N6426725Q5016 - RFQ.pdf

PDF 865 KB Posted

Attached to
60' Dive Support Boat Federal contract opportunity
Solicitation number
N6426725Q5016
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is a Request for Quote (RFQ) issued by the Naval Sea Systems Command for one 60' aluminum Dive Support Boat to be delivered to Naval Submarine Base New London in Groton, Connecticut. The procurement includes the boat construction, an aft deck extreme cold weather enclosure, engineering and industrial services, spare parts, crew training, and shipping.

The contract will be awarded on a Lowest Price Technically Acceptable (LPTA) basis to a single contractor who must provide the boat in accordance with detailed specifications. Payment will be made through 15 progress events ranging from 2-18% of contract value, including post-award conference (2%), design maturity review (11%), hull welding completion (10%), builders trials (18%), and final acceptance (18%). The contractor must provide a one-year warranty and conduct crew familiarization training for up to 10 students at the end user location. No partial quotes are allowed. Offerors must be registered in SAM and submit quotes electronically. The boat must include unique item identification (UID) for items over $5,000 and the contractor must document cybersecurity component details as specified.

View the file

Other files for this federal contract opportunity

Other files attached to 60' Dive Support Boat, newest first.
File Type Posted
N6426725Q5016 - Amendment 3.pdf PDF
7_Attachment 19 - NAVSEACOMBATSYSENGSTA Report No. 6660-99 Rev A Procedures Manual for Stability Analysis of U.S. Navy Small Craft.PDF PDF
7_Attachment 23 - NSWCCD-23-TM-2009-61 RevA Boat Example Data Package.pdf PDF
7_Attachment 28 - NSWCCD-80-TR-2014-38 Weight Management Process Guidance.pdf PDF
7_Attachment 13 - Pricing CLIN Chart.xlsx XLSX spreadsheet
Attachment 14 - Questions and Answers.pdf PDF
7_Attachment 20 - NSWCCD-23-TM-2009-33 RevB Hoisting System Design and Certification Process Guidance.pdf PDF
7_Attachment 27 - NSWCCD-23-TM-2011-38 RevA Mooring Fitting Design and Verification Process Guidance.pdf PDF
N6426725Q5016 - Amendment 2.pdf PDF
7_Attachment 21 - NSWCCD-23-TM-2009-58 RevB Boat Electrical Practices.pdf PDF
7_Attachment 25 - NSWCCD-23-TM-2009-65 RevC Towing Fitting Design and Certification Process Guidance.pdf PDF
7_Attachment 16 - NAVSEA 0900 LP 060 4010 Fabrication Welding and Inspection of Metal Boat and Craft Hulls.pdf PDF
7_Attachment 22 - NSWCCD-23-TM-2009-59 Rev B Ungrounded Electrical Systems Verification Test.pdf PDF
7_Attachment 24 - NSWCCD-23-TM-2009-64 RevC Small Craft Transportability Design and Certification Process Guidance.pdf PDF
7_Attachment 26 - NSWCCD-23-TM-2011-05 Boat Mechanical Practices.pdf PDF
N6426725Q5016 - Amendment 1.pdf PDF
Attachment 4 - Notional DS Boat Arrangement.pdf PDF
Attachment 8 -Notional Dive Boat AC Power - One-Line.pdf PDF
Attachment 1 - DS Boat Specification Rev.pdf PDF
Attachment 2 - Specification Response Matrix.pdf PDF
Attachment 6 - Unique Item Identification.pdf PDF
Attachment 11 - Technical Data Rights Assertion.pdf PDF
Attachment 12 - Past Performance and Experience.pdf PDF
Attachment 9 - Warranty Terms.pdf PDF
Attachment 10 - Delivery Schedule.pdf PDF
Attachment 5 - Electrical Load Analysis AC Distribution.pdf PDF
Attachment 7 - DS Boat Spare Parts List.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6426725Q5016

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

DIVE SUPPORT BOAT

FFP

The Contractor shall build the boat in accordance with Section C: STATEMENT OF WORK and the Specification (Attachment 1 - DS Boat Specification Rev). All boat-specific efforts shall be included in the pricing for this CLIN.

