Attachment 5 - Electrical Load Analysis AC Distribution.pdf

PDF 73 KB Posted

Attached to
60' Dive Support Boat Federal contract opportunity
Solicitation number
N6426725Q5016
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is an electrical load analysis spreadsheet showing AC power distribution requirements for a 60' dive support boat. The document details electrical loads across three voltage categories: 240VAC (for HVAC systems, water pumps, and various receptacles), 120VAC (for lighting, appliances, battery chargers, and general receptacles), and 480VAC (for dive compressors, hydraulic power units, and heavy equipment receptacles). The analysis breaks down usage factors and adjusted loads for different operational conditions including shore power, transit, and dive operations, in both summer and winter conditions.

The spreadsheet includes specific equipment loads such as multiple HVAC units for the main cabin, pilothouse and galley, water heaters, exhaust fans, battery chargers, and dive support equipment. Each line item specifies the quantity, phase, voltage, and usage factors. The document appears to be part of the technical specifications for procurement of a dive support vessel, providing detailed electrical system requirements that bidders must meet in their vessel design and construction.

View the file

Other files for this federal contract opportunity

Other files attached to 60' Dive Support Boat, newest first.
File Type Posted
N6426725Q5016 - Amendment 3.pdf PDF
N6426725Q5016 - Amendment 2.pdf PDF
7_Attachment 21 - NSWCCD-23-TM-2009-58 RevB Boat Electrical Practices.pdf PDF
7_Attachment 25 - NSWCCD-23-TM-2009-65 RevC Towing Fitting Design and Certification Process Guidance.pdf PDF
7_Attachment 19 - NAVSEACOMBATSYSENGSTA Report No. 6660-99 Rev A Procedures Manual for Stability Analysis of U.S. Navy Small Craft.PDF PDF
7_Attachment 23 - NSWCCD-23-TM-2009-61 RevA Boat Example Data Package.pdf PDF
7_Attachment 28 - NSWCCD-80-TR-2014-38 Weight Management Process Guidance.pdf PDF
7_Attachment 13 - Pricing CLIN Chart.xlsx XLSX spreadsheet
Attachment 14 - Questions and Answers.pdf PDF
7_Attachment 20 - NSWCCD-23-TM-2009-33 RevB Hoisting System Design and Certification Process Guidance.pdf PDF
7_Attachment 27 - NSWCCD-23-TM-2011-38 RevA Mooring Fitting Design and Verification Process Guidance.pdf PDF
7_Attachment 16 - NAVSEA 0900 LP 060 4010 Fabrication Welding and Inspection of Metal Boat and Craft Hulls.pdf PDF
7_Attachment 22 - NSWCCD-23-TM-2009-59 Rev B Ungrounded Electrical Systems Verification Test.pdf PDF
7_Attachment 24 - NSWCCD-23-TM-2009-64 RevC Small Craft Transportability Design and Certification Process Guidance.pdf PDF
7_Attachment 26 - NSWCCD-23-TM-2011-05 Boat Mechanical Practices.pdf PDF
N6426725Q5016 - Amendment 1.pdf PDF
Attachment 4 - Notional DS Boat Arrangement.pdf PDF
Attachment 8 -Notional Dive Boat AC Power - One-Line.pdf PDF
Attachment 1 - DS Boat Specification Rev.pdf PDF
Attachment 2 - Specification Response Matrix.pdf PDF
Attachment 6 - Unique Item Identification.pdf PDF
Attachment 11 - Technical Data Rights Assertion.pdf PDF
Attachment 12 - Past Performance and Experience.pdf PDF
Attachment 9 - Warranty Terms.pdf PDF
Attachment 10 - Delivery Schedule.pdf PDF
N6426725Q5016 - RFQ.pdf PDF
Attachment 7 - DS Boat Spare Parts List.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description Supplier OEM P/N Qty Phase Volts Amps PF Attached Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

240VAC Loads Stbd #4 Main Cabin HVAC * 1 1 240 1.0 1.0 1.0 1.0 1.0 1.0 Pilothouse HVAC ** 1 1 240 1.0 1.0 1.0 1.0 1.0 1.0 D.E.R. 240VAC Receptacle 1 1 240 0.1 0.1 0.1 0.1 0.3 0.3 Water Heater 1 1 240 0.3 0.1 0.3 0.3 0.1 0.3 Port #1 Main Cabin HVAC * 1 1 240 1.0 1.0 1.0 1.0 1.0 1.0 Stbd #3 Main Cabin HVAC * 1 1 240 1.0 1.0 1.0 1.0 1.0 1.0 Aft Deck 240VAC Receptacle #1 1 1 240 0.1 0.1 0.1 0.1 0.3 0.3 Aft Deck 240VAC Receptacle #2 1 1 240 0.1 0.1 0.1 0.1 0.3 0.3 Aft Deck 240VAC Receptacle #3 1 1 240 0.1 0.1 0.1 0.1 0.3 0.3 Main Cabin 240VAC Receptacle 1 1 240 0.1 0.1 0.1 0.1 0.3 0.3 Engine Ventilation Exhaust Fan 1 1 240 0.1 1.0 1.0 0.1 1.0 1.0 Port #2 Main Cabin HVAC * 1 1 240 1.0 1.0 1.0 1.0 1.0 1.0 Port #1 Main Cabin HVAC Heat Module 1 1 240 0.0 0.0 0.0 1.0 1.0 1.0 Port #2 Main Cabin HVAC Heat Module 1 1 240 0.0 0.0 0.0 1.0 1.0 1.0 Stbd #3 Main Cabin HVAC Heat Module 1 1 240 0.0 0.0 0.0 1.0 1.0 1.0 Stbd #4 Main Cabin HVAC Heat Module 1 1 240 0.0 0.0 0.0 1.0 1.0 1.0 Pilothouse HVAC Heat Module 1 1 240 0.0 0.0 0.0 1.0 1.0 1.0 Galley HVAC *** 1 1 240 1.0 1.0 1.0 1.0 1.0 1.0 Galley HVAC Heat Module 1 1 240 0.0 0.0 0.0 1.0 1.0 1.0 Dive Room Exhaust Fan 1 1 240 1.0 1.0 1.0 1.0 1.0 1.0 Dive Room Intake Fan 1 1 240 1.0 1.0 1.0 1.0 1.0 1.0 Fresh Water Pump 1 1 240 0.1 0.2 0.5 0.1 0.2 0.5 HVAC Sea Water Pump 1 1 240 0.9 0.9 0.9 0.9 0.9 0.9 LP Compressor 1 1 240 0.1 0.2 0.5 0.1 0.2 0.5 Black Water Discharge Pump 1 1 240 0.1 0.0 0.0 0.1 0.0 0.0 120VAC Loads Port Engine Block Heater 1 1 120 0.1 0.0 0.0 0.6 0.0 0.0 Stbd Engine Block Heater 1 1 120 0.1 0.0 0.0 0.6 0.0 0.0 Port Generator Block Heater 1 1 120 0.1 0.0 0.0 0.6 0.0 0.0 Stbd Generator Block Heater 1 1 120 0.1 0.0 0.0 0.6 0.0 0.0 Engine Room Heater 1 1 120 0.0 0.0 0.0 1.0 1.0 1.0 Engine Room Receptacles 2 1 120 0.1 0.1 0.1 0.1 0.1 0.1 Lazarette Receptacles 1 1 120 0.1 0.0 0.0 0.1 0.0 0.0 Lazarette Fan 1 1 120 0.1 0.5 0.5 0.1 0.5 0.5 Window Defogger / Head Recpt 5 1 120 0.0 0.1 0.1 0.0 0.5 0.2 Fwd Ventilation Fan 1 1 120 0.1 0.5 0.5 0.1 0.5 0.5 Galley Receptacles 4 1 120 0.1 0.5 0.5 0.1 0.5 0.5 Exterior Deck Lighting 14 1 120 0.1 0.5 0.5 0.1 0.5 0.5 Exterior Upper Deck Lighting 3 1 120 0.1 0.1 0.5 0.1 0.1 0.5 Bowthruster Battery Charger 1 1 120 0.5 0.0 0.0 0.5 0.0 0.0 Dive Room Receptacles 4 1 120 0.1 0.1 0.2 0.1 0.1 0.3 Dive Equip Rm Heater 1 1 120 0.0 0.0 0.0 1.0 1.0 1.0 Lazarette Heater 1 1 120 0.0 0.0 0.0 1.0 1.0 1.0 Aft Deck Receptacles #1 2 1 120 0.1 0.1 0.2 0.1 0.1 0.3 Aft Deck Receptacles #2 2 1 120 0.1 0.1 0.2 0.1 0.1 0.3 Main Engine / Gen Battery Charger 1 1 120 0.5 0.0 0.0 0.5 0.0 0.0 House Battery Charger 1 1 120 0.5 0.0 0.0 0.5 0.0 0.0 Galley Heater 1 1 120 0.0 0.0 0.0 1.0 1.0 1.0 Monkey Heater 1 1 120 0.0 0.0 0.5 0.0 0.0 1.0 Refrigerator 1 1 120 0.3 0.3 0.3 0.3 0.3 0.3 Fire Alarm System 1 1 120 0.1 0.1 0.1 0.1 0.1 0.1 Coffee Maker 1 1 120 0.3 0.3 0.3 0.3 0.3 0.3 Microwave Oven 1 1 120 0.1 0.1 0.1 0.1 0.1 0.1 Main Cabin Receptacles 7 1 120 0.1 0.5 0.5 0.1 0.5 0.5 Pilothouse Receptacles 2 1 120 0.1 0.1 0.1 0.1 0.1 0.1 Pilothouse Lighting 1 1 120 0.3 1.0 1.0 0.3 1.0 1.0 TOTAL 120 and 240 VAC LOADS (kW) Available Power (1 Generator) Load as a Percentage of Available Power (%)

Summer Conditions Winter Conditions ShoreShore Transit Dive Operations Dive OperationsTransit

Description Supplier OEM P/N Qty Phase Volts Amps PF Attached Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

Usage Factor

Adjusted Load (kW)

480 VAC Loads DER 480VAC Receptacle 1 3 480 0.1 0.0 0.1 0.1 0.0 0.1 Main Cabin 480VAC Receptacle 1 3 480 0.1 0.0 0.1 0.1 0.0 0.1 Dive Compressor 1 3 480 0.9 0.0 0.9 0.9 0.0 0.9 Seawater Pump / Cofferdam Eductor 1 3 480 0.0 0.0 0.3 0.0 0.0 0.3 Hydraulic Power Unit, 15HP 1 3 480 0.0 0.0 0.3 0.0 0.0 0.3 Aft Work Deck Receptacle 480VAC 1 3 480 0.1 0.0 0.1 0.1 0.0 0.1 TOTAL 480 VAC LOADS (kW) Available Power (1 Generator) Load as a Percentage of Available Power (%)

Total Loads (480VAC & 240/120VAC) (kW) Available Power w/ Paralleled Generators, XXkW each (kW) Load as Percentage of Available Power w/2 generators (%)

Winter ConditionsSummer Conditions Dive Operations TransitShore Dive OperationsTransitShore

File details come from the government source that posted it. Updated .