About this file

This document is a Notice containing questions and answers related to Request for Proposal (RFP) N62742-24-R-1313 for the construction of the FY24 MCON P-870 9th Engineering Support Battalion (ESB) Training Complex at US NAVSUPPACT, Marine Corps Base, Guam.

The key details include: 1) Clarification that all new electrical work shown on Drawing E-601 is the responsibility of the contractor; 2) The government will accept an interim CPARS evaluation for past performance projects that are at least 90% complete if a final CPARS is not available; 3) The contractor shall provide the Commissioning Provider (CxC) per the requirements; 4) The main water line layout is shown on the plans, with additional details in the isometric drawing; and 5) A subcontracting plan is not required for this submittal. Overall, the document provides clarification and responses to specific questions related to the RFP requirements.

View the file

Other files

File Type Posted
24R1313 P870 Notice6.pdf PDF
24R1313 P870 Notice5.pdf PDF
24R1313 P870 Notice4.pdf PDF
N627224R1313_Amd0005.pdf PDF
AMD 0005_P-870_Specifications.pdf PDF
AMD 0004_P-870_Drawings.pdf PDF
AMD 0004_P-870_Specifications.pdf PDF
N627224R1313_Amd0004.pdf PDF
24R1313 P870 Notice5.pdf PDF
AMD 0003_P-870_Specifications.pdf PDF
AMD 0003_P-870_Drawings.pdf PDF
N627224R1313_Amd0003.pdf PDF
24R1313 P870 Notice4.pdf PDF
24R1313 P870 Notice3.pdf PDF
24R1313 P870 Notice3.pdf PDF
24R1313 P870 Notice2.pdf PDF
AMD 0002_P-870_Drawings_Signed.pdf PDF
N627224R1313_Amd0002.pdf PDF
N627224R1313_Amd0002.pdf PDF
AMD_0002_P-870_Drawings.pdf PDF
AMD_0002_P-870_Specification.pdf PDF
N6274224R1313_0001.pdf PDF
0_24R1313-RFP.pdf PDF
0_24R1313-RFP.pdf PDF
CJA No. 20-016 for AMI Meter_Redacted.pdf PDF
MCBG Knox Box Class JA_Redacted.pdf PDF
1_P870 Specs.pdf PDF
2_P870 Drawings.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

Notice No. 1

01 April 2024

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-24-R-1313

WON 1737354, FY24 MCON P-870, 9TH ENGINEERING SUPPORT BATTALION (ESB)

TRAINING COMPLEX, US NAVSUPPACT, MARINE CORPS BASE, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The

RFP remains unchanged unless it is amended in writing on a Standard Form 30.

1. Drawing: E-601

We would like to request a clarification regarding the connection from SW P575-14 to the

25kVA Pad-mounted Transformer as shown below highlighted in “red” dashed lines. Will this be part of DZSP works?

ANSWER: All new work shown on E-601 is under the responsibility of the Contractor.

2. Document 00 21 16

Would the government consider an electronic submission only for this Solicitation via DoD

SAFE or the Procurement Integrated Enterprise Environment (PIEE) portal? This helps reduce production and delivery cost of hard copy proposals and enables offerors the maximum amount of time to compile competitive proposals for submittal. Our experience with NAVFAC has seen this method of electronic submittal become more common and effective. We appreciate NAVFAC's consideration of this request.

ANSWER: Submit proposals in accordance with Document 00 21 16, para 1.1 a.

3. Document 00 22 00, para 2.3, (a)

Will the government accept Interim CPARS for past performance projects that are substantially complete (90% or greater) if a Final CPARS is not available? In the event only an Interim CPARS is available, will a PPQ be required to be submitted?

ANSWER: See Am-0002, document 00 22 00, para 2.3, (a). The Government will accept an interim CPARS evaluation for work that is substantially complete (at least 90% complete).

4. Document 01 91 00.15, para 1.2

Kindly please confirm if Commissioning Provider (CxC) will be provided by the Contractor.

RFP N62742-24-R-1314 / TASK ORDER

Notice No. 1

ANSWER: In accordance with Document 01 90 00.15, para 1.10, the contractor shall provide the Commissioning Provider (CxC).

5. Drawing: M-401

On detail C1 of Bleachers and Head: Plumbing Floor Plan and Roof Plan (DWG M-401), reflects only the sewer line. Kindly please provide floor plan lay-out and distribution for waterline.

ANSWER: The main water line is shown on plan. Refer to isometric drawing for remainder of layout.

6. Document 00 21 16, para 1.1.c

PRICE AND TECHNICAL PROPOSALS, 1.1.c (ELECTRONIC) indicates "a paper copy of the subcontracting plan" shall be submitted with the CD ROM. However, in Section 1.1 a

(PRICE) and Section 1.1 b (TECHNICAL) does not indicate a subcontracting plan is required. Please confirm that a subcontracting plan is not required for this submittal.

ANSWER: See Am-0002, document 00 21 16, para 1.1.c. A subcontracting plan is not required.

7. Drawing: M-502

On detail C1, C2 and C4 for floor drain, cleanout and cleanout to grade detail, there is a note that says underground dwv pipes are ABS pipes and fittings with solvent joint connections.

Please confirm if the government only specifies this pipe and we cannot use other option on

Table I Pipe and Fitting Materials for Drainage, Waste, Vent and Condensate Drain Piping.

ANSWER: The options shown in Table I are acceptable to use for the project.