F_1502000_Facility_Investment_(190815).pdf
PDF 346 KB Posted
- Attached to
- Operation of Government-Owned Facilities
- Solicitation number
- N6274219R1199
About this file
This document summarizes the key requirements for a federal solicitation seeking base operations support services on the island of Guam. The solicitation involves services such as general management and administration, port operations, ordnance, facility management, utilities, and base vehicles and equipment. The anticipated contract period is one twelve-month base period including a three-month mobilization, followed by six one-year option periods and a final twelve-month period including a four-month demobilization. The pre-proposal conference will be held on July 23, 2019 in Guam, with an accompanying site visit July 23-31, and proposals are due on or after July 5, 2019. The solicitation utilizes a best value source selection considering cost and technical factors such as past performance, experience, management, technical approach, safety, and small business utilization.
F 1502000 Facility Investment (190815)
View the file
Other files
Show 40 more
Latest 50 of 111 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N62742-19-R-1199
Amendment No. 0008
Section F – 1502000 Facilities Investment
DELIVERABLES
Spec Item Additional
Information Deliverable
Title Date(s) of
Submission
Distribution
Frequency Original
Copies (including original)
1502000/ 2.2.1
N/A Certification and Training
Within 30 calendar days after contract start and within four hours of request
KO and
COR
1 Once for initial submittal, then as requested
1502000/ 3.1
See attached Monthly Work Schedule
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.1
See attached Recurring Work Summary Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.1.1
See attached Equipment Discrepancy Report
Within 12 hours if a critical facility/component;
24 hours, all others
KO and
COR
1 As required
1502000/ 3.1.4
N/A Project Plan of Action and Milestone
(POAM)
Five working days prior to scheduled start date
KO and
COR
1 As required
1502000/ 3.1.4
N/A Project Work Order Updates Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.3
N/A IMP
Maintenance Schedule and Repair Status Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.3
N/A Generator Log and Test Result
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.6
N/A Inspection, Testing, and Certification Schedule
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.6
N/A Inspection, Testing, and Certification Summary Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.6
N/A Certification Certificate
Within one working day of work completion
KO and
COR
1 As required
1502000/ 3.6.1
See attached Boiler and
UPV
Inspection, Test, and
Within five working days of work completion
KO and
COR
1 As required
Section F – 1502000 Facilities Investment
DELIVERABLES
Spec Item Additional
Information Deliverable
Title Date(s) of
Submission
Distribution
Frequency Original
Copies (including original)
Certification Report
1502000/ 3.6.2
N/A Backflow Prevention Inspection, Test, and Certification Report
Within five working days of work completion
KO and
COR
1 As required
1502000/ 3.6.3
See attached VTE Inspection, Test, and Certification Report
Within five working days of work completion
KO and
COR
1 As required
1502000/ 3.6.4
N/A Water Testing Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.6.5
See attached Lightning Protection and Grounding Systems Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.6.6
N/A Fire Alarm and Suppression Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.6.7
N/A Radon Testing, Monitoring, and Mitigation Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.6.8
N/A Led Testing Report
By the first working day of each month
KO and
COR
1 Monthly
1502000/ 3.6.9
N/A WHE and trackage certification of load test and condition inspection report
Within five working days of work completion
KO and
COR
1 As required
1502000/ 3.7
N/A Other Recurring Services Program Summary Report
By the first working day of each month
KO and
COR
1 Monthly
Deliverables Form Preparation Instructions
Deliverable Title: 1502000/3.1 – Monthly Work Schedule
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic X Direct System Input
Instructions:
The Contractor shall provide a Monthly Work Schedule for all PM and IMP work.
Deliverable Title: 1502000/3.1 – Recurring Work Summary Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic X Direct System Input
Instructions:
The reports shall include all work performed during the previous month. The reports shall identify the Maximo work request, work order, system, asset, and/or service tags on which the work was performed. The report shall include all pertinent work order information and status, including but not limited to, service request received date, work order approval date, work order completion date, labor, material/equipment, and costs. The report shall include maintenance/repair performed, any other deficiencies noted, cause of failure/repair, missing/mismatched assets with Maximo data, and if the Direct Condition Rating (DCR) and Condition Index was updated.
Deliverable Title: 1502000/3.1.1 – Equipment Discrepancy Report
Form Attachment No.: N/A
Government Approval Required: Yes X No
Media: X Hard Copy X Electronic X Direct System Input
Instructions:
The report shall include information such as:
(1) Work Order #, Description, Dates Started and Completed
(2) Equipment Name, Location, and Asset Number
(3) Discrepancy(ies) found
(4) Work completed on work order
(5) Detailed list of Contractor findings
(6) Contractor’s recommendation for resolution
(7) Cost Estimate for Resolution/Repair
(8) Estimated completion date (ECD)/timeline for repair
(9) Other pertinent information as required (e.g., if a critical facility, etc.)
Deliverable Title: 1502000/3.6.1 – Boiler and UPV Inspection, Test, and Certification Report
Form Attachment No.: J-1502000-XX
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic X Direct System Input
Instructions:
Reports shall be in accordance with MIL-HDBK 1152. Reports shall include record of the condition of the systems, tests performed, status, and issuance of the certification certificates including dates and inspector’s signature. The reports shall identify the Maximo system, asset, and/or service tags on which the work was performed.
Deliverable Title: 1502000/3.6.3 – VTE Inspection, Test, and Certification Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic X Direct System Input
Instructions:
Reports shall be in accordance with MO 118. Reports shall include record of the condition of the systems, tests performed, status, and issuance of the certification certificates including dates and inspector’s signature. The reports shall identify the Maximo system, asset, and/or service tags on which the work was performed.
Deliverable Title: 1502000/3.6.5 – Lightning Protection and Grounding Systems Report
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media: X Hard Copy X Electronic X Direct System Input
Instructions:
Reports shall be in accordance with PACNAVFACENGCOMINST 9633.1. Reports shall include record of the condition of the systems, tests performed, status, and issuance of the certification certificates including dates and inspector’s signature. The reports shall identify the Maximo system, asset, and/or service tags on which the work was performed.