AMD 0001 21R1321 Rev DWGS.pdf

PDF 16 MB Posted

Attached to
J-034 BACHELOR OFFICER QUARTERS-B, US NAVSUPPACT MCB, GUAM
Solicitation number
N62742-21-R-1321
Issued by

About this file

This solicitation is for the construction of a new Bachelor Officer Quarters tower at Naval Support Activity Marine Corps Base Guam. The project includes a multi-story housing tower with single-occupancy units, common areas, and support spaces. An attached common area wing and detached utility building will also be constructed. The estimated value of the contract is between $100-150 million. The work will be funded by direct cash contributions from the Government of Japan. The solicitation was issued on June 8, 2021, with an anticipated contract completion period of 760 calendar days. The North American Industry Classification System code for this opportunity is 236116 for new multifamily housing.

View the file

Other files

Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-002

J -0

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

1. REQUEST WATER OUTAGES FROM THE NAVFACMAR BOSC SERVICE SUPPORT CENTER, (671) 333-2011 VIA THE CONTRACTING OFFICER'S REPRESENTATIVE, THIRTY (30) DAYS PRIOR TO THE DESIRED DATE

OF THE OUTAGE. ENSURE THAT APPROVAL HAS BEEN OBTAINED FOR THE OUTAGE PRIOR TO

PERFORMING THE WORK. ENSURE THE APPROPRIATE NAVFAC MARIANAS FACILITY MANAGER

NOTIFIES PERSONNEL LOCATED IN BUILDINGS AFFECTED BY THE OUTAGE UPON APPROVAL OF THE

OUTAGE. ALL WATER OUTAGES SHALL BE PERFORMED BY THE NAVFACMAR BOSC, UNLESS

OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.

2. COORDINATE THE WATER OUTAGE DURATION WITH THE NAVFACMAR BOSC. WATER OUTAGES

AFFECTING AN INDIVIDUAL FACILITY SHOULD NOT EXCEED FOUR (4) HOURS. PROVIDE TEMPORARY WATER SERVICE TO AFFECTED FACILITIES WHEN WATER OUTAGES EXCEED FOUR (4) HOURS, UNLESS AN OUTAGE DURATION BEYOND FOUR (4) HOURS IS APPROPRIATE BY THE FACILITY OR HOUSING

MANAGER AND THE GUAM NAVAL BASE FIRE CHIEF.

3. PROVIDE NAVFACMAR BOSC FOURTEEN (14) DAYS NOTICE PRIOR TO CONNECTING TO ANY

WATERLINE. CONNECTION WORK SHALL BE PERFORMED IN THE PRESENCE OF THE CONTRACTING

OFFICER'S REPRESENTATIVE.

4. NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE THREE (3) WORKING DAYS PRIOR TO CONNECTING TO AN EXISTING NAVY WATER LINE OR DISINFECTING A NEW OR EXISTING LINE.

5. ALL NEW OR REPAIRED POTABLE WATER LINES, FIRE PROTECTION LINES THAT ARE CONNECTED TO

THE POTABLE WATER SYSTEM, IRRIGATION LINES THAT ARE UPSTREAM OF THE BACKFLOW

PREVENTION DEVICES AND AFFECTED PORTIONS OF EXISTING POTABLE WATER LINES SHALL BE

FLUSHED AND DISINFECTED.

6. DISINFECTION WORK SHALL BE PERFORMED IN THE PRESENCE OF THE CONTRACTING OFFICER'S

REPRESENTATIVE, NAVFACMAR PWD UTILITIES, AND NAVFACMAR EV.

7. DISINFECTION FOR REPAIR AND CONNECTIONS TO EXISTING LINES.

A. DISINFECTION PROCEDURES FOR REPAIRS/CONNECTION WORK SHALL BE AS INDICATED IN

AWWA C651 UNDER THE PARAGRAPH TITLED "DISINFECTION PROCEDURES WHEN CUTTING INTO

OR REPAIRING EXISTING MAINS" EXCEPT THAT A FIVE (5) PERCENT HYPOCHLORITE SOLUTION

SHALL BE USED.

B. ALL TAPPING SLEEVES SHALL BE DISINFECTED AS FOLLOWS:

a. THOROUGHLY CLEAN THE EXTERIOR SURFACE OF THE MAIN TO BE TAPPED, THE SURFACES

OF THE TAPPING SLEEVE AND THE SURFACES OF THE TAPPING EQUIPMENT THAT WILL COME

INTO CONTACT WITH THE WATER.

b. THOROUGHLY SWAB THE MAIN, THE TAPPING SLEEVE AND THE TAPPING EQUIPMENT WITH A

FIVE (5) PERCENT SODIUM HYPOCHLORITE SOLUTION.

c. ANY SURFACES THAT BECOME CONTAMINATED AFTER BEING DISINFECTED, SHALL BE

RECLEANED AND RESWABBED AS INDICATED ABOVE.

C. AFTER FINAL FLUSHING AND PRIOR TO PLACING NEW LINES IN SERVICE, BACTERIOLOGICAL

TESTS SHALL BE PERFORMED AS INDICATED IN AWWA C651 AND AS FOLLOWS:

a. STANDARD CONDITIONS: AT LEAST ONE SAMPLE SHALL BE COLLECTED FROM THE END OF

EACH NEW MAIN AND ONE FROM THE END OF EACH NEW BRANCH LINE. THE LOCATION OF

THE ADDITIONAL SAMPLES SHALL BE DETERMINED BY THE CONTRACTOR AND APPROVED BY

THE CONTRACTING OFFICER.

b. SPECIAL CONDITIONS: IF DURING CONSTRUCTION, TRENCH WATER HAS ENTERED THE LINE

OF IF IN THE OPINION OF THE CONTRACTING OFFICER EXCESSIVE QUANTITIES OF DIRT OR

DEBRIS HAVE ENTERED THE LINES, SAMPLES SHALL BE TAKEN AT INTERVALS OF

APPROXIMATELY 200 FEET AND SHALL BE IDENTIFIED BY LOCATION.

D. DISINFECTION OF MAINS AND BRANCH LINES SHALL BE REPEATED UNTIL SAMPLES SHOW THE

ABSENCE OF COLIFORM ORGANISMS.

E. FINAL BACTERIOLOGICAL TEST RESULTS, THAT SHOW THE ABSENCE OF COLIFORM ORGANISMS, SHALL BE PROVIDED TO THE CONTRACTING OFFICER'S REPRESENTATIVE AT THE FINAL

INSPECTION OF THE PROJECT OR PRIOR TO PLACING THE LINE IN SERVICE WHICHEVER OCCURS

FIRST. THE LOCATION WHERE THE BACTERIOLOGICAL SAMPLES WERE TAKEN SHALL BE

IDENTIFIED.

8. PROVIDE NAVFACMAR PWD THREE (3) SETS OF "AS-BUILT" DRAWINGS, VIA THE CONTRACTING

OFFICER.

9. WATER FROM HYDRO TESTING/DISINFECTION SHALL NOT BE DISCHARGED INTO THE STORM

DRAINAGE SYSTEM OR THE SEWER SYSTEM. WATER MAY BE DISCHARGED ONTO THE GROUND IN AN

UNPAVED AREA APPROVED BY THE CONTRACTING OFFICER, PROVIDED THAT THE WATER IS NOT

CONTAMINATED, HAS BEEN DECHLORINATED, WILL NOT ENTER THE STORM DRAINAGE OR SEWER

SYSTEM, AND WILL NOT CREATE A NUISANCE BY PONDING OR FLOODING.

10. WATERLINES TO BE ABANDONED MUST BE CAPPED CLOSEST TO THE MAIN WATERLINE DISTRIBUTION SOURCE. CAPPING OF WATERLINES FOR DEMO PROJECTS 1500mm FROM THE STRUCTURE WILL NOT

BE ALLOWED. ACTIVE DEAD-END WATERLINES WILL COMPROMISE WATER QUALITY PROMOTING

STAGNANT WATER AND DISSIPATION OF CHLORINE RESIDUAL, RESULTING IN POTENTIAL BACTERIAL GROWTH, NOV (NOTICE OF VIOLATION) AND FINES. PRIOR TO ABANDOMENT, PIPE SHALL BE FILLED

WITH FLOWABLE FILL CONCRETE.

WATER NOTES: GRADING NOTES:

1. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATERS FROM DAMAGING THE CUT

FACE OF AN EXCAVATION OR THE SLOPED FACE OF A FILL. FURTHERMORE, ADEQUATE PROVISIONS

SHALL BE MADE TO PREVENT SEDIMENT-LADENT RUNOFF FROM LEAVING THE SITE.

2. THE CONTRACTOR SHALL NOT PERFORM ANY GRADING OPERATIONS THAT MAY CAUSE FALLING ROCKS, SOIL OR DEBRIS, IN ANY FORM, TO FALL, SLIDE OR FLOW INTO BASE DRAINAGE SYSTEMS OR

NATURAL WATER COURSES, OR ONTO ADJOINING PROPERTIES OR STREETS. SHOULD SUCH

VIOLATIONS OCCUR, THE CONTRACTOR MAY BE CITED AND THE CONTRACTOR SHALL IMMEDIATELY

MAKE ALL REMEDIAL ACTIONS NECESSARY AT NO ADDITIONAL COST TO THE GOVERNMENT.

3. WHERE APPLICABLE AND FEASIBLE, THE MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS

SHALL BE IN PLACE BEFORE ANY EARTH-MOVING PHASE OF THE GRADING COMMENCES.

4. ALL SLOPES AND EXPOSED AREAS SHALL BE SODDED OR PLANTED AS SOON AS FINAL GRADES HAVE

BEEN ESTABLISHED. PLANTING SHALL NOT BE DELAYED UNTIL ALL GRADING WORK HAS BEEN

COMPLETED. GRADING TO FINAL GRADE SHALL BE CONTINUOUS AND ANY AREA WITHIN WHICH WORK

HAS BEEN INTERRUPTED OR DELAYED SHALL BE PLANTED.

5. FILL ON SLOPES STEEPER THAN 5: 1 (HORIZONTAL: VERTICAL) SHALL BE KEYED.

6. THE LIMITS OF THE AREA TO BE CLEARED, CLEARED AND GRUBBED, AND/OR GRADED SHALL BE

FLAGGED BY THE CONTRACTOR BEFORE COMMENCEMENT OF THE GRADING WORK.

7. ALL GRADING OPERATIONS SHALL BE PERFORMED IN CONFORMANCE WITH THE APPLICABLE

PROVISIONS OF THE EPA WATER POLLUTION CONTROL AND WATER QUALITY STANDARDS AND THE

NPDES PERMIT FOR THE PROJECT.

8. TEMPORARY EROSION CONTROL PROCEDURES SHALL BE SUBMITTED TO THE CONTRACTING

OFFICER FOR APPROVAL PRIOR TO APPLICATION FOR THE GRADING PERMIT.

9. ALL EXPOSED AREAS THAT ARE NOT AT FINAL GRADE AND ARE LEFT TO BE EXPOSED LONGER THAN TWO (2) WEEKS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION TO THE SATISFACTION

OF THE CONTRACTING OFFICER.

10. LOCATIONS OF UNDERGROUND UTILITIES ARE FROM SURVEY INFORMATION AND AS-BUILT DRAWINGS.

FIELD-VERIFY ALL LOCATIONS AND DEPTHS OF UTILITIES PRIOR TO BEGINNING CONSTRUCTION AND

EXERCISE PROPER CARE IN EXCAVATING IN THE AREA.

11. DURING WET WEATHER PERIODS, SEQUENCE CONSTRUCTION IN A MANNER THAT MINIMIZES IMPACT

ON OPEN EARTHWORK AND COMPACTION OPERATIONS.

12. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER THAT THE J-034 PROJECT SITE HAS BEEN CLEARED OF MEC BY THE J-001B UTILITIES AND SITE IMPROVEMENTS PROJECT TO A DEPTH

OF 4 FEET BELOW ROUGH GRADE. AT AREAS WHERE BEDROCK WAS ENCOUNTERED, MEC

CLEARANCE IS COMPLETE.

1. HORIZONTAL AND VERTICAL CONTROLS WERE BASED ON 1993 GUAM GEODETIC NETWORK (GGN)

COORDINATES AND MONUMENTS GGN 80 (AKA 3.11) ALONG ROUTE 3 AND SOUTHWEST OF THE

PROJECT SITE, WITH THE FOLLOWING PROPERTIES (IN METERS):

GGN80 NAD83 (GGN) COORDINATES

NORTHING: 208,698.2624

EASTING: 111,136.9200

GGN80 WGS84 UTM55N COORDINATES (USED FOR J-023 AND J-034 PROJECT)

NORTHING: 1,502,144.739

EASTING: 267,668.2800

ELEVATION: 137.813 (MSL)

GGGN79 NAD83 (GGN) COORDINATES

NORTHING: 208,327.0570

EASTING: 110,843.2790

GGN79 WGS84 UTM55N COORDINATES (USED FOR J-023 AND J-034 PROJECT)

NORTHING: 1,501,776.1590

EASTING: 267,371.1490

ELEVATION: 133.900 (MSL)

BASIS OF BEARING (GGN79 TO GGN80)

WGS:N 38° 52' 26.56" E, LENGTH= 473.43

GGN: N 38° 20' 44.38" E, LENGTH= 473.31

7/14/2021

CG103

J -0

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

4030201010

1:500

ALL DIMENSIONS AND/OR DIMENSIONS SHOWN

IN CALLOUT/NOTES ARE IN METERS UNLESS

OTHERWISE NOTED.

PLAN

NORTH

PLAN

NORTH

CG103

SCALE:

J-034 GRADING AND DRAINAGE PLAN 11:500

LEGEND:

APPROXIMATE GRADING LIMITS

EXISTING SPOT ELEVATION

PROPOSED SPOT ELEVATION

EXISTING CONTOUR WITH ELEVATION

PROPOSED CONTOUR WITH ELEVATION

EXISTING DRAINAGE INLET

X

X

DIRECTION OF SLOPE

1. EXISTING SITE FEATURES ARE CONCEPTUAL. THE EXISTING

SITE FEATURES ARE BASED UPON THE FINAL DESIGN FOR

PROJECT J-001B.

2. VERIFY LOCATION AND INVERT OF EXISTING UTILITIES PRIOR

TO CONSTRUCTION.

3. UNLESS FEATURES ARE IDENTIFIED FOR REMOVAL, THE

FEATURES MUST REMAIN. PROTECT EXISTING FEATURES TO

REMAIN.

NOTES:

1. EXISTING SITE FEATURES ARE CONCEPTUAL. THE EXISTING

SITE FEATURES ARE BASED UPON THE FINAL DESIGN FOR

PROJECT J-001B.

2. VERIFY LOCATION AND INVERT OF EXISTING UTILITIES PRIOR

TO CONSTRUCTION.

3. UNLESS FEATURES ARE IDENTIFIED FOR REMOVAL, THE

FEATURES MUST REMAIN. PROTECT EXISTING FEATURES TO

REMAIN.

4. SEE ENLARGED GRADING PLAN FOR PAVEMENT SURFACE

ELEVATIONS.

J-023 SITE BOUNDARY

BOQ B BLDG

(FFE=140.000)

PAVILION

(FFE=139.250)

UTILITY BLDG

(FEE=139.000)

BBQ PAVILION

(FFE=139.050)

TRASH/RECYLING

ENCLOSURE

PAVILION

(FFE=142.620)

BIKE PAVILION

(FFE=139.800)

J-034 SITE

BOUNDARY

CG421

CG423

CG423

CG422

KEYNOTES:*

CG203

CG203

CG203

CG203

CG203

CG203

1. 300MM HDPE DRAINAGE PIPE

2. 450MM HDPE DRAINAGE PIPE

3. NOT USED

4. NOT USED

5. NOT USED

6. NOT USED

7. CONCRETE HEADWALL WITH FLARED WINGS, SEE SHEET

CG501, DET C2

8. STORM DRAIN MANHOLE, SEE SHEET CG501, DET C4

9. CHECK DAM, SEE SHEET CG503, DET A2

10. GRATED INLET, TYPE 1, SEE SHEET CG501, DET A4

11. J-034 RETENTION BASIN OUTLET STRUCTURE, SEE CG502,

DET A1

12. NOT USED

13. GRASS SURFACED STORMWATER TREATMENT SECTION, SEE

SHEET CG502, DET A4

14. NOT USED

15. NOT USED

16. NOT USED

17. GRASSY WIDE SWALE, SEE PLANS FOR LENGTH (L) SEE

SHEET CG503, DET C1

18. GRASSY TRAP-SWALE, SEE PLANS FOR LENGTH (H) SEE

SHEET CG503, DET C1

19. STONE DIAGHRAGM, SEE PLANS FOR LENGTH (L), SEE SHEET

CG503, DET A5

APPROXIMATE

GRADING LOCATION

10SDS-13

SDS-16

1 SDP-15

10SDS-12

8 SDS-141SDP-13

1SDP-14

12SDS-22

2SDP-22

SDS-23

EXISTING

INLET

2SDP-21

STONE

APRON

1 SDP-10

2SDP-20

12SDS-21

11SDS-20

1 SDP-11

2 SDP-12

40 M (L)

30 M (L)

39 M (L)

92 M (L)

67 M (L)18

45 M (L)

52 M (L)

CG502

40 M (L)

1 M (H)

0.3 M (H)

0.3 M (H)

0.3 M (H)

0.3 M (H)

9 0.3 M (H)

BASE 2M (W) X 10M (L)

D E P A R T M E N T O F T H E N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A V A L F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

PA

C

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

PN

JCJHDH

B

IM

J-a n d J-

J-

B O Q A R C H r1 .r vt

:5 :2 A M

B O

Q B

E

LE

V

A

TI

O N

S

A-213

A M D

M E C H

Y A R D

W A

LL

G A

TE

E D

IT

SHEET

NAVFAC DRAWING NO.

OF

A-213

SHEET

NAVFAC DRAWING NO.

OF

A-213

17268438 4434434251164

SEALSEAL

P A R T M E N T O F T H E N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A V A L F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

PA

C

IF

IC

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

, G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

972483

PN

DH JH JC

B

IM

J-a n d J-

J-

B O Q D E

TA

IL

S r1 .r vt

:2 :0 P M

E X

TE

R

IO

R

D E

TA

IL

S

FO

U

N D

A

TI

O N

A N

D M

IS

C

A-512

17255405

A M D

C U R B

A D D E D

R. CONTR. NO.

C DRAWING NO.

FORM REVISION: 30 APRIL 2015

OF

CT NO.: 972483

A-512

17255405

R. CONTR. NO.

C DRAWING NO.

FORM REVISION: 30 APRIL 2015

OF

CT NO.: 972483

A-512

17255405 17268465

1641226

4434434278191

05/11/21

P A R T M E N T O F T H E N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A V A L F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

PA

C

IF

IC

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

, G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

972483

PN

DH JH JC

B

IM

J-a n d

J-

J-

B O Q D E

TA

IL

S r1 .r vt

:2 :0

P M

P A

R

TI

TI

O

N T

Y P

E S

A-591

17255417

A M D

P A R

TI

TI

O N

N O

TE

S C U R B

E D

IT

S

R. CONTR. NO.

C DRAWING NO.

FORM REVISION: 30 APRIL 2015

OF

ECT NO.: 972483

A-591

17255417 17268477

1641226

4434434290203

05/11/21

P A R T M E N T O F T H E N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A V A L F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

PA

C

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

PN

JCJHDH

B

IM

J-a n d

J-

J-

B O Q A R C H r1 .r vt

:5 :2

A M

B O

Q B

D

O O

R S

C H

E D

U

LE

G

A

TE

S C

H E

D U

LE

A-603

A M D

M E C H

Y A R D

W A

LL

G A

TE

E D

IT

SHEET

NAVFAC DRAWING NO.

DRAWFORM REVISION: 30 APRIL 2015

OF 434

A-603

SHEET

NAVFAC DRAWING NO.

DRAWFORM REVISION: 30 APRIL 2015

OF 434

A-603

17268478 4434434291204

SEALSEAL

RRE

VD

AT

E

PL

O

TT

ED

C U se rs k a c h o n D o c u m e n ts B O Q J-

M e c h v1 k liu Y W S Q .r vt

:4 :0

A M

H

A W A I I, U.S

.A

I CERTIFY THAT THIS DRAWING WAS PREPARED BY

ME OR UNDER MY DIRECT SUPERVISION.

D E P A R T M E N T O F T H E N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A V A L F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

N

AV

FA

C

PA

C

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

LE

OCKLKL

B O

Q B

O

V E

R A

LL

M

E C

H A

N

IC

A L

P

LA

N

M-103 17268543

A M E N D M E N T

S

LO

P E D

C H W S R

A N

R A

IN

B O X

AutoCAD SHX Text H

AutoCAD SHX Text A

AutoCAD SHX Text W

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

I CERTIFY THAT THIS DRAWING WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION.

AutoCAD SHX Text

AMENDMENT 0001 - ADDED MECH. DETAIL

AutoCAD SHX Text 06/30/21

W W

W

W W W W W W W W W W W W W W

W W

W W

W W

W W

W W

W

WWW

W W

W W

W W

W

W

WWWWWWWW

W

W

W W

W W

W W W W

W W

W W

W

W

W

F

F F F F

W W

SANSANSAN

SA

N

SAN SAN SAN SAN SAN SAN SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SANSAN

SA

N

SA

N

F

F

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

WWWWWWW

W

W

WWWWWWW

W

W

WWWWWWW

W

W

WWWWWWW

W

W

WWWWWWW

W

W

WWWWWWW

W

W

WWWWWWW

W

CU

CU

W W

SA

N

W W

SA

N

W

W W

SA

N

M

M

M

MH P574-8C

MH P574-8B

EHH

UTILITY BLDG

PAVILION

BBQ PAVILION

BOQ B BUILDING

SHH

SHH

ES

ES

ES

ES

ES

ES ES

ES

ES

11 11

10 10

E

MH P574-8D

ES

10ES ES ES

ES ES ES

10 10

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES ES

ES

ES

ES

ES

ES

ES

ES

ES

ESES

ES

ES

ES

ES

ES

9 9

ES

ES

ES

ES

ES

ES

ES

ES

11 11

ES

ES

ES

ES

ES

E

E

ES

E

PAVILION

SDSDSD

BOQ B - ELECTRICAL SITE PLAN

(E) MH P574-8

(E) MH P574A-2

(E) SW P574A-2

(E) SW P574-8

KEY PLAN

NOT TO SCALE

ES101

TYPICAL

E-404

E-404

TYPICAL

E-104

E-124

E-404

E-404

TO SWITCHBOARD "4MDS-BB"

GENERAL NOTES:

FOR ENLARGED PLAN, SEE & .

FOR ENLARGED PLAN, SEE & .

TO SWITCHBOARD "4MDS-UB"

FOR ENLARGED PLAN, SEE & .

M

L

TO ECB-EMB AND ECB-GBB

TO GENERATOR WIRE GUTTER

MH P574-8A

P P

SP SP

E-404

E-404

FOR ENLARGED PLAN, SEE & .

4L1L-9

VIA LC "LC-EL"

4L1L-10

VIA LC "LC-EL"

4L1L-11

VIA LC "LC-EL"

P P

SP SP

P P

SP SP

P P

SP SP

SEE ONE LINE DIAGRAM E-601 AND E-602 FOR CONDUIT AND WIRE SIZES AND

QUANTITIES.

LIGHT LINES INDICATE INFRASTRUCTURE CONSTRUCTED UNDER J-001B

FINEGAYAN UTILITIES AND SITE IMPROVEMENTS PHASE 1 PROJECT. DARK

LINES INDICATE NEW.

P P

SP SP

S

B O

Q B

E

LE

C

TR

IC

A L

S

IT

E P

LA

N

ES101

PAD MOUNTED TRANSFORMER "UB"

4L1L-8

VIA LC "LC-EL"

4L1L-12

VIA LC "LC-EL"

SP

S S S

S S SSP

S S S

S S S

S

TO PANEL "2DP1"

SP

S S S

S S S

VIA CT CABINET, SEE ONE LINE DIAGRAM FOR INFORMATION.

NOTES:

TO PAVILION LIGHTING.2

2 3

4L1L-13

S S

S S S

2L1P-27

TO PAVILION RECEPTACLE.3

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C P

AC

IF

IC

SEAL

J -0

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

AMIA/JF

1641226

05/11/21

DATE

JC

P. NISHIZAKI

MN/KO

JS

NP/RS

OF

EN

GI

N

E

E R

NAL

P R O

F

ESS IO

R

MARIA

N O

A B

NE

(ELECTRICAL)

No.1259

ET

ACIFITRE

C

MAUG

EXP.

V.

April 30,2022

SEAL

WR

WR

WR WR

WR WR

2L1P-34

CT CABINET

S27mmC, FOR AMI METER POWER

BOQ B BUILDING AMI METER

PAD MOUNTED TRANSFORMER "BB"

2L1P-32

TRANSFORMER ENCLOSURE ENLARGED PLAN 2

ES101

FOR ENLARGED PLAN, SEE .

2L1P-37

E-504

RECEPTACLE MOUNTED INSIDE ICS WATER METER ENCLOSURE. SEE TELECOM

PLANS FOR DETAILS

5 1-103mm EMPTY CONDUIT FOR FUTURE MICROGRID CONTROL, SEE FOR CONDUIT STUB-OUT MARKER.

E-606

6 INSTALL TOGETHER WITH ICS TELECOM OUTLET INSIDE THE 18"X18"12"D

LOCKABLE ENCLOSURE. NEMA 4X, 316 SST.SEE FOR

ELEVATION DETAIL.

SP

TO ATS-GUB

17268616

E-504

7 STUBOUT MARKER. SEE FOR DETAIL.

SP

ALL DIMENSIONS AND/OR DIMENSIONS SHOWN IN

CALLOUT/ NOTES ARE IN MILLIMETERS UNLESS

OTHERWISE NOTED.

PLAN

NORTH

P P

SP

P P

SP

P P

SP SP

S

WR

E-124

8 FOR LOCATION OF UTILITY BUILDING AMI METER AND CT CABINET. SEE .

MECH YARD

MECH ROOM

GENERATOR

TRANSFORMER

ELEC

FIRE RISER

TELECOM

WATER SOFTENER

131A

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :2

P M

B O

Q B

U

TI

LI

TY

B

U

IL

D

IN

G L

IG

H

TI

N

G P

LA

N

Z

O N

E E

E-104

17268622

NOTES:

GENERAL NOTES:

AM

D

AD

DE

D

NO

TE

7/

TRANSFORMER

MECH ROOM

ELEC

139 GENERATOR

MECH YARD

WATER SOFTENER

131A

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :2

P M

B O

Q B

U

TI

LI

TY

B

U

IL

D

IN

G P

O W

E R

P

LA

N

Z O

N E

E

E-124

17268630

NOTES:

GENERAL NOTE:

AM

D

RE

VI

SE

D

C

IR

C

UI

T H

OM

ER

UN

A

ND

N

OT

ES

7/

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :3

P M

B O

Q B

U

TI

LI

TY

B

U

IL

D

IN

G L

IG

H

TN

IN

G P

R O

TE

C

TI

O

N P

LA

N

Z

O N

E E

E-143

17268636

THE COMPLETED INSTALLATION SHALL MEET NFPA 780. THE UL LIGHTNING PROTECTION INSPECTION CERTIFICATE

MUST BE FURNISHED TO THE GOVERNMENT UPON COMPLETION.

ALL METAL BODIES WITHIN 1828mm OF LIGHTNING PROTECTION SYSTEM OR THAT PROTRUDE PASSED THE ZONE

OF PROTECTION MUST BE BONDED TO LIGHTNING PROTECTION SYSTEM.

ROOF TOP EQUIPMENT NOT SHOWN ON THIS DRAWING MUST BE PROTECTED AS REQUIRED TO MEET THE REQUIREMENTS LISTED ABOVE INCLUDING THE INSTALLATION OF AIR TERMINAL AND OR BONDING.

ALL LIGHTNING CONDUCTORS MUST MAINTAIN A HORIZONTAL OF DOWNWARD PATH. ALL BENDS IN THE CONDUCTOR MUST HAVE A RADIUS BEND OF 203mm OR GREATER, AND MUST HAVE AN ANGLE BEND NOT LESS

THAN 90 DEGREES OR GREATER.

NOTES:

PROVIDE GROUND TEST WELL. SEE DETAIL .

INSTALL DOWN CONDUCTOR IN PVC CONDUIT

CONCEALED WITHIN CONCRETE WALL.

GENERAL NOTES:

COORDINATE FINAL RATING OF LOOP CONDUCTOR WITH UTILITY SITE PLANS. ADJUST AS NECESSARY AT NO

ADDITIONAL COST TO THE GOVERNMENT.

AM

D

RE

VI

SE

D

LI

GH

TN

IN

G

PR

OT

EC

TI

ON

P

LA

N

7/

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :5

P M

TY

P

IC

A

L R

O O

M E

LE

C

TR

IC

A L

P

LA

N

E-401

17268637

NOTES (APPLICABLE TO ENTIRE SHEET):

AM

D

RE

VI

SE

D

LI

GH

T

FI

XT

UR

E C

IR

C

UI

TI

NG

7/

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :1

P M

B O

Q B

P

A V

IL

IO

N E

N

LA

R G

E D

P

LA

N S

E-404

17268640

GENERAL NOTE:

AM

D

AD

D

ED

N O

TE

7/

NOTE:

ELEVATOR

E01

ELEVATOR

E01

ELEC

GENERATOR

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :1

P M

B O

Q B

U

TI

LI

TY

B

U

IL

D

IN

G E

LE

C

TR

IC

A L

R O

O M

A N

D E

LE

V

A

TO

R P

IT

E

N

LA

R G

E D

P

LA

N

E-405

17268641

NOTES:

NOTES:GENERAL NOTES:

GENERAL NOTE:

AM

D

ED

IT

ED

N

OT

E

NU

M B

ER

7/

203mm

3m m

GENERAL NOTES:

NOTES:

TYPICAL

21mmC, 120mm2 BARE COPPER

LIGHTNING ARRESTER GROUND

102mm RAISED CONCRETE PAD

OUTLINE OF TRANSFORMER

CONCRETE

ENCLOSURE

REFER TO CIVIL DRAWINGS FOR DETAIL OF

CONCRETE ENCLOSURE AND CONCRETE PAD.

VERIFY EXACT DIMENSION WITH EQUIPMENT SUPPLIER.

20mmØ X 3040mm GROUND ROD. AUGER HOLE 102mm DIAMETER X 3658mm FILL HOLE WITH BENTONITE AND INSTALL GROUND ROD IN THE CENTER OF THE HOLE. TOP OF ROD SHALL BE 305mm

BELOW GRADE.

120mm2 BARE COPPER 610mm MINIMUM BELOW GRADE.

BOND TO COUNTERPOISE GROUND.

BOND ENCLOSURE FOUNDATION REBAR TO GROUND.

21mmC,12Omm2 BARE COPPER

BOND TO ENCLOSURE & CABLE

SHIELD

TRANSFORMER FRONT

25mm2 BARE COPPER TO

TRANSFORMER

GROUND RING (TYPICAL OF 2)

mm

914mm 1219mm 1219mm 914mm mm

4m m mm22 mm mm 1829mm

GROUND

ITEM

COVER WITH ENGRAVEMENT "GROUND"

PULL SLOT

BOX

DESCRIPTION

CL

BC GROUND WIRE

EXOTHERMIC WELD

GROUND ROD 20mm X 3040mm5

NOTES:

POLYMER CONCRETE REINFORCED HEAVY-WEAVE FIBERGLASS

HANDHOLE 356mm X 267mm X 323mm OPEN BOTTOM

CONCRETE RING AROUND BOX 27.6 MPa

COMPACTED EARTH

TRAFFIC BEARING TYPE BOX WITH HEAVY DUTY TRAFFIC RATED CAST IRON COVER.

2 AUGER HOLE 102mm DIAMETER X 3658mm. FILLE HOLE WITH BENTONITE AND INSTALL GROUND ROD IN THE CENTER OF THE HOLE. TOP OF ROD SHALL BE 305mm BELOW

GRADE.

ROOF TOP

COPPER LOOP

CABLE HOLDER

AIR TERMINAL

BARE Cu

CONDUCTOR

2m m

4m m

FINISH GRADE

SELECTED BACKFILL

FILL WITH RED EARTH

(TOP SOIL) 76mm MIN. ALL AROUNDGROUND WIRE

1/0 BARE COPPER

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :2

P M

M

IS

C E

LL

A

N E

O U

S D

E

TA

IL

S

E-502

17268643

AM

D

C H

AN

GE

D

DE

TA

IL

T

AR

GE

T

7/

2m m

19mm CHAMFER

FIN. GRADE

ANCHOR BOLTS

CONDUIT

CONCRETE BASE, SEE

CIVIL DRAWINGS

"LED BOLLARD"

GENERAL NOTES:

SUBMIT SHOP DRAWING TO CONTRACTING

OFFICER FOR REVIEW AND APPROVAL.

FOR LIGHT FIXTURE REQUIREMENTS, SEE

LIGHT FIXTURE SCHEDULE.

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :3

P M

M

IS

C E

LL

A

N E

O U

S D

E

TA

IL

S

E-503

17268644

AM

D

R

EV

IS

ED

P

AR

K

IN

G

LI

G H T D

ET

AI

L

7/

GATE POST GROUNDING

914 914

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :3

P M

M

IS

C E

LL

A

N E

O U

S D

E

TA

IL

S

E-504

17268645

GENERAL NOTE:

AM

D

C H

AN

G

ED

D

ET

AI

L

TA

R G

ET

7/

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :4

P M

P R

IM

A

R Y

M A

N H

O

LE

D E

TA

IL

S

E-506

17268647

AM

D

R

EV

IS

ED

M

AN

H O

LE

D

ET

AI

L

7/

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"2L#DB"(1ST TO 5TH FLR.) 208/120V 3 4W 18,000 AIC

12.0

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

12.01 2

PANEL "LCA#12"2/100 2/0

10.0 10.0

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

PANEL "LCA#16"

PANEL "LCA#15"

PANEL "LCA#14"

2/100

PANEL "LCA#08"

PANEL "LCA#09"

PANEL "LCA#10"

PANEL "LCA#07"

PANEL "LCA#11" PANEL "LCA#13"

87.8

220.3 KVA

258.1 A

64.0

93.0 KVA

68.5

CALCULATED LOAD:

1/0 2

SPARE--

SPARE

PFB

2/0

PROVIDE #4 GROUNDING CONDUCTOR.

12.0 12.0

10.0 10.0

10.0 10.0

10.0 10.0

10.0 9.8

12.0 12.0

12.0 12.0

12.0 12.5

PROVIDE #2 GROUNDING CONDUCTOR.

SEE CONDUIT SIZE FOR TABLE.

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

208/120V 3 4W 10,000 AIC

EF-A

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

EF-B

SEE ONE LINE DIAGRAM FOR SIZE.

"2L5PA" (5TH FLR)

11.9

35.7 KVA

95.5 A34.4 KVACALCULATED LOAD:

3.0

1.31.3 1.31.3

1.31.3

- 3/20

DEF-A

KEF-A

SPARE

DEF-B

KEF-B

1/20 - SPARE

PFB

10 3/25

2 3/50

4 3/35

- 1/20

3/25 10

3/35

3/35

2.1

PROVIDE #4 GROUNDING CONDUCTOR.

PROVIDE #2 GROUNDING CONDUCTOR.

29 30

SPARE

11.9 11.9

3.0 2.1

3.0 2.1

2.1 2.1

2.1 2.1

2.1 2.1

PROVIDE #10 GROUNDING CONDUCTOR.

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

480/277V 3 4W 35,000 AIC

ELEVATOR - 1

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

XFMR "TGTR"

SEE ONE LINE DIAGRAM FOR SIZE.

"4GBB"

27.6

67.3 KVA

86.4 A

19.1

71.8 KVA

20.6

CALCULATED LOAD:

0.82.2 0.42.9

0.72.2

12.59.7 4.99.7

5.99.7

PANEL "4L1L"

PANEL "4L3L"

PANEL "4L5L"

PFB

SPARE 1/20 SPARE-1/20

PANEL "4L2L"

PANEL "4L4L"

3/50 - SPARE

SPD

0.8 0.8

0.8

0.4 0.4

0.4

0.7 0.7

0.7

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"2GTR" 208/120V 3 4W 10,000 AIC

RECEP (RM. 126) 12

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

RECEP - AACS/IDS GUTTERBOX (RM. 126)

SPD

1.5

0.6

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

SEE ONE LINE DIAGRAM FOR SIZE.

CALCULATED LOAD:

12.5

23.3 KVA

64.7 A

4.9

23.3 KVA

5.9

PA CABINET (RM. 126)

RECEP - CCTV GUTTERBOX (RM. 126)

TELECOM CABINET (ESS COMPARTMENT)

TELECOM CABINET (ESS COMPARTMENT)

ESS CABINET (RM. 113)

PA CABINET (RM. 118)

GFGI CCTV CABINET (RM. 118)

RECEP-GTC (RM. 118)

SPARE

PANEL "2GTC4"

PANEL "2GTC2"

PFB

0.2

0.5 0.2

0.2 0.3 0.3

0.1

0.5 0.5

0.5 0.5

0.5 0.5

0.2 0.2

121/20

RECEP - AACS/IDS GUTTERBOX (RM. 126)

TELECOM CABINET (ICS COMPARTMENT)

TELECOM CABINET (ICS COMPARTMENT)

VAV-126

ESS CABINET (RM. 111)

PA CABINET (RM. 111)

GFGI CCTV CABINET (RM. 111)

RECEP-GTC (RM. 111)

PANEL "2GTC5"

PANEL "2GTC3"

1/20

TELECOM CABINET (VOICE/DATA/OSP)

TELECOM CABINET (VOICE/DATA/OSP)

0.3 0.3

0.6 0.6

2.0 2.0

0.4 0.4

2.0 2.0

0.4 0.4

1.0 1.0

1.0 1.0

- SPARE

0.6

TELECOM CABINET (GOV EQUIPMENT)

TELECOM CABINET (GOV EQUIPMENT)

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"LC"_____" 208/120V 1 3W 10,000 AIC

LIGHTING - UNIT 12 1/20

22.3

71.2 A

KVA

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B

1 2

RECEPS. - BEDROOM1/20 12

SEE ONE LINE DIAGRAM FOR SIZE.

UNIT ROOM NUMBER.

AFCI TYPE CIRCUIT BREAKER.

RECEPS - KITCHEN, LIVING

SPARE

DRYER

PFB

- COUNTERTOP

- RESTROOM

VAV

2/30 6

2/50 RANGE

-- PFB

SPARE-

- LAUNDRY

- COUNTERTOP

- REFRIGERATOR

- GARBAGE DISPOSAL

- EXHAUST FAN

0.3 1.5

1.3 0.6

0.5 1.0

0.2 1.0

- 1.2

0.1 0.1

1.5 -

2.5 4.0

2.5 4.0

14.8

12.5

9.8

CALCULATED LOAD:

KVA

KVA

WASHER

AFCI AND GFCI TYPE CIRCUIT BREAKER.

SPARE -

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"4EM" 480/277V 3 4W 35,000 AIC

XFMR "TEM"

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

ELEVATOR -2

9.75.7 3.6

-0.1

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______" CALCULATED LOAD:

15.5

42.3 KVA

50.8 A

13.7

42.2 KVA

13.1

SPD

SPARE

PFB

1/20

SPARE

10LIGHTING - MACHINE ROOM (601)

SPARE

3/30

1/20

- ELEVATOR PIT/HOISTWAY 1

- ELEVATOR PIT/HOISTWAY 2

9.7 9.73.0

0.4 0.4

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

208/120V 3 4W 10,000 AIC

ESS CABINET (RM #18) 8 1/20

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

ESS CABINET (RM #11)1/20 80.50.5

0.20.2

0.50.5 0.50.5

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

"2GTC#" (2ND TO 5TH FLR.)

2.0

3.4 KVA

9.4 A

0.4

3.4 KVA

1.0

CALCULATED LOAD:

RECEP-GTC (RM #18)

PA CABINET (RM #18)

GFGI CCTV CABINET (RM #18)

SPARE

PFB

RECEP-GTC (RM #11)

PA CABINET (RM #11)

GFGI CCTV CABINET (RM #11)

SPARE

SPD

3/30

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"LC"_____" 208/120V 1 3W 10,000 AIC

LIGHTING - UNIT 12 1/20

23.5

71.2 A

KVA

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B

1 2

RECEPS. - BEDROOM1/20 12

SEE ONE LINE DIAGRAM FOR SIZE.

UNIT ROOM NUMBER.

AFCI TYPE CIRCUIT BREAKER.

RECEPS - KITCHEN, LIVING

STACKABLE WASHER/DRYER

PFB

- COUNTERTOP

- RESTROOM

VAV

2/30 6

2/50 RANGE

-- PFB

SPARE-

- LAUNDRY

- COUNTERTOP

- REFRIGERATOR

- GARBAGE DISPOSAL

- EXHAUST FAN

0.3 1.5

1.5 0.6

1.5 1.0

0.2 1.0

- 1.2

0.1 0.1

2.5 4.0

2.5 4.0

14.8

12.0 10.0

CALCULATED LOAD:

KVA

KVA

SPARE - -

AFCI AND GFCI TYPE CIRCUIT BREAKER.

SPARE -

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"2EM1" 208/120V 3 4W 10,000 AIC

RECEPS - ELEVATOR PIT 12 1/20

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

ESP-11/20 101.20.8

1.20.8

1.01.0

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______" CALCULATED LOAD:

5.7

12.3 KVA

33.7 A

3.6

12.2 KVA

3.0

- MACHINE ROOM

CAB LIGHTING & RECEP (ELEVATOR 1)

CAB AC & VENTILATION (ELEVATOR 1)

SPARE

PANEL "2BFP"

ESP-2

CAB LIGHTING & RECEP (ELEVATOR 2)

CAB AC & VENTILATION (ELEVATOR 2)

ELEVATOR CALL (MCP)

SPARE

PFB

1.01.0 0.2

PFB

1.7 1.4

1.0

SPD

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

CALCULATED LOAD:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

208/120V 3 4W 10,000 AIC

FMCP 12 1/20

1.7

4.1 KVA

11.4 A

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

1.4

BRK

POLE

BRK

POLE

B C

1.0

1 2

RAP (3RD FLOOR)1/20 100.20.5

0.20.2 0.2

-0.2

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

"2BFP"

RAP (1ST FLOOR)

FEP (1ST FLOOR)

FIP, TRANSCEIVER, TRANSMITTER

RAP (2ND FLOOR)

RESCUE ASSISTANCE (1ST FLOOR)

SPARE

PFB

FEP (3RD FLOOR)

SPARE

SPD

- 3/30

4.1 KVA

FEP (2ND FLOOR)

RESCUE ASSISTANCE (2ND FLOOR)

RESCUE ASSISTANCE (3RD FLOOR)

RESCUE ASSISTANCE (4TH FLOOR)

RESCUE ASSISTANCE (5TH FLOOR)

0.20.2 0.20.2

0.20.2 0.20.2

0.20.2

0.2

0.2 0.2

RAP (4TH FLOOR)

FEP (4TH FLOOR)

RAP (5TH FLOOR)

FEP (5TH FLOOR)

RAP (LOWER ROOF)

FEP (LOWER ROOF)

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

CALCULATED LOAD:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

208/120V 3 4W 10,000 AIC

RECEP (RM #05) 12 1/20

2.6

7.5 KVA

21.1 A

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

2.7

BRK

POLE

BRK

POLE

B C

2.2

1 2

VAV #051/20 120.11.1

0.60.6

0.60.6 0.50.5

0.50.5 0.50.5

0.20.2 -0.5

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

"2CTR#"(1ST TO 5TH FLR.)

TELECOM CABINET (DATA)

TELECOM CABINET (DATA)

VOICE CABINET (RM #17)

DATA CABINET (RM #17)

CATV CABINET (RM #17)

RECEP-CTC (RM #17)

SPARE

PFB

TELECOM CABINET (VOICE)

TELECOM CABINET (VOICE)

VOICE CABINET (RM #10)

DATA CABINET (RM #10)

CATV CABINET (RM#10)

RECEP-CTC (RM #10)

SPARE

SPD

- 3/30

7.6 KVA

8 8

12CATV CABINET (RM #05)

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM REVISION: 30 APRIL 2015

REV

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

N A

VF

A

C P

A C

IF

IC

M

AK

AL

AP

A, H

AW

AI

I

FIRE PROTECTION

AS SHOWN

RANDALL TORIGOE

MARFORPAC DPRI MILCON LEAD

RE

VD

AT

E

PL

O

TT

ED

N

AV

FA

C

P

AC

IF

IC

05/11/21

SEAL

J-

B

A C

H E

LO

R

O

FF

IC

E

R Q

U A

R

TE

R S

-B U

S N

A V

S U

P P

A C

T M

C B

G U

A M

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK

AMONG THE VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO

INSURE THE INSTALLATION OF ALL WORK WITHIN THE AVAILABLE SPACE.

DATE

IF SHEET IS LESS THAN 559 X 864

REDUCED PRINT. USE GRAPHIC

SCALES

JC

P. NISHIZAKI

MN/KO

1641226

JS

AMNP/RSIA/JF

C U se rs n p a c ia D o c u m e n ts M e d ic a l

C lin ic J-

B O Q E

LE

C r1 n e d ie .r vt

:4 :4

P M

P A

N E

LB

O

A R

D S

C H

E D

U

LE

E-609

17268656

GENERAL NOTES:

CONDUIT SIZE TABLE

WIRE SIZE CONDUIT SIZE

1/0 2/0

35mmC 35mmC 41mmC 53mmC

AM

D

RE

VI

SE

D

W

IR

E

SI

ZE

7/

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"2UB" 208/120V 3 4W 10,000 AIC

RECEPS (ELEC RM 133) 12 1/20

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

RECEPS (DDC)1.1

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

SEE ONE LINE DIAGRAM FOR SIZE.

5.4

13.4 KVA

16.1 A5.8 KVACALCULATED LOAD:

0.2

4.0 4.0

0.6 1.5

1.3 0.4

0.4 0.4

0.9

1.2 -

121/20

(RM 131A)

(EXTERIOR)

(MECH RM 131)

AHU-M

12 3/20

(DDC)

(FIRE RISER 141)

(FIRE RISER 141)

(GENERATOR 140)

LIGHTING CONTROLLER

(MECH RM 131)

(DDC)

0.2

0.2

0.2

1.2 1.2

0.2

AMI METER (ELECTRIC)

AMI METER (WATER) 0.2 1.0 ES

SPARE SPARE

SPARE

ES1.0

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"2TR" 208/120V 3 4W 10,000 AIC

VOICE DATA CABINET

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

RECEPS (TELECOM 142)1/20 120.90.5

0.10.1

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

1.4

2.7 KVA

7.8 A

0.6

2.8 KVA

0.7

=CALCULATED LOAD:

RECEP (ICS SYSTEM)

- SPARE

12 1/20

0.2 0.2

3/30 SPD

SPARE

RECEP (CCTV SYSTEM)

- 1/20

12 2/20

SPARE

FCU-2

0.10.1 2/20 12 ACCU-2

ACS/ESS CABINET 0.5

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"4UB1" 480/277 3 4W 14,000 AIC

WSHP-2 2/0

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

-1 2

SPARE3/20

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

3/225

PFBPFB

39.3

3.8

SEE ONE LINE DIAGRAM FOR SIZE.

52.7

155.3 KVA

51.3

147.2 KVACALCULATED LOAD:

CWP-6 12 3/30

CWP-8 (BACKUP)

CWP-10 (BACKUP)

SPARE - 3/20

CWP-73/30 12

CWP-9

XFMR "TUB"

SPARE3/20 -

177.1 A

3.8

3.8 3.8

3.8 3.8 0.4

5.4 4.0

4.0

51.3

3/20

3/20

0.4

0.4

-39.3 39.3

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"2UFP" 208/120V 3 4W 10,000 AIC

FACP 12 1/20

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

SPARE0.5

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

SEE ONE LINE DIAGRAM FOR SIZE.

0.7

1.1 KVA

2.2 ACALCULATED LOAD:

0.2 0.2

0.2 0.2

0.2 -

-1/20

SPD3/30

RAPRAP

FIP, TRANSMITTER

FEP

SPARE

FEP

PFB

PFB-

0.8 KVA

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"2GUB" 208/120V 3 4W 10,000 AIC

ENGINE SPACE HEATER 12 1/20

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

BATTERY CHARGER1/20 121.01.0

0.3

-0.7 0.2

0.2 -1.4

-0.6 -0.7

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

4.1

12.5 KVA

33.3 A

4.3

12.0 KVA

4.1

CALCULATED LOAD:

DT-1

PANEL "2UFP"

PANEL "2TR"

3.0 -

SPD

0.2

- PFB

0.2 SPARE

LEAK DETECTION AND FUEL ALARM PANEL

REMOTE ANNUNCIATOR

3.0

ENGINE JACKET WATER HEATER

2/3012

SPARE - -

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"4MDS-UB" 480/277V 3 4W 14,000 AIC

52.7

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

33.9

294.7

1 2

SPARE

PANEL "4UB2"

CH-4

PANEL "4UB1"

ATS "GUB"

51.3 33.9 51.3

13.1 13.3

14.0 98.2

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

297.0

886.6 KVA

743.2 A

294.9

617.9 KVACALCULATED LOAD:

3/100SPARE

PFB

CH-3

3/100 -

33.9

98.2

3/50

98.2 98.2

98.2 98.2

SPD

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"4GUB" 480/277V 3 4W 10,000 AIC

LIGHTING (UTILITY BUILDING) 12 1/20

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

-0.9 -0.1

3.0 3.0

3.0

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

DBP-5

14.0

40.4 KVA

42.0 A

13.3

34.9 KVA

13.1

CALCULATED LOAD:

(EXTERIOR)

SPARE -

1/20 12 SPARE

SPARE

-4.1 -4.3

-4.1

SPDXFMR "TGUB"

DBP-4

DBP-6

12 3/25 3.0

3.0 3.0

3.0 3.0

3.0

3/25 12

3/20 -

CKT

NO. NO.

CKT

PANEL:

LOCATION:

AIC RATING:PHASE:VOLTS: WIRE:

ENCL. TYPE: NEMA AMPERE:MTG:

TOTAL KVA/ :

CONNECTED KVA:

LOAD - KVA

A

BREAKER

LUGS ONLY

REMARKS:

MAINS:DRY

INDOOR OUTDOOR

WET SURF. FLUSH

BRANCH CIRCUIT

DESCRIPTION

NEUTRAL BUS GROUND BUS ISOLATED GROUND BUS NEUTRAL BUS GND. BONDING: YES NO

"4UB2" 480/277V 3 4W 14,000 AIC

ASHP-3 8 3/70

BRANCH CIRCUIT

DESCRIPTION

WIRE

SIZE

WIRE

SIZE

BRK

POLE

BRK

POLE

B C

1 2

ASHP-43/70 8

14.7

0.8

1.3

0.6

SEE ONE LINE DIAGRAM FOR SIZE.

PROVIDE PERMANENT LABEL

INDICATING THE FOLLOWI NG

"POWER SUPPLY ORIGINATES

IN "______"

33.9

101.7 KVA

101.0 KVACALCULATED LOAD:

EF-6

12 3/20HWP-3

HWCP-2

EF-8

SPARE

EF-7

3/20 12 HWP-4

0.3

121.49 A

PFB

SPARE-

0.8

0.8 0.8

0.8 0.8 0.3

0.6 0.6

0.2

0.2 0.2

0.2

0.2 0.2

- PFB-

14.7

14.7 14.7

14.7 14.7

1.3 1.3

0.3 0.3

0.3 0.3

33.9 33.9

HWRP-3

HWRP-4

COORDINATE EXACT LOCATION WITH PLUMBING

DRAWINGS.

ENG

IN

E E R

NA L

P R

OFESS IO

R

MARIANOAB

NE

(ELECTRICAL)

No.1259

ET

ACIFITREC

MAUG

EXP.

V.

April 30,2022

D E P A R T M E N T

O F

T H E

N A V Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

S Y S T E M S

C O M M A N D

DES DRW

S Y M

D E S C R

IP

TI

O N

D A

TE

A P P R

DRAWFORM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .