V-22 Pre Solic Conf QAs FINAL v2 (2020-03-09).pdf

PDF 99 KB Posted

Attached to
J015 Maintenance and Repair Service for V-22 Aircraft
Solicitation number
N6264920R0032
Issued by

About this file

This document contains questions and answers from a pre-solicitation conference for a V-22 aircraft maintenance and repair services contract opportunity. The U.S. Navy is seeking maintenance and repair services for 39 V-22 aircraft from 2021 through 2030. The conference provided interested parties an opportunity to ask questions about the forthcoming solicitation requirements. The Navy aims to award contracts to two companies by October 2020, with a 9-month transition period. Proposals must include plans to use only contractor facilities, as the Navy is still evaluating potential government sites but has not committed to providing facilities. The anticipated annual workload estimates provided are subject to change. Each maintenance induction will be competed between awardees as a new task order unless an exception applies.

View the file

Other files

File Type Posted
V-22 ATTACH 07 GFP LIST DRAFT.xlsx XLSX spreadsheet
V-22 ATTACH 01 PWS (2020-04-02).docx DOCX document
N626492R0032 DRAFT RFP v2.docx DOCX document
N626492R0032 DRAFT RFP v2.docx DOCX document
QandA 4.17.20.docx DOCX document
V-22 PreSol Conference Additional QA 3.16.pdf PDF
1. V-22 Pre Solic Conf FRCWP Sched.pdf PDF
V-22 Pre Solic Conf QAs FINAL.pdf PDF
4. DCMA Command Brief V-22.pdf PDF
3. V-22 Pre Sol Conf FLCY PCO Pres.pdf PDF
2. V-22 PSC FRCWP Cmd Brief.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION V-22.pdf PDF
CDRL A009 EXAMINER & EVALUATOR DISCREPANCY REPORT V-22.pdf PDF
CDRL B004 EXCESS MATERIAL REPORT V-22.pdf PDF
V-22 ATTACH 12 Projected Induction Schedule DRAFT.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT V-22.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LISTING V-22.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT V-22.pdf PDF
CDRL D004 TRAINING PLAN_V-22.pdf PDF
V-22 ATTACH 02 GOV REL.docx DOCX document
CDRL A008 SITUATION SUMMARY REPORT V-22.pdf PDF
CDRL A011 WEIGHT AND BALANCE REPORTS V-22.pdf PDF
CDRL A016 PMI MAN-HOURS per MATERIAL COST REPORT V-22.pdf PDF
CDRL B009 DAILY REQUISITION REPORT (DRR) V-22.pdf PDF
V-22 ATTACH 05 Repairable Items DRAFT.docx DOCX document
CDRL B008 ACTIVE ITEM REPORT V-22.pdf PDF
CDRL C001 MEETING MINUTES V-22.pdf PDF
CDRL A006 NOTIFICATION OF AIRCRAFT DELAY V-22.pdf PDF
CDRL B002 AIRCRAFT AWAITING PARTS REPORT (AWP) V-22.pdf PDF
V-22 ATTACH 01 PWS DRAFT.docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REQUIREMENTS 10 DAY REPORT V-22.pdf PDF
CDRL A007 SCHEDULED REMOVAL CARDS V-22.pdf PDF
CDRL A013 NON-DESTRUCTIVE INSPECTION (NDI) REPORT V-22.pdf PDF
CDRL B005 ANNUAL PHYSICAL INVENTORY V-22.pdf PDF
CDRL B003 FINAL MATERIAL CONSUMPTION REPORT V-22.pdf PDF
V-22 ATTACH 14_Price_Summary_Spreadsheet DRAFT.xlsx XLSX spreadsheet
CDRL A014 NOTED AND CORRECTED (NAC) REPORT V-22.pdf PDF
V-22 ATTACH 11 Airfield Requirements DRAFT.docx DOCX document
CDRL D003 TRANSITION INVENTORY PLAN (SHUT-DOWN) V-22.pdf PDF
CDRL A012 Maintenance History Summary (MHS) Report V-22.pdf PDF
CDRL D002 TRANSITION STATUS REPORT V-22.pdf PDF
CDRL A004 DISCREPANT PART ON INDUCTION REPORT V-22.pdf PDF
V-22 ATTACH 08 TEI Process DRAFT.docx DOCX document
CDRL B010 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY RECORD REPORT V-22.pdf PDF
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT Sample Format.docx DOCX document
CDRL B007 RECEIPT REPORT V-22.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE V-22.pdf PDF
V-22 ATTACH 10 Maintenance Facility Req DRAFT.docx DOCX document
CDRL B006 SUPPLY EFFECTIVENESS REPORT V-22.pdf PDF
V-22 ATTACH 03 QASP DRAFT.docx DOCX document
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fleet Logistics Center Yokosuka (FLCY) Fleet Readiness Center Western Pacific (FRCWP)

MV-22 MAC Pre-solicitation Conference Questions & Answers Held 3 March 2020 via telecom

Note: This Q&A should not be construed as a guarantee of the Government’s course of action proceeding with the acquisition. The solicitation will have the finalized criteria and will take precedence in the case of a conflict.

FLCY Procuring Contracting Officer Presentation

One question asked regarding nomenclature – Navy variant is CMV-22.

Defense Contract Management Agency Pacific Presentation

No questions asked.

One-on-One Q&A

1) Q: Does the Government anticipate providing any facilities to support this requirement? Facilities may be a limiting factor.

A: USG is looking at other site locations for potential opportunities. For the purposes of this contract, Camp Kisarazu Hangar K is considered a contractor facility, coordinated between the contractor and Japan Ministry of Defense (JMOD). Individual offerors will need to contact JMOD directly regarding their plans. However, at this time, proposals must be written using only contractor facilities.

2) Q: When does FLCY intend to have the final RFP out?

A: Late March 2020 to mid April 2020

3) Q: A mid to late spring solicitation may challenging. Is there a firm RFP release date?

A: There is no firm date as of now. If the concern is for proposal development timeframes, the RFP will follow a standard 60 day proposal development period.

Additionally, the draft RFP is posted at beta.SAM.gov and is kept as up to date as possible. A final version of the RFP will be released in the late March 2020 to mid-April timeframe.

4) Q: With regard to CMV-22 coming online, is this variation included in the contract?

A: The V-22 anticipated induction schedule in the RFP does include CMV-22 aircraft inductions for Planned Maintenance Interval (PMI).

5) Q: Is the US Government looking to find facilities in Atsugi or Okinawa?

A: Yes, the USG is looking at both of these sites for government facilities compatible with this aircraft. However, at this time, proposals must be written using only contractor facilities.

6) Q: Performance Work Statement (PWS) 5.7, Facilities, states that scheduled and unscheduled requirements will be in either government or contractor facilities. Does the Government anticipate providing facilities to support this requirement?

A: Contractor facility must meet minimum PMI requirements, and be able to fit at least the lowest nominal workload expectation of two (2) V-22 aircraft. The USG is not committing any USG facilities at this time. As such, proposals must be written using only

7) Q: What is the target site of PMI work?

A: Contractor facilities are required for V-22 PMI work. USG is actively, aggressively looking at all potential Government sites, but no commitments for any potential USG sites have been made at this time. For the purposes of this contract, JMOD facilities are considered contractor facility. At this time, proposals must be written using only

8) Q: Awarding Target, will the Base Year 1 begin 1 OCT 2020?

A: This is the goal; however, is subject to change.

9) Q: What transition period is included in the contract? Referring to the F-2.0 Ordering Period.

A: A 9 month transition period is included in Base Year 1. Refer to PWS 6.1.

10) Q: With regards to the turnaround time in the draft RFP, is there background information or clarification on why the new TAT is 482 days?

A: The revised TAT accounts for the V-22 PMI Specification that was released in Nov 2019. The 482 days is the worst case scenario to complete all the work in the PMI Spec.

Ideally, awardees will perform at the 365 day threshold TAT, or less.

11) Q: Correction of defects, where are those costs included?

A: Any discrepancies directly related to the PMI Specification should be included in CLIN x001 as described in the specification. Any discrepancies not related to the PMI Specification should be included in CLINx003.

12) Q: When will the latest PMI Specification be provided?

A: The USG is finalizing the release authority for the V-22 PMI Specification and associated manuals. Once this is complete, all offerors who have submitted the required Non-Disclosure Agreements (NDA) for all their personnel who will be reading the USG documents will receive the documentation.

13) Q: Will PEMAs with technical data made available to the contractors?

A: The USG is investigating this and will ensure all offerors receive the V-22 PMI Specification and associated manuals in the same format.

14) Q: Regarding PWS 3.1.10.1, the Government requires contractors to provide facilities, do you intend to allow contractors to use government fuel trucks?

A: The fuel truck requirement is as written in PWS 3.1.10.1.

15) Q: With regard to US Government awarding to 2 companies, if two new companies start doing PMI work, how will that work?

A: Both awardees are required to provide contractor facilities. If two new companies are awarded the MAC, then they will work out of their own site / facilities.

16) Q: Understand there are 39 aircraft scheduled inductions during 2021 through 2030.

How is it decided what company gets each induction?

A: Each individual task order will be competed between the awardees on the MAC unless the Government utilizes an exception to the fair opportunity requirement as provided in FAR 16.505(b)(2). Please refer to Section H of the draft RFP for the task order competition procedures.

17) Q: With regard to the “Anticipated Workload” identified in FLCY presentation, the 2021 scheduled number of inductions is 4, is this definite?

A: The anticipated workload is an estimated number of inductions per year. This schedule is to provide an awareness of anticipated V-22 PMI workload, however it is subject to change. The USG will provide insight into the actual workload to the MAC awardees as V-22s are scheduled for PMI. Each induction under this contract will be a new task order. There is a possibility that the task order competition may result on one awardee getting more inductions in accordance with the Section H task order procedures for quality and schedule of PMI performance.