NET AMT

0001AA 1 Each Event #1

FFP

Post Award Conference Event Percent Value: 2% Percentage of Task Completed: 2%

- See SECTION H for complete Event Table NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PSC CD: 1940

0001AB 1 Each Event #2

FFP

Start of Engineering Services Event Percent Value: 2% Percentage of Task Completed: 4%

- See SECTION H for complete Event Table

0001AC 1 Each Event #3

FFP

Ordering of Main Engines Event Percent Value: 4% Percentage of Task Completed: 8%

- See SECTION H for complete Event Table

0001AD 1 Each Event #4

FFP

Ordering of Major Components Event Percent Value: 4% Percentage of Task Completed: 12%

- See SECTION H for complete Event Table

0001AE 1 Each Event #5

FFP

Completion of successful DMR Event Percent Value: 11% Percentage of Task Completed: 23%

- See SECTION H for complete Event Table

0001AF 1 Each Event #6

FFP

Proof of Receipt of Major Components Event Percent Value: 9% Percentage of Task Completed: 32%

- See SECTION H for complete Event Table

0001AG 1 Each Event #7

FFP

Proof of Receipt for Main Engines Event Percent Value: 7% Percentage of Task Completed: 39%

- See SECTION H for complete Event Table

0001AH 1 Each Event #8

FFP

Proof of Receipt for Dive Compressor Event Percent Value: 5% Percentage of Task Completed: 44%

- See SECTION H for complete Event Table

0001AJ 1 Each Event #9

FFP

Proof of Receipt for Generator Event Percent Value: 4% Percentage of Task Completed: 48%

- See SECTION H for complete Event Table

0001AK 1 Each Event #10

FFP

Hull Completely welded Event Percent Value: 10% Percentage of Task Completed: 58%

- See SECTION H for complete Event Table

0001AL 1 Each Event #11

FFP

Delivery of Preliminary TDP Event Percent Value: 2% Percentage of Task Completed: 60%

- See SECTION H for complete Event Table

0001AM 1 Each Event #12

FFP

Builders Trials Event Percent Value: 18% Percentage of Task Completed: 78%

- See SECTION H for complete Event Table

0001AN 1 Each Event #13

FFP

Completion and Acceptance of PDIT Event Percent Value: 3% Percentage of Task Completed: 81%

- See SECTION H for complete Event Table

0001AP 1 Each Event #14

FFP

Acceptance of Boat Event Percent Value: 18% Percentage of Task Completed: 99%

- See SECTION H for complete Event Table

0001AQ 1 Each Event #15

FFP

Retentions Event Percent Value: 1% Percentage of Task Completed: 100%

- See SECTION H for complete Event Table

0002 1 Each

AFT DECK EXTREME COLD WEATHER ENCLOSURE

FFP

The Contractor shall construct an insulated extreme cold weather enclosure for the aft deck in accordance with Section 169-5 of the Specification (Attachment 1 - DS Boat Specification Rev).

0003 1 Each

SHIPPING

FFP

The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with SOW, Paragraph 5.3. Spare parts and items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping.

1001 1 Each

OPTION ENGINEERING & INDUSTRIAL SERVICES

FFP

The Contractor shall provide Engineering and Industrial Services in support of this contract in accordance with Section H of this Contract entitled “ENGINEERING &

INDUSTRIAL SERVICES.”

Section C - Descriptions and Specifications

GENERAL TEXT

USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paperbased or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

(End of text)

PERMITS AND RESPONSIBILITIES

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

ACCESS TO THE VESSEL

Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.

(End of Text)

PROTECTION OF THE SHIP DURING ADVERSE ENVIRONMENTAL CONDITIONS

The Contractor shall ensure that the ship(s) and all related material at the Contractor's facilities are protected during conditions of heavy weather, high winds, heavy snow and icing, high water or similar adverse environmental conditions. The Contractor shall develop, maintain, and implement as necessary an “Adverse Environmental Conditions Plan” which prescribes the actions and procedures and assigns responsibilities for action to be taken in preparation for and during the period of adverse environmental conditions. The Contractor shall furnish the plan to the Supervisor and shall make such changes in the plan as the Supervisor considers necessary to provide for adequate protection of the ship(s) and the materials and equipment to be installed therein.

APPROVAL BY THE GOVERNMENT

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

PROTECTION OF THE VESSEL

(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been off‑loaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.

(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirty‑five degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipe‑lines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the Contractor from frost damage by applied heat through the use of a salamander or other proper means.

(c) The work shall, whenever practicable, be performed in such manner as not to interfere with the work performed by military personnel attached to the vessel, and provisions shall be made so that personnel assigned shall have access to the vessel at all times, it being understood that such personnel will not unduly interfere with the work of the Contractor's workmen.

(d) The Contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees, or the work performed by the Contractor in accordance with this contract, and at the completion of such work shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity "broom clean", unless more exactly specified by the Supervisor.

ACCESS TO THE VESSELS BY NON-U.S. CITIZENS

(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST 5510.2D.

(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:

(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.

(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.

(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.

(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.

(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.

(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.

(3) Data reflecting the number, nationality, and positions held by non‑U.S. citizen employees, including procedures to update data as non‑U.S. citizen employee data changes, and pass to cognizant CAO

(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.

(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.

(c) To request approval for non-U.S. citizens of hostile and/or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non- U.S. citizens of hostile and/or communist-controlled countries.

(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated for default in accordance with the clause entitled "Default (Fixed-Price Supply And Service)" (FAR 52.249-8), "Default (Fixed-Price Research And Development)" (FAR 52.249-9) or "Termination (Cost Reimbursement)" (FAR 52.249- 6), as applicable.

(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.

(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.

(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S.

Navy personnel who are non-U.S. citizens and who are either assigned to the ship or require access to the ship to perform their duties.

LOGISTICS SUPPORT REQUIREMENT

(a) This requirement applies whenever the contract specifications, by reference to a Military Specification or otherwise, specify repair parts or stock components (hereinafter called "repair parts") for a ship component or item of equipment.

(b) With respect to ship components or equipment manufactured other than in the United States or Canada, in addition to any other data required by this contract, the Contractor agrees that it will furnish under this contract sufficient data so that the repair parts can be reproduced in the United States or Canada unless the suppliers of the ship components or equipment have made arrangements, satisfactory to the Contractor and approved by the Contracting Officer, for the manufacturing of repair parts in the United States or Canada. For the purpose of this requirement, "sufficient data" shall mean detail drawings and other technical information sufficiently extensive in detail to show design, construction, dimensions, and operation or function, manufacturing methods or processes, treatment or chemical composition of materials, plant layout, and tooling. All data shall be in the English language and according to the United States system of weights and measures, and drawings for components, assemblies, subassemblies and parts protected by U.S. patents shall contain a prominent notation to that effect fully identifying the patent or patents involved, and bearing the number of this contract.

(c) In order to satisfy the requirements of paragraph (b), above, unless the supplier of the ship components or equipment has made arrangements, satisfactory to the Contractor and approved by the Contracting Officer, for the manufacture of such repair parts in the United States or Canada, the Contractor shall include a clause in all subcontracts for the purchase of ship components or equipment from foreign sources, acceptable to the Contracting Officer, granting to the United States Government for a period of seven (7) years, "Government Purpose Rights" (as defined in paragraph (a) of the clause of this contract entitled "Rights In Technical Data--Other Than Commercial Products and Commercial Services" (DFARS 252.227‑7013) in all technical data necessary to manufacture spare and repair parts for such components or equipment.

DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT

(a) For the purposes of this requirement, the term “change” includes not only a change that is made pursuant to a written order designated as a “change order” but also (i) an engineering change proposed by the Government or the Contractor pursuant to other requirements of this contract and (ii) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment under the “Changes” clause or any other article or requirement of this contract.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect of a change made pursuant to a written order designated as a “change order” or in respect of a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect of any other act or omission to act on the part of the Government, the proposal supporting such request shall include the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of identifiable components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of identifiable raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work which is substituted or added by the change. A list of identifiable components and equipment (not bulk materials or items) involved, should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of disruption attributable solely to the change; which description shall include the following information:

(i) Description of each identifiable element of disruption and how work has been, or may be, disrupted;

(ii) The calendar period of time during which disruption occurred, or may occur;

(iii) Area(s) of the Contractor’s operations where disruption occurred, or may occur;

(iv) Trade(s) or functions disrupted, with a breakdown of manhours and material for each trade or function;

(v) Scheduling of trades before, during, and after period of disruption insofar as such scheduling may relate to or be affected by the estimated disruption;

(vi) Description of any measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work or increased costs attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the nature of the alleged Government act or omission, when the alleged Government act or omission occurred, and the “causal” relationship between the alleged Government act or omission and the claimed consequences thereof, cross-referenced to the detailed information provided as required above.

