J034 BOQ B Specs_Vol 2_Final Design.pdf
PDF 5 MB Posted
- Solicitation number
- N62742-21-R-1321
About this file
This Request for Proposal (RFP) solicits bids for the construction of a new Bachelor Officer Quarters (BOQ) tower and common area wing at the US Naval Supply Systems Command base in Guam. The project involves constructing a multi-story housing tower with approximately 100 single-occupancy units, common areas, and a detached utility building. The estimated value of the contract is between $100-150 million. The work must be completed within 760 calendar days of award. The Government of Japan will contribute funding for the project and participate in the contracting process as observers. The North American Industry Classification System code for this project is 236116 for new multifamily housing. Bids are due by the date specified in the RFP.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC PACIFIC
WORK ORDER NO:
SPECIFICATIONS
For
J-0 BACHELOR OFFICER QUARTERS
At the
US NAVSUPPACT MCB GUAM
VOLUME of 2 (DIVISIONS – )
PREPARED BY:
Architectural: ASMD/DESIGN PARTNERS INCORPORATED Mechanical: ASMD/INSYNERGY ENGINEERING INCORPORATED Civil: ASMD/STANLEY CONSULTANTS Landscape: ASMD/BELT COLLINS HAWAII LLC Electrical: ASMD/EMCE CONSULTING ENGINEERS Telecommunications: ASMD/STANLEY CONSULTANTS Structural: ASMD/BALDRIDGE & ASSOCIATES STRUCTURAL
ENGINEERING, INCORPORATED
Fire Protection: ASMD/INSYNERGY ENGINEERING INCORPORATED Safety: ASMD/INSYNERGY ENGINEERING INCORPORATED Geotechnical: ASMD/HIRATA AND ASSOCIATES, INCORPORATED
Submitted By: __________________________ Date: , 202 _ Duane Hamada, ASMD LLC
APPROVED BY:
Specification: _________________________________________________ Mr. Clint Hashiba, P.E.
For Commander, NAVFAC Pacific: ________________________________________________
Mr. Evan A. Mizue, P.E.
Date: _______________________
HASHIBA.CLINT.T.1232054359 Digitally signed by HASHIBA.CLINT.T.1232054359 Date: 2021.06.05 14:49:51 -10'00'
6/7/21
J-034 BACHELOR OFFICER QUARTERS-B 1641226
US NAVSUPPACT MCB GUAM
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/10 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 11/15 UNIT MASONRY
DI VI SI ON 05 - METALS
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
PROJECT TABLE OF CONTENTS Page 1
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 30 02.00 20 DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE,
FIXTURES AND EQUIPMENT
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 13.02 INDUSTRIAL CONTROL SYSTEMS PROCUREMENT
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.03 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (MRESS)
Guam Construction
01 57 19.04 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (DPRI)
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 91 00.15 20 TOTAL BUILDING COMMISSIONING
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/10 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 24 00 05/11 EXTERIOR FINISH SYSTEMS
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 27 36 05/17 SPRAY FOAM AIR BARRIERS
07 56 00 08/09 FLUID-APPLIED ROOFING SYSTEM
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 02/10 STEEL DOORS AND FRAMES
08 11 16 05/17 ALUMINUM DOORS, FRAMES, WINDOW WALL
AND SUNSHADE
08 14 00 08/16 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 05/11 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 02/10 SUPPORTS FOR GYPSUM BOARD
09 26 00 08/16 VENEER PLASTER
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC AND GLASS TILING
09 51 00 08/17 ACOUSTICAL CEILINGS
09 65 00 08/10 RESILIENT FLOORING
09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00 05/11 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/17 PLAQUE SIGNAGE
10 14 53 02/15 TRAFFIC SIGNAGE
10 26 00 08/17 WALL PROTECTION
10 28 13 08/17 TOILET ACCESSORIES
10 71 13.13 04/06 STORM SHUTTERS
10 99 00 05/21 MISCELLANEOUS BUILDING SPECIALTIES
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 08/17 ROLLER WINDOW SHADES
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 08/17 SITE FURNISHINGS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
PROJECT TABLE OF CONTENTS Page 2
14 21 23 05/16 ELECTRIC TRACTION PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13.00 20 04/08 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 08/18 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 05/18 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 21 23 08/17 HYDRONIC PUMPS
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 NAVFAC PAC 09/18 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 08 11.00 20 04/20 RISK MANAGEMENT FRAMEWORK FOR
FACILITY-RELATED CONTROL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 07/06 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 12 19.10 05/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 24 13 05/15 SWITCHBOARDS
26 27 14.00 20 02/11 ELECTRICITY METERING
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 29 23 04/06 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER
600 VOLTS
26 32 13.00 20 08/18 SINGLE OPERATION GENERATOR SETS
26 36 23.00 20 04/06 AUTOMATIC TRANSFER SWITCHES
PROJECT TABLE OF CONTENTS Page 3
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/16 INTERIOR LIGHTING
26 56 00 05/13 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 16 04/06 RADIO AND PUBLIC ADDRESS SYSTEMS
27 54 00.00 20 04/06 COMMUNITY ANTENNA TELEVISION (CATV)
SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 08/11 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 21 13 11/18 RADON MITIGATION
31 23 00.00 20 02/11 EXCAVATION AND FILL
31 31 16.13 08/16 CHEMICAL TERMITE CONTROL
31 31 16.19 02/16 TERMITE CONTROL BARRIERS
31 32 23 08/08 FOUNDATION DRILLING AND GROUTING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 08/17 SUBBASES FOR FLEXIBLE PAVING
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 11/11 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 14 13.13 11/19 INTERLOCKING PRECAST CONCRETE UNIT
PAVING
32 16 15 04/08 CONCRETE BLOCK PAVEMENTS
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 31 13 11/16 CHAIN LINK FENCES AND GATES
32 84 24 08/11 TEMPORARY IRRIGATION SPRINKLER SYSTEMS
32 92 19 08/17 SEEDING
32 93 00 08/17 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 08 55 08/19 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 52 10 11/18 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE TANKS
33 58 00 04/08 LEAK DETECTION FOR FUELING SYSTEMS
33 61 13.13 02/16 PREFABRICATED UNDERGROUND HYDRONIC
ENERGY DISTRIBUTION
33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT IN VALVE
MANHOLES
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER
PROJECT TABLE OF CONTENTS Page 4
PIPING
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 6
J- 034 BACHELOR OFFI CER QUARTERS- B 1641226
SECTI ON 21 12 00
STANDPI PE SYSTEMS
05/11
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)
AWWA C651 ( 2014) St andar d f or Di s i nf ect i ng Wat er Mains
FM GLOBAL ( FM)
FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 13 ( 2019; TI A 16- 1; TI A 16- 2; TI A 16- 3 2016;
Er r at a 17- 1; Er r at a 17- 2) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems
NFPA 14 ( 2019) St andar d f or t he I nst al l at i on of St andpi pes and Hose Syst ems
NFPA 24 ( 2019; ERTA 2016) St andar d f or t he I nst al l at i on of Pr i vat e Fi r e Ser vi ce Mai ns and Thei r Appur t enances
UNDERWRI TERS LABORATORI ES ( UL)
UL Fi r e Pr ot Di r ( 2019) Fi r e Pr ot ect i on Equi pment Di r ect or y
1. 2 RELATED REQUI REMENTS
Sect i on 23 03 00. 00 20 BASI C MECHANI CAL MATERI ALS AND METHODS appl i es t o t hi s sect i on wi t h addi t i ons and modi f i cat i ons speci f i ed her ei n.
1. 3 SYSTEM DESCRI PTI ON
Desi gn and pr ovi de new manual wet Cl ass I st andpi pe syst ems as shown.
1. 4 SYSTEM DESCRI PTI ON
Syst em desi gn and manuf act ur er ' s pr oduct s shal l be i n accor dance wi t h t he r equi r ed and advi sor y pr ovi s i ons of NFPA 14 except as modi f i ed her ei n.
St andpi pe syst em shal l be desi gned by hydr aul i c cal cul at i ons. Pr ovi de spr i nkl er por t i on of syst em under Sect i on 21 13 13. 00 20 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON. Each syst em shal l be desi gned f or ear t hquakes and shal l i ncl ude mat er i al s, accessor i es, and equi pment i nsi de and out si de t he bui l di ng necessar y t o pr ovi de each syst em compl et e and
SECTI ON 21 12 00 Page 1 r eady f or use. Devi ces and equi pment shal l be UL Fi r e Pr ot Di r l i s t ed or FM APP GUI DE appr oved f or f i r e pr ot ect i on ser vi ce. I n t he publ i cat i ons r ef er r ed t o her ei n, t he advi sor y pr ovi s i ons shal l be consi der ed t o be mandat or y, as t hough t he wor d " shal l " had been subst i t ut ed f or " shoul d" wher ever i t appear s; r ef er ence t o t he " aut hor i t y havi ng j ur i sdi ct i on" shal l be i nt er pr et ed t o mean t he Paci f i c Di v i s i on, Naval Faci l i t i es Engi neer i ng Command, Fi r e Pr ot ect i on Engi neer .
1. 4. 1 Resi dual Pr essur e
The mi ni mum r esi dual pr essur e at t he out l et of t he most r emot e 64 mm hose connect i on shal l be 689. 5 kPa whi l e t he syst em i s di schar gi ng at t he r equi r ed desi gn f l ow r at es.
1. 4. 2 Fr i ct i on Losses
Cal cul at e l osses i n pi pi ng i n accor dance wi t h t he Hazen- Wi l l i ams f or mul a wi t h ' C' val ue of 120 f or st eel pi pi ng, 150 f or copper t ubi ng, and 140 f or cement - l i ned duct i l e- i r on pi pi ng.
1. 4. 3 Wat er Suppl y
Manual wet st andpi pe shal l be suppl i ed by t he f i r e depar t ment connect i on and f i r e appar at us.
1. 4. 4 St andpi pe Syst em Dr awi ngs
Pr epar e i n accor dance wi t h t he r equi r ement s f or " Pl ans and Speci f i cat i ons" as speci f i ed i n NFPA 14. Each dr awi ng shal l beA1 841 by 594 mm. Pl ans shal l be dr awn t o a scal e not l ess t han 1 mm equal s 100 mm Do not commence wor k unt i l t he desi gn of each syst em and t he var i ous component s have been appr oved. Show dat a essent i al f or pr oper i nst al l at i on of each syst em. Show det ai l s, pl an v i ew, el evat i ons, and sect i ons of t he syst ems suppl y and pi pi ng. Show pi pi ng schemat i c of syst ems suppl y, devi ces, val ves, pi pe, and f i t t i ngs. Show:
a. Room, space or ar ea l ayout and i ncl ude pi pe suppor t s and hanger s.
b. Fi el d wi r i ng di agr ams showi ng l ocat i ons of devi ces and poi nt s of connect i on and t er mi nal s used f or al l el ect r i cal f i el d connect i ons i n t he syst em, wi t h wi r i ng col or code scheme.
1. 5 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
The NAVFAC Paci f i c Fi r e Pr ot ect i on Engi neer del egat es t he aut hor i t y t o t he Qual i t y Cont r ol ( QC) Repr esent at i ve' s US Regi st er ed Fi r e Pr ot ect i on Engi neer f or r evi ew and appr oval of submi t t al s r equi r ed by t hi s sect i on.
The QC f i r e pr ot ect i on engi neer ( QCFPE) shal l base t he r evi ew and appr oval on pl ans and speci f i cat i ons and has no aut hor i t y t o gr ant var i ance t o t he desi gn document s. Submi t t o t he NAVFAC Paci f i c Fi r e Pr ot ect i on Engi neer t wo set s of al l appr oved submi t t al s i ncl udi ng but not l i mi t ed t o shop dr awi ngs, cat al og cut s, suppor t i ng cal cul at i ons, et c. i mmedi at el y af t er
SECTI ON 21 12 00 Page 2 appr oval but no l at er t han 15 wor ki ng days pr i or t o t he f i nal i nspect i on.
al l r evi ew l et t er s or memos shal l be submi t t ed i mmedi at el y af t er t he QCFPE' s r evi ew.
SD- 02 Shop Dr awi ngs
St andpi pe syst em
SD- 03 Pr oduct Dat a
Abovegr ound Pi pe and f i t t i ngs
Mechani cal coupl i ngs
Pi pe hanger s and suppor t s
Val ves, i ncl udi ng gat e, check, and hose
Fi r e depar t ment connect i ons
Val ve t amper swi t ch
Bur i ed Pi pe and f i t t i ngs
Dat a whi ch descr i bes mor e t han one t ype of i t em shal l be c l ear l y mar ked t o i ndi cat e whi ch t ype t he Cont r act or i nt ends t o pr ovi de.
Submi t one or i gi nal f or each i t em and cl ear , l egi bl e, f i r st - gener at i on phot ocopi es f or t he r emai nder of t he speci f i ed copi es. I ncompl et e or i l l egi bl e phot ocopi es wi l l not be accept ed. Par t i al submi t t al s wi l l not be accept ed.
SD- 06 Test Repor t s
Pr el i mi nar y t est s
Accept ance t est s
Submi t f or al l i nspect i ons and t est s speci f i ed under par agr aph ent i t l ed " Fi el d Qual i t y Cont r ol . "
SD- 07 Cer t i f i cat es
Qual i f i cat i ons of i nst al l er
Submi t i nst al l er s qual i f i cat i ons as r equi r ed under par agr aph ent i t l ed " Qual i f i cat i ons of I nst al l er . "
SD- 11 Cl oseout Submi t t al s
Syst em as- bui l t dr awi ngs; G
1. 6 QUALI TY ASSURANCE
1. 6. 1 Qual i f i cat i ons of I nst al l er
Pr i or t o commenci ng wor k, submi t dat a showi ng t hat t he Cont r act or has successf ul l y i nst al l ed f i r e ext i ngui shi ng st andpi pe syst ems of t he same t ype and desi gn as speci f i ed her ei n, or t hat he has a f i r m cont r act ual agr eement wi t h a subcont r act or havi ng t he r equi r ed exper i ence. I ncl ude
SECTI ON 21 12 00 Page 3 t he names and l ocat i ons of at l east t wo i nst al l at i ons wher e t he Cont r act or , or t he subcont r act or r ef er r ed t o above, has i nst al l ed such syst ems. I ndi cat e t he t ype and desi gn of each syst em, and cer t i f y t hat t he syst em has per f or med sat i sf act or i l y f or a per i od of at l east 18 mont hs.
Qual i f i cat i ons of Syst em Techni c i an: I nst al l at i on dr awi ngs, shop dr awi ng and as- bui l t dr awi ngs shal l be pr epar ed, by or under t he super vi s i on of , an i ndi v i dual who i s exper i enced wi t h t he t ypes of wor ks speci f i ed her ei n, and i s cur r ent l y cer t i f i ed by t he Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) as an engi neer i ng t echni c i an wi t h mi ni mum Level - I I I cer t i f i cat i on i n Aut omat i c Spr i nkl er Syst em pr ogr am. Cont r act or shal l submi t dat a f or appr oval showi ng t he name and cer t i f i cat i on of al l i nvol ved i ndi v i dual s wi t h such qual i f i cat i ons at or pr i or t o submi t t al of drawings.
1. 6. 2 Syst em As- Bui l t Dr awi ngs
Upon compl et i on, and bef or e f i nal accept ance of t he wor k, submi t a compl et e set of as- bui l t dr awi ngs of each syst em. Submi t A1 841 by 594 mm r epr oduci bl e as- bui l t dr awi ngs on myl ar f i l m wi t h t i t l e bl ock s i mi l ar t o f ul l s i ze cont r act dr awi ngs. Fur ni sh as- bui l t ( r ecor d) wor ki ng dr awi ngs i n addi t i on t o t he as- bui l t dr awi ngs r equi r ed by Di v i s i on 1, " Gener al Requirements."
1. 7 DELI VERY, STORAGE AND HANDLI NG
Pr ot ect st or ed equi pment f r om weat her , humi di t y and t emper at ur e var i at i ons, di r t , dust , and ot her cont ami nant s.
PART 2 PRODUCTS
2. 1 ABOVEGROUND PI PI NG SYSTEMS
Pr ovi de f i t t i ngs f or changes i n di r ect i on of pi pi ng and f or connect i ons.
Make changes i n pi pi ng si zes t hr ough t aper ed r educi ng pi pe f i t t i ngs;
bushi ngs wi l l not be per mi t t ed. Per f or m wel di ng i n t he shop; f i el d wel di ng wi l l not be per mi t t ed. Conceal pi pi ng i n ar eas wi t h suspended ceiling.
2. 1. 1 Pi pe and Fi t t i ngs
NFPA 14, except as modi f i ed her ei n. St eel pi pi ng shal l be Schedul e 40 f or s i zes l ess t han 200 mm, and Schedul e 30 or 40 f or s i zes 200 mm and l ar ger . Fi t t i ngs shal l be wel ded, t hr eaded, or gr ooved- end t ype.
Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs and f i t t i ngs whi ch use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe when pr essur e i s appl i ed wi l l not be per mi t t ed. Rubber gasket ed gr ooved- end pi pe and f i t t i ngs wi t h mechani cal coupl i ngs shal l be per mi t t ed i n pi pe si zes 40 mm and l ar ger .
Fi t t i ngs shal l be UL Fi r e Pr ot Di r l i s t ed or FM APP GUI DE appr oved f or use i n wet pi pe spr i nkl er syst ems. Fi t t i ngs, mechani cal coupl i ngs, and r ubber gasket s shal l be suppl i ed by t he same manuf act ur er . Si de out l et t ees usi ng r ubber gasket ed f i t t i ngs shal l not be per mi t t ed. Pi pe and f i t t i ngs shal l be met al .
2. 1. 2 Pi pe Hanger s and Suppor t s
Pr ovi de i n accor dance wi t h NFPA 14.
SECTI ON 21 12 00 Page 4
2. 1. 3 Valves
NFPA 14. Pr ovi de val ves of t ypes appr oved f or f i r e ser vi ce. Hose and gat e val ves shal l open by count er cl ockwi se r ot at i on. Pr ovi de i sol at i on and check val ves as r equi r ed by NFPA 14. I sol at i on val ves shal l be OS&Y t ype. Check val ves shal l be f l anged cl ear openi ng swi ng- check t ype wi t h f l anged i nspect i on and access cover pl at e f or s i zes 100 mm and l ar ger .
2. 1. 3. 1 Hose Val ves
Pr ovi de br onze hose val ve wi t h 65 mm Nat i onal St andar d mal e hose t hr eads, and 65 mm NH f emal e by 40 mm I PT mal e r educer wi t h cap and chai n.
2. 1. 4 I dent i f i cat i on Si gns
NFPA 14. At t ach pr oper l y l et t er ed and appr oved met al s i gns t o each val ve and al ar m devi ce.
2. 1. 5 Mai n Dr ai ns
Pr ovi de separ at e dr ai n pi pi ng t o di schar ge at saf e poi nt s out si de each bui l di ng or t o s i ght cones at t ached t o dr ai ns of adequat e s i ze t o r eadi l y r ecei ve t he f ul l f l ow f r om each dr ai n under maxi mum pr essur e. Pr ovi de auxi l i ar y dr ai ns as r equi r ed by NFPA 13 and NFPA 14.
2. 1. 6 Pi pe Sl eeves
Pr ovi de wher e pi pi ng passes ent i r el y t hr ough wal l s, f l oor s, r oof s and par t i t i ons. Secur e s l eeves i n posi t i on and l ocat i on dur i ng const r uct i on.
Pr ovi de sl eeves of suf f i c i ent l engt h t o pass t hr ough ent i r e t hi ckness of wal l s, f l oor s, r oof s and par t i t i ons. Pr ovi de one i nch mi ni mum cl ear ance bet ween ext er i or of pi pi ng and i nt er i or of s l eeve or cor e- dr i l l ed hol e.
Fi r ml y pack space wi t h mi ner al wool i nsul at i on. Seal space at bot h ends of t he s l eeve or cor e- dr i l l ed hol e wi t h pl ast i c wat er pr oof cement whi ch wi l l dr y t o a f i r m but pl i abl e mass, or pr ovi de a mechani cal l y adj ust abl e segment ed el ast omer i c seal . I n f i r e wal l s and f i r e f l oor s, seal bot h ends of pi pe s l eeves or cor e- dr i l l ed hol es wi t h UL l i s t ed f i l l , voi d, or cavi t y material.
2. 1. 6. 1 Sl eeves i n Masonr y and Concr et e Wal l s, Fl oor s, and Roof s
Pr ovi de hot - di p gal vani zed st eel , duct i l e- i r on, or cast - i r on s l eeves.
Cor e dr i l l i ng of masonr y and concr et e may be pr ovi ded i n l i eu of pi pe s l eeves when cavi t i es i n t he cor e- dr i l l ed hol e ar e compl et el y gr out ed smoot h. Ext end sl eeves i n f l oor s l abs 76 mm above f i ni shed f l oor s.
2. 1. 6. 2 Sl eeves i n Par t i t i ons
Pr ovi de 26 gage gal vani zed st eel sheet .
2. 1. 7 Escut cheon Pl at es
Pr ovi de one pi ece or spl i t hi nge t ype met al pl at es f or pi pi ng passi ng t hr ough wal l s, f l oor s, and cei l i ngs i n bot h exposed and conceal ed spaces.
Pr ovi de pol i shed st ai nl ess st eel pl at es or chr omi um- pl at ed f i ni sh on copper al l oy pl at es i n f i ni shed spaces. Pr ovi de pai nt f i ni sh on met al pl at es i n unf i ni shed spaces. Secur el y anchor pl at es i n pl ace.
SECTI ON 21 12 00 Page 5
2. 1. 8 Fi r e Depar t ment Connect i ons
Pr ovi de connect i ons appr oxi mat el y one met er above f i ni sh gr ade, of t he appr oved t wo- way t ype wi t h 65 mm Nat i onal St andar d f emal e hose t hr eads wi t h pl ug, chai n, and i dent i f y i ng f i r e depar t ment connect i on escut cheon plate.
2. 1. 9 Val ve Tamper Swi t ch
Pr ovi de val ve t amper swi t ch( es) t o moni t or t he open posi t i on of val ve( s) cont r ol l i ng wat er suppl y t o t he st andpi pe syst em. Swi t ch cont act s shal l t r ansf er f r om t he nor mal ( val ve open) posi t i on t o t he of f - nor mal ( val ve c l osed) posi t i on dur i ng t he f i r st t wo r evol ut i ons of t he hand wheel or when t he st em of t he val ve has moved not mor e t han one- f i f t h of t he di st ance f r om i t s nor mal posi t i on. Swi t ch shal l be t amper r esi st ant .
Removal of t he cover shal l cause swi t ch t o oper at e i nt o t he of f - nor mal position.
2. 2 BURI ED PI PI NG SYSTEMS
2. 2. 1 Bur i ed Pi pe and Fi t t i ngs
NFPA 24, out si de coat ed, cement l i ned, duct i l e i r on pi pe and f i t t i ngs f or pi pi ng under t he bui l di ng and t o a poi nt 1. 52 m out si de t he bui l di ng wal l s. Anchor t he j oi nt s i n accor dance wi t h NFPA 24 usi ng pi pe cl amps and st eel r ods. Mi ni mum pi pe si ze shal l be 150 mm. Mi ni mum dept h of cover shal l be one met er . Pi pi ng mor e t han 1. 52 m out si de t he bui l di ng wal l s shal l be pr ovi ded under Sect i on 33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG.
2. 2. 2 Bur i ed Ut i l i t y War ni ng and I dent i f i cat i on Tape or Tr ace Wi r e
Pr ovi de det ect abl e t ape or t r ace wi r e i n accor dance wi t h Sect i on 33 11 00
WATER UTI LI TY DI STRI BUTI ON PI PI NG.
2. 3 ELECTRI CAL WORK
Pr ovi de el ect r i cal wor k associ at ed wi t h t hi s sect i on under Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM, except f or f i r e al ar m wi r i ng. Pr ovi de f i r e al ar m wi r i ng and connect i on t o f i r e al ar m syst ems under Sect i on 28 31 76
I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM.
PART 3 EXECUTI ON
3. 1 EXCAVATI ON, BACKFI LLI NG, AND COMPACTI NG
Pr ovi de under t hi s sect i on as speci f i ed i n Sect i on 31 23 00. 00 20
EXCAVATI ON AND FI LL.
3. 2 CONNECTI ONS TO EXI STI NG WATER SUPPLY SYSTEMS
Connect i ons t o exi st i ng wat er suppl y syst em ar e speci f i ed i n Sect i on
33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG.
3. 3 STANDPI PE SYSTEM I NSTALLATI ON
Equi pment , mat er i al s, i nst al l at i on, wor kmanshi p, f abr i cat i on, assembl y, er ect i on, exami nat i on, i nspect i on, and t est i ng shal l be i n accor dance wi t h t he NFPA st andar ds r ef er enced her ei n. I nst al l pi pi ng st r ai ght and t r ue t o bear evenl y on hanger s and suppor t s. Conceal pi pi ng t o t he maxi mum ext ent
SECTI ON 21 12 00 Page 6 possi bl e. Pi pi ng shal l be i nspect ed, t est ed and appr oved bef or e bei ng conceal ed. Pr ovi de f i t t i ngs f or changes i n di r ect i on of pi pi ng and f or al l connect i ons Make changes i n pi pi ng si zes t hr ough st andar d r educi ng pi pe f i t t i ngs; do not use bushi ngs. Cut pi pe accur at el y and wor k i nt o pl ace wi t hout spr i ngi ng or f or c i ng. Ream pi pe ends and f r ee pi pe and f i t t i ngs f r om bur r s. Cl ean wi t h sol vent t o r emove al l var ni sh and cut t i ng oi l pr i or t o assembl e. Make scr ew j oi nt s wi t h PTFE t ape appl i ed t o mal e t hr ead onl y.
3. 4 DISINFECTION
Di si nf ect new wat er pi pi ng f r om t he poi nt of connect i on at t he wat er mai n and exi st i ng wat er pi pi ng af f ect ed by t he Cont r act or ' s oper at i on i n accor dance wi t h AWWA C651. Exer ci se caut i on when mi xi ng chl or i ne di s i nf ect ant sol ut i ons. Fi l l pi pi ng syst ems wi t h sol ut i on cont ai ni ng mi ni mum of 50 par t s per mi l l i on of f r ee avai l abl e chl or i ne and al l ow sol ut i on t o st and f or a mi ni mum of 24 hour s. Fl ush sol ut i on f r om syst ems wi t h c l ean wat er unt i l maxi mum r esi dual chl or i ne cont ent i s not gr eat er t han 0. 2 par t s per mi l l i on. Obt ai n at l east t wo consecut i ve sat i sf act or y bact er i ol ogi cal sampl es f r om new wat er pi pi ng, anal yze by a cer t i f i ed l abor at or y, and submi t r esul t s pr i or t o new wat er pi pi ng bei ng pl aced i nt o service.
3. 5 FI ELD PAI NTI NG
Fi el d pai nt i ng of f i r e ext i ngui shi ng st andpi pe syst em shal l be speci f i ed i n Sect i on 09 90 00 PAI NTS AND COATI NGS. Fi el d pai nt i ng r equi r ement s f or " Fi r e Ext i ngui shi ng Spr i nkl er Syst ems" shal l appl y.
3. 5. 1 Pi pi ng Label s
Pr ovi de per manent l abel s i n mechani cal r ooms, spaced at 6 met er s maxi mum i nt er val s al ong pi pe, i ndi cat i ng " STANDPI PE. "
3. 6 ELECTRI CAL WORK
Pr ovi de el ect r i cal wor k associ at ed wi t h t hi s sect i on under Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM, except f or f i r e al ar m wi r i ng. Pr ovi de f i r e al ar m wi r i ng and connect i on t o f i r e al ar m syst ems under Sect i on 28 31 76
I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM.
3. 7 FLUSHING
Fl ush t he pi pi ng syst em wi t h pot abl e wat er i n accor dance wi t h NFPA 14.
Cont i nue f l ushi ng oper at i on unt i l wat er i s c l ear , but f or not l ess t han 10 minutes.
3. 8 FI ELD QUALI TY CONTROL
Pr i or t o i ni t i al oper at i on, i nspect equi pment and pi pi ng syst ems f or compl i ance wi t h dr awi ngs, speci f i cat i ons, and manuf act ur er ' s submi t t al s.
Per f or m t est s i n t he pr esence of t he Cont r act i ng Of f i cer t o det er mi ne conf or mance wi t h t he speci f i ed r equi r ement s.
3. 8. 1 Pr el i mi nar y Test s
Each pi pi ng syst em shal l be hydr ost at i cal l y t est ed at 1379 kPa ( gage) i n accor dance wi t h NFPA 14 and NFPA 24 and shal l show no l eakage or r educt i on i n gauge pr essur e af t er 2 hour s. The Cont r act or shal l conduct compl et e
SECTI ON 21 12 00 Page 7 pr el i mi nar y t est s, whi ch shal l encompass al l aspect s of syst em oper at i on.
I ndi v i dual l y al l ot her component s and accessor i es t o demonst r at e pr oper f unct i oni ng. When t est s have been compl et ed and al l necessar y cor r ect i ons made, submi t t o t he Cont r act i ng Of f i cer a s i gned and dat ed cer t i f i cat e, s i mi l ar t o t hat speci f i ed i n NFPA 13, at t est i ng t o t he sat i sf act or y compl et i on of al l t est i ng and st at i ng t hat t he syst em i s i n oper at i ng condi t i on. Al so i ncl ude a wr i t t en r equest f or a f or mal i nspect i on and t est . The QCFPE shal l wi t ness al l pr el i mi nar y t est i ng and shal l cer t i f y t he pr el i mi nar y t est i ng i s compl et e and t he syst ems ar e i n compl i ance wi t h t he cont r act document s pr i or t o schedul i ng f i nal t est i ng wi t h t he gover nment .
3. 8. 2 For mal I nspect i on and Test s ( Accept ance Test s)
The Paci f i c Di v i s i on, Naval Faci l i t i es Engi neer i ng Command, Fi r e Pr ot ect i on Engi neer , wi l l wi t ness f or mal t est s and appr ove al l syst ems bef or e t hey ar e accept ed. The syst em shal l be consi der ed r eady f or such t est i ng onl y af t er al l necessar y pr el i mi nar y t est s have been made and al l def i c i enci es f ound have been cor r ect ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer and wr i t t en cer t i f i cat i on t o t hi s ef f ect i s r ecei ved by t he Di v i s i on Fi r e Pr ot ect i on Engi neer . Submi t t he r equest f or f or mal i nspect i on at l east 15 wor ki ng days pr i or t o t he dat e t he i nspect i on i s t o t ake pl ace. Exper i enced t echni c i ans r egul ar l y empl oyed by t he Cont r act or i n t he i nst al l at i on of bot h t he mechani cal and el ect r i cal por t i ons of such syst ems shal l be pr esent dur i ng t he i nspect i on and shal l conduct t he t est i ng. Al l i nst r ument s, per sonnel , appl i ances and equi pment f or t est i ng shal l be f ur ni shed by t he Cont r act or . The Gover nment wi l l f ur ni sh wat er f or t he t est s. Al l necessar y t est s encompassi ng al l aspect s of syst em oper at i on shal l be made i ncl udi ng t he f ol l owi ng, and any def i c i ency f ound shal l be cor r ect ed and t he syst em r et est ed at no cost t o t he Gover nment .
The QCFPE shal l be pr esent f or t he f i nal t est i ng.
3. 8. 2. 1 Fl ow Test
Per f or m f l ow t est s of t he st andpi pe syst em i n accor dance wi t h NFPA 14.
Fur ni sh hose, nozzl es and f i t t i ngs r equi r ed f or t hi s t est .
3. 8. 3 Addi t i onal Test s
When def i c i enci es, def ect s or mal f unct i ons devel op dur i ng t he t est s r equi r ed, al l f ur t her t est i ng of t he syst em shal l be suspended unt i l pr oper adj ust ment s, cor r ect i ons or r evi s i ons have been made t o assur e pr oper per f or mance of t he syst em. I f t hese r evi s i ons r equi r e mor e t han a nomi nal del ay, t he Cont r act i ng Of f i cer shal l be not i f i ed when t he addi t i onal wor k has been compl et ed, t o ar r ange a new i nspect i on and t est of t he syst em. Al l t est s r equi r ed shal l be r epeat ed pr i or t o f i nal accept ance, unl ess di r ect ed ot her wi se.
- - End of Sect i on - -
SECTI ON 21 12 00 Page 8
SECTI ON 21 13 13. 00 20
WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON
04/08
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM D709 ( 2017) St andar d Speci f i cat i on f or Lami nat ed Ther moset t i ng Mat er i al s
FM GLOBAL ( FM)
FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 13 ( 2019; TI A 16- 1; TI A 16- 2; TI A 16- 3 2016;
Er r at a 17- 1; Er r at a 17- 2) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems
NFPA 24 ( 2019; ERTA 2016) St andar d f or t he I nst al l at i on of Pr i vat e Fi r e Ser vi ce Mai ns and Thei r Appur t enances
NFPA 1963 ( 2019) St andar d f or Fi r e Hose Connect i ons
UNDERWRI TERS LABORATORI ES ( UL)
UL 668 ( 2004; Repr i nt Jul 2016) UL St andar d f or Saf et y Hose Val ves f or Fi r e- Pr ot ect i on Service
UL Fi r e Pr ot Di r ( 2019) Fi r e Pr ot ect i on Equi pment Di r ect or y
1. 2 SYSTEM DESCRI PTI ON
Desi gn and pr ovi de new aut omat i c wet pi pe f i r e ext i ngui shi ng spr i nkl er syst ems f or compl et e f i r e pr ot ect i on cover age t hr oughout each pr oj ect bui l di ng i ndi cat ed on t he dr awi ngs.
1. 3 SPRI NKLER SYSTEM DESI GN
Except as modi f i ed her ei n, desi gn aut omat i c wet pi pe f i r e ext i ngui shi ng spr i nkl er syst ems i n accor dance wi t h t he r equi r ed and advi sor y pr ovi s i ons of NFPA 13, i ncl udi ng al l r ecommendat i ons and advi sor y por t i ons, whi ch shal l be consi der ed mandat or y; t hi s i ncl udes advi sor y pr ovi s i ons l i s t ed i n t he appendi ces of such st andar d( s) , as t hough t he wor d " shal l " had been subst i t ut ed f or t he wor d " shoul d" wher ever i t appear s. Desi gn syst em by hydr aul i c cal cul at i ons f or uni f or m di st r i but i on of wat er over t he desi gn
SECTI ON 21 13 13. 00 20 Page 1 ar ea. Hydr aul i c cal cul at i ons shal l assume a 80 kPa pr essur e l oss f or t he backf l ow pr event er assembl y. Locat e spr i nkl er s i n a consi st ent pat t er n wi t h cei l i ng gr i d, l i ght s, and ai r suppl y di f f user s. Pr ovi de spr i nkl er s and pi pi ng syst em l ayout . Al l Devi ces and equi pment f or f i r e pr ot ect i on ser vi ce shal l be UL Fi r e Pr ot Di r l i s t ed or FM APP GUI DE appr oved f or use i n wet pi pe spr i nkl er syst ems. Pr ovi de sei smi c pr ot ect i on f or t he spr i nkl er syst em. Desi gn and i nst al l sei smi c pr ot ect i on i n accor dance wi t h t he r equi r ement s of NFPA 13 sect i on t i t l ed " Pr ot ect i on of Pi pi ng Agai nst Damage Wher e Subj ect t o Ear t hquakes. "
1. 3. 1 Locat i on of Spr i nkl er s
Spr i nkl er s i n r el at i on t o t he cei l i ng and t he spaci ng of spr i nkl er s shal l not exceed t he hazar ds i ndi cat ed on t he cont r act dr awi ngs. Uni f or ml y space spr i nkl er s on t he br anch pi pi ng. Spr i nkl er s shal l pr ovi de cover age t hr oughout 100 per cent of t he bui l di ng. Thi s i ncl udes, but i s not l i mi t ed t o, t el ephone r ooms, el ect r i cal equi pment r ooms, boi l er r ooms, swi t chgear r ooms, t r ansf or mer r ooms, and ot her el ect r i cal and mechani cal spaces.
1. 3. 2 Wat er Di st r i but i on
Di st r i but i on shal l be uni f or m t hr oughout t he ar ea i n whi ch t he spr i nkl er s wi l l open. Di schar ge f r om i ndi v i dual spr i nkl er s i n hydr aul i cal l y most r emot e ar ea shal l be bet ween 100 per cent and 120 per cent of t he speci f i ed density.
1. 3. 3 Densi t y of Appl i cat i on of Wat er
Si ze pi pe t o pr ovi de t he speci f i ed densi t y when t he syst em i s di schar gi ng t he speci f i ed t ot al maxi mum r equi r ed f l ow. Appl i cat i on t o hor i zont al sur f aces bel ow t he spr i nkl er s shal l be as i ndi cat ed on t he cont r act drawings.
1. 3. 4 Spr i nkl er Di schar ge Ar ea
Ar ea shal l be as i ndi cat ed on dr awi ngs. Ar ea r educt i ons f r om NFPA 13 shal l not be appl i ed t o t hi s ar ea.
1. 3. 5 Out si de Hose Al l owances
Hydr aul i c cal cul at i ons shal l i ncl ude a hose al l owance as i ndi cat ed on t he dr awi ngs f or out si de hose st r eams.
1. 3. 6 Wat er Suppl y
Base hydr aul i c cal cul at i ons on t he wat er suppl y dat a shown on t he f i r e pr ot ect i on cont r act dr awi ngs at t he j unct i on wi t h t he exi st i ng wat er di st r i but i on pi pi ng syst em.
1. 4 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
The NAVFAC Paci f i c Fi r e Pr ot ect i on Engi neer del egat es t he aut hor i t y t o t he
SECTI ON 21 13 13. 00 20 Page 2
Qual i t y Cont r ol ( QC) Repr esent at i ve' s US Regi st er ed Fi r e Pr ot ect i on Engi neer f or r evi ew and appr oval of submi t t al s r equi r ed by t hi s sect i on.
The QC f i r e pr ot ect i on engi neer ( QCFPE) shal l base t he r evi ew and appr oval on pl ans and speci f i cat i ons and has no aut hor i t y t o gr ant var i ance t o t he desi gn document s. Submi t t o t he NAVFAC Paci f i c Fi r e Pr ot ect i on Engi neer t wo set s of al l appr oved submi t t al s i ncl udi ng but not l i mi t ed t o shop
SD- 02 Shop Dr awi ngs
Shop Dr awi ngs
Pr epar e A1 841 by 594 mm det ai l wor ki ng dr awi ngs of spr i nkl er s and pi pi ng. Fl oor pl ans shal l be dr awn t o a scal e not l ess t han 1: 100.
Show dat a essent i al f or pr oper i nst al l at i on of each syst em. Show det ai l s, pl an v i ew, el evat i ons and sect i ons of t he syst ems suppl y and pi pi ng. Show pi pi ng schemat i c of syst ems suppl y, devi ces, val ves, pi pe and f i t t i ngs. Show poi nt t o poi nt el ect r i cal wi r i ng di agr ams. Submi t dr awi ngs si gned by a r egi st er ed f i r e pr ot ect i on engi neer . Pr ovi de t hr ee copi es of t he Spr i nkl er Syst em Shop Dr awi ngs, no l at er t han 21 days pr i or t o t he st ar t of spr i nkl er syst em i nst al l at i on.
SD- 03 Pr oduct Dat a
Pi pe Fi t t i ngs Val ves, i ncl udi ng gat e, check, and gl obe Spr i nkl er s Pi pe hanger s and suppor t s Spr i nkl er Al ar m Swi t ches Fi r e depar t ment connect i ons Mechani cal coupl i ngs Backf l ow Pr event i on Assembl y Sei smi c Br aci ng
Annot at e descr i pt i ve dat a t o show t he speci f i c model , t ype, and si ze of each i t em. Cat al og cut s shal l al so i ndi cat e UL Li st i ng/ FM Appr oval and count r y of manuf act ur e.
SD- 05 Desi gn Dat a
Hydr aul i c Cal cul at i ons
Submi t comput er pr ogr am gener at ed hydr aul i c cal cul at i ons t o subst ant i at e compl i ance wi t h hydr aul i c desi gn r equi r ement s.
Cal cul at i ons shal l be per f or med by comput er usi ng sof t war e i nt ended speci f i cal l y f or f i r e pr ot ect i on syst em desi gn. Submi t name of sof t war e pr ogr am used.
SD- 06 Test Repor t s r equest t o schedul e Pr el i mi nar y Test s
Pr el i mi nar y Test Repor t
Pr ovi de Thr ee copi es of t he compl et ed Pr el i mi nar y Test Repor t , no l at er t han 7 days af t er t he compl et i on of t he Pr el i mi nar y Test s.
The Pr el i mi nar y Test s Repor t shal l i ncl ude bot h t he Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Under gr ound Pi pi ng and t he
SECTI ON 21 13 13. 00 20 Page 3
Cont r act or ' s Mat er i al and Test Cer t i f i cat e f or Abovegr ound Pi pi ng. Al l i t ems i n t he Pr el i mi nar y Test s Repor t shal l be s i gned by t he Fi r e Pr ot ect i on Engi neer .
r equest t o schedul e Fi nal Accept ance Test
SD- 07 Cer t i f i cat es
I nspect i on by Fi r e Pr ot ect i on Engi neer
Concur r ent wi t h t he Fi nal Accept ance Test Repor t , cer t i f i cat i on by t he Fi r e Pr ot ect i on Engi neer t hat t he spr i nkl er syst em i s i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s, i ncl udi ng si gned appr oval of t he Pr el i mi nar y and Fi nal Accept ance Test Reports.
Fi r e Pr ot ect i on Engi neer
The name and document at i on of cer t i f i cat i on of t he pr oposed Fi r e Pr ot ect i on Engi neer , no l at er t han 14 days af t er t he Not i ce t o Pr oceed and pr i or t o t he submi t t al of t he spr i nkl er syst em dr awi ngs and hydr aul i c cal cul at i ons.
Spr i nkl er Syst em I nst al l er
Submi t dat a showi ng t he Spr i nkl er Syst em I nst al l er has successf ul l y i nst al l ed syst ems of t he same t ype and desi gn as speci f i ed her ei n, Dat a shal l i ncl ude names and l ocat i ons of at l east t wo i nst al l at i ons wher e t he Cont r act or , or t he subcont r act or r ef er r ed t o above, has i nst al l ed such syst ems. I ndi cat e t ype and desi gn of each syst em and cer t i f y t hat each syst em has per f or med sat i sf act or i l y i n t he manner i nt ended f or not l ess t han 18 mont hs. Pr ovi de NI CET cer t i f i cat i on of t he syst em t echni c i an.
Cont r act or shal l submi t dat a al ong wi t h submi t t al of t he Fi r e Pr ot ect i on Engi neer Qual i f i cat i ons.
SD- 10 Oper at i on and Mai nt enance Dat a
Oper at i ng and Mai nt enance I nst r uct i ons
Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA as suppl ement ed and modi f i es by t hi s speci f i cat i on sect i on.
Pr ovi de si x manual s i n accor dance wi t h NFPA 13. The manual s shal l i ncl ude t he manuf act ur er ' s name, model number , par t s l i s t , l i s t of par t s and t ool s t hat shoul d be kept i n st ock by t he owner f or r out i ne mai nt enance i ncl udi ng t he name of a l ocal suppl i er , s i mpl i f i ed wi r i ng and cont r ol s di agr ams, t r oubl eshoot i ng gui de, and r ecommended ser vi ce or gani zat i on ( i ncl udi ng addr ess and t el ephone number ) f or each i t em of equi pment . Each ser vi ce or gani zat i on submi t t ed shal l be capabl e of pr ovi di ng 4 hour on- si t e r esponse t o a ser vi ce cal l on an emer gency basi s.
SD- 11 Cl oseout Submi t t al s
As- bui l t dr awi ngs
As- bui l t shop dr awi ngs, at no l at er t han 14 days af t er compl et i on
SECTI ON 21 13 13. 00 20 Page 4 of t he Fi nal Test s. The Spr i nkl er Syst em Dr awi ngs shal l be updat ed t o r ef l ect as- bui l t condi t i ons af t er al l r el at ed wor k i s compl et ed. Pr ovi de el ect r oni c dr awi ngs i n dwg or pdf f or mat .
On- si t e t r ai ni ng
1. 5 QUALIFICATIONS
1. 5. 1 Fi r e Pr ot ect i on Engi neer
A Fi r e Pr ot ect i on Engi neer i s a r egi st er ed pr of essi onal engi neer ( P. E. ) who has passed t he f i r e pr ot ect i on engi neer i ng wr i t t en exami nat i on admi ni st er ed by t he Nat i onal Counci l of Exami ner s f or Engi neer i ng and Sur veys ( NCEES) .
1. 5. 2 Spr i nkl er Syst em I nst al l er
The Spr i nkl er Syst em I nst al l er shal l be r egul ar l y engaged i n t he i nst al l at i on of t he t ype and compl exi t y of syst em speci f i ed i n t he Cont r act document s, and shal l have ser ved i n a s i mi l ar capaci t y f or at l east t hr ee syst ems t hat have per f or med i n t he manner i nt ended f or a per i od of not l ess t han 6 mont hs. I nst al l at i on dr awi ngs, shop dr awi ngs and as- bui l t dr awi ngs shal l be pr epar ed, by or under t he super vi s i on of , an syst em t echni c i an who i s exper i enced wi t h t he t ypes of wor ks speci f i ed her ei n, and i s cur r ent l y cer t i f i ed by t he Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) as an engi neer i ng t echni c i an wi t h mi ni mum Level I I I cer t i f i cat i on i n Aut omat i c Spr i nkl er Syst em pr ogr am or by a f i r e pr ot ect i on engi neer .
1. 6 QUALI TY ASSURANCE
1. 6. 1 Mat er i al and Equi pment Qual i f i cat i ons
Pr ovi de mat er i al s and equi pment t hat ar e st andar d pr oduct s of manuf act ur er s r egul ar l y engaged i n t he manuf act ur e of such pr oduct s, whi ch ar e of a s i mi l ar mat er i al , desi gn and wor kmanshi p. St andar d pr oduct s shal l have been i n sat i sf act or y commer ci al or i ndust r i al use f or 2 year s pr i or t o bi d openi ng. The 2- year use shal l i ncl ude appl i cat i ons of equi pment and mat er i al s under s i mi l ar c i r cumst ances and of s i mi l ar s i ze.
The pr oduct shal l have been f or sal e on t he commer ci al mar ket t hr ough adver t i sement s, manuf act ur er s ' cat al ogs, or br ochur es dur i ng t he 2 year period.
1. 6. 2 Al t er nat i ve Qual i f i cat i ons
Pr oduct s havi ng l ess t han a t wo- year f i el d ser vi ce r ecor d wi l l be accept abl e i f a cer t i f i ed r ecor d of sat i sf act or y f i el d oper at i on f or not l ess t han 6000 hour s, excl usi ve of t he manuf act ur er ' s f act or y or l abor at or y t est s, can be shown.
1. 6. 3 Manuf act ur er ' s Namepl at e
Each i t em of equi pment shal l have a namepl at e bear i ng t he manuf act ur er ' s name, addr ess, model number , and ser i al number secur el y af f i xed i n a conspi cuous pl ace; t he namepl at e of t he di st r i but i ng agent wi l l not be acceptable.
SECTI ON 21 13 13. 00 20 Page 5
1. 6. 4 Fi el d Fabr i cat ed Namepl at es
ASTM D709. Pr ovi de l ami nat ed pl ast i c namepl at es f or each equi pment encl osur e, r el ay, swi t ch, and devi ce; as speci f i ed i n t he t echni cal sect i ons or as i ndi cat ed on t he dr awi ngs. Each namepl at e i nscr i pt i on shal l i dent i f y t he f unct i on and, when appl i cabl e, t he posi t i on.
Namepl at es shal l be mel ami ne pl ast i c, 3 mm t hi ck, whi t e wi t h bl ack cent er cor e. Sur f ace shal l be mat t e f i ni sh. Cor ner s shal l be squar e.
Accur at el y al i gn l et t er i ng and engr ave i nt o t he cor e. Mi ni mum si ze of namepl at es shal l be 25 by 65 mm. Let t er i ng shal l be a mi ni mum of 6. 35 mm hi gh nor mal bl ock st y l e.
1. 7 ACCESSIBILITY
I nst al l al l wor k so t hat par t s r equi r i ng per i odi c i nspect i on, oper at i on, mai nt enance, and r epai r ar e r eadi l y accessi bl e. I nst al l conceal ed val ves, expansi on j oi nt s, cont r ol s, damper s, and equi pment r equi r i ng access, i n l ocat i ons f r eel y accessi bl e t hr ough access door s.
1. 8 DELI VERY, STORAGE AND HANDLI NG
Al l equi pment del i ver ed and pl aced i n st or age shal l be housed i n a manner t o pr ecl ude any damage f r om t he weat her , humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s. Addi t i onal l y, al l pi pes shal l ei t her be capped or pl ugged unt i l i nst al l ed.
PART 2 PRODUCTS
2. 1 UNDERGROUND PI PI NG COMPONENTS
2. 1. 1 Pipe
Pi pe shal l compl y wi t h NFPA 24. Mi ni mum pi pe si ze shal l be 150 mm.
Pi pi ng mor e t han 1. 50 met er s out si de t he bui l di ng wal l s shal l compl y wi t h Sect i on 33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG.
2. 1. 2 Bur i ed Ut i l i t y War ni ng and I dent i f i cat i on Tape
Pr ovi de det ect abl e al umi num f oi l pl ast i c backed t ape or det ect abl e magnet i c pl ast i c t ape manuf act ur ed speci f i cal l y f or war ni ng and i dent i f i cat i on of bur i ed pi pi ng. Tape shal l be det ect abl e by an el ect r oni c det ect i on i nst r ument . Pr ovi de t ape i n r ol l s, 80 mm mi ni mum wi dt h, col or coded f or t he ut i l i t y i nvol ved wi t h war ni ng and i dent i f i cat i on i mpr i nt ed i n bol d bl ock l et t er s cont i nuousl y and r epeat edl y over t he ent i r e t ape l engt h. War ni ng and i dent i f i cat i on shal l r ead " CAUTI ON BURI ED WATER PI PI NG BELOW" or s i mi l ar wor di ng. Use per manent code and l et t er col or i ng unaf f ect ed by moi st ur e and ot her subst ances cont ai ned i n t r ench backf i l l mat er i al .
2. 2 ABOVEGROUND PI PI NG COMPONENTS
Al l component s of t he abovegr ound pi pi ng shal l f ul l y compl y wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13 and t hi s speci f i cat i on sect i on. Abovegr ound pi pi ng shal l be st eel .
2. 2. 1 St eel Pi pe
Pi pe shal l be r i gi dbl ack st eel . St eel pi pi ng shal l be Schedul e 40 f or s i zes l ess t han 200 mm and Schedul e 40 f or s i zes 200 mm or l ar ger . Fi t t i ngs
SECTI ON 21 13 13. 00 20 Page 6 i nt o whi ch spr i nkl er s, spr i nkl er r i ser ni ppl es, or dr op ni ppl es ar e t hr eaded shal l be wel ded, t hr eaded, or gr ooved- end t ype. Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs, f i t t i ngs t hat use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe and segment ed wel ded f i t t i ngs shal l not be per mi t t ed. Rubber gasket ed gr ooved- end pi pe and f i t t i ngs wi t h mechani cal coupl i ngs shal l be per mi t t ed i n pi pe si zes 40 mm and l ar ger . Fi t t i ngs, mechani cal coupl i ngs, and r ubber gasket s shal l be suppl i ed by t he same manuf act ur er . St eel pi pi ng wi t h wal l t hi ckness l ess t han Schedul e 30 shal l not be t hr eaded. Si de out l et t ees usi ng r ubber gasket ed f i t t i ngs shal l not be per mi t t ed. Spr i nkl er pi pe and f i t t i ngs shal l be met al .
2. 2. 2 Gr ooved Mechani cal Joi nt s and Fi t t i ngs
Gr ooved coupl i ngs, f i t t i ngs and gr oovi ng t ool s shal l be pr oduct s of t he same manuf act ur er .
2. 2. 3 Fl exi bl e Spr i nkl er Hose
The use of f l exi bl e spr i nkl er hose i s not per mi ssi bl e.
2. 2. 4 Sprinklers
Pr ovi de spr i nkl er s wi t h K- f act or s as i ndi cat ed on t he dr awi ngs. Spr i nkl er s wi t h i nt er nal O- r i ngs shal l not be used. Spr i nkl er s shal l be used i n accor dance wi t h t hei r l i s t ed cover age l i mi t at i ons. Pr ovi de qui ck r esponse conceal ed pendent and r ecessed si dewal l spr i nkl er s i n ar eas wi t h f i ni shed cei l i ngs. Pr ovi de r esi dent i al conceal ed pendent and conceal ed si dewal l spr i nkl er s i n dwel l i ng uni t s. Li st ed r esi dent i al spr i nkl er s ar e per mi t t ed t o be used at t hei r l i s t ed/ appr oved spaci ng and cover age. Pr ovi de qui ck r esponse pendent and upr i ght spr i nkl er s i n ar eas t hat r equi r e head guar ds.
Pr ovi de qui ck r esponse upr i ght spr i nkl er s i n ar eas wi t hout f i ni shed cei l i ngs. Pendent spr i nkl er s shal l have a whi t e pol yest er f i ni sh.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .