This document outlines deliverables and performance requirements for the Base Operations Support contract solicitation number N6945021R0049 issued by the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks Base Operations Support services at Naval Air Station Pensacola, Florida and surrounding areas, including port operations, facility management, facility investment, utilities management, environmental services, and other related services.
The document specifies over 100 deliverables required from the contractor, including management plans, inspection and testing schedules, status and repair reports, training documentation, waste disposal logs and certifications. It identifies delivery dates for each deliverable ranging from daily to annually. Key recurring deliverables include weekly and monthly service order and project reports, preventative maintenance plans and schedules, and condition assessment, inspection and certification program reports. Pricing, award dates, incumbents and other contractual terms are not included in this deliverables document.
View the file
Other files
Show 40 more
Latest 50 of 96 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000 Management and Administration
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 0200000 Deliveries or Performance
Deliverables
Spec Item
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Provide Sign in
Sheets and Minutes from Administrative and Coordination Meetings
Within 2 working days of the meeting.
KO and
COR
1 After each Meeting
2.3.1 N/A Final Meeting
Minutes
Within 2 working days after return from
KO/COR
KO/COR 1 After each Meeting
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 15 calendar days prior to contract start
2.3.5 N/A Certificate of
Insurance Within 15 calendar days prior to contract start.
KO and
COR
1 15 calendar days prior to contract start
2.3.5.1 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.3.10 N/A Phase-in Plan Within 5
calendar days after award, or as requested by the KO.
KO and
COR
1 As specified
2.3.10 N/A Phase-out Plan Within 5
calendar days after award, or as requested by the KO.
KO and
COR
1 As specified
2.6.1 N/A Plans of Action and
Milestones (POA&Ms)
Within 30 calendar days after award.
KO and
COR
1 30 Days after
Award
2.6.1 N/A Notification of
Cybersecurity Incident
Within 8 hours of the incident
KO and
COR
1 As required
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.6.3.1 N/A Copy of Completed
Work Order
One work day after completion of work
KO and
COR
1 As required
2.6.4 N/A Verbal Status
Updates
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.4 N/A Work Schedule
Report
Within 48 hours of the request
KO and
COR
1 As requested
2.6.5 N/A Scheduling
Exception Report
Within 48 hours of the scheduling conflict
KO and
COR
1 As required
2.6.6 N/A Deliverable Status
Report
Within 5 work days after completion of the month.
KO and
COR
1 Monthly
2.6.7 Outage_report
_example.xls (included in Amendment
0006)provided after award
Outage Request Report
Tuesday KO, COR, FMD, FEAD, UEM
Electronic Weekly
2.6.8 N/A Service Provider and
Characteristic Meter Reading Information Report
At the end of each workday when changes occur
KO and
COR
1 Daily
2.6.8 N/A Asset and
Specification information
At the end of each workday when changes occur
KO and
COR
1 Daily
2.6.8.3 N/A Systems
Authorization Access Request (SAAR) Form
At least 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.8.3 N/A List of personnel
requiring access to Government’s Maximo
At least 15 calendar days prior to contract start.
KO and
COR
1 As specified
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.6.9.1 N/A Quality Management
Plan
At least 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion or termination of the contract.
KO and
COR
1 As specified
2.6.9.3 N/A Contractor Quality
Inspection and Surveillance Report
Within 5 work days after completion of the month.
KO and
COR
1 Monthly
2.6.10 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and Qualifications
At least 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1 N/A Key Personnel
Changes
Within 48 hours after Contractor determines a change must be made.
KO and
COR
1 As specified
2.7.1 N/A Organizational Chart At least 15
calendar days prior to contract start
KO and
COR
1 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to being admitted to site of work.
KO 1 As specified
2.7.3 N/A Contractor Labor
Hours (eCMRA) Report
Within 30 calendar days after award, then 15 calendar days after the end of each Contract Period.
KO 1 Annually for labor executed during the period of performanc e during each Governmen t fiscal year
(FY)
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.8.1 N/A Employee List Upon request. KO and
COR
1 As required
2.8.7 N/A Employee Status As Specified KO and
COR
1 As required
2.8.8 N/A Systems
Authorization Access Request (SAAR) Form
As Specified KO and
COR
1 As required
2.8.9 N/A IT, OT and FRCS
Employee List
As Specified KO and
COR
As required
2.9.2 N/A Accident Prevention
Plan
At least 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.9.3 N/A Activity Hazard
Analysis
At least 15 calendar days prior to contract start, submitted together with the Accident Prevention Plan.
Within 7 calendar days of any change.
KO and
COR
1 As specified
2.9.4 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and for changes.
KO and
COR
1 As specified
2.9.6 N/A Vandalism Report Immediately
upon occurrence and summary report within 5 work days after completion of the month.
KO/COR Electronic Monthly
2.9.6 J-0200000-05 NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident or near miss.
KO and
COR
1 As required
2.9.6 J-0200000-05 Weight Handling
Equipment Accident Report
Within 15 working days of accident.
KO and
COR
required
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.9.6 J-0200000-05 Crane and Rigging
Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
Within 5 work days after completion of the month.
KO and
COR
1 Monthly
2.9.9 N/A OSHA Citations and
Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.9.10 N/A Contractor safety
records
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety Certifications At least 15
calendar days prior to contract start and as old certifications expire.
KO and
COR
1 As specified
2.10 N/A EMS Goals and
Policy Measurement Information
Upon request. KO and
COR
1 As required
2.10.1.1 N/A Water Conservation
Plan
At least 15 calendar days after award and for changes.
KO and
COR
1 As specified
2.10.2 N/A Environmental
Protection Plan
At least 15 calendar days after award and for changes.
KO and
COR
1 As specified
2.10.2.1 N/A Sampling Plan At least 15
calendar days after award and for each event.
KO and
COR
1 As specified
2.10.2.1 N/A Training Plan to
implement the Sampling Plan
At least 15 calendar days after award and for changes.
KO and
COR
1 As specified
2.10.2.2 N/A ODS Technician
Certifications.
At least 15 calendar days prior to contract start and as old certifications expire.
KO and
COR
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.10.2.2 N/A OTIS database or
representative data files
Within the first 15 days of each quarter, at the conclusion of the contract, and upon request.
KO and
COR
1 Quarterly, as specified and required
2.10.2.2 N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
1 As required
2.10.2.3 N/A Solid Waste
Management Report
Within 5 work days after completion of the month.
KO and
COR
1 Monthly
2.10.2.3 N/A Recycling Report First work week
of each quarter.
KO and
COR
1 Quarterly
2.10.2.5 N/A Waste Stream
Determination Forms
Per 40 CFR KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
Within 15 minutes of discovery
NASP Fire Department
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill report
Within 48 hours of discovery
KO and
COR
1 As required
2.10.2.8 N/A Emergency Planning
and Community Right-To-Know Act (EPCRA) Report
At least 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.8 J-0200000-05 Contractor
Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.10.2.12 N/A Asbestos Containing
Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
1 As specified
2.10.2.15 N/A Hazardous Air
Pollutant (HAP) Report
Within 7 days of the reporting requirement
KO and
COR
1 Monthly and Semi- Annually
2.10.3 N/A Sustainable
Procurement and Practices Plan
At least 15 calendar days prior to contract start and within 15 calendar days after option periods are awarded.
KO and
COR
1 Annually
2.10.3 N/A Sustainable Delivery
of Services Report
Within 15 work days after completion of the contract period.
KO and
COR
1 Annually
2.10.3.2 N/A Recovered Material
Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.11 N/A Disaster
Preparedness Plan
At least 15 days prior to contract start and within 7 calendar days of changes
KO and
COR
1 As specified
2.11 N/A Mission Essential
Contractor Services Plan and Mission Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of
Submission
Distribution
Frequency Original
Copies (including original)
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.13 N/A Warranty records At contract
completion or termination
KO and
COR
1 As specified
2.14.1 N/A Proposals to the
Government for Work NOT above the Recurring Work Limitations
Within two work days for each proposal.
KO and
COR
1 As specified
2.14.2 N/A Notification to the
Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude Estimate
Within two four hours of identification
KO and
COR
1 As required
2.14.2 N/A Detailed Scope of
Work and Detailed Estimate
Within two three work days
KO and
COR
1 As required
2.14.2 N/A Over Limit of
Liability report
Mondays KO/Require ments
Branch Manager/U
EM/COR
Electronic Weekly
2.15.1.1 N/A FedMall non-
recurring work summary
Within 5 work days after completion of the month.
KO and
COR
1 Monthly and as requested.
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two five working days following receipt of request
KO 1 As required
Section F – 0600000 Port Operations
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 0600000
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.4 N/A Berthing Services
Report
Within 5 work days after completion of the month.
KO/COR/
Port
Operations/
UEM
Electronic Monthly
Section F – 1501000 Facility Management
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 150100 Deliveries or Performance
Deliverables
Spec Item Deliverable Title Quantity Submit To Due Date/Frequency
2.3.1 List of employees requiring
ass to Maximo (Same as in Annex 2)
1 KO/COR As required
3.1 Data Call Response As specified KO/FMD As scheduled
3.1 Weekly WO Report Electronic KO/Requirements
Branch Manager/COR
Weekly, Mondays or First Day of the Work Week.
3.2.13.1.1 Scoping Estimate As specified KO/FMD As scheduled
3.2.23.1.2 In-house Specification
Package As specified KO/FMD As scheduled
3.2.23.1.2 In-House Scoping
Modifications
As specified KO/FMD As scheduled
3.2.33.1.3 Technical Specification
Packages for IDIQ Contracts
As specified KO/FMD As scheduled
3.2.33.1.3 IDIQ Scoping
Modifications
As specified KO/FMD As scheduled
3.2.43.1.4 Technical Specification
Packages for Non-IDIQ Contracts
As specified KO/FMD As scheduled
3.2.43.1.4 Non-IDIQ Scoping
Modifications
As specified KO/FMD As scheduled
3.2.53.1.5 Solicitation Package
Revisions
As specified KO/FMD As scheduled
3.33.2 Infrastructure Condition
Assessment Program Plan
Within 30 days of
Contract Award
KO and COR 30 days after Contract Award, Update as changes occur.
3.33.2 Infrastructure Condition
Assessment Program Monthly Schedule Report.
Five business days prior to the beginning of each month
KO and COR Monthly
3.33.2 Infrastructure Condition
Assessment Program Monthly Status Report
Within 5 business days after completion of the month.
KO and COR Monthly
3.33.2 Infrastructure Condition
Assessment Program Monthly Unaccomplished Work Report
Within 5 business days after completion of the month.
KO and COR Monthly
3.3.13.2.1 Maximo Asset Change
Report
Within 5 business days after completion of the month.
KO and COR Monthly
Section F – 1501000 Facility Management
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 150100 Deliveries or Performance
Deliverables
Spec Item Deliverable Title Quantity Submit To Due Date/Frequency
3.3.23.2.1 Annual ICAP Report Within 15
work days after completion of the reporting period.
KO and COR Annually
3.4.23.3.2 Technical Library Report Within 4
hours of request
KO and COR As requested
3.4.33.3.3 Excavation Permits As specified KO/FMD As scheduled
Section F – 1502000 Facility Investment
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 1502000 Deliveries of Performance
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1 N/A
Certifications and Licenses
Within 15 days after award and as requested by KO
KO/COR Electronic
Once for initial submittal, then whenever personnel change
2.3.3 N/A
Equipment and Systems Monitoring Report
Within 90 days of start of performance
KO/Requirements Branch
Manager/COR Electronic
Once for initial submittal, then as system changes are made
3 N/A Top ten HVAC issues.
Within 15 calendar days after the end of the Contract
Period
KO/Requirements Branch
Manager/COR Electronic Annually
3 N/A Top ten roof issues.
Within 15 calendar days after the end of the Contract
Period
KO/Requirements Branch
Manager/COR Electronic Annually
3.1 N/A
Service Order Weekly Report
Mondays KO/Requirements
Branch Manager/COR
Electronic Weekly
3.1 N/A
Service Order Monthly Report, includes Consumed and Remaining Balance of Open Service Orders.
Within 5 business days after completion of the month.
KO/Requirements Branch
Manager/COR Electronic Monthly
3.2 N/A
Project Order Weekly Report
Mondays KO/Requirements
Branch Manager/COR
Electronic Weekly
3.2 N/A
Project Order Monthly Report, includes Consumed and Remaining Balance of Open Project Orders.
Within 5 business days after
Manager/COR
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.3 N/A
Preventive Maintenance Plan
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic
Annually, Update as changes occur.
3.3 N/A
Monthly PM Schedule
5 business days prior to the beginning of each month
KO/Requirements Branch
Manager/COR Electronic Monthly
3.3 N/A
Findings, discrepancies, recommendations, estimates for repairs, and certifications
Within 7 days of completion of the work
KO/Requirements Branch
Manager/COR Electronic
As Required
3.3 N/A
Monthly Unaccomplished PM Report
Within 5 business days after completion of the month.
KO and COR Electronic Monthly
3.3.1 N/A
Water Treatment Test Report
Within 5 business days after completion of the month.
KO and Environmental
Department Electronic
Twice Annually
3.3.1 N/A
Open Chiller Condenser Inspections Report
Within 5 business days after completion of the Data.
KO and Environmental
Department Electronic
As requested
3.3.1 N/A
Refrigerant Usage Report
Within 5 business days after completion of the month.
KO and Environmental
Department Electronic Monthly
3.3.2 N/A
Generator Run Time Report
Within 5 business days after completion of the month.
KO and COR Electronic Monthly
3.3.9.1 N/A
WHE Schedule for Maintenance, Servicing/Lubricati on, Inspection and Testing
Five business days prior to the beginning of each month.
KO/COR/WHE
Certifying
Official/SME
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.3.9.1 N/A
Maintenance, inspection and testing certifications, and qualifications of personnel.
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/COR/WHE
Certifying
Official/SME Electronic
Annually, Update as changes occur.
3.3.9.1 N/A
Certification Package (Maintenance Inspection Specification Record (MISR), Crane condition Record (CCIR), Certification of Load Test and Condition Inspection (CLTCI), Detailed CMMS Work order (including lubrication/servicin g)
Within 24 hours of occurrence
KO/COR/WHE
Certifying
Official/SME Electronic
Annually, Update as changes occur.
3.3.9.1 N/A
Lubrication Instructions
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/COR/WHE
Certifying
Official/SME Electronic
Annually, Update as changes occur.
3.3.9.1/ 3.3.9.2
N/A Crane Alteration Request
Prior to commencement of any alterations to load bearing parts, load controlling parts, or operational safety devices.
KO/COR/WHE
Certifying
Official/SME Electronic
Annually, Update as changes occur.
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.3.9.2 N/A
Maintenance, inspection and testing certifications, and qualifications of personnel.
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/COR/WHE
Certifying
Official/SME Electronic
Annually, Update as changes occur.
3.3.10 N/A
Aircraft Protective Equipment Required Repairs Report
Within 5 business days after completion of the
PM.
KO/COR/APES
QA Manager
Electronic As
Required
3.4 N/A
Integrated Maintenance Plan
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic
Annually, Update as changes occur.