(c) Each proposal submitted in accordance with this requirement shall include a copy of the Contractor's ship's labor budget at the cost level in effect as of the date the event began, the cost incurred at the cost level as of the same date, and the proposed effect of the change at the cost class level.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in subparagraphs (b)(1) through (b)(8) above, or that the Contractor may not reasonably be able to furnish complete information on all of the factors listed in subparagraph (b)(1) through (b)(8) above. Accordingly, the Contractor is only required to set forth in its request for equitable adjustment information with respect to those factors which are relevant to the individual request for equitable adjustment, or in the level of detail which is reasonably available to the Contractor.

(e) In addition to any information required under paragraph (b) above, each proposal submitted in support of a claim for equitable adjustment, under any requirement of this contract, in an amount which requires certified cost or pricing data, shall contain such cost or pricing data as the Contracting Officer shall require with respect to each individual claim item, and shall be in sufficient detail to permit the Contracting Officer to cross‑reference the claimed increased costs, or delay in delivery, or both, as appropriate, with the information submitted pursuant to subparagraphs (b)(1) through (b)(8) hereof.

CONTRACTOR PROBLEM IDENTIFICATION REPORTS

(a) Contract Problem Identification Reports (CPIRs) shall be used by the Contractor for the purpose of alerting the Government to actual or potential contract problems and of establishing an early dialogue between the Contractor and the Government with regard thereto.

(b) A "contract problem" is a fact or circumstance of which the Contractor is aware that does, will or reasonably is anticipated to (1) have a significant or substantial impact on the delivery schedule or completion of contract performance or the cost of performance of the contract (increase or decrease) or (2) requires modification to the contract or specification(s). The terms "significant" and "substantial" shall be interpreted in the same manner as they would be interpreted by a reasonably prudent business person under the relevant circumstances.

(c) The Contractor shall report each contract problem promptly and in no event later than ten (10) calendar days, after the Contractor identifies such contract problem. A written CPIR shall be transmitted via the Administrative Contracting Officer (ACO) to the Procuring Contracting Officer and to the cognizant NAVSEA Program Office.

Each CPIR shall be entitled "Contract Problem Identification Report", shall be dated, numbered sequentially and shall set forth the following based on the best and most complete information then known or available to the Contractor:

(1) The nature of the contract problem;

(2) The date on which the contract problem arose and the date on which the contract problem was identified as such;

(3) The anticipated direct and consequential effects of the contract problem upon the delivery schedule or completion of contract performance or the cost of performance of the contract;

(4) Identification of the supplies and/or services which are or may be affected; and

(5) The Contractor's recommended solution to the reported contract problem

(d) Follow-up status reports of each contract problem, identified by the original CPIR number, shall be furnished monthly or more frequently as required by the Contracting Officer. A final follow-up report shall be furnished immediately following resolution of each contract problem.

(e) CPIRs shall not be submitted when notice of the same contract problem is required to be furnished to the Government pursuant to any other requirement of this contract. The submission of a CPIR, however, does not relieve the Contractor of its obligations to provide notice required under any other requirement of this contract.

EXTENSION OF COMMERCIAL WARRANTY

The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software.

Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.

DRY-DOCKING FACILITIES AND SHIPBUILDING WAYS CERTIFICATION

Dry-docking facilities and shipbuilding ways employed in the performance of this contract shall be certified in accordance with MIL‑STD‑1625D (SH) dated 27 August 2009, Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships. The "Facility Certification Report" shall be submitted to NAVSEA Code 04 via the cognizant Supervisor of Shipbuilding not less than twelve (12) months prior to the scheduled launching of the first vessel constructed under this contract.

(End of Text)

COMMONALITY AND STANDARDIZATION

The Contractor shall develop and implement a Commonality and Standardization Plan, reducing range and increasing depth of like equipment, to enhance supportability, minimize life cycle costs, and increase system readiness and interoperability across ships/ship classes through the selection of equipment and components which are, to the maximum extent possible, (1) common for application within the Class and (2) common with equipment/components currently installed in U.S. Navy ships. The Contractor shall utilize both Industry (e.g., the Common Parts Catalog) and Government (e.g., NAVSEA Enterprise Commonality Virtual Shelf and the Hull, Mechanical and Electrical Equipment Data Research System (HEDRS)) tools to implement its Commonality and Standardization Plan. For selecting Hull Mechanical and Electrical (HM&E) equipment/components, the Contractor shall utilize NAVSEA Enterprise Commonality Virtual Shelf before other tools, if the items meet the contract requirements. The Virtual Shelf is a web-based repository of HM&E equipment/components that meet cross-platform requirements and specifications and provide superior Total Ownership Cost (TOC). Information to gain access to the Virtual Shelf is located on the following web site: https://www.pdrep.csd.disa.mil/.

