This document contains questions and answers regarding a draft request for proposals for V-22 aircraft maintenance and repair services. The solicitation will utilize an indefinite-delivery, indefinite-quantity multiple award contract approach, with individual task orders competed amongst awardees. For task order competitions, contractors will provide pricing quotes using the labor rates established in their base IDIQ contracts, and task order proposals will be evaluated based on criteria in the task order request. The document also clarifies that contractors should provide their best price given information provided to address discrepancies related to programmed depot maintenance, applying hourly rates as indicated in the base solicitation.

View the file

Other files

File Type Posted
V-22 ATTACH 07 GFP LIST DRAFT.xlsx XLSX spreadsheet
V-22 ATTACH 01 PWS (2020-04-02).docx DOCX document
N626492R0032 DRAFT RFP v2.docx DOCX document
N626492R0032 DRAFT RFP v2.docx DOCX document
V-22 PreSol Conference Additional QA 3.16.pdf PDF
V-22 Pre Solic Conf QAs FINAL v2 (2020-03-09).pdf PDF
1. V-22 Pre Solic Conf FRCWP Sched.pdf PDF
V-22 Pre Solic Conf QAs FINAL.pdf PDF
4. DCMA Command Brief V-22.pdf PDF
3. V-22 Pre Sol Conf FLCY PCO Pres.pdf PDF
2. V-22 PSC FRCWP Cmd Brief.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION V-22.pdf PDF
CDRL A009 EXAMINER & EVALUATOR DISCREPANCY REPORT V-22.pdf PDF
CDRL B004 EXCESS MATERIAL REPORT V-22.pdf PDF
V-22 ATTACH 12 Projected Induction Schedule DRAFT.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT V-22.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LISTING V-22.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT V-22.pdf PDF
CDRL D004 TRAINING PLAN_V-22.pdf PDF
V-22 ATTACH 02 GOV REL.docx DOCX document
CDRL A008 SITUATION SUMMARY REPORT V-22.pdf PDF
CDRL A011 WEIGHT AND BALANCE REPORTS V-22.pdf PDF
CDRL A016 PMI MAN-HOURS per MATERIAL COST REPORT V-22.pdf PDF
CDRL B009 DAILY REQUISITION REPORT (DRR) V-22.pdf PDF
V-22 ATTACH 05 Repairable Items DRAFT.docx DOCX document
CDRL B008 ACTIVE ITEM REPORT V-22.pdf PDF
CDRL C001 MEETING MINUTES V-22.pdf PDF
CDRL A006 NOTIFICATION OF AIRCRAFT DELAY V-22.pdf PDF
CDRL B002 AIRCRAFT AWAITING PARTS REPORT (AWP) V-22.pdf PDF
V-22 ATTACH 01 PWS DRAFT.docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REQUIREMENTS 10 DAY REPORT V-22.pdf PDF
CDRL A007 SCHEDULED REMOVAL CARDS V-22.pdf PDF
CDRL A013 NON-DESTRUCTIVE INSPECTION (NDI) REPORT V-22.pdf PDF
CDRL B005 ANNUAL PHYSICAL INVENTORY V-22.pdf PDF
CDRL B003 FINAL MATERIAL CONSUMPTION REPORT V-22.pdf PDF
V-22 ATTACH 14_Price_Summary_Spreadsheet DRAFT.xlsx XLSX spreadsheet
CDRL A014 NOTED AND CORRECTED (NAC) REPORT V-22.pdf PDF
V-22 ATTACH 11 Airfield Requirements DRAFT.docx DOCX document
CDRL D003 TRANSITION INVENTORY PLAN (SHUT-DOWN) V-22.pdf PDF
CDRL A012 Maintenance History Summary (MHS) Report V-22.pdf PDF
CDRL D002 TRANSITION STATUS REPORT V-22.pdf PDF
CDRL A004 DISCREPANT PART ON INDUCTION REPORT V-22.pdf PDF
V-22 ATTACH 08 TEI Process DRAFT.docx DOCX document
CDRL B010 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY RECORD REPORT V-22.pdf PDF
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT Sample Format.docx DOCX document
CDRL B007 RECEIPT REPORT V-22.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE V-22.pdf PDF
V-22 ATTACH 10 Maintenance Facility Req DRAFT.docx DOCX document
CDRL B006 SUPPLY EFFECTIVENESS REPORT V-22.pdf PDF
V-22 ATTACH 03 QASP DRAFT.docx DOCX document
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V-22 DRAFT RFP Additional Questions 4.17.2020

Questions
Answers

Q1) In Pre-Solicitation Conference on 3 Mar, regarding the question on how aircrafts for PMI are distributed to multi-contractors, the response was that "each individual task order will be competed between the awardees on the MAC". Also, there was USG response that “Each Task Order is for one induction and will be individually competed” in A21, of the attached PDF "V-22+PreSol+ Conference+Additional+QA+3.16.pdf".

Having read through H section of RFP and related FAR as recommended, however, we would like you to show us the detailed process of the competition, especially on pricing. The point of the question is if the evaluation of pricing for the contractor selection is based on the total evaluated price in the proposal of RFP or based on separate prices to be provided by each MAC awardee newly for each task order.

Citation: RFP Pages 129-131 Section H - Special Contract Requirements

A1) If an Offeror wins a multiple award contract (MAC), they will initially be awarded an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for the total evaluated price proposed as fair and reasonable. This will establish labor rates and ceiling values.

Subsequently, any work required will be competed amongst the MAC holders in accordance with FAR 16.505(b). The pricing for Task Order competition is based on the ordering procedures identified in Section H of the Draft RFP. MAC holders will provide a quote for each task order competition; however, they shall quote using no higher than the rates identified in the base IDIQ contract. The MAC holder may choose to offer a lower rate if so desired. Additionally, a MAC holder has the option not to quote at all. The task order proposed price will then be evaluated in accordance with the criteria included in the task order proposal request.

Q2) We understand that CLIN x001 includes O&A related to PMI. Regarding the O&A related to PMI, does the Contractor need to apply CLIN x001 hourly rate even for the repairs with insufficient directions or processes by PMI SPEC and other Authorized Engineering Directives which require further technical analysis?

Citation: PWS Pages 13-14

3.2.1.2 Correction of Discrepancies Related to PMI

A2) The Contractor should provide its best price given the information provided and as indicated in Section M of the RFP