12-R-0098_0002_Solicitation.pdf
PDF 22 KB Posted
- Attached to
- Engineering Support Services Federal contract opportunity
- Solicitation number
- N6893612R0098
About this file
Solicitation Extension and Answers 12-R-0098
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12-R-0098_CDRLS.pdf | ||
| 12-R-0098_0004.pdf | ||
| N68936-12-R-0098.pdf | ||
| 12-R-0098_0001_Solicitation_.pdf | ||
| Exhibit_A_CDRLS.pdf | ||
| Attachment-6-Ventura-County-CA-Wage-Determination.pdf | ||
| Attachment-7-St-Marys-MD-Wage-Determination.pdf | ||
| Attachment-5-Kern-County-CA-Wage-Determination.pdf | ||
| Attachment-P4-Past-Performance-Questionnaire.doc | DOC document | |
| Attachment-1-Data-Item-Transmittal-Acceptance-Rejection-Form.doc | DOC document | |
| 12-R-0098_Solicitation.pdf | ||
| Attachment-3-Scheduled-GFP-List.pdf | ||
| Attachment-P1-Workforce-Qualifications.xls | XLS spreadsheet | |
| Attachment-2-Incurred-Cost-Reporting-Data-Table.xls | XLS spreadsheet | |
| Attachment-P3-Past-Performance-Contract-Data.xls | XLS spreadsheet | |
| Attachment-4-Scheduled-GFP-Form-Filled.pdf | ||
| Attachment-8-Labor-Category-Qualifications.pdf | ||
| Draft_Statement_of_Work.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300287167
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to grant a one day extension on the due date for proposal submissions and answ er contractor questions.
1. CONTRACT ID CODE PAGE OF PAGES
U 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Apr-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N68936-12-R-0098
X 9B. DATED (SEE ITEM 11)
27-Mar-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Apr-2014
CODE
CDR NAWCWD CODE 254300D
ATTN: L. PETTY
(760) 939-2016
429 E BOWEN RD - STOP 4015
CHINA LAKE CA 93555
N68936 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N68936-12-R-0098
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 29-Apr-2014 03:00 PM to 30-Apr-
2014 03:00 PM.
The following have been added by full text:
AMENDMENT 2
The purpose for this amendment is to grant a one day extension on the due date for proposal submissions and answer contractor questions.
Questions and Answers:
Request 1: Contractor requests that the ESS proposal delivery date be extended by one day to Wed 30 Apr 2014 due to shipping constraints.
Answer:
Government grants one day extension by extending proposal due date to 30 April 2014.
Question 1:
Page 5 of the RFP calls for three program managers as key personnel. Page 98 identifies a local organization manager and a deputy local organization manager. Is it intended that two of the key program managers be the local organization manager and deputy local organization manager positions, or are the three program manager positions in addition to the local organization manager and the deputy local organization manager positions for the contract?
Answer 1:
Page 98 covers the management plan requirement of an offer. The ‘Local Organization Manager’ and ‘Deputy Local Organization Manager’ listed were used as an example of how the offeror should show the management structure of the organization and the duties/responsibilities of each manager proposed. The paragraph was not intended to construe a requirement for additional program managers nor was it intended to require those specific categories be included in an offer. The offeror is required to propose only three program managers and to describe the management roles of the proposed workforce.
Question 2:
Page 17 table shows the anticipated locations of various personnel. The table shows the two program managers at China Lake and the one at Pont Mugu as located at the Government's facility. Is this location a firm requirement, or was the location identified this way simply as a convenience to show that the Government had office space available for use by the program managers?
Answer 2:
The table 2 locations for the program manager positions are not a firm requirement. Due to the size and complexity of having multiple Task Orders located at Pt Mugu, a program manager would need to be located near the base (within the commuting area) of Pt Mugu. There is no requirement to have the program manager actually seated on base. The Government has office space for use by the program managers; however, they are not required to utilize it.
N68936-12-R-0098
(End of Summary of Changes)
File details come from the government source that posted it. Updated .