DEPARTMENT OF LABOR SAFETY AND HEALTH STANDARDS FOR SHIPBUILDING

Attention of the Contractor is directed to Public Law 91‑596, approved December 29, 1970 (84 Stat. 1590, 29 USC

655) known as the "Occupational Safety and Health Act of 1970" and to the "Occupational Safety and Health Standards for Shipyard Employment" promulgated thereunder by the Secretary of Labor (29 CFR. 1910 and 1915).

These regulations apply to all shipbuilding and related work, as defined in the regulations. Nothing contained in this contract shall be construed as relieving the Contractor from any obligations which it may have for compliance with the aforesaid regulations.

EQUITABLE ADJUSTMENTS: WAIVER AND RELEASE OF CLAIMS

(a) Whenever the Contractor, after receipt of a change made pursuant to the clause of this contract entitled "Changes" or after affirmation of a constructive change under the clause entitled "Notification Of Changes", submits any claim for equitable adjustment under the foregoing, such claim shall include all types of adjustments in the total amounts to which the foregoing entitle the Contractor, including but not limited to adjustments arising out of delays or disruptions or both caused by such change.

(b) Further, the Contractor agrees (except as the parties may otherwise agree) that, if required by the Contracting Officer, it will execute a release, in form and substance satisfactory to the Contracting Officer, as part of the supplemental agreement setting forth the aforesaid equitable adjustment, and that such release shall discharge the Government, its officers, agents and employees, from any further claims including but not limited to further claims arising out of delays or disruptions or both, caused by the aforesaid change.

STATEMENT OF WORK

SALES TAX EXEMPTION

The contractor is hereby advised that the United States Government and Agencies thereof are exempt from State and Local Government tax by virtue of Article 6 of the United States Constitution. No exemption certificate is required.

This is an official Request for Quote (RFQ) under FAR Part 13.

This procurement contains the following contract type(s): FFP – Firm-Fixed Price

60’ Dive Support Boat

1. INTRODUCTION

PMS300 requires the procurement and delivery of one (1) 60’ aluminum Dive Support (DS) Boat to NSSF NEW LONDON w/ cold weather Enclosure located in Groton, Connecticut as directed by OPNAV N97.

2. BACKGROUND

Dive boats serve US Navy divers in underwater ship’s husbandry, maintenance, repair, and cleaning of various vessels and other assets at Naval Bases, Shipyards and other activities, and other salvage and diving operations worldwide. These boats directly support material readiness and mission readiness of various vessels and carriers.

3. SCOPE

The Contractor shall provide and deliver one (1) Dive Support Boat in accordance with this Statement of Work (SOW), Paragraph 5.0 Requirements.

4. APPLICABLE DOCUMENTS

N/A

5. REQUIREMENTS

5.1 GENERAL STATEMENT OF WORK

This Statement of Work (SOW) defines the effort required for the design, build, testing, configuration control, documentation, and program management for the acquisition of the Dive Support Boat.

Only the Procuring Contracting Officer (PCO) has the authority for the U.S. Navy to authorize or change work and sign contract documents. No other personnel are authorized by their formal communications or by their course of conduct to commit the U.S. Navy to price changes, schedule changes, or to perform different or additional work. The Contractor shall only execute tasking or requests for support under this contract when such direction comes from, or is agreed to by, the PCO.

The award of the contract does not indicate the Government has approved or certified the design provided with the proposal. The Contractor shall remain fully responsible for delivering the boat, which meets the requirements of this Contract.

5.1.1 BACKGROUND

Dive operations are primarily conducted via surface support air to conduct underwater ships husbandry for surface ship and submarine availabilities and repairs. Basic underwater ships husbandry for surface ships include cofferdam installations to support internal work, hull inspections, propeller inspections and change-outs, underwater painting and epoxy repairs, photography (both still and video), and masker emitter belt cleaning.

5.1.2 QUANTITIES

The contract is for one (1) boat.

5.1.3 DESIGN, MANAGEMENT AND PRODUCTION

The Contractor will be responsible for managing all activities (design, engineering, logistics, testing and production) under this contract for successful execution. After award the Government will conduct a Design Maturity Review with the Contractor that will occur prior to the start of Initial Production.

