AMD 0004 21R1321.pdf
PDF 676 KB Posted
- Solicitation number
- N62742-21-R-1321
About this file
This document contains an amendment to a solicitation and related federal contract opportunity. The amendment revises the solicitation for the construction of a new Bachelor Officer Quarters tower on Marine Corps Base Guam. Revisions include adding a section on flashing and sheet metal, revising door hardware sets and construction details, and modifying language on steel mesh installation. The related federal contract opportunity notices that the solicitation was issued on June 8, 2021 for the $100-150 million design-build construction project, which will be funded by the Government of Japan and have a 760-day period of performance. The project involves building a multi-story housing tower, common area wing, and utility building to provide single-occupancy housing and support spaces for deployed military personnel on Guam.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1641226
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N62742-21-R-1321, J-034 BACHELOR OFFICER QUARTERS-B, US NAVSUPPACT MCB, GUAM
See Next Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274221R1321
X 9B. DATED (SEE ITEM 11)
08-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Dec-2021
CODE
NAVFAC PACIFIC
CONSTRUCTION CONTRACTS BR (CODE ACQ33)
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274221R1321
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
This amendment is issued to revise the following:
1. Project Table of Contents if revised to add Section 07 60 00 FLASHING AND SHEET METAL after Section 07
56 00 08/09 FLUID-APPLIED ROOFING SYSTEM.
2. Section 01 33 00, Submittal Register, add attached page 20A after page 20.
3. Section 07 60 00 FLASHING AND SHEET METAL is added after Section 07 56 00 08/09 FLUID-APPLIED
ROOFING SYSTEM.
4. Section 08 71 00 Door Hardware, Hardware Sets is revised to remove hardware sets 3.0 and 26.0
5. Section 31 31 16.19, paragraph 3.3 Installation is revised to delete both paragraphs and to replace them with the following:
Submit shop drawings of the steel mesh at the perimeter foundations, joints, and penetration conditions to the Contractor Officer for approval before installation.
6. Revised Drawings: The following previously issued drawings are revised and reissued. These revised drawings supersede any previously issued drawings:
NO.
SHEET
NO.
NAVFAC
NO.
DESCRIPTION
1 S-156 17268369 REVISED DETAILS
2 A-152 17268416 REVISED NOTE
3 A-156 17268420 REVISED SLAB
4 A-314 17268447 CHAIR RAIL EDIT
5 A-317 17268420 REVISED SLAB
6 A-523 17268470 MATERIAL TAG EDIT
7 A-542 17268476 DETAILS ADD/EDIT
8 A-603 17268478 DOOR TYPE EDIT
9 A-612 17268482 LOUVER ADDED
7. All other terms and conditions remain unchanged.
End of Amendment
SUBMITTAL FORM,Jan 96
J-034 BACHELOR OFFICER QUARTERS-B
07 60 00 SD-02 Shop Drawings
2.1 SRecycled Content
SD-08 Manufacturer’s Instructions
1.4.2 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.2 GCleaning and Maintenance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
PAGE 20A OF 82 PAGESPREVIOUS EDITION IS OBSOLETE
AMD-0004
jching Text Box AMD-0004 November 22, 2021 jching Text Box AMD-0004 November 22, 2021
J-034 BACHELOR OFFICER QUARTERS-B 1641226
US NAVSUPPACT MCB GUAM
SECTION 07 60 00
FLASHING AND SHEET METAL
05/17, CHG 2: 11/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A240/A240M (2020) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition
1.2 GENERAL REQUIREMENTS
Finished sheet metal assemblies must form a weathertight enclosure without waves, warps, buckles, fastening stresses or distortion, while allowing for expansion and contraction without damage to the system. The sheet metal installer is responsible for cutting, fitting, drilling, and other operations in connection with sheet metal modifications required to accommodate the work of other trades. Coordinate installation of sheet metal items used in conjunction with roofing with roofing work to permit continuous, uninterrupted roofing operations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Recycled Content; S
SD-08 Manufacturer's Instructions
Instructions for Installation; G
Quality Control Plan; G
SD-10 Operation and Maintenance Data
Cleaning and Maintenance; G
SECTION 07 60 00 Page 1
AMD-0004
1.4 MISCELLANEOUS REQUIREMENTS
1.4.1 Product Data
Indicate thicknesses, dimensions, fastenings, anchoring methods, expansion joints, and other provisions necessary for thermal expansion and contraction. Scaled manufacturer's catalog data may be submitted for factory fabricated items.
1.4.2 Operation and Maintenance Data
Submit detailed instructions for installation and quality control during installation, cleaning and maintenance, for each type of assembly indicated.
1.5 DELIVERY, HANDLING, AND STORAGE
Package and protect materials during shipment. Uncrate and inspect materials for damage, dampness, and wet-storage stains upon delivery to the job site. Remove from the site and replace damaged materials that cannot be restored to like-new condition. Handle sheet metal items to avoid damage to surfaces, edges, and ends. Store materials in dry, weather-tight, ventilated areas until installation.
PART 2 PRODUCTS
2.1 RECYCLED CONTENT
Provide products with recycled content. Provide data for each product with recycled content, identifying percentage of recycled content.
2.2 MATERIALS
Use stainless steel, 2D finish, fully annealed, 0.51 mm unless indicated otherwise. Provide materials, thicknesses, and configurations in accordance with SMACNA 1793 for each material. Different items need not be of the same metal, except that contact between dissimilar metals must be avoided.
Furnish sheet metal items in 2400 to 3000 mm lengths. Single pieces less than 2400 mm long may be used to connect to factory-fabricated inside and outside corners, and at ends of runs. Factory fabricate corner pieces with minimum 300 mm legs. Provide accessories and other items essential to complete the sheet metal installation. Provide accessories made of the same or compatible materials as the items to which they are applied.
Fabricate sheet metal items of the materials specified below and to the gage, thickness, or weight shown in Table I at the end of this section.
Provide sheet metal items with mill finish unless specified otherwise.
Where more than one material is listed for a particular item in Table I, each is acceptable and may be used, except as follows:
2.2.1 Exposed Sheet Metal Items
Must be of the same material. Consider the following as exposed sheet metal: sill flashings and related accessories.
2.2.2 Stainless Steel
Provide in accordance with ASTM A240/A240M , Type 316, 2D Finish, fully
SECTION 07 60 00 Page 2 annealed, dead-soft temper. Provide minimum 0.51 mm unless indicated otherwise; 1.2 mm at downspout straps.
2.2.3 Fasteners
Use stainless steel fasteners to fasten.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Protection from Contact with Dissimilar Materials
3.1.1.1 Metal Surfaces
Paint surfaces in contact with mortar, concrete, or other masonry materials with alkali-resistant coatings such as heavy-bodied bituminous paint.
3.2 PAINTING
Touch ups in the field may be applied only after metal substrates have been cleaned and pretreated in accordance with manufacturer's written instructions and products.
Field-paint sheet metal for separation of dissimilar materials.
3.3 CLEANING
Clean exposed sheet metal work at completion of installation. Remove grease and oil films, handling marks, contamination from steel wool, fittings and drilling debris, and scrub-clean. Free the exposed metal surfaces of dents, creases, waves, scratch marks, and solder or weld marks.
3.4 REPAIRS TO FINISH
Scratches, abrasions, and minor surface defects of finish may be repaired in accordance with the manufacturer's printed instructions and as approved. Repair damaged surfaces caused by scratches, blemishes, and variations of color and surface texture. Replace items which cannot be repaired.
3.5 FIELD QUALITY CONTROL
Establish and maintain a Quality Control Plan for sheet metal used in conjunction with roofing to assure compliance of the installed sheet metalwork with the contract requirements. Remove work that is not in compliance with the contract and replace or correct. Include quality control, but not be limited to, the following:
a. Observation of environmental conditions; number and skill level of sheet metal workers; condition of substrate.
b. Verification that specified material is provided and installed.
c. Inspection of sheet metalwork, for proper size(s) and thickness(es), fastening and joining, and proper installation.
-- End of Section --
SECTION 07 60 00 Page 3
File details come from the government source that posted it. Updated .