P-2005 -Notice 5.pdf
PDF 157 KB Posted
- Attached to
- FY22 P-2005 WORKING DOG TREATMENT FACILITY REPLACEMENT, JOINT BASE PEARL HARBOR-HICKAM, HAWAII
- Solicitation number
- N6274222R1319
About this file
This document contains a notice and questions and answers related to a solicitation for the FY22 P-2005 WORKING DOG TREATMENT FACILITY REPLACEMENT at Joint Base Pearl Harbor-Hickam in Hawaii. The solicitation seeks to construct a new veterinary treatment facility that will provide preventative, diagnostic, surgical, dental care and food inspection services for government-owned and privately-owned animals of service members. The notice includes answers to questions from prospective offerors that clarify details of the facility's design and construction requirements. Specifics addressed include the scope of work for visual display boards, television brackets, fire alarm and mass notification systems, underground to above-grade conduit transitions, telecommunications cabling, an electrical load bank connection cabinet, ceiling materials, and proprietary roof truss details. An amendment to the solicitation extended the proposal deadline from February 3rd to February 10th to allow more small businesses time to develop competitive offers. The Navy's Naval Facilities Engineering Command is the contracting agency for this project.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742-22-R-1319 Notice No. 5
4 February 2022
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-22-R-1319
FY22 P-2005 WORKING DOG TREATMENT FACILITY REPLACEMENT, JOINT BASE
PEARL HARBOR-HICKAM, HAWAII
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
31. SPEC 10 11 00 / Drawing Number E-601 - Project documents included specification 10 11 00 for Visual Display Board. Equipment schedule on sheet E-601 lists JSN items F3025, F3050, and F3065 as owner furnished, owner installed. Please confirm that GC will not be responsible for furnishing and installing visual display boards.
ANSWER: Deferred
32. SPEC 10 99 00 / Drawing Number E-601 - Project documents included specification 10 99 00 for Miscellaneous Specialties. Equipment schedule on sheet E-601 lists JSN items A5210, A5210P, and A5220 as owner furnished, owner installed. Please confirm that GC will not be responsible for furnishing and installing television brackets
ANSWER: Deferred
33. SPEC 28 31 76 / Drawing Number F-102 - There is a Fire Alarm and Mass Notification requirement for the project, but the plans do not show location of devices (LED text signs, pull-stations, AV devices, etc). Prior NAVFAC projects always included complete fire alarm mass notification drawings for bidding. Will the missing information be provided?
ANSWER: See response to Item #11.
34. SPEC 26 20 00 / Drawing Number ET-504 / Paragraph Reference 3.1.6.4 - Spec Section 26 20 00, para 3.1.6.4 indicates to provide stainless steel conduit stubs through the slab. Detail B3/E-521 shows a fiberglass conduit transition; detail B1/ET504 shows a rigid stainless steel conduit transition; detail C4/ET504 shows a PVC Coated GRC conduit transition. What type of conduit are we to use when transitioning from underground to above grade?
ANSWER: See response to Item #10.
RFP N62742-21-R-1302
35. SPEC 27 10 00 / Drawing Number ET-101 - ET101 shows us to provide 3 each 3” 3 cell fabric ducts in the existing 4” spare duct. Do we need to provide pullstrings with each of the 3 cell fabric ducts?
ANSWER: See response to Item #9.
36. SPEC 26 00 00 / Drawing Number E-602 - A load bank connection cabinet is shown on E-602 but we could not locate this on the plan sheets. Where is this located?
ANSWER: See response to Item #8.
37. SPEC 09 51 00 / Drawing Number ID-601 - RCP Sheet A-114 Rm ICO2 indicates a Drywall Ceiling. Room Finish schedule Sheet ID-601 calls for AT-2 Acoustical Ceiling. Sheet ID-601 Calls for AT-2 Ceiling but Sheet A-104 doesn’t include Rooms 1C14A and 1C14B.
Please Clarify.
ANSWER: Design intent is gypsum board ceiling at Imaging Room 1C02 on Sheet A-114. Will revise Sheet ID-601 via future Amendment to change the room name for Room 1C02 from “PROCEDURE” to “IMAGING”, change the Ceiling Material from “A” to “G”, and change the Ceiling Finish from “T2” to “EP5”. Will revise Sheet A-114 to indicate gypsum board ceiling for Room 1D01, will revise Sheet ID-601 to change the room name for Room 1D01 from “IMAGING” to “PROCEDURE”. Will clarify the location of Rooms 1C14A SCRUB and
1C14B INSTRUMENT
38. SPEC 26 20 00 / Drawing Number S-501 / Paragraph Reference 2. 1. e - Specification Section 05400 Item 2.1.e Pre Engineered Roof Trusses calls for standard C-Shaped Section or Proprietary Section. Sheet S501 calls for 8” Depth Top Chord and 6” Depth Bottom Chord.
Please confirm it is acceptable for a propriety system to deviate from the chord sizes listed on Sheet S501.
ANSWER: Deferred
39. Drawing Number E-102 - Please confirm details for Duct Bank Type L2. No details provided.
ANSWER: Will clarify requirements for Duct Bank Type L2 via future Amendment.
40. We respectfully request the proposal deadline be extended from Feb. 3 to Feb. 10 to allow some of our small business partners enough time to generate a competitive proposal.
ANSWER: Refer to Amendment 0003.
41. Refer to Notice 3
42. Refer to Notice 3