5.2 CONTRACT LINE ITEM NUMBER DESCRIPTIONS

5.2.1 CLIN 0001– DIVE SUPPORT BOAT

The Contractor shall build the boat in accordance with SOW, Paragraph 5.3 below and the Specification (Attachment 1 - DS Boat Specification Rev). All boat-specific efforts shall be included in the pricing for this CLIN including:

5.2.1-1 BOAT– The Contractor shall provide the boat in accordance with the Specification (Attachment 1 DS Boat Specification Rev).

5.2.1-2 UID – The Contractor shall provide Unique Item Identification (UID) and Documentation for every boat in accordance with DFARS Clause 252.211-7003 and the requirements provided in the UID (Attachment 6 - Unique Item Identification Item Identification).

5.2.1-3 BOAT SPARES – The Contractor shall provide initial boat spares for the boat in accordance with Attachment 7 - DS Boat Spare Parts List and SOW, Paragraph 5.3 below.

5.2.1-4 COPY OF BOAT SPECIFIC TECHNICAL DATA PACKAGE (TDP) – The contractor shall provide for each boat one hard copy and one electronic copy (CD/DVD) of the Final TDP specific to each boat.

5.2.1-5 PRE-DELIVERY INSPECTIONS AND TRIALS (PDIT)

The Contractor shall perform boat Pre-Delivery Inspections and Trials (PDIT), in accordance with SOW, Paragraph 5.3 and the Specification (Attachment 1 - DS Boat Specification Rev), Section 094.

5.2.1-6 CREW FAMILIARIZATION AND TRAINING

The Contractor shall provide crew familiarization and training, in accordance with SOW, Paragraph

5.3. Crew familiarization training will be scheduled at a mutually agreeable time following receipt and issue of the boat at the end user location.

5.2.2 CLIN 0002 – AFT DECK EXTREME COLD WEATHER ENCLOSURE

The Contractor shall build an insulated extreme cold weather enclosure for the aft deck in accordance with Section 169-5 of the Specification (Attachment 1 - DS Boat Specification Rev).

5.2.3 CLIN 0003– ENGINEERING & INDUSTRIAL SERVICES

The Contractor shall provide Engineering and Industrial Services in support of this contract in accordance with Section H of this Contract entitled “ENGINEERING & INDUSTRIAL SERVICES.” The work to be performed shall consist of that which is required to support the program in any of the following areas:

Design Engineering & Production Services, and Testing Phase Support. Requirements under this CLIN might include, but are not limited to changes to the configuration baseline, Government requirements identified during pre-delivery inspection, issue resolution support during Government testing, and the development of various engineering products. Examples of work that might be accomplished under this CLIN include equipment installation, rigging support, component replacement, minor design upgrades and subject matter expert technical assistance. The requirements associated with this CLIN are over and above those specified in other contract CLINs.

5.2.4 CLIN 0004 – SHIPPING - The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with SOW, Paragraph 5.3. Spare parts and items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping.

5.3 STATEMENT OF WORK, DESIGN, PRODUCTION AND DOCUMENTATION

5.3.1 CONFERENCES AND REVIEWS

The Contractor shall conduct a Post Award Conference (PAC) and Progress Reviews. The Contractor shall prepare meeting minutes.

5.3.1-1 Post Award Conference: The Contractor shall conduct a PAC with the Government within 45 days after contract award and subsequent boat option exercise, as needed. The conference will be held at the Contractor’s facility or by phone at the Government’s discretion. The purpose of the conference is to (1) review the contract and technical documents, (2) review the technical and schedule requirements, and (3) discuss the roles and working relationships between the Contractor and the Government.

5.3.1-2 Design Maturity Review (DMR): The Contractor shall schedule and host Government personnel for a DMR prior to the start of the building of the first boat. The DMR shall be scheduled at least 30 days prior to the review. The purpose of the DMR is to demonstrate that the design is sufficiently mature to start building and that the status of material ordering and delivery will support the proposed build schedule. Any potential risk areas shall be identified and mitigation plans discussed.

The Government should be satisfied that all requirements in the Specification (Attachment 1 - DS Boat Specification Rev) have been incorporated into the design. The Government will notify the Contractor within 7 days of the Design Maturity Review whether or not the start of building the boat is authorized.

The following shall be provided 14 days prior to the Design Maturity Review:

A. Updated Design, Production, and Delivery Schedule, including:

• Production facilities: The Contractor shall provide evidence of the facilities readiness,

• Production Manning: The Contractor shall provide evidence that manning resources are available to support planned production, B. Material and purchased parts status, including but not limited to:

• hull and deck materials,

• major equipment,

• long-lead time items.

C. Preliminary Master Data Index.

D. DRAFT Technical Design Analyses for final Government Approval:

• Allocated Baseline Weight Estimate (ABWE),

• Initial Stability (including General HydroStatics (GHS) geometry and run files used in the analysis).

E. Preliminary Technical Design Analyses demonstrating approach and maturity of the design, including but not limited to:

• Electrical load analysis,

• HVAC Sizing and Insulation Design,

• Engine Room and Dive Equipment Room Ventilation Sizing and Design.

F. Preliminary build drawings to support reviews of Technical Design Analyses and demonstrate the approach to meet the Specification, including but not limited to:

• Outboard Arrangement Drawing,

• Inboard Arrangement Drawing,

• AC and DC Electrical One Line Drawings,

• Hoisting Drawing, G. Description of approach to completing Preliminary Test Plans, including but not limited to:

• Scale Weight,

• Pull Tests,

• Fuel Tank(s) and System(s) Pressure Tests

H. Specification Review of Proposed Equipment, submitted in Microsoft Word/Excel format for review of proposed commercial off-the-shelf (COTS) products intended to meet the requirements of the specification for the following, at minimum:

• Electrical cabling and circuit protection,

• Lighting,

• HVAC systems,

• Safety equipment (e.g. detectors, alarms, etc.),

• Outfitting,

• Any proposed brand name “equals” (see Attachment 1 - DS Boat Specification Rev, Section 042),

• Any additional items identified by the Contractor or Government during the Post

Award Conference.

I. Requests For Variance (RFV): There shall be no open RFVs. Contract Problem Identification

Reports (CPIRs) shall have a documented resolution.

J. Risk Assessment: an assessment of risk and the risk management approach to eliminate or mitigate those risks.

5.3.1-3 Progress Reviews: Progress Reviews shall be held at the Contractor’s discretion or by Government request, as needed to support the production schedule. Reviews will be held at the Contractor’s facility or by phone and shall not interfere with continued progress or production of the boat. Reviews shall not be used as approval to proceed in design or production, unless otherwise specified, and should be used only for informing the Government of process on production, builder questions, and impending risk to program.

5.3.2 WARRANTY

The Contractor will correct defects for the boat, and all installed equipment, for minimum of 1 year, starting from the date the boat is officially issued to the Navy's end-user after the contractor resolves all discrepancies from the Post Delivery Inspection Report (PDIR) in accordance with the warranty provided in Attachment 9 - Warranty Terms.

5.3.3 PROGRAM MANAGEMENT

Roles and Responsibilities

5.3.3-1 The Contractor shall establish a project management structure that ensures overall quality of the boat components, consistent with their chosen engineering and manufacturing approach.

5.3.3-2 The Contractor shall designate a Project Manager (PM) to serve as the principal representative of the Contractor throughout the duration of contract performance. The PM shall be responsible for the performance of the contract and on-time delivery of technically compliant boats and associated equipment. At all times, the PM shall have the responsibility for ensuring program integrity and overall contract performance. The contractor shall ensure that administration, logistics, financial and other task requirements pertinent to contract performance are addressed.

5.3.3-3 The Government points of contact are listed in Section G - Contract Administration Data, GENERAL TEXT, GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT

AND RESPONSIBILITIES (c) and (d).

5.3.4 INVOICES

The Contractor shall provide affidavits or invoices from the suppliers of all essential materials used in the building of the boat. The affidavits or invoices shall be used together with records identifying the lot or serial numbers of the boat in which such materials were used.

5.3.5 SPARES

5.3.5-1 Boat (initial) Spares: The Contractor shall provide initial spares for the boat as outlined in Attachment 7 - DS Boat Spare Parts List. The spares provided for the boat shall match the propulsion configuration/OEM installed on the boat. Spares shall be managed as part of the configuration management process and the Contractor shall inform the Government of any necessary part number updates that will be required throughout the execution of this contract. Boat and Spares shall be packaged and marked in accordance with Section D of this contract.

5.3.5-2 Updates: The Contractor shall recommend updates to the contract spares list throughout the life- cycle of this contract. It is anticipated that parts will become obsolete or newer parts will become available that should be provided as part of spares offered.

