20R1313-AMD2 Dwgs.pdf
PDF 361 KB Posted
- Solicitation number
- N6274220R1313
About this file
This document package includes a construction phasing plan and related federal contract solicitation. The construction phasing plan outlines safety and operational requirements for airport development work at Tinian International Airport in the Commonwealth of the Northern Mariana Islands. The four-year project involves demolition, grading, drainage, fencing and road construction. Strict protocols are established for working in and around the airport operations area, including coordination meetings, inspection requirements and protections for runways and taxiways.
The related federal contract solicitation seeks bids for the airport development work described in the phasing plan, as well as an optional parking apron and taxiways. The solicitation was issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy. The work includes site preparation, utilities, demolition, environmental remediation and airfield pavements to develop a usable site for military air access. Bids are due within the timeframe specified in the solicitation document. The optional parking apron and taxiways are priced separately and may be exercised by the government within 360 days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20R1313-Note9.pdf | ||
| 20R1313-AMD10.pdf | ||
| 20R1313-AMD3 Dwgs.pdf | ||
| 20R1313-AMD7 Dwgs.pdf | ||
| 20R1313-AMD8 Dwgs.pdf | ||
| 20R1313-Note8.pdf | ||
| 20R1313-AMD9.pdf | ||
| 20R1313-Note7.pdf | ||
| 20R1313-AMD8.pdf | ||
| 20R1313-Note6.pdf | ||
| 20R1313-Note5.pdf | ||
| 20R1313-AMD7.pdf | ||
| 20R1313-AMD6.pdf | ||
| 20R1313-SV Sign-In.pdf | ||
| 20R1313-Note4.pdf | ||
| 20R1313-AMD5.pdf | ||
| 20R1313-AMD4.pdf | ||
| 20R1313-Note3.pdf | ||
| 20R1313-AMD3.pdf | ||
| 20R1313-Note2.pdf | ||
| 20R1313-Note1.pdf | ||
| 20R1313-AMD2.pdf | ||
| 20R1313_AMD1.pdf | ||
| 20R1313_Specs_PARTA.pdf | ||
| 20R1313_P9021Dwgs.pdf | ||
| 20R1313_Specs_PARTB.pdf | ||
| 20R1313_P9022Dwgs.pdf | ||
| 20R1313-RFP.pdf | ||
| 20R1313_Specs_PARTC.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KHK SMC JDE
1 2 3 4 5
D
C
B
A
1 2 3 4 5
TI
N
IA
N
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (T
IQ
TI
N
IA
N
, C N
M I
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AS SHOWN
1607709
N
AV
FA
C
P
AC
IF
IC
FI
N
AL
D
ES
IG
N
TEXAS REGISTERED ENGINEERING FIRM F-2966
D
C
B
A
DRAWFORM REVISION: 30 APR 2015
FY
M C
AF
P
-9
AP
SI
A
IR
FI
EL
D D
EV
EL
O
PM
EN
T
PH
AS
E
COORDINATION
PROGRESS MEETINGS:
1. THE CONTRACTOR WILL BE REQUIRED TO HOLD WEEKLY MEETINGS THROUGHOUT
THE DURATION OF THE PROJECT. OPERATIONAL SAFETY MUST BE A STANDING
AGENDA ITEM FOR DISCUSSION DURING THE PROGRESS MEETINGS. ATTENDEES
MUST INCLUDE CONTRACTOR, CONTRACTING OFFICER, CPA REPRESENTATIVE, AND
OTHER AGENCIES AS NEEDED (BECQ, CUC, DPW FIRE DEPARTMENT).
SCOPE OR SCHEDULE CHANGES:
1. CHANGES IN SCOPE OR DURATION AT ANY POINT OF THE PROJECT MAY REQUIRE
REVISIONS TO THE CSPP AND REVIEW AND APPROVAL BY CPA (AIRPORT) AND FAA
ADO HNL.
PHASE I WORK:
1. DEMOLITION OF EXISTING TREES AND GRAVEL ROADWAYS.
2. GRADING INSIDE AND AROUND THE AOA, DRAINAGE WORK AND INSTALLATION
OF NEW SEGMENTS OF AIRPORT FENCE AND ACCESS GATES.
3. ROADWAY DEVELOPMENT INCLUDING THE REHABILITATION (ASPHALT PAVEMENT)
OF THE ROUTE FROM TINIAN HARBOR TO THE AIRPORT CONSISTING OF 8TH AVE.
(ASPHALT PAVED ROAD AND GRAVEL ACCES ROAD, 1.6 KILOMETERS LONG), 42ND
STREET (7.3 METERS WIDE, 2 KILOMETERS LONG), BROADWAY AVE.(REHABILITATION
FOR SOUTHBOUND LANE AND MILL AND RESURFACE FOR NORTHBOUND LANE, EACH
LANE IS 4.57 METERS WIDE WITH A MEDIAN SEPARATING THEM, 2.6 KILOMETERS
LONG) AND THE AIRPORT ACCESS ROAD (7.2 METERS WIDE, 2KILOMETERS LONG)
AS WELL AS SIGNAGE, MARKINGS AND UTILITIES TO ACCOMPANY THE ROAD AS
WELL AS A GATE FOR AIRPORT ACCESS.
RESTRICTIONS:
1. PHASE I WORK IS ANTICIPATED TO TAKE PLACE OVER A FOUR-YEAR TIMEFRAME.
2. FOR ALL WORK WITHIN THE AOA, ALL REQUIREMENTS FOR AOA ACCESS AND
WORK APPLY. CONTRACTOR MUST INSTALL PERMANENT AOA FENCE AND PASS
INSPECTION PRIOR TO REMOVAL OF EXISTING AOA FENCE. WORK OCCURS
OUTSIDE OF RUNWAY 8-26 ROFA AND WILL NOT REQUIRE RUNWAY 8-26 CLOSURE
DURING CONSTRUCTON.
AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY
IDENTIFICATION OF EFFECTED AREAS:
1. CONSTRUCTION IN THE AOA WILL OCCUR AS SHOWN ON THE PHASE DRAWING,
G-102. WORK IS OUTSIDE OF THE RSA, ROFA, TSA AND TOFA.
MITIGATION OF EFFECTS:
1. SOME CONSTRUCTION WILL REQUIRE AOA ACCESS, ALL REQUIREMENTS FOR
AOA ACCESS AND WORK APPLY. WORK WILL REMAIN CLEAR OF RSA, ROFA, TSA.
AND TOFA.
NAVIGATION AID (NAVAID) PROTECTION:
1. NOT APPLICABLE.
CONTRACTOR ACCESS
ACCESS AND STAGING AREAS:
1. CONTRACTOR ACCESS ROUTES AND STAGING AREA ARE SHOWN ON SHEET G-100
ON THE HAUL ROUTE AND LOCATION MAP.
VEHICLE AND PEDESTRIAN OPERATIONS:
1. CONTRACTOR PERSONNEL REQUIRING AOA ACCESS MUST COMPLY WITH THE
AIRPORT'S BADGING PROCEDURES.
2. INDIVIDUALS IDENTIFIED BY THE CONTRACTOR TO WORK WITHIN THE AOA MUST
UNDERGO TRAINING TO COMPLY WITH THE AIRPORT'S RULES FOR GROUND
VEHICLE OPERATIONS AND WILL BE RESPONSIBLE FOR MAINTAINING COMPLIANCE.
3. ENTRY GATES MUST BE LOCKED AT ALL TIMES. IN THE EVENT THAT THE GATES
MUST BE OPENED FOR AN EXTENDED PERIOD OF TIME, THE GATES MUST BE
MANNED.
4. THE CONTRACTOR MUST PROVIDE AN ESCORT BE PERSONNEL TRAINED BY THE
AIRPORT FOR ALL VEHICLES REQUIRING ACCESS TO THE AOA.
5. THE CONTRACTOR'S PERSONNEL AND EQUIPMENT MUST STAY WITHIN THE
INDICATED STAGING AREA, HAUL ROUTE(S), AND WORK LOCATION IDENTIFIED..
6. THE CONTRACTOR MUST MAINTAIN CONTROL OF ALL PERSONNEL AND
EQUIPMENT TO PREVENT UNAUTHORIZED ENTRY OF PERSONS OR VEHICLES
FROM ENTERING THE AOA.
7. THE CONTRACTOR'S VEHICLES MUST BE MARKED AND LIGHTED IN ACCORDANCE
WITH FAA AC 150/5370-2 AND 150/5210-5 (LATEST EDITION) AT ALL TIMES WHILE
ON THE PROJECT SITE. THIS MUST INCLUDE A FLAG ON A STAFF ATTACHED TO
THE VEHICLE SO THAT THE FLAG WILL BE READILY VISIBLE. THE FLAG MUST BE
AT LEAST A (0.9 METER BY 0.9 METER) SQUARE HAVING A CHECKERED PATTERN
OF INTERNATIONAL ORANGE AND WHITE SQUARES AT LEAST 300 MM ON EACH
SIDE. CONSTRUCTION VEHICLES MUST BE EQUIPPED WITH A YELLOW FLASHING
LIGHT MEETING THE REQUIREMENTS OF FAA AC 150/5210-5D DURING PERIODS
OF LOW VISIBILITY AS DETERMINED BY THE CONTRACTING OFFICER.
RADIO COMMUNICATIONS:
1. WHEN WORKING WITHIN THE AOA, BADGED AND TRAINED INDIVIDUALS ARE
RESPONSIBLE FOR MONITORING THE AIRPORT'S COMMON TRAFFIC ADVISORY
FREQUENCY (CTAF) 123.6 MHZ. THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING
AN ADEQUATE NUMBER OF RADIOS FOR HIS PERSONNEL.
WILDLIFE MANAGEMENT:
1. CONTRACTOR MUST CAREFULLY CONTROL AND CONTINUOUSLY REMOVE TRASH,
WASTE, OR LOOSE MATERIALS THAT MAY ATTRACT WILDLIFE.
2. IF STOCKPILES OR STORED MATERIALS ARE FOUND TO BE A WILDLIFE ATTRACTANT,
THE CONTRACTOR MUST IMPLEMENT MITIGATION MEASURES AS DIRECTED BY THE
CONTRACTING OFFICER.
3. THE CONSTRUCTION SITE MUST BE GRADED TO MAINTAIN POSITIVE DRAINAGE
ALWAYS TO ELIMINATE AREAS OF STANDING WATER.
4. CONTRACTOR IS RESPONSIBLE FOR MOWING WITHIN THE PROJECT WORK LIMITS.
GRASS MUST NOT EXCEED 15 CM IN HEIGHT.
5. CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL FENCES AND GATES
INSTALLED AS PART OF THEIR CONTRACT, IN SUFFICIENTLY GOOD CONDITION TO
PREVENT PASSAGE OF WILDLIFE INTO THE AOA.
6. CONTRACTOR WILL MONITOR FOR ANY DISRUPTIONS OF EXISTING WILDLIFE HABITAT
THAT TAKES PLACE.
7. CONTRACTOR TO CONTINUOUSLY MONITOR THE TEMPORARY AOA FENCE FOR
POTENTIAL ENTRY POINTS FOR WILDLIFE.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT:
1. THE PERIMETER OF THE CONSTRUCTION SITE AND ALL HAUL ROUTES MUST BE
CONTINUOUSLY MONITORED BY THE CONTRACTOR TO ENSURE THE TEMPORARY
BARRICADES ARE PER PLAN AND TO ENSURE NO FOD HAZARD IS PRESENT.
2. FOD SIGNS MUST BE INSTALLED AT CONSTRUCTION AIRFIELD POINTS OF ENTRY
WHEN VEHICULAR TRAFFIC IS NEAR AND WILL BE ENTERING THE AIRFIELD.
3. A FOD CHECK MUST BE PERFORMED ON ALL VEHICLES ENTERING ACTIVE AIRFIELD
PAVEMENTS. DRIVERS WILL BE RESPONSIBLE FOR A VISUAL INSPECTION OF ALL
TIRES AND FOR REMOVING MUD AND OTHER DEBRIS PRIOR TO PROCEEDING ON
ACTIVE PAVEMENT.
4. CONTRACTOR IS RESPONSIBLE FOR THE EFFORT AND COST OF IMMEDIATE CLEANING
OF PAVEMENT WHERE EQUIPMENT CROSSES ACTIVE PAVEMENTS. THE CONTRACTOR
MUST USE A POWER SWEEPER TO CONTINUOUSLY MAINTAIN A FOD FREE
ENVIRONMENT.
5. WATER SHALL BE USED AS A DUST CONTROL MEASURE AS NEEDED OR AS DIRECTED
BY THE CONTRACTING OFFICER. IF, IN THE OPINION OF THE CONTRACTING OFFICER
OR THE AIRPORT, DUST FROM CONSTRUCTION ACTIVITIES CREATES A NUISANCE OR
LIMITED VISIBILITY CONDITION FOR OPERATIONS, CONSTRUCTION ACTIVITY WILL
CEASE UNTIL THE DUST HAS BEEN MITIGATED BY SPRINKLING ACTIVITIES TO THE
SATISFACTION OF THE CONTRACTING OFFICER OR AIRPORT. TIME LOST DUE TO
WORK STOPPAGE FOR THIS ACTIVITY WILL NOT CONSTITUTE AN EXTENSION
OF CONTRACT TIME.
HAZMAT MANAGEMENT:
1. THE CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER MANAGEMENT
PROCEDURES FOR FUEL DELIVERIES, EQUIPMENT FUELING, AND SPILL RECOVERY
PROCEDURES PRIOR TO WORK BEGINNING ON THE PROJECT.
NOTIFICATION OF CONSTRUCTION ACTIVITIES
A LIST OF RESPONSIBLE REPRESENTATIVES/POINTS OF CONTACT:
TINIAN AIRPORT:
OPERATIONS: ANTONIO L. BORJA 1(670) 433-9294
DISPATCH: AIRPORT ADVISORY STATION 1(670) 433-9295
CONTRACTOR:
PROJ. MANAGER: TBD PHONE NUMBER
PROJ. FOREMAN: TBD PHONE NUMBER
SAFETY OFFICER: TBD PHONE NUMBER
NOTICE TO AIRMEN (NOTAM):
PRIMARY: ANTONIO L. BORJA 1(670) 433-9294
SECONDARY: NATASHA MORGAN 1(670) 433-9295
EMERGENCY NOTIFICATION PROCEDURES:
PRIMARY: ANTONIO L. BORJA 1(670) 433-9294
SECONDARY: GERALD CRISOSTOMO 1(670) 433-9294
COORDINATION WITH ARFF PERSONNEL:
PRIMARY: ASST. CHIEF JOHN MITHNOY 1(670) 433-9303
SECONDARY: CAPTAIN JOHN BARCINAS 1(670) 433-9296
NOTIFICATION TO THE FAA:
PRIMARY: RONSON FOX (808) 312-6034
SECONDARY: WILLIAM BROWN (808) 312-6034
INSPECTION REQUIREMENTS:
1. THE CONTRACTING OFFICER, TINIAN AIRPORT OPERATIONS AND
CONTRACTOR'S SAFETY OFFICER MUST CONDUCT DAILY INSPECTIONS
OF THE PROJECT SITE TO ENSURE ALL SAFETY REQUIREMENTS IN THE
CONTRACT DOCUMENTS ARE MET.
2. PROJECT AREAS TO BE RE-OPENED AFTER A CLOSURE MUST BE
INSPECTED AND APPROVED BY THE CONTRACTING OFFICER AND
TINIAN AIRPORT OPERATIONS PRIOR TO RE-OPENING.
3. A FINAL INSPECTION FOR EACH PHASE MUST INCLUDE THE
CONTRACTING OFFICER, TINIAN AIRPORT OPERATIONS AND
CONTRACTOR'S SAFETY OFFICER AND MUST BE SCHEDULED WITH
7 DAYS' NOTICE.
4. CPA FLIGHT SERVICE MUST BE NOTIFIED AND ALLOWED TO
PARTICIPATE IN INSPECTION ACTIVITIES AS THEY DEEM APPROPRIATE.
5. ANY PART 139 DEFICIENCIES REQUIRE IMMEDIATE ATTENTION
WHETHER CAUSED BY NEGLIGENCE, OVERSIGHT, OR PROJECT SCOPE
CHANGE.
UNDERGROUND UTILITIES:
1. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA
FLIGHT SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF
LOCATING AND IDENTIFYING ALL UNDERGROUND UTILITIES IN THE
PROJECT WORK AREAS IF EXCAVATION IS NECESSARY.
2. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA
FLIGHT SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF
PROTECTING ALL UNDERGROUND UTILITIES IN THE PROJECT WORK
AREAS.
3. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA
FLIGHT SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF
PROTECTING THE FAA BACKUP EMERGENCY COMMUNICATIONS
SYSTEM (BUEC) LOCATED NEAR THE ARFF STATION. THE BUEC
SYSTEM COMMUNICATES WITH SAIPAN TOWER AND THE ELECTRONIC
SIGNAL MUST BE PRESERVED.
4. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA
FLIGHT SERVICE AND TINIAN AIRPORT OPERATIONS, MEANS OF
REPORTING AND REPAIRING ALL UNDERGROUND UTILITY DAMAGES IN
PROJECT WORK AREAS.
5. CONTRACTOR MUST PROVIDE TO THE CONTRACTING OFFICER, CPA
FLIGHT SERVICE, AND TINIAN AIRPORT OPERATIONS, UTILITY OWNER
AND EMERGENCY CONTACT INFORMATION PRIOR TO STARTING ANY
EXCAVATION.
PENALTIES FOR VIOLATIONS:
1. 1ST OFFENSE: WRITTEN WARNING OF VIOLATION.
2. 2ND OFFENSE: 30-DAY SUSPENSION OF MOVEMENT AREA PRIVILEGES.
3. 3RD OFFENSE: PERMANENT REVOCATION OF MOVEMENT AREA
PRIVILEGES.
SPECIAL CONDITIONS:
1. NOT APPLICABLE.
RUNWAY AND TAXIWAY VISUAL AIDS:
1. NOT APPLICABLE.
MARKING AND SIGNS FOR ACCESS ROUTES:
1. ACCESS ROUTES ARE LIMITED TO HAUL ROUTES DESIGNATED IN THE
PHASED AREAS OF CONSTRUCTION.
2. APPROPRIATE MARKING AND SIGNAGE SHALL BE REVIEWED BY THE
AIRPORT PRIOR TO ANY WORK IN THE PHASED AREA BEGINS.
3. APPROPRIATE LIGHTING WILL BE REQUIRED IF THE CONTRACTOR
INTENDS ON WORKING DURING NIGHTTIME HOURS.
HAZARD MARKING AND LIGHTING:
1. DESCRIPTION - LIGHTED BARRICADES MUST BE UTILIZED TO DENOTE
HAZARDS, CLOSED AREAS, OPEN EXCAVATIONS, AND DELINEATE WORK
AREAS, RE: G-102.
2. LOCATIONS - SEE CONSTRUCTION PHASING PLAN SHEET G-102 FOR
LOCATIONS.
3. MAINTENANCE - CONTRACTOR IS RESPONSIBLE FOR DAILY INSPECTIONS
AND MAINTENANCE OF ALL HAZARD MARKING AND LIGHTING
APPURTENANCES.
4. RESPONSIBLE INDIVIDUAL - THE CONTRACTOR'S SAFETY OFFICER AS
IDENTIFIED IN SECTION 8 MUST BE RESPONSIBLE FOR ALL HAZARD
MARKING AND LIGHTING.
WORK ZONE LIGHTING FOR NIGHTTIME CONSTRUCTION:
1. IF THE CONTRACTOR ANTICIPATES WORKING DURING NIGHTTIME
HOURS, THE CONTRACTOR MUST PROVIDE TO THE CONTRACTING
OFFICER A LIGHTING PLAN 10 DAYS PRIOR TO COMMENCING WORK AT
NIGHT. LIGHTING MUST BE PLACED IN A MANNER TO NOT CREATE A
SAFETY HAZARD TO AIRCRAFT IN TAXI OR IN FLIGHT.
PROTECTION OF RUNWAY AND TAXIWAY SAFETY AREAS:
1. RUNWAY SAFETY AREA (RSA) - NO CONSTRUCTION MUST OCCUR
WITHIN THE RUNWAY 8-26 RSA. CONSTRUCTION FLAGS MAY BE PLACED
AT 30-METER INTERVALS TO VISUALLY SHOW THE RSA LIMITS.
2. RUNWAY OBJECT FEE AREA (ROFA) - CONSTRUCTION MAY OCCUR WITHIN
THE RUNWAY 8-26 OFA WHILE THE RUNWAY IS OPERATIONAL.
CONSTRUCTION EQUIPMENT, HOWEVER, MUST BE REMOVED FROM THE
ROFA WHEN NOT IN USE AND MATERIAL MUST NOT BE STOCKPILED IN
THE ROFA. THIS PROJECT PLACES THE LIMIT OF CONSTRUCTION AT THE
ROFA BOUNDARY TO MITIGATE POTENTIAL PENETRATIONS INTO THE RSA
DURING CONSTRUCTION.
3. TAXIWAY SAFETY AREA (TSA) -CONSTRUCTION ACTIVITIES WITHIN THE
TSA MUST NOT OCCUR UNLESS THE TAXIWAY IS CLOSED TO AIRCRAFT
OPERATIONS.
4. TAXIWAY OBJECT FREE AREA (TOFA) - CONSTRUCTION ACTIVITIES WITHIN
THE TOFA MUST NOT OCCUR UNLESS THE TAXIWAY IS CLOSED TO
AIRCRAFT OPERATIONS.
5. OBSTACLE FREE ZONE (OFZ) - CONSTRUCTION PERSONNEL, EQUIPMENT,
AND MATERIAL MAY NOT PENETRATE THE OFZ WHILE THE RUNWAY IS
OPERATIONAL.
6. RUNWAY APPROACH / DEPARTURE SURFACES - ALL CONSTRUCTION
PERSONNEL, EQUIPMENT, AND MATERIAL MUST REMAIN CLEAR OF THE
THRESHOLD SITING SURFACES.
OTHER LIMITATIONS ON CONSTRUCTION:
1. THE CONTRACTOR MUST MAINTAIN THE AIRFIELD SECURITY 24 HOURS
A DAY. THE NEW AIRFIELD PERIMETER FENCE MUST BE INSTALLED AND
APPROVED BY CPA BEFORE THE EXISTING AIRFIELD FENCE IS REMOVED.
THE CONTRACTOR MUST PROVIDE SECURITY GUARDS AT ANY GATES
THAT THE CONTRACTOR USES. GATES MUST BE LOCKED WHEN
NOT MANNED.
2. THE CONTRACTOR MUST REFERENCE THE DRAFT CONSTRUCTION
SAFETY AND PHASING PLANS (CSPP) IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR IS REQUIRED TO PREPARE AND SUBMIT A SAFETY
PLAN COMPLIANCE DOCUMENT (SPCD) THAT MEETS FAA ADVISORY
CIRCULAR 150/5370-2 REQUIREMENTS AND DETAILS HOW THE
CONTRACTOR WILL COMPLY WITH THE CSPP. THE CONTRACTOR IS
REQUIRED TO SUBMIT THE SPCD TO THE CONTRACTING OFFICER, CPA
FLIGHT SERVICE, AND AIRPORT OPERATIONS FOR APPROVAL PRIOR TO
THE START OF CONSTRUCTION ACTIVITIES.
G-101
C O
N
ST
R U
C
TI
O N
P H
AS
IN
G N
O
TE
S
17247472
05-21-20200 2
06/04/2020
Mark Petersen Dated: 26 May 2020
JC
K. YOSHIMOTO
KY
RM
EVAN MIZUE
ROADWAY DEVELOPMENT INCLUDING THE RELOCATION OF 8TH AVE. (GRAVEL ACCES
ROAD 4 METERS WIDE, 800 METERS LONG) AND THE AIRPORT ACCESS ROAD (7.2
METERS WIDE, 2 KILOMETERS LONG) AS WELL AS SIGNAGE, MARKINGS AND UTILITIES
TO ACCOMPANY THE ROAD AS WELL AS A GATE FOR AIRPORT ACCESS.
A M
EN
D
M
EN
T
J
U N
SS
| 2020-07-01T11:03:13-1000 | |
| EVAN MIZUE | |
| I authorize this document. |
File details come from the government source that posted it. Updated .