This document contains pre-proposal questions and answers regarding solicitation number N62742-21-R-1321 for the construction of a new Bachelor Officer Quarters (BOQ) tower at Marine Corps Base Guam. The project includes construction of a multi-story housing tower with single-occupancy units, common areas, and a detached utility building. Key details include clarification that dowel bars and tie bars are not required for PCC pavement, confirmation that CSS-1h emulsion can be used for prime and tack coats, revision of aggregate gradation and asphalt binder requirements, and corrections to foundation depths and stair locations on drawings. The estimated value of the contract is between $100-150 million, with an anticipated period of performance of 760 calendar days. The soliciting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice No. 2
04 August 2021
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-21-R-1321
J-034 BACHELOR OFFICER QUARTERS-B,
US NAVSUPPACT MCB, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
3. Detail 6/CS505, Reflective Pavement Marker. The sheet referenced in the detail 6/CS505 for marker locations was not provided in the RFP drawing set, and we were unable to locate marker locations on the provided sheets. Please provide marker locations.
RESP: Details 1 and 6 on CS505 are not required and will be removed. See Amendment 0002.
4. Details 1/CS501and 6/CS502. PCC Pavement and Base Course Thickness. These two details show different thickness for the PCC Pavement and Base Course. Please confirm the driveway section.
RESP: Detail 6 will be revised to match the PCC pavement thickness shown in Detail 3/CS501.
See Amendment 0002.
5. PCC Pavement (Roads). Please provide Jointing Plan/Layout for PCC Pavement in the vicinity of the Utility Building.
RESP: Will provide jointing plan around utility building and will revise drawing CS421. See Amendment 0002.
6. Spec Section 32 13 13.06, para 2.1.5. PCC Pavement Reinforcement. Please provide Dowel and Tie Bar sizing and spacing.
RESP: Dowel and Tie Bars are not required. Paragraphs 2.1.5.1 Coated Dowel Bars and 2.1.5.2 Tie Bars will be removed from Section 32 13 13.06. See Amendment 0002.
7. Detail 4/CS507. PCC Pavement Welded Wire Reinforcement. Please provide Welded Wire Reinforcement sizing.
RESP: PCC pavement welded wire reinforcement size in detail 4 will be provided. See Amendment 0002.
8. Detail 4/CS502. Engineered Soil. Please provide specification for engineered soil for the stormwater treatment basin.
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC
258 MAKALAPA DRIVE, SUITE 100
JOINT BASE PEARL HARBOR HICKAM, HAWAII 96860-3134
RESP: Detail 4/CG502 indicates that engineered soil is defined in the specifications. Section 33 40 00 STORM DRAINAGE UTILITIES 2.8 ENGINEERED SOIL MIX provides the material specifications.
9. Spec Section 32 12 13, Emulsified Asphalt for Tack and Prime Coats. Spec section 32 12 13 paras 2.1 Prime Coat and 2.2 Tack Coat specifies SS-1 or SS1h, which is not available in Guam.
The paving contractor has found that using anionic SS-1 and SS-1h emulsion (negative charge) diluted with Guam water, which contains soluble minerals (negative charge), causes the emulsion to de-emulsify and coagulate in the distributor truck preventing application. We propose to use CSS-1h conforming to D2397 for both prime and tack coat. This material is used for all the paving jobs in Guam. Please confirm this is acceptable.
RESP: Use of emulsified asphalt conforming to ASTM D2397/D2397M, Type CSS-1h is acceptable. Section 32 12 13 subparts 2.1 Prime Coat and 2.2 Tack Coat will be amended. See Amendment 0002.
10. Spec Section 32 12 16, Hot Mix Asphalt for Roads. The local asphalt paving provider has not successfully produced a mix meeting the VMA requirement of Section 32 12 16 Table 5 utilizing local materials. The currently accepted Gradation 3 job-mix formula (attached) is 14.7 VMA using viscosity grade AR-16000. This mix is retaining 1 percent 1/2 –inch size, whereas Table 4 requires 100% passing this sieve. Please confirm it is acceptable to use the attached
JMF.
RESP: The aggregate gradation will be revised to gradation 2, revising Table 4 percentage passing by mass requirements in section 32 12 16, paragraph 2.2.4. Paragraph 2.3 Asphalt Cement binder will be revised to performance grade 76-10 or ASTM D3381/D3381M Viscosity Grade AR16000. See Amendment 0002.
11. Detail 2/CS503, Removable Bollard Foundation. Detail 2/CS503 lists two different depths for the foundation below grade. Please confirm the correct foundation depth.
RESP: 760mm is the required foundation depth. DWG CS503, Detail 2/CS503 will be revised.
See Amendment 0002.
12. Sheet CS103 and detail 2/CS504, Sheet CS103 and detail 2/CS504. Sheet CS103 keynote 15 designates the stairs at the sidewalk at northeast corner of the parking area, but does not designate the two sets of stairs at the parking lot medians. Please add the two sets of exterior stairs at the parking lot median and south project boundary to the information table in detail
2/CS504.
RESP: Keynotes will be added to stair locations 2 and 3 on DWG CS103. Table on DWG CS504 will be revised. See Amendment 0002.
End of Notice