5.3.6 DELIVERY

The Contractor shall safely deliver the boat to the awarded location, as defined in Section F of this contract.

The Contractor shall be responsible for ensuring the boat is delivered fully assembled, operational, in original condition and still meets the Specification (Attachment 1 - DS Boat Specification Rev) requirements upon delivery. The boat may be delivered on the water, under its own power, to the final destination. Main engine hours at final delivery should be less than 350 hours per engine. If delivered in this manner, all periodic maintenance shall be conducted (oil changes, filter changes, cleanings or any other item or action required by the equipment’s OEM/manual), logged along with date, hours of the equipment or other relevant data, and any spare liquids, filters, etc., that are used, shall be replaced prior to final acceptance of the boat. The boat shall be properly cleaned and restored to like-new condition following the delivery trip. The boat shall be hauled-out and the hull shall be pressure washed, hull paint touched up, repairs made if necessary, and made available for inspection by the Government at a location not more than approximately a 4-hour drive from the final destination. A log of the trip shall be made, including passage descriptions, speeds, engine RPMs, all stop-overs, any equipment failures and remedies, or any other significant issues arising. The log shall be presented to the Government at final delivery. The boat shall be inspected in accordance with Section E and all PDIR discrepancies must be resolved prior to acceptance by the Government.

5.3.7 ESSENTIAL CYBERSECURITY COMPONENT (ECSC) DATA COLLECTION

For each boat the Contractor shall document and provide the Essential Cybersecurity Component (ECSC) details of hardware model/part number, hardware serial number, software version, and firmware version in accordance with Sections 085 of the Specification (Attachment 1 - DS Boat Specification Rev).

5.3.8 TECHNICAL DATA PACKAGE

5.3.8-1 General: The Contractor shall provide a copy of the Technical Data Package (TDP) with the boat in accordance with Section 085 of the Specification (Attachment 1 - DS Boat Specification Rev).

The costs (e.g. print, arrange, bind, etc.) to provide a copy of the TDP, including updating boat applicability and individual boat certifications, shall be included in the unit prices under the corresponding Boat CLIN.

5.3.8-2 Format: Drawings shall be provided in hard copy, DWG/DXF format and PDF format. Boat technical manual and COTS manuals, instructions or cut sheets, certifications, analyses, master data index, and all other data shall be provided in hard copy and PDF format. Calculations shall be submitted in their native electronic format.

5.3.8-3 Data Security: Most of the data in the TDP is considered Controlled Unclassified Information (CUI) and therefore, the Contractor shall exchange data with the Government via a Government provided Integrated Digital Environment (IDE) or Government approved File Exchange Server utilizing appropriate Public Key Infrastructure/Information Assurance protocols.

5.3.8-4 Submittal: A complete preliminary TDP shall be submitted electronically to the TPOC a minimum of 45 days prior to pre-delivery inspection and trials (PDIT). The Government will provide comments and questions on the preliminary TDP. Early submittals are encouraged and will be reviewed as soon as practicable. One hard copy of the TDP and one electronic copy of the TDP shall be provided at each PDIT for additional Government review. Any additional TDP comments will be included in the PDIT Discrepancy List. The Contractor shall respond to the comments either by correction/incorporation or by providing Contractor responses (e.g. resolution plan, notification of boat correction, clarification questions, etc.) within 15 days of the PDITs.

One hard copy and one electronic copy (CD/DVD) of the Final TDP (with all comments incorporated) shall be provided with the delivery of the boat. One electronic copy of the Final TDP (with all comments incorporated) shall be submitted to the Government TPOC concurrent with delivery of the boat.

5.3.8-5 TDP Acceptance: Government acceptance of the preliminary technical analysis package, preliminary TDP, and final TDP for payment events is predicated upon accuracy (data matching the as-built configuration of the boat) and completeness (all technical data provided with status/rationale provided for any outstanding/missing data).

5.3.9 DATA RIGHTS

5.3.9-1 It is the Government's desire that all non-commercial technical data (TD) included in the TDP (baseline or as modified by any Engineering Change Proposals) be delivered with a minimum of Government Purpose Rights (as defined in DFARS 252.227-7013 and 252.227-7014). If the Offeror proposes to deliver commercial TD, it is the Government’s desire to obtain a license to the commercial TD that would grant the Government the equivalent of Government Purpose Rights as a minimum.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .