custodial | 1503010 | B003 | B003AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Navy Exchange (NEX) | Custodial | 1503010 | B003 | B003AB | 3.2 | Unscheduled Services | 6 | EA | $ - 0 | |
| Defense Logistics Agency (DLA) | Facility Investment | 1502000 | B004 | B004AA | 3.1.1 | Emergency Service Orders | 1 | EA | $ - 0 | |
| Defense Logistics Agency (DLA) | Facility Investment | 1502000 | B004 | B004AB | 3.1.2 | Urgent Service Orders | 1 | EA | $ - 0 | |
| Defense Logistics Agency (DLA) | Facility Investment | 1502000 | B004 | B004AC | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Department of Homeland Security (DHS) | Custodial | 1503010 | B005 | B005AA | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| Department of Homeland Security (DHS) | Custodial | 1503010 | B005 | B005AB | 3.2 | Unscheduled Services | 2 | EA | $ - 0 | |
| U.S. Army | Facility Investment | 1502000 | B006 | B006AA | 3.1.2 | Urgent Service Orders | 4 | EA | $ - 0 | |
| U.S. Army | Facility Investment | 1502000 | B006 | B006AB | 3.1.3 | Routine Service Orders | 4 | EA | $ - 0 | |
| U.S. Army | Facility Investment | 1502000 | B006 | B006AC | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| U.S. Army | Custodial | 1503010 | B006 | B006AD | 3.1 | Scheduled Services | 12 | MO | $ - 0 | |
| U.S. Army | Custodial | 1503010 | B006 | B006AE | 3.2 | Unscheduled Services | 3 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | B007 | B007AA | 3.1.1 | Emergency Service Orders | 5 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | B007 | B007AB | 3.1.2 | Urgent Service Orders | 200 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | B007 | B007AC | 3.1.3 | Routine Service Orders | 20 | EA | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | B007 | B007AD | 3.2.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | B007 | B007AE | 3.2.2 | Boilers and Unfired Pressure Vessels (UPVs) | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | B007 | B007AF | 3.2.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | B007 | B007AG | 3.2.6 | Tank Maint and Repair | 12 | MO | $ - 0 | |
| Stennis Space Center, Stennis, MS (CNRSE) | Facility Investment | 1502000 | B007 | B007AH | 3.3.1 | Boilers and UPVs | 12 | MO | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .