This document contains questions and answers related to a solicitation for the construction of a new veterinary treatment facility at Joint Base Pearl Harbor-Hickam in Hawaii. The solicitation seeks the construction of a facility to provide full service preventive, diagnostic, surgical and dental care to government-owned animals as well as food inspection spaces and services for privately-owned animals. Questions covered in the document relate to architectural, mechanical and structural drawings and specifications included in the solicitation. Answers provide clarification on ceiling and wall finishes, ductwork requirements, soil contamination remediation, and termite treatment warranties.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742-22-R-1319 Notice No. 6
Notice No. 7 February 11, 2022
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-22-R-1319
FY22 P-2005 WORKING DOG TREATMENT FACILITY REPLACEMENT, JOINT BASE
PEARL HARBOR-HICKAM, HAWAII
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
49. ID-601, RCP Sheet A-114 Rm 1C02 shows drywall ceiling which does not correlate with the room finish schedule sheet ID-601 which calls for AT-2 Acoustical Ceiling. Sheet ID-601 calls for AT-2 ceiling at room 1C14B, but sheet A-114 shows rooms 1C14, 1C14A, and 1C14B as drywall ceiling. Please Clarify.
ANSWER: See responses to Items #26 and #37.
50. D1/A-439 & M-403 - Equipment number UT027 Downdraft Workstation requires a “10/10 DN transition to table” as noted on sheet M-403. The mechanical plans indicate this to be external of the wall, but the architectural drawings do not indicate the ductwork. Is the ductwork required to be stainless steel, galvanized with a stainless cover or galvanized painted and exposed?
ANSWER: Fabricate Necropsy room ductwork from stainless steel. Provide stainless steel ductwork down to downdraft table. Refer to Section 23 35 19.00 20, para. 2.7.
51. A-111 - Composite gyp bd lid plan A-111 indicates 1 hour rated and STC rated ceilings.
Enlarged RCP plan A-112 – A115 do not correspond with the composite plan. For example, Room CONF 1A09 on drawing A-112 shows 2’-0” x 2’-0” ACT, and the composite plan A-111 shows STC 50 sound rated gypsum ceiling. Please advise which to follow.
ANSWER: See response to Item #24.
52. H-002 - Note shows that pesticide-contaminate soil around west concrete slab. Please confirm that the contamination is only 4 feet outside of the concrete slab and 0’ – 3’ below ground surface.
ANSWER: See response to Item #45.
53. ID- 601 & ID-603 - Room schedule calls for ceiling finishes A, or G. However, the room finish abbreviation for ACT. On the other hand, on ID-603 room finish legend calls for AT1 and AT2. Please clarify.
ANSWER: See response to Item #25. In ID-603, the key (AT1 and AT2) is the ceiling material and finish combined. T1 is for Standard Finish and T2 is for Waterproof Finish.
54. A-111 - Composite Gypsum board lid plan shows gypsum board on most rooms, however RCP ceiling shows some of the rooms with ACT tile too. Please clarify the intent of the design is to have hard ceilings at Top of CMU and finished ceiling at room finished schedule states.
ANSWER: See response to Item #24.
57. As per view panel schedule (see DWG A-611), frame construction is Aluminum whereas in view panel types it is stated as Steel. Please confirm whether frame is Aluminum or Steel.
ANSWER: In the View Panel Types, material should be aluminum, and not steel. Refer to Amendment 0006.
58. As Door Schedule (see DWG A-601), jamb and threshold Details C1/A-502 and B4/A- 502 are missing from architectural drawing set. Please provide.
ANSWER: Sheet A-601, Door 1A01 – Jamb detail C1/A-502 was revised to B1/A-502 via Amendment 0001. Door 1A01B – Threshold detail B4/A-502 was revised to A4/A-502 via Amendment 0006.
59. H-002, Note #2-A, B-101, Spec Sections 31 23 00.00 20, Para 2.1.5 & Para 3.6.1 & B- 701 Boring log B-1: Note #2-A states “reuse the pesticide contaminated soil at the project site if it meets the Spec section requirement.
Para 2.1.5 defines Fill and Backfill material (satisfactory material w/ CBR > 20%) and Para 3.6.1 states to provide fill and backfill material for paved area and under conc slab.
Boring B-1 is located where the contaminated soil exists and it shows the layer of exiting GC type soil, which is NOT satisfactory material.
Please clarify, the existing contaminated soil exceeding DOH EAL, if it falls under the GC type of unsatisfactory per boring log, need to dispose at PVT Landfill per spec and note.
ANSWER: Per Sheet H-002, Note #2-B, if the contaminated soil does not meet requirements and is not feasible to be reused, the soil will need to be disposed of at a local landfill (e.g. PVT) with all necessary soil sampling and analysis for disposal, in accordance with the specifications.
60. Spec Section 31 23 00.00 20, Para 2.1.4, Common Fill: Please clarify if the excavated onsite material, less than 3” minus, can be approved as common fill and reused under the non-pavement fill area.
ANSWER: Excavated onsite material that meets the specification requirement for common fill may be reused as common fill under the non-pavement fill area.
61. Spec Section 01 74 19, Para 1.11.2, Surplus Soil: Please confirm that surplus soil from the project site to be disposed at PVT Landfill per the spec section.
ANSWER: Confirmed.
62. EC-102 & CD-101, Onsite excavated material from the encapsulation of relocated pesticide impacted soil: The excavated soil from the encapsulation of relocated pesticide impacted soil can be allowed to backfill the area excavated to remove the contaminated soil?
Otherwise, the excavated material not meeting the Spec from the relocation area need to haul out and import backfill material meets per Section 31 23 00.00 20.
ANSWER: Excavated material may be reused onsite in accordance with the specifications.
63. A1/CG201. 24” x 24” DI: Plan view of DI, Detail A1 shows 3’ x 3’ with 6” wall, but the Section A-A indicates 2’ with 6” wall. Please clarify.
ANSWER: Section A-A is correct. Drain inlet is 24”x24” with 6” walls. Detail A1/CG201 was revised via Amendment 0006.
64. Please provide wall type for exterior wall.
ANSWER: Wall types are intended for interior partitions. Refer to wall sections on A-310 and A-311 for exterior wall.
65. Refer to Roof Detail on A-521. Details depict continuous Z purlins. However, no plan shows where purlins to be installed. Please provide more information.
ANSWER: Locations of continuous Z purlins occur where metal roofing panels are tied down to the roof structure per roof manufacturer installation requirements.
66. Q-601 Equipment Schedule lists A5210P as wall mount TV brackets that are to be Owner furnished, Owner installed using non-construction funds. However, Specification 10 99 00 describes Wall Mount TV Bracket (A5210P) as if it is CFCI product. Please confirm equipment #A5210P is Owner furnished, Owner installed, and spec 10 99 00 can be removed from the project documents.
ANSWER: See response to Item #32.
67. Q-601 Equipment Schedule lists visual display units F3025, F3050, and F3065 as being Owner furnished, Owner installed using non-construction funds. However, Specification 10 11 00 lists these items as if they are CFCI products. Please confirm equipment #F3025, F3050, and F3065 are Owner furnished, Owner installed, and spec 10 11 00 can be removed from the project documents.
ANSWER: See response to Item #31.
68. Keeping track of notices, we realized that the Notes do not have consecutive numbers?
Are we missing something?
ANSWER: Although out of sequence, responses to questions 1 through 73 were provided via Notices 1 through 7.
69. Spec 072400 - Exterior Finish Systems: The system in this specification does not match the details in the drawings. The drawing indicates a cement board system while the specification indicates a Glass Matt Gypsum Sheathing direct applied system. Which system are we to follow?
o If we are to follow the drawings with the cement board system no furring is currently shown to attach the cement board, how would you like the cement board attached to the CMU substrate over the 3/8” drainage matt?
o If we are to follow the specifications again no furring is shown and the spec calls for the Glass Matt Sheathing to be attached to metal framing (3.3.1). Please clarify.
ANSWER: Follow the specifications and use glass mat gypsum sheathing board. However, metal framing for the sheathing board is not required. Sheathing board will be fastened directly to the substrate with the drainage mat in between. Will clarify requirements via future Amendment.
70. On ID-604 in rooms 1B02, 1B10, 1B13, 1B14, 1B17, 1C05, 1C05A all have “LG” listed in the ceiling finish which according to the abbreviations is “Liquid Glaze Coat” I do not see a product specified in the 099000 section please clarify what product “LG” is referring to.
ANSWER: Rooms indicated to receive “PT5/LG” or “PT1/LG” as the ceiling finish will be revised to indicate “EP5”. Will clarify requirements via future Amendment.
71. On ID-601, the finish schedule notes LG Liquid Glaze Coat on ceilings in multiple rooms. Please clarify coating product/requirements.
ANSWER: See response to Item #70.
72. On ID-601, the finish schedule notes T2 Waterproof Finish on ceilings in multiple rooms.
Please clarify finish requirements.
ANSWER: The Government’s intent is to require a finish appropriate for maintaining an aseptic environment. The T2 Waterproof Finish is intended to be a smooth-texture panel with a water-repellent, scrubbable surface. Will clarify requirements for T2 Waterproof Finish via future Amendment.
73. SPECIFICATION SECTION 31 31 16.13 - SPECIFICATION PARAGRAPH 1.7
Warranty, Chemical Termite Control specification requires a 5 year warranty. Chemical Treatment Firms will not provide 5 year warranty due to the chemicals used currently, no manufacturer of termiticide product will provide a warranty more than 2 years. Found out that with the new EPA restrictions on chemicals, no termiticide manufacturer will honor a 5-year warranty. Requesting to have warranty issue investigated and revise specification requirements.
ANSWER: The Government confirmed at least three firms providing subterranean termite treatment services on Oahu advertise a 5-year warranty against infestation/reinfestation.