3.4 N/A
Monthly IMP Schedule
Five business days prior to the beginning of each month.
KO/Requirements Branch
Manager/COR Electronic Monthly
3.4 N/A
IMP Maintenance and Repair Status Report
Within 5 business days after the completion of each month.
Manager/COR Electronic Monthly
3.4 N/A
IMP
Unaccomplished Work Report
Within 5 business days after the completion of each month.
KO/Requirements Branch
Manager/COR Electronic Monthly
3.4.1.1 N/A
Refrigeration Usage Report
Within 5 business days after the completion of each month.
KO and Environmental
Department Electronic Monthly
3.4.1.3 N/A
Seasonal Startup/Shutdown Notifications
Within 5 business days following completion of startup/shutdown.
KO/Requirements Branch
Manager/COR Electronic
Twice Annually
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.4.1.4 N/A
HVAC Water Treatment Test Report
Within 5 business days following mid-term of the Contract Period.
KO/COR and Environmental
Department Electronic
Twice Annually
3.4.1.4 N/A
Open Chiller Condenser Inspections Report
Within 5 business days after completion of the Data.
KO/COR and Environmental
Department Electronic
As requested
3.4.2 N/A
Top ten fire alarm issues.
NLT 15 October KO/Requirements
Branch Manager/COR
Electronic Annually
3.4.2 N/A
Fire Protection Authorized Caller List
15 days prior to start of performance and when changed.
KO/COR Electronic As
Required
3.4.3.2 N/A
VTE Inspection and Testing Schedule
Five business days prior to the beginning of each month.
KO/Requirements Branch Manager, COR, VTE
Program Manager
Electronic Monthly
3.4.3.2 N/A
Inspection and Test Report for Vertical Transportation Equipment
Within 5 business days of testing.
Branch Manager, COR, VTE
Program Manager
Electronic Monthly
3.4.4.2 N/A
Boiler Water Treatment test Report
Within 5 business days of completion of testing.
KO and Environmental
Department Electronic As required
3.4.7 N/A
Lift Stations IMP Schedule
Five business days prior to the beginning of each month.
KO/Requirements Branch Manager, COR, LS Program
Manager
Electronic Monthly
3.4.7 N/A
Lift Stations IMP Monthly Report
Within 5 business days of
Branch Manager, COR, LS Program
Manager
Electronic Monthly
3.4.8 N/A
DDC IMP
Schedule
Five business days prior to the beginning of each
KO/ COR Electronic Monthly
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.5 N/A
Inspection, Testing, and Certification Program
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic
Annually, Update as changes occur.
3.5 N/A
Monthly Inspection, Testing, and Certification Program Summary Report
Within 5 business days of
Manager/COR Electronic Monthly
3.5 N/A
Inspection, Testing, and Certification Schedule and Equipment Certifications
Within 5 business days of
Manager/COR Electronic Monthly
3.5.1 N/A
Backflow Code Compliance Issue Report
Within 5 business days after the completion of the month
KO/
Environmental
Department/COR Electronic Monthly
3.5.2 N/A
Ground Point Inspection and Testing Program
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic
Annually, Update as changes occur.
3.5.3 N/A
Fuel Storage Tank and Gas Station Inspection Schedule
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Electronic Annually
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.5.3.3 N/A
Monthly Fuel Storage Tank and Gas Station Inspection Report
Within 5 business days after the completion of the month.
KO/
Environmental
Department/COR Electronic Monthly
3.6 N/A
Other Recurring Services Program
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic
Annually, Update as changes occur.
3.6 N/A
Other Recurring Services Program, Monthly Summary Report.
Within 5 business days after the completion of the month.
KO/Requirements Branch
Manager/COR
3.6.1
N/A
Grease Trap and Oil/Water Separator Cleaning Schedule
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic Annually
3.6.2 N/A
Exhaust Hood Cleaning Schedule
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic Annually
3.6.3 N/A
Roof Drains and Gutters Cleaning Schedule
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.6.4 N/A
Freeze Protection Plan
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic Annually
3.6.4 N/A
Freeze Damage Repairs Required
Within two work days following freeze event.
KO/Requirements Branch
Manager/COR Electronic As required
3.6.5 N/A
Exterior Lighting Systems Program
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic Annually
3.6.6 N/A
Traffic Control Device Program
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Requirements Branch
Manager/COR Electronic Annually
3.6.7 N/A
Disaster Preparedness Locker Inspection and Test Report
15 calendar days after the beginning of a new Contract
Period.
Manager/COR Electronic Annually
3.6.8 N/A
DDC System Documentation Report
Within 2 business days of any change in the system documentation
KO/COR Electronic As
Required
3.6.8.1 N/A
Daily DDC Error Report
Daily by 0800 KO/Requirements
Branch
Electronic Daily
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.6.8.1 N/A
Weekly DDC Status Report
Mondays KO/Requirements
Branch
Electronic Weekly
Section F – 1502000-DHA
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.1.1 N/A Proof of all
certification, training, and licensing
Within 30 calendar days prior to start of contract performance and within four hours of request
KO/FSCM
/NHOS
Facilities
Electronic Once for initial submittal, then as requested
3.1 N/A Weekly Service
Order Report
Mondays KO/FSCM
/NHOS
Facilities
Electronic Weekly
3.1 N/A Service Order
Summary Report, includes Consumed and Remaining Balance of Open Service Orders.
Within 5 business days after
KO/FSCM
/NHOS
Facilities
Electronic Monthly
3.2 N/A Preventive
Maintenance Program Plan
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.2 N/A Monthly PM Work
Schedule
Five business days prior to the beginning of each month.
KO/FSCM
/NHOS
Facilities
Electronic Monthly
3.2 N/A Previous Month
PM Work Status Report
Within 5 business days after
Facilities
Electronic Monthly
3.2.1.2 N/A HVAC Water
Testing and Treatment Program
Within 30 calendar days prior to start of contract performance
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.2.1.2 N/A HVAC Water
Testing and Treatment Report
Within 5 business days after
Facilities
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.2.2.1 N/A Boiler Water
Testing and Treatment Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.2.2.1 N/A Boiler Water
Testing and Treatment Report
Within 5 business days after
Facilities
Electronic Monthly
3.2.3 N/A Security Systems
and Equipment test results
Within one (1) week of completing test
KO/FSCM
/NHOS
Facilities
Electronic Quarterly
3.2.4 N/A Emergency
Generator Log
Within 5 business days after
Facilities
Electronic Monthly
3.2.4 N/A Emergency
Generator Load Bank Results
Within 10 business days of completing test.
KO/FSCM
/NHOS
Facilities
Electronic As Specified
3.2.5 N/A Isolation and Clean
Room Inspection and Calibration Report
Within 10 business days of completion.
KO/FSCM
/NHOS
Facilities
Electronic Semi- Annually
3.2.8 N/A Fire Alarm and
Protective System Maintenance Report
Within 5 business days after the completion of each month
KO/FSCM
/NHOS
Facilities
Electronic Monthly
3.2.11 N/A Public Address PM
Report
Within 5 business days of completion of Quarter.
KO/FSCM
/NHOS
Facilities
Electronic Quarterly
3.2.12 N/A Nurse Call Station
Checklist
Within 5 business days of completion of the Reporting Period.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.3 N/A Inspection, Testing, and Certification Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.3 N/A Inspection, Testing, and Certification Program Summary Report
Within 5 business days after the
Facilities
Electronic Monthly
3.3 N/A Inspection, Testing
and Certification Schedule and Equipment Certifications
Within 5 business days after the
Facilities
Electronic Monthly
3.3.1 N/A Boiler and UPV
Inspection, Testing and Certification Results
Within 5 business days after the
Facilities
Electronic Monthly
3.3.2 N/A Vertical
Transportation Equipment Inspection, Testing and Certification Results
Within 5 business days after the
Facilities
Electronic Monthly
3.3.3 N/A Backflow Code
Compliance Issue Report
Within 5 business days after the completion of each month.
KO/FSCM
/NHOS
Facilities
Electronic Monthly
3.3.4 N/A Water Quality
Testing Reports
Within 5 business days after receiving/complet ing the report.
KO/FSCM
/NHOS
Facilities
Hard Copy As Required
3.3.5 N/A Daily Testing and
Re-Certification Reports
Each Day during the Testing and Re-Certification Period.
KO/FSCM
/NHOS
Facilities
Electronic As Required
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.3.6 N/A Medical Gas
Certifications
Provide copies of all Medical Gas Certifications within 5 business days after the inspection
KO/FSCM
/NHOS
Facilities
Hard Copy As Required
3.4 N/A Other Recurring
Services Program Summary Report
Within 5 business days after the
Facilities
Electronic Monthly
3.4.1 N/A Lighting Systems
Maintenance and Repair Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.4.1 N/A Lighting Systems
Maintenance and Repair Schedule
Five business days prior to the beginning of each month.
KO/FSCM
/NHOS
Facilities
Electronic Monthly
3.4.2 N/A Exhaust Fan and
Duct Systems Cleaning Schedule
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.4.3 N/A HVAC Systems
Visual and Audible Check Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.4.3 N/A HVAC Systems
Visual and Audible Check Report
Within 5 business days after the
Facilities
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.4.3 N/A HVAC Failure
Report
Within one-hour after discovery of an inoperative system.
KO/NHOS
Facilities
Electronic As required
3.4.4 N/A Electrical
Receptacles Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.4.4 N/A Electrical
Receptacles Report
Within 3 Days of Inspection.
KO/FSCM
/NHOS
Facilities
Electronic As Specified
3.4.5 N/A Electrical
Transformers, Breakers and Switches Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic Annually, Update as changes occur.
3.4.5 N/A Electrical
Transformers, Breakers and Switches Report
Within 3 Days of Inspection.
KO/FSCM
/NHOS
Facilities
Electronic As Specified
3.4.6 N/A Crawlspace
Inspection Schedule
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic As Specified
3.4.6 N/A Crawlspace
Inspections
Within 7 Days of Inspection
KO/FSCM
/NHOS
Facilities
Electronic As Specified
3.4.7 N/A Roofs and Roof
Drainage Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/FSCM
/NHOS
Facilities
Electronic As specified, Update as
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.4.7 N/A Roofs and Roof
Drainage Inspections
Within 7 Days of Inspection
KO/FSCM
/NHOS
Facilities
Section F – 1601000 Utilities Management
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 1601000
Spec Item
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original
Copies (includin g original)
3.1 N/A Service Order
Weekly Report
Mondays KO/Requireme nts Branch
Manager/COR
Electronic Weekly
3.1 N/A Service Order
Monthly Report, includes Consumed and Remaining Balance of Open Service Orders.
Within 5 business days after completion of the month.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly
3.2.1 N/A Electrical
System Single Line Drawing Sets
15 January and 15 July
Electrical Commodity
Manager
7 Semi Annually
3.2.1 N/A Natural Gas
System Drawing Sets
15 January and 15 July
Gas Commodity
Manager
3 Semi Annually
3.2.1 N/A Wastewater
System Drawing Sets
15 January and 15 July
Wastewater Commodity
Manager
3 Semi Annually
3.2.1 N/A Steam System
Drawing Sets
15 January and 15 July
Steam Commodity
Manager
3 Semi Annually
3.2.1 N/A Potable Water
System Drawing Sets
15 January and 15 July
Water Commodity
Manager
3 Semi Annually
3.2.1 N/A Chilled Water
System Drawing Sets
15 January and 15 July
Chilled Water Commodity
Manager
3 Semi Annually
3.2.1 N/A SCADA System
Drawing Sets
15 January and 15 July
SCADA
Program Manager
3 Semi Annually
3.2.2 N/A Scheduled
Outage Plan/ Service Disruption Plan
Within 15 days prior to contract start
KO/COR/
Utilities
Branch Head
2 Once for initial submittal, then as requested / Electronic
3.2.2 N/A Unscheduled
Outage Report
Within one business day of the outage.
KO/COR/
Utilities
Branch Head
2 As needed/ Electronic
3.2.2 J-1601000-14 Outage Request
Form
Within three business days of the outage.
KO/COR/
Utilities
Branch Head
2 As needed/ Electronic
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Item
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original
Copies (includin g original)
3.2.3 N/A Meter Readings Within one
business day of meter reading date
KO/FSCM/
Commodity
Manager
Electronic Monthly
3.2.3 N/A Re-read Meter Within 1 business
day of request
KO/FSCM/
Commodity
Manager
Electronic As Required
3.2.3 N/A Meter Reading
Spreadsheet titled “NASP
EXCEL ROUTE
Template – 05-C Route”
First Day of the Month
KO/FSCM/UE
M
Electronic Monthly
3.2.5 N/A Freeze
Protection Plan
Within 30 days following contract award.
KO/FSCM/UE
M
Electronic As Required
3.3.1 N/A UICAP Plan 30 calendar days
after contract award, NLT 15 calendar days prior to the new Contract Period thereafter.
KO/Requireme nts Branch
Manager/COR
Electronic Annually, Update as changes occur.
3.3.1 N/A Notification of
utility assets not included in the listing
Within 5 business days of discovery.
KO/FSCM/
Commodity
Manager
Electronic As Required
3.3.1 N/A Notification of
utility assets not properly tagged
Within 5 business days of discovery.
KO/FSCM/
Commodity
Manager
Electronic As Required
3.3.1 N/A Monthly
Maximo Asset Change Report
Within 5 work days after completion of the month.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly
3.3.1 N/A Monthly UICAP
Schedule Report
Five work days prior to the beginning of each month.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly
3.3.1 N/A Monthly UICAP
Status Report
Within 5 work days after completion of the month.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly
3.3.1 N/A Monthly UICAP
Unaccomplished Work Report
Within 5 work days after completion of the month.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly
3.3.2 N/A Annual UICAP
Report
Within 15 work days after completion of the contract period.
KO/Requireme nts Branch
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Item
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original
Copies (includin g original)
3.4.1 N/A SCADA status
report
Every Monday KO/FSCM/UE M
Electronic Weekly
3.4.2.1 N/A Integrated
Maintenance Plan
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract
Period annually thereafter.
KO/Requireme nts Branch
Manager/COR
Electronic Annually, Update as changes occur.
3.4.2.1 N/A Monthly IMP
Schedule
Five work days prior to the beginning of each month.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly
3.4.2.1 N/A IMP
Maintenance and Repair Status Report
Within 5 work days after completion of the month.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly
3.4.2.1 N/A IMP Monthly
Unaccomplished Work Report
Within 5 work days after completion of the month.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly
3.4.2.1.3 N/A Enclosure
Maintenance Plan
Within 30 calendar days after contract award, 15 calendar days prior to the new Contract
Period annually thereafter.
KO/Requireme nts Branch
Manager/COR
Electronic Monthly, Update as changes occur.
3.4.2.2 N/A Outage
Notification
At least 1-day prior to performing maintenance.
Commodity Managers
E-Mail As required
Section F – 1602000 Electrical
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 1602000
Form Attachment
Number Deliverable
Title Date (s) of
Submission
Distribution
Frequency Original/ Copies
Number of Copies (including original)
2.2.1 N/A Proof of all
Certification, Training, and
Licensing Requirements
Within 30 days following award, or as changes occur.
KO/ Electrical Commodity
Manager/FSCM
Electronic Once. Update as changes occur.
3.1 N/A Tree Trunks
within 3 ft. of Power Lines
Within 30 days of
Discovery
KO/COR Electronic As Specified
3.2 N/A Integrated
Maintenance
Program (IMP)
30 days after award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/ Electrical Commodity
Manager/FSCM
Electronic Annually, Update as changes occur.
3.2 N/A Monthly IMP
Schedule
5 business days prior to the beginning of each
KO/ Electrical Commodity
Manager/FSCM
Electronic Monthly
3.2 N/A Unaccomplished
IMP Work
Report
5 business days after the end of the month.
KO/ Electrical Commodity
Manager/FSCM
Electronic Monthly
3.2 N/A Repair Status
Report
5 business days after the end of the month.
KO/ Electrical Commodity
Manager/FSCM
Section F – 1603000 Natural Gas
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 1603000
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency
Original/ Copies
Number of Copies
(including original)
KO/Water Commodity
Manager/FSCM
Electronic, 4 ea. hard copies per occurrence
2.2.1 N/A Proof of all
Certification, and Licensing Requirements
Within 30 days following award, update as changes occur.
KO/Natural Gas Commodity
Manager/FSCM
Electronic Once. Update as changes occur.
3.1 N/A Notification of
Unsafe
Conditions Report
Within 24 hours of occurrence
KO/Natural Gas Commodity
Manager/FSCM
Electronic, 4 ea. hard copies per occurrence
As Specified
3.1.2 N/A Operating Logs
(Multiple)
Within 1 day of request
KO/Natural Gas Commodity
Manager/FSCM
Electronic As requested.
3.2 N/A Integrated
Maintenance
Program (IMP)
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/ Natural Gas Commodity
Manager/FSCM
Electronic Annually, update as changes occur.
3.2 N/A Monthly IMP
Schedule
5 business days prior to the beginning
KO/ Natural Gas
Manager/FSCM
Electronic Monthly
3.2 N/A Unaccomplished
Maintenance
Report
5 days after the end of the month.
KO/ Natural Gas Commodity Manager/FSCM
Electronic Monthly
3.2 N/A Repair Status
Report
5 days after the end of the month.
KO/ Natural Gas Commodity
Section F – 1604000 Wastewater
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 1604000
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency Original/ Copies
Number of Copies
(including original)
3.1 N/A Standard
Operating Procedures
30 calendar days after contract award, 15 calendar days prior to the new Contract
Period annually thereafter.
KO/Wastewater Commodity
Manager/FSCM
Electronic Annually, Update as changes occur
3.2 N/A Integrated
Maintenance
Program (IMP)
30 calendar days after contract award, 15 calendar days prior to the new Contract
Period annually thereafter.
KO/Wastewater Commodity
Manager/FSCM
Electronic Annually, Update as changes occur
3.2 N/A Monthly IMP
Schedule
5 business days prior to the beginning month
KO/Wastewater
Manager/FSCM
Electronic Monthly
3.2 N/A IMP
Maintenance and Repair
Status Report
5 business days after following the end of the month
KO/Wastewater Commodity
Manager/FSCM
Electronic Monthly
3.2 N/A IMP
Unaccomplished
Work Report
5 business days after following the end of the month
KO/Wastewater Commodity
Manager/FSCM
Electronic Monthly
3.3 N/A Inspection
Program and
Schedule
30 calendar days after contract award, 15 calendar days prior to the new Contract
Period annually thereafter.
KO/Wastewater Commodity
Manager/FSCM
Electronic Annually, update as
Section F – 1604000 Wastewater
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 1604000
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency Original/ Copies
Number of Copies
(including original)
3.3 N/A Inspection
Reports
Within 3 days of performing the
Inspection.
KO/Wastewater Commodity
Manager/FSCM
Electronic As required
3.3.1 N/A Manhole
Photographs and
Reports
15 days after performance of the work
KO/Wastewater Commodity
Manager
Electronic As required
3.3.2 N/A Wet Well
Photographs and
Reports
15 days after performance of the work
KO/Wastewater Commodity
Manager
Electronic As required
3.4.1 N/A Sampling
Records
5 business days after following the end of the
KO/Wastewater
Manager
Section F – 1605000 Steam
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F-1605000
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1 N/A Proof of all
Certification, Training, and Licensing Requirements
Within 30 days following award, update as changes occur.
KO/Steam Commodity Manager/FS
CM
Electronic Once.
Update as changes occur.
3.0 N/A Updated drawings, equipment inventories and diagrams Report
5 business days after the end of the month.
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.1 N/A Notification of
Unsafe Conditions Report
Within 24 hours of occurrence
KO/Steam Commodity Manager/FS
CM
Electronic , 4 ea hard copies per occurrenc e
As Specified
3.1 N/A Updated SOP’s Within 30 days of
Award, and within 5 calendar days after changes occur
KO/Steam Commodity Manager/FS
CM
Electronic As required
3.1.2 N/A Plant Boiler
Combustion Limits and Efficiencies
5 business days after the end of the month.
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.1.4 N/A Boiler Water
Testing and Treatment Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Steam Commodity Manager/FS
CM
Electronic As Required
3.1.4 N/A Boiler Water
Treatment Test Report
5 business days after the end of the month.
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.1.4 N/A Feed Water Test
Report
5 business days after the end of the month.
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.1.4 N/A Condensate Water
Test Report
5 business days after the end of the month.
KO/Steam Commodity Manager/FS
CM
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.1.6 N/A Operating Records, Logs and Reports
5 business days after the end of the month.
KO/Steam Commodity Manager/FS
CM
Electronic Excel
Monthly
3.1.6 N/A Daily operating
logs
Upon Request KO/Steam Commodity Manager/FS
CM
Electronic Excel
As Required
2.2.1 N/A Proof of all
Certification, and Licensing Requirements
Within 30 days following award, update as changes occur.
KO/Steam Commodity Manager/FS
CM
Electronic Once.
Update as changes occur.
3.1.6 N/A Monthly
Production Report
5 business days after the end of the month.
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.2 N/A Integrated
Maintenance Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Steam Commodity Manager/FS
CM
Electronic Annually, Update as
3.2 N/A Monthly IMP
Schedule
5 business days prior to the beginning of each month
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.2 N/A IMP Maintenance
and Repair Status Report
5 business days after following the end of the month
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.2 N/A IMP
Unaccomplished Work Report
5 business days after following the end of the month
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.3 N/A Inspection, Testing, and Certification Program
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Steam Commodity Manager/FS
CM
Electronic Annually, Update as
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
3.3 N/A Inspection, Testing, and Certification Program Summary Report
5 days after following the end of the month
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.3 N/A Boiler and UPV
Files
Within 3 business days of request
KO/Steam Commodity Manager/FS
CM
requested
Section F – 1606000 Water
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 1606000
Form Attachment
Number Deliverable
Title Date (s) of Submission
Distribution
Frequency Original/ Copies
Number of Copies
(including original)
2.2.1 N/A Proof of all
Certification, Training, and Licensing Requirements
Within 30 days following award, update as changes occur.
KO/Water Commodity
Manager/FSCM
Electronic Once.
Update as changes occur.
3.1 N/A Standard
Operating Procedures
30 days after award and 5 days after changes
KO/Water Commodity
Manager
Electronic As required
3.1 N/A Notification of
Unsafe Conditions Report
Within 24 hours of occurrence
KO/Water Commodity
Manager/FSCM
Electronic, 4 ea. hard copies per occurrence
As Specified
3.1.2 N/A Water Treatment
Plant Reports
Within 5 business days after completion of the month.
KO/Water Commodity
Manager
Electronic Monthly
3.1.3 N/A Notification of
Unsafe Conditions Report
Within 24 hours of occurrence
KO/Water Commodity
Manager/FSCM
Electronic, 4 ea. hard copies per occurrence
As Specified
3.3 N/A Integrated
Maintenance Program (IMP)
30 calendar days after contract award, 15 calendar days prior to the new Contract Period annually thereafter.
KO/Water Commodity
Manager/FSCM
Electronic Annually, Update as changes occur.
3.3 N/A Monthly IMP
Schedule
5 business days prior to the beginning of each month
KO/Water Commodity
Section F – 1606000 Water
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
3.3 N/A IMP
Maintenance and Repair Status Report
Within 5 business days after completion of the month.
KO/Water Commodity
Manager/FSCM
Electronic Monthly
3.3 N/A IMP
Unaccomplished Work Report
Within 5 business days after completion of the month.
KO/Water Commodity
Section F – 1607000 Chiller
N69450-21-R-0049
Pensacola Base Operations Support Naval Air Station Pensacola, Florida
Section F 1607000
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1 N/A Proof of all
Certification, Training, and Licensing Requirements
Within 30 days following award, update as changes occur.
KO/Chiller Commodity Manager/FS
CM
Electronic Once.
Update as changes occur.
3.0 N/A Updated drawings, equipment inventories and diagrams Report
Within 5 business days after the end of the previous month.
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.1 N/A Notification of
Unsafe Conditions Report
Within 24 hours of occurrence
KO/Chiller Commodity Manager/FS
CM
Electronic As specified
3.1 N/A Standard Operating
Procedures
Within 30 days of Award, and within 5 calendar days after changes occur
KO/Chiller Commodity Manager/FS
CM
Electronic As required
3.1 N/A Monthly
Operational Efficiency Report
Within 5 business days after the end of the previous month.
KO/Steam Commodity Manager/FS
CM
Electronic Monthly
3.1.1 N/A System Monitoring
Schedule
Within 30 days following award
KO/Chiller Commodity Manager/FS
CM
Electronic As specified
3.1.2 N/A Chiller Plant and
Hydronic Systems Testing and Treatment Program
Within 30 days following award
KO/Chiller Commodity Manager/FS
CM
Electronic Annually, Update as changes occur.
3.1.3 N/A Notification of
Unsafe Conditions Report
Within 24 hours of occurrence
KO/Chiller Commodity Manager/FS
CM
Electronic As specified
3.2 N/A Integrated
Maintenance Program
30 calendar days after contract award, 15…