This solicitation requests proposals for site development and construction work for airfield projects at Tinian International Airport in the Commonwealth of the Northern Mariana Islands. The work includes clearing, grading, and paving a site for Air Force access; installing security fencing, drainage, utilities, and a water well; demolishing WWII-era pavements; and constructing an aircraft parking apron sized for 12 large aircraft with associated taxiways and hydrant piping. The solicitation also includes one priced option to exercise within 360 days for increased quantities of the parking apron and taxiways. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20R1313-Note9.pdf | ||
| 20R1313-AMD10.pdf | ||
| 20R1313-AMD3 Dwgs.pdf | ||
| 20R1313-AMD7 Dwgs.pdf | ||
| 20R1313-AMD2 Dwgs.pdf | ||
| 20R1313-AMD8 Dwgs.pdf | ||
| 20R1313-Note8.pdf | ||
| 20R1313-AMD9.pdf | ||
| 20R1313-Note7.pdf | ||
| 20R1313-AMD8.pdf | ||
| 20R1313-Note6.pdf | ||
| 20R1313-Note5.pdf | ||
| 20R1313-AMD6.pdf | ||
| 20R1313-SV Sign-In.pdf | ||
| 20R1313-Note4.pdf | ||
| 20R1313-AMD5.pdf | ||
| 20R1313-AMD4.pdf | ||
| 20R1313-Note3.pdf | ||
| 20R1313-AMD3.pdf | ||
| 20R1313-Note2.pdf | ||
| 20R1313-Note1.pdf | ||
| 20R1313-AMD2.pdf | ||
| 20R1313_AMD1.pdf | ||
| 20R1313_Specs_PARTA.pdf | ||
| 20R1313_P9021Dwgs.pdf | ||
| 20R1313_Specs_PARTB.pdf | ||
| 20R1313_P9022Dwgs.pdf | ||
| 20R1313-RFP.pdf | ||
| 20R1313_Specs_PARTC.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. N6274220R1313 Amendment No. 0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 01 15 LIST OF DRAWINGS
PARA 1.2 CONTRACT DRAWINGS
1.2.1 Part B List of Drawings
The following drawings are added and accompany this Amendment:
NAVFAC
DWG NO.
DRAWING
SHEET NO.
CHANGE
NO.
TITLE
17247490 B-103 1 BORING LOGS
The following drawings are revised as of 10/9/2020 and accompany this Amendment:
DRAWING
SHEET NO.
CHANGE
NO.
TITLE
17247469 G-002 1 SHEET INDEX
17247488 B-101 1 BORING LOGS
17247478 GC500 1 EROSION CONTROL DETAILS
17247492 CD100 2 OVERALL DEMOLITION PLAN
17247493 CD101 1 DEMOLITION PLAN
17247494 CD102 1 DEMOLITION PLAN
17247541 CU101 1 UTILITY PLAN – AREA R1-4
17247539 CP104 1 ACCESS ROAD SIGNAGE AND PAVEMENT
MARKING PLAN
17247540 CP105 1 ACCESS ROAD SIGNAGE AND PAVEMENT
MARKING PLAN
17247581 D-802 1 INSTRUMENT LIST AND DEFINITIONS
17247548 CG503 1 GRADING AND DRAINAGE DETAILS
17247556 CP500 1 SIGNAGE AND PAVEMENT MARKING DETAILS
1.2.2 Part C List of Drawings
The following drawings are revised as of 10/9/2020 and accompany this Amendment:
DRAWING
SHEET NO.
CHANGE
NO.
TITLE
17247715 CU201 1 RAW WATER LINE PROFILE
17247727 CU500 1 UTILITY DETAILS
PART C: FY20 P-9022 APSI – PARKING APRON, TINIAN, CNMI (WON 1607704)
SECTION 33 52 23.15 POL SERVICE PIPING WELDING
Delete section in its entirety and replace with the attached Section 33 52 23.15.
SECTION 33 52 43.13 AVIATION FUEL PIPING
Delete section in its entirety and replace with the attached Section 33 52 43.13.
PART C: FY20 P-9022 APSI - Parking Apron, Tinian 1607704
SECTION 33 52 23.15
POL SERVICE PIPING WELDING
11/18
Amendment No. 07
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN PETROLEUM INSTITUTE (API)
API Std 650 (2013; Errata 1 2013; Addendum 1 2014;
Errata 2 2014; Addendum 2 2016; Addendum 3 2018) Welded Tanks for Oil Storage
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ASNT SNT-TC-1A (2016) Recommended Practice for Personnel Qualification and Certification in Nondestructive Testing
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
AWS A3.0M/A3.0 (2010) Standard Welding Terms and Definitions
AWS A5.1/A5.1M (2012) Specification for Carbon Steel Electrodes for Shielded Metal Arc Welding
AWS A5.10/A5.10M (2017) Welding Consumables - Wire Electrodes, Wires and Rods for Welding of Aluminum and Aluminum-Alloys - Classification
AWS A5.18/A5.18M (2017) Specification for Carbon Steel Electrodes and Rods for Gas Shielded Arc Welding
AWS A5.22/A5.22M (2012) Specification for Stainless Steel Flux Cored and Metal Cored Welding Electrodes and Rods
AWS A5.3/A5.3M (1999; R 2007) Specification for Aluminum and Aluminum-Alloy Electrodes for Shielded Metal Arc Welding
AWS A5.32/A5.32M (2011) Specification for Welding Shielding Gases
AWS A5.4/A5.4M (2012) Specification for Stainless Steel
JEG# WFXO6311 SECTION 33 52 23.15 Page 1 Amendment No. 07 07 October 2020
Electrodes for Shielded Metal Arc Welding
AWS A5.9/A5.9M (2017) Welding Consumables-Wire Electrodes, Strip Electrodes, Wires, and Rods for Arc Welding of Stainless and Heat Resisting Steels- Classification
AWS C5.5/C5.5M (2003) Recommended Practices for Gas Tungsten Arc Welding
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS D10.10/D10.10M (1999; R 2009) Recommended Practices for Local Heating of Welds in Piping and Tubing
AWS D10.11M/D10.11 (2007) Guide for Root Pass Welding of Pipe Without Backing
AWS D10.12M/D10.12 (2000) Guideline for Welding Mild Steel Pipe
AWS D10.4 (1986; R 2000) Recommended Practices for Welding Austenitic Chromium-Nickel Stainless Steel Piping and Tubing
AWS D10.7/D10.7M (2008) Guide for the Gas Shielded Arc Welding of Aluminum and Aluminum Alloy Pipe
AWS QC1 (2016) Specification for AWS Certification of Welding Inspectors
AWS WHB-4.9 (2010) Welding Handbook, Volume 4 - Materials and Applications Part 1
AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes
ASME INTERNATIONAL (ASME)
ASME B31.3 (2016) Process Piping
ASME BPVC SEC V (2017) BPVC Section V-Nondestructive Examination
ASTM INTERNATIONAL (ASTM)
ASTM E2700 (2014) Standard Practice for Contact Ultrasonic Testing of Welds Using Phased Arrays
1.2 DEFINITIONS
Definitions must be in accordance with AWS A3.0M/A3.0 except as follows:
a. Weld slag is defined as the crystalline residue remaining on the weld surface following a weld procedure which uses flux as a shielding method.
JEG# WFXO6311 SECTION 33 52 23.15 Page 2
b. POL service piping consists of piping and components used for petroleum, oil and lubricants (POL) under pressure or gravity force including modifications to existing hydrant fueling systems.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval and must be submitted for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Welding Procedure Specifications (WPS); G
Welder Performance Qualification (WPQ); G
Procedure Qualification Record (PQR); G
Welding Operations; G
SD-02 Shop Drawings
POL Service Piping; G
SD-06 Test Reports
Welding Reports
Examinations, Inspections and Tests
SD-07 Certificates
Qualifications; G
1.4 GENERAL REQUIREMENTS
This section covers the welding of Petroleum, Oil and Lubricant (POL) Service systems. Deviations from applicable codes, approved procedures, and approved detail drawings will not be permitted without prior written approval by the Contracting Officer. Materials or components with welds made offsite will not be accepted if the welding does not conform to the requirements of this specification, unless otherwise specified.
Procedures must be developed by the Contractor for welding all metals included in the work. Welding must not be started until welding procedures, welders, and welding operators have been qualified.
Qualification testing must be performed by an approved testing laboratory, or by the Contractor if approved by the Contracting Officer. Costs of such testing must be borne by the Contractor. The Contracting Officer must be notified at least one week in advance of the time and place of the tests. If the Contracting Officer elects to witness the tests, the qualification tests must be performed at or near the worksite. The Contractor must maintain current records of the test results obtained in the welding procedure, welding operator, welder performance qualifications, and nondestructive examination (NDE) procedures readily available at the site for examination by the Contracting Officer. The procedures for making transition welds between different materials or
JEG# WFXO6311 SECTION 33 52 23.15 Page 3 between plates or pipes of different wall thicknesses must be qualified.
Unless otherwise specified, the choice of welding process must be the responsibility of the Contractor. It should be noted that ASME B31.3 incorporates by reference, other requirements of ASME Section V, Section IX and specific AWS requirements.
1.5 PERFORMANCE
The Contractor will be responsible for the quality of all joint preparation, welding, and examination. All materials used in the welding operations must be clearly identified and recorded. The inspection and testing defined in this specification are minimum requirements.
Additional inspection and testing must be the responsibility of the Contractor when he deems it necessary to achieve the quality required.
1.6 QUALIFICATIONS
Welding procedures, welders, and welding operators previously qualified by test may be accepted for the work without requalification, provided that all of the following conditions are fulfilled:
a. Copies of the welding procedure specifications (WPS), the procedure qualification record (PQR) record, and the welder performance qualification (WPQ) are submitted and approved in accordance with paragraph SUBMITTALS.
b. Testing was performed by an approved testing laboratory or approved technical consultant or by the Contractor's approved quality assurance organization.
c. The welding procedures, welders, and welding operators were qualified in accordance with ASME B31.3 and base materials, filler materials, electrodes, equipment, and processes conformed to the applicable requirements of this specification.
d. The requirements of paragraph RENEWAL OF QUALIFICATION below are met and records showing name of employer and period of employment using the process for which qualified are submitted as evidence of conformance.
1.6.1 Welding Operations
The Contractor must provide a description of how the critical welding operations will be accomplished. Provide the welding procedures to be used for each operation, the sequence of welding to minimize heat distortion, sequence of welding piping sections both in the trench and outside, machine welding if used, and multiple welders on same pipe weld.
Submit detailed procedures which define methods of compliance to contract drawings and specifications.
1.6.2 Welding Procedure Specification and Procedure Qualification Records
The Contractor must record in detail and must qualify the Welding Procedure Specifications for every proposed welding procedure.
Qualification for each welding procedure must conform to the requirements of ASME B31.3 and to this specification. The welding procedures must specify back purge gas requirements, end preparation for butt welds including cleaning, alignment, and root openings. Preheat, interpass temperature control, and postheat treatment of welds must be as required
JEG# WFXO6311 SECTION 33 52 23.15 Page 4 by approved welding procedures, unless otherwise indicated or specified.
Copies of the welding procedure specifications and weld procedure qualification record results for each type of welding required must be submitted in accordance with paragraph SUBMITTALS. Approval of any procedure does not relieve the Contractor of the sole responsibility for producing acceptable welds. Welding procedures must be identified individually and must be referenced on the POL service piping shop drawings. Submit detail drawings showing location, length, and type of welds; and indicating preweld and postweld heat treatment and NDE as required. The drawings must show the welding procedure specification (WPS) to be used at each weld location.
1.6.3 Welder and Welding Operator Performance
Each welder and welding operator assigned to work must be qualified in accordance with ASME B31.3 .
1.6.3.1 Certification
Before assigning welders or welding operators to the work, the Contractor must provide the Contracting Officer with their names together with certification that each individual is performance-qualified as specified.
The certification must state the type of welding and positions for which each is qualified, the code and welding procedure specification under which each is qualified, date qualified, and the firm and individual certifying the qualification tests. The Contractor must provide a summary table showing all welders and the WPS with which they are qualified to weld.
1.6.3.2 Identification
Each particular weld must be identified with the personal number, letter, or symbol assigned to each welder or welding operator. To identify welds, written records indicating the location of welds made by each welder or welding operator must be submitted, and each welder or welding operator must apply the personal mark adjacent to the welds using a rubber stamp or felt-tipped marker with permanent, weatherproof ink or other methods approved by the Contracting Officer that do not deform the metal.
Identification by die stamps or electric etchers will not be allowed.
1.6.3.3 Renewal of Qualification
Requalification of a welder or welding operator must be required under any of the following conditions:
a. When a welder or welding operator has not used the specific welding procedure for a period of 3 months; the period may be extended to 6 months if the welder or welding operator has been employed on another welding procedure.
b. When a welder or welding operator has not welded with any procedure during a period of 3 months, all the personal qualifications must be considered expired, including any extension by virtue of a. above.
c. There is specific reason to question the person's ability to make welds that will meet the requirements of the specifications.
d. The welder or welding operator was qualified by an employer, other than those firms performing work under this contract, and a
JEG# WFXO6311 SECTION 33 52 23.15 Page 5 qualification test has not been taken within the preceding 12 months.
e. Renewal of qualification for a specific welding procedure under conditions a., b., and d., above, needs to be made on only a single test joint or pipe of a thickness, position, or material required by the welding procedure specifications to reestablish the welder's or welding operator's qualification for the previous qualification.
1.6.4 Test Reports
Test reports must consist of the following.
a. Records made by the AWS certified inspector for all duties performed per paragraph 4.2 of AWS QC1.
b. All NDE (radiograph, PAUT) reports with unique weld ID for each weld tested.
c. "Weld Maps". These maps/drawings correlate the shop drawings submitted to the NDE reports. The NDE report that shows a weld number as acceptable is correlated with weld number on the drawings.
d. Provide the location of each weld, what procedure was used, which welder did the weld, the results of the visual test, and the results of the NDE.
1.6.5 Inspection and NDE Personnel
Contractor must provide a commercially independent organization for all weld examinations. All inspection and NDE personnel must be qualified in accordance with the following requirements. The contractor must submit the qualifications of all the testing personnel that will perform all field tests for review by the Contracting Officer. The qualifications of all personnel on the job site that will perform welding inspections and NDE must be submitted for approval. All inspectors and NDE personnel must have a minimum of one year experience inspecting the piping material being used and five years in military or commercial aircraft hydrant fueling systems or truck fueling systems, petroleum refineries, power generating plants, or chemical process plants. In addition, all PAUT personnel must meet ASNT Level III requirements.
1.6.5.1 Inspector Certification
Visual welding inspectors must be qualified in accordance with AWS QC1.
1.6.5.2 NDE Personnel
NDE personnel must be certified Level II in accordance with ASME Section V, ASME B31.3 and ASNT SNT-TC-1A for each NDE procedure he is required to use, and a written procedure for the control and administration of NDE personnel training, examination, and certification must be established.
The procedures must be based on appropriate specific and general guidelines of training and experience recommended by ASNT SNT-TC-1A .
Should the NDE examiner also be a welder, that individual is disqualified from examining their own work. Examiners performing PAUT must be qualified in accordance with ASME Section 5, Article 4, Mandatory Appendix
VII.
JEG# WFXO6311 SECTION 33 52 23.15 Page 6
1.7 DELIVERY, STORAGE, AND HANDLING
All filler metals, electrodes, and other welding materials must be delivered to the site in manufacturers' original packages and stored in a dry space until used. Packages must be properly labeled and designed to give maximum protection from moisture and to insure safe handling.
1.7.1 Material Control
Materials must be stored in a controlled access and clean, dry area that is weathertight and is maintained at a temperature recommended by the manufacturer. The materials must not be in contact with the floor and must be stored on wooden pallets or cribbing.
1.7.1.1 Damaged Containers
Low-hydrogen steel electrodes must be stored in their sealed shipping container. If the seal is damaged during shipment or storage, and the damage is not immediately detected, the covered electrodes in that container must be rebaked in accordance with the manufacturer's instructions prior to issuance or must be discarded. If a container is damaged in storage and the damage is witnessed, the electrodes from that container must be immediately placed in a storage oven. The storage oven temperature must be as recommended by the manufacturer or the welding material specification.
1.7.1.2 Partial Issues
When a container of covered electrodes is opened and only a portion of the content is issued, the remaining portion must, within 1/2-hour; be placed in a storage oven.
1.7.2 Damaged Materials
Materials which are damaged must be discarded. Covered electrodes which are oil or water-soaked, dirty, or on which the flux has separated from the wire must be discarded.
1.8 SYMBOLS
Symbols must be in accordance with AWS A2.4 .
1.9 SAFETY
Safety precautions must conform to AWS Z49.1 .
PART 2 PRODUCTS
2.1 WELDING MATERIALS
Welding materials for carbon steel, stainless steel and aluminum must comply with AWS WHB-4.9. Welding equipment, electrodes, welding wire, shielding and backing gas, and fluxes must be capable of producing satisfactory welds when used by a qualified welder or welding operator using qualified welding procedures. All field girth root pass welds must be made with non-covered electrodes or welding wire. All root passes must be made with shielding and backing gas. External welds on the pipe such as attaching pipe supports may be made with covered electrodes or welding wire. Electrodes, welding wire and fluxes must be in accordance with
JEG# WFXO6311 SECTION 33 52 23.15 Page 7
Table 1. Welding materials for aluminum and aluminum alloy must comply with AWS D10.7/D10.7M .
TABLE I
AWS Process Alloy Consumable Use
(Examples) (1)
AWS A5.1/A5.1M SMAW Low Carbon E7018 Fill
AWS A5.4/A5.4M SMAW Stainless E308L, E309L Fill
AWS A5.3/A5.3M SMAW Aluminum Fill
AWS A5.9/A5.9M GTAW Stainless ER308L,ER309L Root and Fill
AWS A5.10/A5.10M GTAW Aluminum Root and Fill
AWS A5.18/A5.18M GTAW Low Carbon E70S-3,E70S-6 Root and Fill
AWS A5.22/A5.22M GTAW Stainless E308LT1-1 Root (Backing and Shielding Gas Required)
AWS A5.32/A5.32M GTAW All Shielding Gas
Note(1): The consumable material designations shown are examples only and are not intended to limit the Contractor's selection of consumable materials.
PART 3 EXECUTION
3.1 WELDING OPERATIONS
Welding must be performed in accordance with qualified procedures using qualified welders and welding operators. Welding must not be done when the quality of the completed weld could be impaired by the prevailing working or weather conditions. The Contracting Officer must determine when weather or working conditions are unsuitable for welding.
Welding must be performed in accordance with ASME B31.3 and the applicable portions of AWS D10.4 , AWS D10.7/D10.7M , AWS D10.10/D10.10M , AWS D10.11M/D10.11 , AWS D10.12M/D10.12 , and AWS C5.5/C5.5M .
All joints unless indicated otherwise, in carbon steel, aluminum and stainless steel piping systems must be welded. Unless otherwise approved, all girth welds must be complete penetration groove welds made in accordance with qualified welding procedures. The root pass on stainless steel, aluminum, and carbon steel pipe must be by the GTAW process.
a. Weld Preparation must comply with the requirements of ASME B31.3 and the qualified Welding Procedure Specification. The use of "rice paper" as purge blocks is not permitted. Contractor must submit alternate method for approval.
b. Backing Rings. The use of backing rings for making or repairing welds
JEG# WFXO6311 SECTION 33 52 23.15 Page 8 will not be permitted.
3.1.1 Base Metal Preparation
Oxy-fuel cutting must not be used on austenitic stainless steel or nonferrous materials.
Mechanical grinding of thermal cut ends must be used to remove the heat affected area but should be limited to maximum 3 mm.
3.1.2 Weld Joint Fit-Up
Parts that are to be joined by welding must be fitted, aligned, and retained in position during the welding operation by the use of bars, jacks, clamps, or other mechanical fixtures. End welds must be properly aligned prior to welding in accordance with Chapter V of ASME B31.3 . All socket-welded joints must be properly fitted with gaps between the pipe and the bottom of the socket in accordance with ASME B31.3 . Contractor must implement a program to ensure gaps are properly measured and documented. Welded temporary attachments must not be used except when it is impractical to use mechanical fixtures. When temporary attachments are used, they must be the same material as the base metal, and must be completely removed by grinding or thermal cutting after the welding operation is completed. If thermal cutting is used, the attachment must be cut to not less than 6 mm from the member and the balance removed by grinding. After the temporary attachment has been removed, the area must be visually examined.
3.1.3 Butt Weld Joint Spacing
Butt weld joints must be spaced a minimum of 150 mm apart. Measurement must be taken from the toe of the first weld to the toe of the second weld. The measurement must be taken at the closest point between the welds when visually inspected. If spacing is not possible due to existing conditions, a reduction in spacing to not less than 50 mm may be made.
3.1.4 Preheat and Interpass Temperatures
Preheat temperatures must meet the requirements specified by ASME B31.3 .
However, in no case will the preheat be below 10 degrees C for ferritic steel or austenitic stainless steel, or 0 degrees C for nonferrous alloys. The maximum interpass temperatures must not exceed 149 degrees C for austenitic stainless steels, nickel alloys, and copper alloys; and 260 degrees C for carbon steels. Preheat techniques must be such as to ensure that the full thickness of the weld joint preparation or adjacent base material, at least 75 mm in all directions, is at the specified temperature. Preheating by induction or resistance methods is preferred.
When flame heating is used, only a neutral flame must be employed.
Oxy-fuel heating must not be used on austenitic stainless steel; however, air-fuel heating is acceptable if controlled to ensure that the surface temperature does not exceed 66 degrees C. Interpass temperatures must be checked on the surface of the component within 25 mm of the weld groove and at the starting location of the next weld pass, and for a distance of about 150 mm ahead of the weld, but not on the area to be welded.
3.1.5 Production Welding Instructions
a. Welding must not be done when the ambient temperature is lower than minus 18 degrees C.
JEG# WFXO6311 SECTION 33 52 23.15 Page 9
b. Welding is not permitted on surfaces that are wet or covered with ice, when snow or rain is falling on the surfaces to be welded, or during periods of high winds, unless the welders and the work are properly protected.
c. Gases for purging and shielding must be welding grade and must have a dew point of minus 40 degrees C or lower.
d. Back purges are required for austenitic stainless steels and nonferrous alloys welded from one side and must be set up such that the flow of gas from the inlet to the outlet orifice passes across the area to be welded. The oxygen content of the gas exiting from the purge vent must be less than 2 percent prior to welding. The flow rate must be that required by the approved weld procedure specification.
e. The purge on groove welds must be maintained for at least two passes or 5 mm whichever is greater.
f. Removable purge dam materials must be made of expandable or flexible plugs, such as Plexiglas, plywood (which must be dry when used). Wood dams must be kiln-dried quality. Purge dams must not be made of polyvinyl alcohol.
g. Any welding process which requires the use of external gas shielding must not be done in a draft or wind unless the weld area is protected by a shelter. This shelter must be of material and shape appropriate to reduce wind velocity in the vicinity of the weld to a maximum of 8 km/hour.
h. Tack welds to be incorporated in the final welds must have their ends tapered by grinding or welding technique. Tack welds that are cracked or defective must be removed and the groove must be retacked prior to welding. Temporary tack welds must be removed, the surface ground smooth, and visually inspected. For low-alloy and hardenable high-alloy steels, the area must be magnetic particle examination inspected.
i. Grinding of completed welds is to be performed only to the extent required for NDE, including any inservice examination, and to provide weld reinforcement within the requirements of ASME B31.3 . If the surface of the weld requires grinding, reducing the weld or base material below the minimum required thickness must be avoided.
Minimum weld external reinforcement must be flush between external surfaces.
j. Each qualified welder must be assigned an identification symbol. All welds must be permanently marked with the symbol of the individual who made the weld.
k. Direct welded connection of carbon steel and stainless steel must not be made.
3.1.6 Postweld Heat Treatment
a. When required postweld heat treatment must be performed in accordance with ASME B31.3 . Temperatures for local postweld heat treatment must be measured continuously by thermocouples in contact with the weldment.
JEG# WFXO6311 SECTION 33 52 23.15 Page 10
b. Postweld heat treatment of low-alloy steels, when required, must be performed immediately upon completion of welding and prior to the temperature of the weld falling below the preheat temperature.
However, postweld heat treatment may be postponed after the completion of the weld, if, immediately after the weld is completed, it is maintained at a minimum temperature of 149 degrees C or the preheat temperature, whichever is greater, for 2-hours per 25 mm of weld thickness.
3.2 EXAMINATIONS, INSPECTIONS AND TESTS
Weld inspection and NDE must be performed by the Contractor to detect surface and internal discontinuities in completed welds. The services of a qualified commercial inspection or testing laboratory or technical consultant meeting the requirements of paragraph INSPECTION AND NDE PERSONNEL, approved by the Contracting Officer, must be employed by the Contractor. All completed welds must be visually inspected in accordance with the visual inspection requirements of ASME B31.3 and AWS D1.1/D1.1M .
Radiographic, liquid penetrant, magnetic particle or PAUT examination must be required as indicated below. When in-process weld quality control is required for tie-in welds, it must be performed in accordance with ASME B31.3 . When inspection and testing indicates disqualifying defects in a weld joint, the weld must be repaired by a qualified welder in accordance with paragraph CORRECTIONS AND REPAIRS. The Contractor must submit weld inspection and NDE field testing reports to the Contracting Officer. In all cases where PAUT is used, all welds must be recorded and the results reviewed by an ASNT Level III certified inspector and the requirements in this section.
The person performing the weld inspection must perform the following:
a. Verify that the base materials and consumable welding materials conform to the specifications and that welding filler metals used are as specified for each base material.
b. Verify that the welding equipment to be used for the work is appropriate for use with the welding procedure specification and has the capability to meet the applicable requirements of the welding procedure.
c. Verify that only approved or qualified welding procedures are used for the work.
d. Verify that the edge preparation or joint geometry meet the requirements of the welding procedure and drawings.
e. Verify that the specified filler metals are used and that filler metals are maintained in proper condition, per requirements, or as recommended by the manufacturer.
f. Verify that the technique and performance of each welder, welding operator, and tack welder are as specified.
g. Verify that the work conforms to requirements of the applicable standards, drawings, or other documents.
h. Verify that the work inspected is identified and documented in accordance with specified requirements.
JEG# WFXO6311 SECTION 33 52 23.15 Page 11
i. Prepare clear and concise reports and verify that records of the results of examinations are maintained.
j. Verify the approved WPS pre-heat and post heat procedures are being used.
3.2.1 Visual Inspection
Weld joints must be inspected visually as follows:
a. Before welding - for compliance with requirements for joint preparation, alignment and fit-up, and cleanliness in accordance with
ASME B31.3 .
b. During welding - for cracks and conformance to the approved welding procedure only when in-process weld quality control is required by
ASME ASME B31.3 .
c. After welding - for cracks, contour and finish, bead reinforcement, undercutting, overlap, weld slag on the interior of the pipe and size of welds in accordance with ASME B31.3 and AWS D1.1/D1.1M . Visual examination of the interior of the pipe may be performed by any of the remote means allowed by ASME BPVC SEC V, visual inspection. Visual examination of the weld must be performed prior to any other NDE examinations as required by this specification.
3.2.2 NDE Testing Frequency
All pipe field welds, including high point vent pipe tees, insert butt welded weld-o-lets, and low point drain pipe, must be examined by radiographic methods to determine conformance to the paragraph ACCEPTANCE STANDARDS. All socket welds and sock-o-lets or weld-o-lets to pipe welds must be examined with either magnetic particle or liquid penetrant methods, in addition to the visual examinations. The services of a qualified commercial or testing laboratory approved by the Contracting Officer must be employed by the Contractor for testing of piping welds.
Costs of testing, including retesting of repaired welds, must be borne by the Contractor.
a. Provide 100 percent radiographic testing, or 100 percent PAUT for all butt welds on piping.
3.2.3 NDE Testing
NDE must be as required by ASME B31.3 and in accordance with written procedures. Procedures for radiographic, liquid penetrant, or magnetic particle or PAUT tests and methods must conform to ASME BPVC SEC V. Only Radiography or PAUT are acceptable test methods for butt welded joints.
Refer to ASTM E2700 for PAUT. The approved procedure must be demonstrated to the satisfaction of the Contracting Officer. In addition to the information required in ASME BPVC SEC V, the written procedures must include the timing of the NDE in relation to the welding operations and safety precautions.
The services of a commercially independent qualified testing agency approved by the Contracting Officer must be employed by the Contractor for testing of piping welds. Costs of testing, including retesting of repaired welds, must be borne by the Contractor. Weld ripples or surface
JEG# WFXO6311 SECTION 33 52 23.15 Page 12 irregularities that might mask or be confused with the radiographic image of any objectionable defect must be removed by grinding orother suitable mechanical means. The weld surface must be merged smoothly with the base metal surface.
3.2.4 Special Requirements for PAUT Testing
Phased array inspection must meet the review requirements of API Std 650 Twelfth Edition, Annex U, Section U5 and the Inspection requirements of ASME Section V 2017.
Calibration standards must meet the requirements of ASME Section V 2017 figure T-434.3-1, T-434.3-2.
The final data package shall be reviewed by a UT Level-III individual qualified in accordance with their employer's written practice.
ASNT SNT-TC-1A or CP-189 shall be used as a guideline. Only Level-II or Level-III personnel shall perform UT examinations, analyze the data, or interpret the result. Alternatively, the review may be achieved by arranging for a data acquisition and initial interpretation by a Level-II individual, and a final interpretation and evaluation shall be performed by a Level-III individual qualified. The review shall include the following:
3.2.4.1 Essential Variables
Essential variables are listed below. Changes in any one of them beyond that allowed in the specification must require procedure requalification.
a. Weld configurations to be examined, including thickness dimensions and base material product form (pipe, plate)
b. The surfaces from which the examination shall be performed Technique(s) Angle(s) and mode(s) of wave propagation in the material
c. Search unit type(s), frequency(ies), and element size(s)/shape(s) element size and number, and pitch and gap dimensions
d. Focal range (identify plane, depth, or sound path)
e. Virtual aperture size (i.e., number of elements, effective height, and element width)
f. Angular range used (i.e., 40 deg. to 50 deg., 50 deg. to 70 deg.)
g. Angle incremental change (i.e., 12 deg , 1 deg.)
h. Element incremental change (i.e., 1,2)
i. Additional S-scan, E-scan requirements Range of element numbers used (i.e., 1-126, 10-50)
j. Scan plan
k. Weld axis reference point marking
l. Rastering angle(s)
m. Aperture start and stop element numbers
JEG# WFXO6311 SECTION 33 52 23.15 Page 13
n. Aperture incremental change(s) (number of elements stepped)
o. Additional S-scan requirements: Sweep angular range(s)
p. Angular sweep increment (incremental angle change, deg)
q. Aperture element numbers (first and last)
r. Calibration (calibration blocks and techniques)
s. Scanning technique (automated vs. semi-automated)
t. Scanner adhering and guiding mechanism
u. Method for discriminating geometric from flaw indications
v. Method for sizing indications
w. Computer enhanced data acquisition, when used Scan overlap
x. Computer software revision
y. Personnel performance requirements, Personnel qualification requirements
z. Surface condition (examination surface, calibration block)
3.2.4.2 Non-Essential Variables
a. Couplant: brand name or type
b. Post-examination cleaning technique
c. Automatic alarm and recording equipment, when applicable Records, including minimum calibration data to be recorded (e.g., instrument settings)
3.2.5 Inspection and Tests by the Government
The Government may perform inspection and supplemental nondestructive or destructive tests as deemed necessary. The cost of supplemental NDE will be borne by the Government. The correction and repair of defects and the reexamination of weld repairs must be performed by the Contractor at no additional cost to the Government. Inspection and tests will be performed as required for visual inspection and NDE, except that destructive tests may be required also. When destructive tests are ordered by the Contracting Officer and performed by the Contractor and the specimens or other supplemental examinations indicate that the materials and workmanship do not conform to the contract requirements, the cost of the tests, corrections, and repairs must be borne by the Contractor. When the specimens or other supplemental examinations of destructive tests indicate that materials or workmanship do conform to the specification requirements, the cost of the tests and repairs will be borne by the Government. When destructive tests are made, repairs must be made by qualified welders or welding operators using welding procedures which will develop the full strength of the members cut. Welding must be subject to inspection and tests in the mill, shop, and field. When materials or workmanship do not conform to the specification requirements, the work may
JEG# WFXO6311 SECTION 33 52 23.15 Page 14 be rejected at any time before final acceptance of the system containing the weldment.
3.3 ACCEPTANCE STANDARDS
Interpretation of test results and limitations on imperfections in welds f or bot h r adi ogr aphy and phased ar r ay ul t r asoni c i nspect i on must comply with the requirements of 100 percent radiography, per ASME B31.3 , paragraph 341.3.2, Chapter VI. For hydrant systems and stainless steel systems the evaluation must be based on severe cyclic conditions in addition to the following-specified items.
3.3.1 Visual
The following indications are unacceptable:
Weld Slag on the interior of the pipe.
3.3.2 Magnetic Particle Examination
The following relevant indications are unacceptable:
a. Any linear indications.
b. Rounded indications with dimensions greater than 5 mm.
c. Four or more rounded indications in a line separated by 2 mm or less edge-to-edge.
d. Ten or more rounded indications in any 3870 square mm of surface with the major dimension of this area not to exceed 150 mm with the area taken in the most unfavorable location relative to the indications being evaluated.
3.3.3 Liquid Penetrant Examination
Indications with major dimensions greater than 2 mm must be considered relevant. The following relevant indications are unacceptable:
a. Any cracks or linear indications.
b. Rounded indications with dimensions greater than 5 mm.
c. Four or more rounded indications in a line separated by 2 mm or less edge-to-edge.
d. Ten or more rounded indications in any 3870 square mm of surface with the major dimension of this area not to exceed 150 mm with the area taken in the most unfavorable location relative to the indications being evaluated.
3.4 CORRECTIONS AND REPAIRS
Disqualifying defects must be removed and repaired as specified in ASME B31.3 unless otherwise specified. Disqualifying defects discovered between weld passes must be repaired before additional weld material is deposited. After defect removal is complete and before rewelding, the area must be examined by the same test method which first revealed the defect to ensure that the defect has been eliminated. After rewelding, JEG# WFXO6311 SECTION 33 52 23.15 Page 15 the repaired area must be reexamined by the same test method originally used for that area. Any indication of a defect must be regarded as a defect unless reevaluation by NDE or by surface conditioning shows that no disqualifying defects are present.
3.4.1 Defect Removal
Defective or unsound weld joints must be corrected by removing and replacing the entire weld joint, or for the following defects corrections must be made as follows:
a. Excessive Convexity and Overlap: Reduce by removal of excess metal.
b. Excessive Concavity of Weld, Undersized Welds, Undercutting: Clean and deposit additional weld metal.
c. Excessive Weld Porosity, Inclusions, Lack of Fusion, Incomplete Penetration: Remove defective portions and reweld.
d. Cracks or liner indications in Weld or Base Metal: Remove crack throughout its length, including sound weld metal for a distance of twice the thickness of the base metal or two inches, whichever is less, beyond each end of the crack, followed by the required rewelding. Complete removal must be confirmed by magnetic particle inspection for carbon steel or liquid penetrant inspection for stainless steel. Inspection procedures must comply with the requirements of ASME B31.3 .
e. Poor Fit-Up: Cut apart improperly fitted parts, and reweld.
3.4.1.1 Methods of Defect Removal
The removal of weld metal or portions of the base metal must be done preferably by chipping, grinding, sawing, machining, or other mechanical means. Defects also may be removed by thermal cutting techniques. If thermal cutting techniques are used, the cut surfaces must be cleaned and smoothed by mechanical means to remove the heat affected zone. In addition, a maximum of 3 mm of metal must be removed by mechanical means from the cut surfaces of stainless steel.
Wherever a defect is removed, and repair by welding is not required, the affected area must be blended into the surrounding surface eliminating sharp notches, crevices, or corners.
3.4.1.2 Rewelding
Repair welds must be made using an electrode or filler wire smaller than that used in making the original weld. Rewelding must be done using qualified welding procedures. The surface must be cleaned before rewelding. Repair welds must meet the requirements of this specification.
3.4.1.3 Peening or Caulking
The use of force (peening) or foreign materials to mask, fill in, seal, or disguise any welding defects must not be permitted.
3.5 MAINTAINING CLEANLINESS OF PIPING
The Contractor must keep the interior and ends of all new piping affected
JEG# WFXO6311 SECTION 33 52 23.15 Page 16 by the Contractor's operations thoroughly cleaned of foreign matter and water before and after being installed. Piping systems must be kept clean during installation by means of plugs or other approved methods. When work is not in progress, open ends of piping and fittings must be closed so that no water or other foreign substance will enter the pipes or fittings. Piping must be inspected before placing into position. The interior of each length of pipe must be cleaned after welding; A swab, with a leather or canvas belt disc to fit the inside diameter of pipe, must be pulled through each length of pipe after welding in place. It must be the Contractor's responsibility for insuring that the interior of the piping is free of foreign matter including weld slag when it is connected into the system.
-- End of Section --
JEG# WFXO6311 SECTION 33 52 23.15 Page 17
THIS PAGE INTENTIONALLY LEFT BLANK
JEG# WFXO6311 SECTION 33 52 23.15 Page 18
SECTION 33 52 43.13
AVIATION FUEL PIPING
08/18
Amendment No. 07
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN PETROLEUM INSTITUTE (API)
API RP 1110 (2013; R 2018) Recommended Practice for the Pressure Testing of Steel Pipelines for the Transportation of Gas, Petroleum Gas, Hazardous Liquids, Highly Volatile Liquids, or Carbon Dioxide
API STD 600 (2015) Steel Gate Valves-Flanged and Butt-welding Ends, Bolted Bonnets
API STD 608 (2012) Metal Ball Valves - Flanged, Threaded, And Welding End
API Spec 6D (June 2018, 4th Ed; Errata 1 July 2018;
Errata 2 August 2018) Specification for Pipeline and Piping Valves
API Std 607 (2016) Fire Test for Quarter-turn Valves and Valves Equipped with Non-metallic Seats
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C209 (2013) Cold-Applied Tape Coatings for the Exterior of Special Sections, Connections and Fitting for Steel Water Pipelines
AWWA C215 (2016) Extruded Polyolefin Coatings for Steel Water Pipe
AMERICAN WELDING SOCIETY (AWS)
AWS A5.9/A5.9M (2017) Welding Consumables-Wire Electrodes, Strip Electrodes, Wires, and Rods for Arc Welding of Stainless and Heat Resisting Steels- Classification
ASME INTERNATIONAL (ASME)
ASME B1.1 (2003; R 2018) Unified Inch Screw Threads (UN and UNR Thread Form)
JEG# WFXO6311 SECTION 33 52 43.13 Page 1
ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded
ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges
ASME B16.5 (2017) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings
ASME B18.2.1 (2012; Errata 2013) Square and Hex Bolts and Screws (Inch Series)
ASME B18.2.2 (2015) Nuts for General Applications:
Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)
ASME B31.3 (2016) Process Piping
ASTM INTERNATIONAL (ASTM)
ASTM A182/A182M (2018) Standard Specification for Forged or Rolled Alloy and Stainless Steel Pipe Flanges, Forged Fittings, and Valves and Parts for High-Temperature Service
ASTM A193/A193M (2017) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A194/A194M (2018) Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both
ASTM A269/A269M (2015a) Standard Specification for Seamless and Welded Austenitic Stainless Steel Tubing for General Service
ASTM A312/A312M (2017) Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes
ASTM A358/A358M (2015) Standard Specification for Electric-Fusion-Welded Austenitic Chromium-Nickel Stainless Steel Pipe for High-Temperature Service and General Applications
ASTM A403/A403M (2018a) Standard Specification for Wrought Austenitic Stainless Steel Piping Fittings
ASTM A436 (1984; R 2015) Standard Specification for Austenitic Gray Iron Castings
ASTM A961/A961M (2016a) Standard Specification for Common
JEG# WFXO6311 SECTION 33 52 43.13 Page 2
Requirements for Steel Flanges, Forged Fittings, Valves, and Parts for Piping Applications
ASTM D229 (2013) Rigid Sheet and Plate Materials Used for Electrical Insulation
ASTM D3276 (2015; E 2016) Standard Guide for Painting Inspectors (Metal Substrates)
AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)
AWWA C225 ( 2007) Fused Pol yol ef i n Coat i ng Syst ems f or t he Ext er i or of St eel Wat er Pi pel i nes
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C62.41 (1991; R 1995) Recommended Practice on Surge Voltages in Low-Voltage AC Power Circuits
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 9001 (2008; Corr 1 2009) Quality Management Systems- Requirements
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-58 (2009) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 30 (2018) Flammable and Combustible Liquids Code
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC SP 1 (2015) Solvent Cleaning
SSPC QP 1 (2019) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
SSPC QP 3 (2010) Standard Procedure for Evaluating Qualifications of Shop Painting Applicators
SSPC QP 5 (2012) Standard Procedure for Evaluating the Qualifications of Coating and Lining Inspection Companies
SSPC QS 1 (2015) Standard Procedure for Evaluating a Contractor's Advanced Quality Management System
JEG# WFXO6311 SECTION 33 52 43.13 Page 3
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J514 (2012) Hydraulic Tube Fittings
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 1110-1-8167 (2016) Petroleum, Oil, And Lubricants Mandatory Center Of Expertise
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-161 (2005; Rev G; Notice 1 2010) Identification Methods for Bulk Petroleum Products Systems Including Hydrocarbon Missile Fuels
1.2 ADMINISTRATIVE REQUIREMENTS
Design conditions must be as specified in Section 33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT. Submit Operation and Maintenance Manuals for the equipment items or systems listed below. Refer to Section 01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL SYSTEMS for the information to be submitted for various type of equipment and systems.
Manual Valves Protective Coatings Sample Connections Isolating Gasket Kits Gaskets
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval and must be submitted for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Video Inspection Work Plan; G
Contractor Qualifications; G
Coating Work Plan; G
SD-03 Product Data
Stainless Steel Piping; G
Protective Coatings for Buried Stainless Steel Piping; G
Fittings; G
Isolating Gasket Kits; G
Flange Protectors; G
JEG# WFXO6311 SECTION 33 52 43.13 Page 4
Lightning Surge Arrester; G
Nuts and Bolts
Gaskets
Ball Valves; G
Plug (Double Block and Bleed) Valves; G
Swing Check Valves; G
SD-05 Design Data
Pipeline Inventory; G
SD-06 Test Reports
Pneumatic Test
Hydrostatic Test
Video Inspection Report; G
Testing Of Shop-Applied External Pipe Coating
Testing Of Field-Applied External Pipe Coating
SD-07 Certificates
Stainless Steel Piping
Protective Coatings for Buried Stainless Steel Piping
Fittings
Isolating Gasket Kits
Lightning Surge Arrester
Nuts and Bolts
Gaskets
Ball Valves
Plug (Double Block and Bleed) Valves
Survey Final Elevations
Pipeline Pigging Verification; G
Qualifications Of Pipe Coating Shop; G
Qualifications Of Coating Contractors For Field Coating; G
Qualifications Of Coating Inspection Company For Field Coating; G
Qualifications Of Coating Inspector For Field Coating; G
JEG# WFXO6311 SECTION 33 52 43.13 Page 5
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G
SD-11 Closeout Submittals
Certification Of The Entire System
1.4 QUALITY ASSURANCE
1.4.1 Design Data
1.4.1.1 Pipeline Inventory
Fuel system volume must be calculated using as constructed pipe lengths, internal diameters, fittings, and components. Totals must be provided for all items containing fuel with the exception of tanks which is covered by other specifications. A detailed list with sizes, lengths, quantity, and volumes must be provided for hydrant loop, etc.
1.4.2 Contractor Qualifications
Aviation fuel system Installation Contractor must be the Prime Contractor or first-tier subcontractor and have successfully completed at least 3 aviation fuel system projects of the same scope and the same size or larger within the last 6 years. Installation Contractor shall demonstrate specific installation experience in regard to the specific system installation to be performed. Installation Contractor shall have taken, if applicable, manufacturer's training courses on the installation of piping and shall meet the licensing requirements of the local jurisdiction.
Submit a letter listing prior projects, the date of construction, a point of contact for each prior project, the scope of work of each prior project, and a detailed list of work performed. Provide in the letter evidence of prior manufacturer's training and applicable licensing.
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
Pipe and fittings in contact with fuel must be stainless steel as indicated on the drawings.
This is the start of the file's text. The full file is on GovTribe.