This solicitation is for the construction of training facilities to support the 9th Engineer Support Battalion of the 3rd Marine Expeditionary Force on Marine Corps Base Guam. The scope of work includes building a medium-heavy equipment training area for earthmoving equipment, a water supply training area for purifying non-potable water, a bulk fuel training area for distributing fuel or water, and associated structures constructed of concrete with slab on grade foundations, reinforced concrete roofs, windows, and mechanical and electrical systems. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command under number N6274224R1313 for the fiscal year 2024 military construction project.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY24 MCON P-870
9th Engineering Support Battalion (ESB) Training Complex
US NAVSUPPACT, Marine Corps Base Guam ePROJECT WORK ORDER NO 1737354
Final Submittal
SPECIFICATIONS
05 FEBRUARY 2024
PREPARED BY
EMCE Consulting Engineers • Pacific Cost Engineering, Inc.
Myounghee Noh & Associates • Pacific Geotechnical Engineers, Inc.
Setiadi Architects LLC • Thermal Engineering Corporation
Wilson Okamoto Corporation • Brownlie & Lee • InSynergy Engineering, Inc.
AMEL Technologies • UXO Pro, Inc. • NAVFAC Pacific
SUBMITTED BY
Moffatt & Nichol & Design Partners Inc. Pacific Joint Venture
NAVFAC PACIFIC
WORK ORDER NO:
1737354
FINAL DESIGN SPECIFICATIONS
For
FY24 MCON P-870
9th Engineering Support Battalion (ESB) Training Complex
At the
US NAVSUPPACT, Marine Corps Base Guam
P-870
PREPARED BY:
Architectural: Setiadi Architects, LLC Mechanical: Thermal Engineering Corp.
Civil: Wilson Okamoto Corp.
Electrical: EMCE Consulting Engineers Structural: Moffatt & Nichol Fire Protection: NAVFAC Pacific Geotechnical: Pacific Geotechnical Engineers, Inc.
Safety: NAVFAC Pacific MEC/MPPEH: UXO Pro, Inc.
Commissioning: AMEL Technologies, Inc.
Environmental: Myounghee Noh & Associates, LLC Landscape: Brownlie & Lee
Submitted By: _______________________________ Date: ____________ Mrs. Goska Nichol, P.E.
APPROVED BY:
For Commander, NAVFAC Pacific: ________________________________________________
Mr. Evan A Mizue, P.E.
Date: _______________________
20 February 2024
02/29/2024
Evan Mizue
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/22, CHG 1: 02/23 WORK RESTRICTIONS
01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 08/23 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 13.02 04/23 INDUSTRIAL CONTROL SYSTEMS PROCUREMENT
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 08/21 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS MCBCB EV
01 57 19.03 20 01/24 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS Munitions Response Explosives Safety Submission (MRESS) Guam Construction Support
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 05/23 FACILITY DATA WORKBOOK (FDW)
01 91 00.15 05/23, CHG 1: 08/23 BUILDING COMMISSIONING
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 24 00 05/11, CHG 4: 08/18 DIRECT APPLIED EXTERIOR FINISH SYSTEMS
07 56 00 02/12 FLUID-APPLIED ROOFING SYSTEM
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
PROJECT TABLE OF CONTENTS Page 1
FY24 MCON P-870 9TH ENGINEERING SUPPORT BATTALION (ESB) TRAINING COMPLEX
US NAVSUPPACT, MARINE CORPS BASE GUAM
1737354
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 91 00 08/20 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 08/17, CHG 2: 11/18 CEMENT PLASTER
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC TILING
09 67 23.14 08/16, CHG 1: 08/18 CHEMICAL RESISTANT RESINOUS FLOORING
09 67 23.15 02/21 FUEL RESISTIVE RESINOUS FLOORING,
3-COAT SYSTEM
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 21 11/22 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 00 05/21, CHG 1: 05/22 HIGH-FIREPOINT FLUIDS INSULATED
PAD-MOUNTED SWITCHGEAR
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 31 - EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID PAVING
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
PROJECT TABLE OF CONTENTS Page 2
FY24 MCON P-870 9TH ENGINEERING SUPPORT BATTALION (ESB) TRAINING COMPLEX
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 84 24 08/11, CHG 1: 05/17 TEMPORARY IRRIGATION SPRINKLER SYSTEMS
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23.19 05/20 MONORAIL HOISTS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
FY24 MCON P-870 9TH ENGINEERING SUPPORT BATTALION (ESB) TRAINING COMPLEX
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 4
FY24 MCON P-870 9TH ENGINEERING SUPPORT BATTALION (ESB) TRAINING COMPLEX
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11, CHG 1: 08/14
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
INDEX # SHEET REF # NAVFAC DWG NO. SHEET TITLE
1 G-001 17312245 TITLE SHEET AND VICINITY MAPS
2 G-002 17312246 INDEX OF DRAWINGS
3 G-003 17312247 CODE COMPLIANCE SUMMARY SHEET
4 G-101 17312248 CODE COMPLIANCE SITE PLAN
5 G-102 17312249 LIFE SAFETY PLANS
6 G-103 17312250 PROJECT SITE PLAN
7 G-104 17312251 MEC LIKELIHOOD DETERMINATION PLAN
8 V-001 17312252 OVERALL EXISTING CONDITION PLAN
9 V-101 17312253 EXISTING CONDITION PLAN (1 OF 4)
10 V-102 17312254 EXISTING CONDITION PLAN (2 OF 4)
11 V-103 17312255 EXISTING CONDITION PLAN (3 OF 4)
12 V-104 17312256 EXISTING CONDITION PLAN (4 OF 4)
17312257 NOT USED
13 B-001 17312258 BORING LEGEND AND NOTES
14 B-701 17312259 BORING LOG (1 OF 4)
15 B-702 17312260 BORING LOG (2 OF 4)
16 B-703 17312261 BORING LOG (3 OF 4)
DOCUMENT 00 01 15 Page 1
17 B-704 17312262 BORING LOG (4 OF 4)
17312263 NOT USED
18 C-001 17312264 CIVIL NOTES, LEGEND, AND ABBREVIATIONS
19 CD001 17312265 OVERALL DEMOLITION PLAN
20 CD101 17312266 DEMOLITION PLAN (1 OF 3)
21 CD102 17312267 DEMOLITION PLAN (2 OF 3)
22 CD103 17312268 DEMOLITION PLAN (3 OF 3)
23 CS001 17312269 OVERALL SITE PLAN
24 CS002 17312270 GEOMETRIC SITE PLAN
25 CS101 17312271 SITE PLAN (1 OF 4)
26 CS102 17312272 SITE PLAN (2 OF 4)
27 CS103 17312273 SITE PLAN (3 OF 4)
28 CS104 17312274 SITE PLAN (4 OF 4)
29 CS401 17312275 BULK FUEL AREA SITE PLAN
30 CS501 17312276 FENCE DETAILS (1 OF 3)
31 CS502 17312277 FENCE DETAILS (2 OF 3)
32 CS503 17312278 FENCE DETAILS (3 OF 3)
33 CS504 17312279 PAVEMENT DETAILS (1 OF 2)
34 CS505 17312280 PAVEMENT DETAILS (2 OF 2)
35 CS506 17312281 MISCELLANEOUS DETAILS
36 CR101 17312282 ROADWAY PLAN AND PROFILE (1 OF 5)
37 CR102 17312283 ROADWAY PLAN AND PROFILE (2 OF 5)
38 CR103 17312284 ROADWAY PLAN AND PROFILE (3 OF 5)
39 CR104 17312285 ROADWAY PLAN AND PROFILE (4 OF 5)
40 CR105 17312286 ROADWAY PLAN AND PROFILE (5 OF 5)
41 CR301 17312287 TYPICAL ROAD SECTIONS (1 OF 3)
42 CR302 17312288 TYPICAL ROAD SECTIONS (2 OF 3)
DOCUMENT 00 01 15 Page 2
43 CR303 17312289 TYPICAL ROAD SECTIONS (3 OF 3)
44 CG001 17312290 OVERALL GRADING PLAN
45 CG101 17312291 GRADING PLAN (1 OF 4)
46 CG102 17312292 GRADING PLAN (2 OF 4)
47 CG103 17312293 GRADING PLAN (3 OF 4)
48 CG104 17312294 GRADING PLAN (4 OF 4)
49 CG301 17312295 GRADING SECTION (1 OF 4)
50 CG302 17312296 GRADING SECTION (2 OF 4)
51 CG303 17312297 GRADING SECTION (3 OF 4)
52 CG304 17312298 GRADING SECTION (4 OF 4)
53 CG401 17312299 BULK FUEL AREA GRADING PLAN
54 CG402 17312300 BULK FUEL AREA GRADING SECTION
55 CG411 17312301 HE DIG PIT GRADING PLAN (1 OF 2)
56 CG412 17312302 HE DIG PIT GRADING PLAN (2 OF 2)
57 CG413 17312303 HE DIG PIT GRADING SECTION (1 OF 2)
58 CG414 17312304 HE DIG PIT GRADING SECTION (2 OF 2)
59 CG421 17312305 DRAINAGE HEADWALL PLAN
60 CG422 17312306 LINING AND RIPRAP PLAN
61 CU001 17312307 OVERALL UTILITY PLAN
62 CU101 17312308 UTILITY PLAN (1 OF 4)
63 CU102 17312309 UTILITY PLAN (2 OF 4)
64 CU103 17312310 UTILITY PLAN (3 OF 4)
65 CU104 17312311 UTILITY PLAN (4 OF 4)
66 CU201 17312312 WATER PROFILE
67 CU211 17312313 SEWER PROFILE
68 CU221 17312314 DRAIN PROFILE (1 OF 2)
69 CU222 17312315 DRAIN PROFILE (2 OF 2)
DOCUMENT 00 01 15 Page 3
70 CU501 17312316 WATER SYSTEM DETAILS (1 OF 5)
71 CU502 17312317 WATER SYSTEM DETAILS (2 OF 5)
72 CU503 17312318 WATER SYSTEM DETAILS (3 OF 5)
73 CU504 17312319 WATER SYSTEM DETAILS (4 OF 5)
74 CU505 17312320 WATER SYSTEM DETAILS (5 OF 5)
75 CU511 17312321 SEWER SYSTEM DETAILS (1 OF 2)
76 CU512 17312322 SEWER SYSTEM DETAILS (2 OF 2)
77 CU521 17312323 STORM SYSTEM DETAILS (1 OF 3)
78 CU522 17312324 STORM SYSTEM DETAILS (2 OF 3)
79 CU523 17312325 STORM SYSTEM DETAILS (3 OF 3)
17312326 NOT USED
17312327 NOT USED
17312328 NOT USED
17312329 NOT USED
17312330 NOT USED
17312331 NOT USED
17312332 NOT USED
17312333 NOT USED
17312334 NOT USED
80 L-101 17312335 LANDSCAPE PLAN
81 L-501 17312336 PLANT LIST AND DETAILS
17312337 NOT USED
82 A-101 17312338 FLOOR PLAN, REFLECTED CEILING PLAN,
ROOF PLAN - BLEACHERS
83 A-102 17312339 FLOOR PLAN, REFLECTED CEILING PLAN,
ROOF PLAN - HEAD
84 A-201 17312340 BUILDING ELEVATIONS AND SECTIONS -
BLEACHERS
85 A-202 17312341 BUILDING ELEVATIONS AND SECTIONS - HEAD
86 A-501 17312342 WALL SECTIONS
DOCUMENT 00 01 15 Page 4
87 A-601 17312343 ROOM FINISH SCHEDULE, SIGNAGE SCHEDULE,
DOOR & LOUVER TYPES AND SCHEDULE
88 A-602 17312344 MOUNTING HEIGHT SCHEDULE, SIGNAGE TYPES
AND DETAILS
89 A-701 17312345 MISCELLANEOUS DETAILS
17312346 NOT USED
90 S-001 17312347 STRUCTURAL GENERAL NOTES (1 OF 3)
91 S-002 17312348 STRUCTURAL GENERAL NOTES (2 OF 3)
92 S-003 17312349 STRUCTURAL GENERAL NOTES (3 OF 3)
93 S-101 17312350 BLEACHERS & HEAD - FOUNDATION AND ROOF
FRAMING PLANS
94 S-201 17312351 HEAD - BUILDING ELEVATIONS
95 S-301 17312352 BLEACHERS - BUILDING SECTIONS
96 S-501 17312353 TYPICAL DETAILS (1 OF 4)
97 S-502 17312354 TYPICAL DETAILS (2 OF 4)
98 S-503 17312355 TYPICAL DETAILS (3 OF 4)
99 S-504 17312356 TYPICAL DETAILS (4 OF 4)
100 S-511 17312357 HOSE DRYING RACK AND BLADDER DRYING
FRAME DETAILS
17312358 NOT USED
101 M-001 17312359 PLUMBING LEGEND AND ABBREVIATIONS,
FIXTURE TABLES, NOTES, SYMBOL LEGEND
102 M-101 17312360 PLUMBING SITE PLAN
103 M-401 17312361 BLEACHERS AND HEAD: PLUMBING FLOOR PLAN
AND ROOF PLAN
104 M-402 17312362 FUEL AREA PLUMBING PLAN
105 M-403 17312363 OIL WATER SEPERATOR PLUMBING PLAN
106 M-501 17312364 DETAILS
107 M-502 17312365 DETAILS
108 M-503 17312366 DETAILS
109 M-504 17312367 DETAILS
110 M-901 17312368 FUEL AREA AND HEAD PIPING DIAGRAMS,
EQUIPMENT SCHEDULE
111 M-902 17312369 OIL WATER SEPERATOR PIPING DIAGRAM,
EQUIPMENT SCHEDULE
DOCUMENT 00 01 15 Page 5
17312370 NOT USED
112 E-001 17312371 GENERAL ELECTRICAL NOTES
113 E-002 17312372 ELECTRICAL SYMBOL LIST, ABBREVIATIONS,
AND MOUNTING HEIGHT SCHEDULE
114 E-101 17312373 ELECTRICAL SITE PLAN
115 E-401 17312374 LIGHTING AND POWER PLAN
116 E-501 17312375 MISCELLANEOUS DETAILS - SHEET 1 OF 5
117 E-502 17312376 MISCELLANEOUS DETAILS - SHEET 2 OF 5
118 E-503 17312377 MISCELLANEOUS DETAILS - SHEET 3 OF 5
119 E-504 17312378 MISCELLANEOUS DETAILS - SHEET 4 OF 5
120 E-505 17312379 MISCELLANEOUS DETAILS - SHEET 5 OF 5
121 E-601 17312380 ONE LINE DIAGRAM
122 E-602 17312381 PANEL SCHEDULE & LIGHT FIXTURE SCHEDULE
123 E-603 17312382 MISCELLANEOUS DIAGRAMS
17312383 NOT USED
124 T-001 17312384 TELECOMMUNICATIONS GENERAL NOTES
125 T-002 17312385 TELECOMMUNICATIONS SYMBOL LIST,
ABBREVIATIONS, AND MOUNTING HEIGHT
SCHEDULES
126 T-101 17312386 TELECOMMUNICATIONS SITE PLAN
127 T-401 17312387 TELECOMMUNICATIONS PLAN
128 T-501 17312388 TELECOMMUNICATIONS DETAILS - SHEET 1 OF
129 T-502 17312389 TELECOMMUNICATIONS DETAILS - SHEET 2 OF
130 T-503 17312390 TELECOMMUNICATIONS DETAILS - SHEET 3 OF
131 T-504 17312391 TELECOMMUNICATIONS DETAILS - SHEET 4 OF
132 T-601 17312392 TELECOMMUNICATIONS OSP PATHWAY AND
CABLING DIAGRAM
133 T-602 17312393 GOVERNMENT ICS DIAGRAM
17312394 NOT USED
-- End of Document --
DOCUMENT 00 01 15 Page 6
SECTION 01 11 00
SUMMARY OF WORK
08/15, CHG 2: 08/21
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes construction of training facilities to support III Marine Expeditionary Force (MEF) 9th Engineer Support Battalion.
Facilities contists of a medium-heavy equipment training area (HE Dig Pit), a water supply training area (UT) and a bulk fuel training area (BF).
Covered training area (bleachers), public toilet (head), paving and site improvements, and incidental related work.
1.1.2 Location
The work is located at the Marine Corps Base, Camp Blaz, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.3 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact the Contracting Officer prior to excavating, to mark utilities, and to verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utlities, and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.
Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
SECTION 01 11 00 Page 1
1.3.1 Notification Prior to Excavation
Notify the Contracting Officer at least 30 days prior to starting excavation work.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS
11/22, CHG 1: 02/23
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 State
"State" when used in reference to states of the United States also includes the Territory of Guam.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
Personnel List
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, SECTION 01 14 00 Page 1 correct and change the information contained in previous lists.
1.4.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/.
No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.4.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/.
Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/.
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.4.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.4.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the
SECTION 01 14 00 Page 2
Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.4.1.2.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.4.1.3 NCACS Identification Badges and Installation Access
Application for and use of badges will be as directed. Obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS), or by obtaining passes each day from the Base Pass and Identification Office. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.
Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.
a. NCACS Program: NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit.
The Government performs background screening and credentialing.
Throughout the year the Contractor employee will continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com or by calling 1-877-727-4342. Contractors should be aware that the costs incurred to obtain NCACS credentials, or costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining NCACS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.
1.4.1.4 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to
SECTION 01 14 00 Page 3 existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.4.2 Working Hours
Regular working hours will consist of an 8 1/2 hour period , between 7:30 a.m. and 4:30 p.m., Monday through Friday, excluding Government holidays.
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
1.4.4 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to four hours. This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection and in accordance with Section 33 30 00 SANITARY SEWERAGE.
1.5 SECURITY REQUIREMENTS
1.5.1 Employment Restrictions For Guam
The Contractor must not employ any person, for any work required by this contract, who: (1)is a non-immigrant as described in section 101(a)(15)(H)(ii) of the Immigration and Nationality Act (8 U.S.C.
1101(a)(15)(H)(ii), (2) is an alien having a residence in a foreign
SECTION 01 14 00 Page 4 country which he has no intention of abandoning and who is coming to the United States to perform temporary services or labor.
1.5.2 Personnel List
Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:
a. Name
b. Date and place of birth
c. Citizenship
d. Home address
e. Social security number
f. Current pass expiration date
g. Naturalization or Alien Registration number or Temporary Non-Immigrant ID card number
h. Passport number, place of issue, and expiration date
i. Guam Police clearance report for last six months
The request for personnel passes must be accompanied with the following certification:
"I hereby certify that all personnel on this list are either born U.S.
citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated or Temporary Non-Immigrant with the Temporary Non-Immigrant ID cards number shown."
Signature/Firm Name
1.5.2.1 Citizenship Requirements
Aliens will not be admitted to the work site without approval. Clearance for aliens may require approximately 21 workdays for approval.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 14 00 Page 5
SECTION 01 14 00 Page 6
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
11/20, CHG 3: 02/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Earned Value Report; G
1.3 EARNED VALUE REPORT
1.3.1 Data Required
This Contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Within 30 calendar days of Contract Award, prepare and deliver to the Contracting Officer a Earned Value Report (construction Contract) as directed by the Contracting Officer. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.
1.3.2 Payment Schedule Instructions
Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer.
Additionally, the Earned Value Report must be separated as follows:
a. Primary Facilities Cost Breakdown:
Defined as work on the primary facilities out to the 5 foot line.
Work out to the 5 foot line includes construction encompassed within a
SECTION 01 20 00 Page 1 theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.
b. Supporting Facilities Cost Breakdown:
Defined as site work, including incidental work, outside the 5 foot line.
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the
EP 1110-1-8.
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.
a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.
b. The Earned Value Report from the cost-loaded NAS.
c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.
d. Monthly Work-hour report.
e. Updated Construction Progress Schedule and tabular reports required by the contract.
f. Contractor Safety Self Evaluation Checklist.
g. Updated submittal register.
h. Solid Waste Disposal Report.
i. Certified payrolls.
j. Updated testing logs.
k. Other supporting documents as requested.
SECTION 01 20 00 Page 2
1.5.2 Submission of Invoices
If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.
Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.
1.5.3 Final Invoice
a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.6.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR
32.103 Progress Payments Under Construction Contracts:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this Contract;
SECTION 01 20 00 Page 3
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.
1.6.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Earned Value Report requirement of this Contract.
Requests for progress payment consideration for such items must be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation must be stored in Guam. Other locations are subject to written approval by the Contracting Officer.
g. Materials in transit to the job site or storage site are not acceptable for payment.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used -- End of Section --
SECTION 01 20 00 Page 4
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
11/20, CHG 3: 08/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
Z308.1-1998 Minimum Requirements for Workplace First-aid Kits
GUAM PUBLIC LAW
31-72 Policy For Workforce Housing Facilities For Temporary Workers
GUAM CODE ANNOTATED (GCA)
10 G.C.A. §§ 20-54 Environmental Health
10 G.C.A. §§ 55-79 Public Safety
10 G.C.A. §§ 84-96 Guam Public Health Act
10 G.C.A. §§ 21 Sanitary Permit
10 G.C.A. §§ 23, P.L 25-15 Eating and Drinking Establishments
10 G.C.A. §§ 24 Food Establishments
10 G.C.A. §§ 40 Guam Food, Drug and Cosmetic Act
16 G.C.A. §§ 1101, et seq. Vehicles
22 G.C.A. § 7 Guam Employment Service Law
GUAM ADMINISTRATIVE RULES AND REGULATIONS (GAR)
25 G.A.R. § 6 Guam Board of Nurse Examiners
25 G.A.R. § 11 Guam Board of Medical Examiners
26 G.A.R. §§ 4401, et seq. Health Certificate Regulations
26 G.A.R. §§ 6200, et seq. Ambulance and Emergency Medical Technician
GOVERNMENT OF GUAM - DEPARTMENT OF PUBLIC HEALTH AND SOCIAL SERVICES
Guidebook: Rules & Regulation Pertaining to Eating and Drinking Establishments (GovGuam/DPHSS)
SECTION 01 30 00 Page 1
Guidebook: Rules & Regulations Pertaining to Retail Food Store Sanitation (GovGuam/DPHSS)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
15 CFR 772 Definition of Terms
15 CFR 773 Special Licensing Procedures
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.142 Temporary Labor Camps
29 CFR 1926 Safety and Health Regulations for Construction
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
View Location Map
Progress and Completion Pictures
Workforce Housing Logistics And Material Management (Whl&Mm) Plan
Insurance
Permits
Licenses
Pre-Deployment Physical Condition And General Health Screening
Medical Contractual Agreement
Medical Certification
Housing List
Housing Certification
Background Check
Safety & Security Certification
SECTION 01 30 00 Page 2
1.3 CONTRACTOR WORKFORCE HOUSING LOGISTICS AND MATERIAL MANAGEMENTS
REQUIREMENTS
a. For the purposes of this specification, the term, "temporary resident worker" means all workers except the following:
1. Permanent residents of Guam
2. Managers and supervisors (U.S. citizens or resident aliens)
b. For the purpose of this specification, the term, "worksites" means locations at Finegayan, Naval Base, and Andersen Air Force Base.
c. For the purpose of this specification, the term, "peak hours" for traffic means 6:30 a.m. to 8:30 a.m. and 3:30 p.m. to 6:00 p.m.
d. Workforce Housing Logistics and Material Management (WHL&MM) Plan: The WHL&MM Plan must address the requirements for Medical, Housing, Food, Material Management, Safety & Security, and Transportation set forth in this specification section. Approval of the WHL&MM Plan is required prior to the start of construction. The Contracting Officer reserves the right to require changes in the WHL&MM Plan and operations as necessary. Maintain the WHL&MM Plan and submit any changes for Contracting Officer review.
1.3.1 Medical
Assure that staffing, personnel assignment and other human resources practices result in development and maintenance of a healthy Contractor and Subcontractor workforce employed in the performance of this contract in accordance with all statutes and regulations of the U.S Federal Government or the GovGuam in effect on the date of award of this contract or thereafter promulgated by the aforementioned governmental authorities.
Perform health care activities in accordance with 10 G.C.A. §§ 84-96 - Guam Public Health Act, 25 G.A.R. § 6 - Guam Board of Nurse Examiners, 25 G.A.R. § 11 - Guam Board of Medical Examiners, 26 G.A.R. §§ 4401, et seq., Health Certificate Regulations, and 26 G.A.R. §§ 6200, et seq., Ambulance and Emergency Medical Technician.
1.3.1.1 Medical Quality Control Manager
Medical QC Manager qualifications:
A licensed physician from a state or territory in the U.S. with either an Internal Medicine or Family Practice background or credentials. Also have occupational health or public health experience. Submit a copy of the medical license to the Contracting Officer for approval.
Medical QC Manager responsibilities:
a. Prepare a medical plan to include medical care surveillance, worksite and workforce housing monitoring, appropriate occupational health screening of employees per federal OSHA regulations and identifies the process and medical professional or responsible party that verifies each worker's pre-island TB and immunization/titer screening and the post-arrival TB screening.
b. Ensure validity and document all medical testing, screening and immunizations completed.
SECTION 01 30 00 Page 3
c. Monitor the workers at the construction site and workforce housing facilities for medical problems and symptoms.
d. Prepare weekly Medical Reports that represents the general medical condition of the workers from medical care surveillance rates, occupational injuries sustained and worksite monitoring.
e. Maintain medical records.
1.3.1.2 Clinical Examinations
Perform worker pre-deployment physical condition and general health screening for all deployed workers prior to their departure for Guam.
Screening must include, within 3 months of departure for Guam, a chest x-ray (CXR), syphilis screening by RPR, HIV testing, documented tetanus vaccination within past 10 years, MMR vaccination (or documentation of positive titers for measles, mumps and rubella), influenza vaccination, varicella vaccination (or documentation of positive titers for varicella), blood pressure check, and a comprehensive dental exam, which is comprised of (1) a brief medical history to rule out any medical problems that may affect conventional dental treatment; (2) a visual intra-oral exam, including evaluation of caries, defective restorations (fillings) and appliances (both fixed and removable), oral cancer check (visual), and percussion of suspect teeth and Periodontal Screening and Recording (PSR) (No need for forensic exam - recording which teeth are missing or existing restorations); and (3) a radiographic evaluation including bitewing and pan-oral view. Ensure that each worker's health status prior to deployment to Guam for work on this Government contract is adequate for performance of the activities to which the worker will be assigned giving consideration to the climatic and other physical elements to be experienced on Guam. Any applicants that are found to have conditions inconsistent with the prospective future employment term on Guam will be promptly referred for medical advice and treatment and their employment status will be determined by the employer in accordance with their firm's hiring policies. Report applicants suspected of having tuberculosis on the basis of a CXR suggestive of tuberculosis or who have signs and symptoms suggestive of tuberculosis to their respective country's tuberculosis program office. Within two weeks of arrival on Guam, and prior to commencing work, workers must receive a baseline CXR and clinical examination for signs and symptoms of tuberculosis. Report workers with findings suggestive of tuberculosis to the Guam Department of Health and Social Services for evaluation. These requirements do not apply to managerial, specialized technical and administrative Contractor and Subcontractor workers and consultants visiting Guam for business purposes for periods of 14 calendar days or less. If these personnel plan on visiting Guam between 15-45 calendar days, they must report to the Contractor's Medical Quality Control Manager (MQCM) for a check-up. Those that show symptoms of TB may be required to take a baseline CXR and clinical examination.
1.3.1.3 Monitoring
a. Monitor the workers at the construction site and workforce housing facilities for incidences of fever, bloody sputum, pneumonia, influenza-like illness, rash illness, diarrhea, and other indicators that would raise the index of suspicion of an infectious disease etiology. Report the numbers of workers with these conditions to Guam Department of Public Health and Social Services every week.
SECTION 01 30 00 Page 4
Additionally, report any conditions on the Official Guam Notifiable Disease List (Chapter 3, Title X, Guam Code Annotated) to Guam Department of Public Health and Social Services within the timeframe required by Guam Code.
b. Perform annual screening of workers in Guam to include, but not limited to, an annual tuberculosis screening exam with option for chest X-ray if screening is positive. Refer workers with positive screening and CXR results to the Guam Department of Public Health and Social Services for evaluation.
1.3.1.4 Health and Medical Care
Each Contractor worker deployed to work on Guam for a period in excess of 14 calendar days must be covered by either commercially purchased health and medical care insurance or a Contractor self-furnished health and medical facilities for the entire duration of the worker's or consultant's deployed assignment. For workers or consultants that are not deployed to the work site, the medical coverage must commence within 45 calendar day of arrival on Guam. The Contractor must effectively appropriate contractual agreements with its workers or workers' representatives that require such workers to accept the Contractor's insurance plan coverage or use of the Contractor furnished medical facilities. The minimum insurance plan coverage or medical facilities furnished by the Contractor must be as follows:
a. Emergency Medical Care - initial emergency response treatment, stabilization, and transport of a sudden and unexpected medical condition (e.g. either severe injury or severe illness symptoms/signs). If immediate medical attention is not obtained, the symptoms could result in serious and permanent adverse medical outcomes. Examples include severe chest pains, difficulty in breathing, traumatic injury, convulsions, severe abdominal pains, etc. Any medical condition or diagnosis that anticipates either an extended acute care hospitalization or any critical care hospitalization will be evaluated as soon as possible by a competent medical authority for emergency civilian medical evacuation and transfer to an off-island regional referral hospital, if necessary.
b. Primary Health Care - services typically included represent the full spectrum of organizations which provide care services to the population of focus. The services must include care for chronic diseases, preventive and screening services, and acute care delivery in the outpatient setting; as well as health promotion services delivered through an inter-professional team. NOTE: Termination medical surveillance physical exams are only required for workers enrolled in a periodic surveillance program due to: (1) documented hazardous exposures in the workplace or (2) if they are enrolled in an occupational medical surveillance program.
c. Prescription Drugs - drugs or medicines that require a doctor's signature to dispense and are approved by the U.S.F.D.A. for use in treating the sickness or injury for which they are prescribed.
1.3.1.5 Medical Care at Worksites
Comply with U.S. Government Occupational Safety & Health Administration (OSHA) standards and requirements (29 CFR 1910, et seq. - Occupational Safety & Health Standards). Provide medical care at the worksites during
SECTION 01 30 00 Page 5 all work operations in accordance with EM 385-1-1, Section 3 Medical and First-Aid Requirements. At least two employees on each shift must be qualified to administer first-aid and CPR when a medical facility or physician is not accessible within five minutes of an injury to a group of two or more employees. Worksites for which fewer than 100 persons are employed (greatest number of employees on a shift), and where neither a first-aid station nor an infirmary is available, must be provided with a first-aid kit complying with ANSI Z308.1-1998. There must be one first-aid kit for every 25 (or fewer) employees. Worksites for which more than 99 and fewer than 300 persons are employed (greatest number of employees on a shift), must establish and equip, as directed by a Licensed Physician (LP), a first-aid station. Worksites for which 300 or more persons are employed (greatest number of employees on a shift), must establish and equip, as directed by a LP, an infirmary. The type of facilities, equipment, and qualified personnel provided at the first-aid station and infirmary must comply with EM 385-1-1.
1.3.1.6 Medical Records
Maintain medical records in accordance with HIPAA and Privacy Act…
This is the start of the file's text. The full file is on GovTribe.