N626492R0032 DRAFT RFP v2.docx

DOCX document 406 KB Posted

Attached to
J015 Maintenance and Repair Service for V-22 Aircraft
Solicitation number
N6264920R0032
Issued by

About this file

This document announces a pre-solicitation conference for solicitation number N6264920R0032, which seeks maintenance and repair services for V-22 aircraft. Interested parties are invited to attend the conference on March 3, 2020 at Naval Air Facility Atsugi to provide feedback on draft solicitation documents and ask questions. Attendees must register by February 11 with their base access requests and passport information. The conference will inform industry on the government's requirements for aircraft maintenance including scheduled, unscheduled, and component repair services to be provided at the contractor's facility over five base years and five option years.

View the file

Other files

File Type Posted
V-22 ATTACH 07 GFP LIST DRAFT.xlsx XLSX spreadsheet
V-22 ATTACH 01 PWS (2020-04-02).docx DOCX document
N626492R0032 DRAFT RFP v2.docx DOCX document
QandA 4.17.20.docx DOCX document
V-22 PreSol Conference Additional QA 3.16.pdf PDF
V-22 Pre Solic Conf QAs FINAL v2 (2020-03-09).pdf PDF
1. V-22 Pre Solic Conf FRCWP Sched.pdf PDF
V-22 Pre Solic Conf QAs FINAL.pdf PDF
4. DCMA Command Brief V-22.pdf PDF
3. V-22 Pre Sol Conf FLCY PCO Pres.pdf PDF
2. V-22 PSC FRCWP Cmd Brief.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION V-22.pdf PDF
CDRL A009 EXAMINER & EVALUATOR DISCREPANCY REPORT V-22.pdf PDF
CDRL B004 EXCESS MATERIAL REPORT V-22.pdf PDF
V-22 ATTACH 12 Projected Induction Schedule DRAFT.docx DOCX document
CDRL A002 TECHNICAL DIRECTIVES REPORT V-22.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LISTING V-22.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT V-22.pdf PDF
CDRL D004 TRAINING PLAN_V-22.pdf PDF
V-22 ATTACH 02 GOV REL.docx DOCX document
CDRL A008 SITUATION SUMMARY REPORT V-22.pdf PDF
CDRL A011 WEIGHT AND BALANCE REPORTS V-22.pdf PDF
CDRL A016 PMI MAN-HOURS per MATERIAL COST REPORT V-22.pdf PDF
CDRL B009 DAILY REQUISITION REPORT (DRR) V-22.pdf PDF
V-22 ATTACH 05 Repairable Items DRAFT.docx DOCX document
CDRL B008 ACTIVE ITEM REPORT V-22.pdf PDF
CDRL C001 MEETING MINUTES V-22.pdf PDF
CDRL A006 NOTIFICATION OF AIRCRAFT DELAY V-22.pdf PDF
CDRL B002 AIRCRAFT AWAITING PARTS REPORT (AWP) V-22.pdf PDF
V-22 ATTACH 01 PWS DRAFT.docx DOCX document
CDRL A001 TECHNICAL DIRECTIVES REQUIREMENTS 10 DAY REPORT V-22.pdf PDF
CDRL A007 SCHEDULED REMOVAL CARDS V-22.pdf PDF
CDRL A013 NON-DESTRUCTIVE INSPECTION (NDI) REPORT V-22.pdf PDF
CDRL B005 ANNUAL PHYSICAL INVENTORY V-22.pdf PDF
CDRL B003 FINAL MATERIAL CONSUMPTION REPORT V-22.pdf PDF
V-22 ATTACH 14_Price_Summary_Spreadsheet DRAFT.xlsx XLSX spreadsheet
CDRL A014 NOTED AND CORRECTED (NAC) REPORT V-22.pdf PDF
V-22 ATTACH 11 Airfield Requirements DRAFT.docx DOCX document
CDRL D003 TRANSITION INVENTORY PLAN (SHUT-DOWN) V-22.pdf PDF
CDRL A012 Maintenance History Summary (MHS) Report V-22.pdf PDF
CDRL D002 TRANSITION STATUS REPORT V-22.pdf PDF
CDRL A004 DISCREPANT PART ON INDUCTION REPORT V-22.pdf PDF
V-22 ATTACH 08 TEI Process DRAFT.docx DOCX document
CDRL B010 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY RECORD REPORT V-22.pdf PDF
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT Sample Format.docx DOCX document
CDRL B007 RECEIPT REPORT V-22.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE V-22.pdf PDF
V-22 ATTACH 10 Maintenance Facility Req DRAFT.docx DOCX document
CDRL B006 SUPPLY EFFECTIVENESS REPORT V-22.pdf PDF
V-22 ATTACH 03 QASP DRAFT.docx DOCX document
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6264920R0032

Section B - Supplies or Services and Prices

SECTION B

Consistent with FAR Clause 52.216-22 Indefinite Quantity, the Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in each individual task order. The unit prices identified in Attachment (1) are Firm-Fixed-Price (FFP) and shall not be adjusted as a result of the actual cost of performance. The quantities identified in Attachment (1) are estimates only. The exact quantities of deliveries are not known at the time of award:

The cumulative amount of all task orders to be issued under this contract shall not exceed the maximum specified below, and the Government shall order at least the minimum specified below:

Minimum: Post-Award Conference Maximum: $225,000,000.00

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Scheduled Maintenance Base Year 1

FFP

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0001AA

6
Lot

Planned Maintenance Interval (PMI)

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

FOB: Origin (Shipping Point)

PSC CD: J015

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot

As Required Maintenance - Base Year 1

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Unschedule Maintenance - Base Year 1

The contractor shall perform V-22 Unscheduled Maintenance in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0003AA

18,000
Hours

Over and Above (O&A) - Base Year 1

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0003AB

27,000
Hours

In-Service Repair (ISR) - Base Year 1

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0003AC

15,000
Hours

Customer Service (CS) - Base Year 1

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0003AD

600
Hours

Aircraft Modification - Base Year 1

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Parts and Materials - Base Year 1

The contractor shall procure V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0004AA

6
Lot

Purchase of Parts - Base Year 1

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0004AB

6
Lot

Manufacture of Material - Base Year 1

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0004AC

6
Lot

Repair of Material - Base Year 1

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

CDRL Deliverables - Base Year 1

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours

Accelerated Delivery - Base Year 1

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

GFM Handling - Base Year 1

The contractor shall provide Government Furnished Material Handling in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0007AA

6
Lot

Preserve & Pack - Base Year 1

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

0007AB

6
Lot

Ship & Transport - Base Year 1

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Travel - Base Year 1

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Transistion In Period

The contractor shall perform requirements as required in the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Post-Award Conference

This CLIN is reserved for Post-Award Conference. Offerors shall auto-populate $5,000.00.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Scheduled Maintenance Base Year 2

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1001AA

6
Lot

Planned Maintenance Interval (PMI)

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot

As Required Maintenance - Base Year 2

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Unschedule Maintenance - Base Year 2

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1003AA

18,000
Hours

Over and Above (O&A) - Base Year 2

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1003AB

27,000
Hours

In-Service Repair (ISR) - Base Year 2

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1003AC

15,000
Hours

Customer Service (CS) - Base Year 2

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1003AD

600
Hours

Aircraft Modification - Base Year 2

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Parts and Materials - Base Year 2

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1004AA

6
Lot

Purchase of Parts - Base Year 2

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1004AB

6
Lot

Manufacture of Material - Base Year 2

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1004AC

6
Lot

Repair of Material - Base Year 2

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

CDRL Deliverables - Base Year 2

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours

Accelerated Delivery - Base Year 2

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

GFM Handling - Base Year 2

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1007AA

6
Lot

Preserve & Pack - Base Year 2

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

1007AB

6
Lot

Ship & Transport - Base Year 2

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Travel - Base Year 2

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Scheduled Maintenance Base Year 3

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2001AA

6
Lot

Planned Maintenance Interval (PMI)

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot

As Required Maintenance - Base Year 3

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Unschedule Maintenance - Base Year 3

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2003AA

18,000
Hours

Over and Above (O&A) - Base Year 3

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2003AB

27,000
Hours

In-Service Repair (ISR) - Base Year 3

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2003AC

15,000
Hours

Customer Service (CS) - Base Year 3

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2003AD

600
Hours

Aircraft Modification - Base Year 3

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Parts and Materials - Base Year 3

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2004AA

6
Lot

Purchase of Parts - Base Year 3

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2004AB

6
Lot

Manufacture of Material - Base Year 3

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2004AC

6
Lot

Repair of Material - Base Year 3

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

CDRL Deliverables - Base Year 3

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours

Accelerated Delivery - Base Year 3

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

GFM Handling - Base Year 3

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2007AA

6
Lot

Preserve & Pack - Base Year 3

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

2007AB

6
Lot

Ship & Transport - Base Year 3

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Travel - Base Year 3

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Scheduled Maintenance Base Year 4

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3001AA

6
Lot

Planned Maintenance Interval (PMI)

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot

As Required Maintenance - Base Year 4

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Unschedule Maintenance - Base Year 4

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3003AA

18,000
Hours

Over and Above (O&A) - Base Year 4

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3003AB

27,000
Hours

In-Service Repair (ISR) - Base Year 4

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3003AC

15,000
Hours

Customer Service (CS) - Base Year 4

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3003AD

600
Hours

Aircraft Modification - Base Year 4

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Parts and Materials - Base Year 4

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3004AA

6
Lot

Purchase of Parts - Base Year 4

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3004AB

6
Lot

Manufacture of Material - Base Year 4

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3004AC

6
Lot

Repair of Material - Base Year 4

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

CDRL Deliverables - Base Year 4

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours

Accelerated Delivery - Base Year 4

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

GFM Handling - Base Year 4

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3007AA

6
Lot

Preserve & Pack - Base Year 4

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

3007AB

6
Lot

Ship & Transport - Base Year 4

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Travel - Base Year 4

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Scheduled Maintenance Base Year 5

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4001AA

6
Lot

Planned Maintenance Interval (PMI)

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot

As Required Maintenance - Base Year 5

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Unschedule Maintenance - Base Year 5

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4003AA

18,000
Hours

Over and Above (O&A) - Base Year 5

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4003AB

27,000
Hours

In-Service Repair (ISR) - Base Year 5

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4003AC

15,000
Hours

Customer Service (CS) - Base Year 5

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4003AD

600
Hours

Aircraft Modification - Base Year 5

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

Parts and Materials - Base Year 5

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4004AA

6
Lot

Purchase of Parts - Base Year 5

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4004AB

6
Lot

Manufacture of Material - Base Year 5

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4004AC

6
Lot

Repair of Material - Base Year 5

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

CDRL Deliverables - Base Year 5

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001.This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours

Accelerated Delivery - Base Year 5

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

GFM Handling - Base Year 5

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4007AA

6
Lot

Preserve & Pack - Base Year 5

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

4007AB

6
Lot

Ship & Transport - Base Year 5

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot

Travel - Base Year 5

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Scheduled Maintenance Option Year 1

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5001AA

6
Lot
OPTION
Planned Maintenance Interval (PMI)

FFP

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot
OPTION
As Required Maintenance - Option Year 1

FFP

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Unschedule Maintenance - Option Year 1

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5003AA

18,000
Hours
OPTION
Over and Above (O&A) - Option Year 1

FFP

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5003AB

27,000
Hours
OPTION
In-Service Repair (ISR) - Option Year 1

FFP

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5003AC

15,000
Hours
OPTION
Customer Service (CS) - Option Year 1

FFP

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5003AD

600
Hours
OPTION
Aircraft Modification - Option Year 1

FFP

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Parts and Materials - Option Year 1

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5004AA

6
Lot
OPTION
Purchase of Parts - Option Year 1

FFP

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5004AB

6
Lot
OPTION
Manufacture of Material - Option Year 1

FFP

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5004AC

6
Lot
OPTION
Repair of Material - Option Year 1

FFP

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
CDRL Deliverables - Option Year 1

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours
OPTION
Accelerated Delivery - Option Year 1

FFP

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
GFM Handling - Option Year 1

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5007AA

6
Lot
OPTION
Preserve & Pack - Option Year 1

FFP

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

5007AB

6
Lot
OPTION
Ship & Transport - Option Year 1

FFP

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot
OPTION
Travel - Option Year 1

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Scheduled Maintenance Option Year 2

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6001AA

6
Lot
OPTION
Planned Maintenance Interval (PMI)

FFP

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot
OPTION
As Required Maintenance - Option Year 2

FFP

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Unschedule Maintenance - Option Year 2

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6003AA

18,000
Hours
OPTION
Over and Above (O&A) - Option Year 2

FFP

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6003AB

27,000
Hours
OPTION
In-Service Repair (ISR) - Option Year 2

FFP

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6003AC

15,000
Hours
OPTION
Customer Service (CS) - Option Year 2

FFP

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6003AD

600
Hours
OPTION
Aircraft Modification - Option Year 2

FFP

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Parts and Materials - Option Year 2

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6004AA

6
Lot
OPTION
Purchase of Parts - Option Year 2

FFP

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6004AB

6
Lot
OPTION
Manufacture of Material - Option Year 2

FFP

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6004AC

6
Lot
OPTION
Repair of Material - Option Year 2

FFP

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
CDRL Deliverables - Option Year 2

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours
OPTION
Accelerated Delivery - Option Year 2

FFP

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
GFM Handling - Option Year 2

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6007AA

6
Lot
OPTION
Preserve & Pack - Option Year 2

FFP

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

6007AB

6
Lot
OPTION
Ship & Transport - Option Year 2

FFP

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot
OPTION
Travel - Option Year 2

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Scheduled Maintenance Option Year 3

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7001AA

6
Lot
OPTION
Planned Maintenance Interval (PMI)

FFP

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot
OPTION
As Required Maintenance - Option Year 3

FFP

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Unschedule Maintenance - Option Year 3

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7003AA

18,000
Hours
OPTION
Over and Above (O&A) - Option Year 3

FFP

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7003AB

27,000
Hours
OPTION
In-Service Repair (ISR) - Option Year 3

FFP

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7003AC

15,000
Hours
OPTION
Customer Service (CS) - Option Year 3

FFP

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7003AD

600
Hours
OPTION
Aircraft Modification - Option Year 3

FFP

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Parts and Materials - Option Year 3

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7004AA

6
Lot
OPTION
Purchase of Parts - Option Year 3

FFP

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7004AB

6
Lot
OPTION
Manufacture of Material - Option Year 3

FFP

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7004AC

6
Lot
OPTION
Repair of Material - Option Year 3

FFP

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
CDRL Deliverables - Option Year 3

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours
OPTION
Accelerated Delivery - Option Year 3

FFP

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
GFM Handling - Option Year 3

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7007AA

6
Lot
OPTION
Preserve & Pack - Option Year 3

FFP

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

7007AB

6
Lot
OPTION
Ship & Transport - Option Year 3

FFP

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot
OPTION
Travel - Option Year 3

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Scheduled Maintenance Option Year 4

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8001AA

6
Lot
OPTION
Planned Maintenance Interval (PMI)

FFP

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Lot
OPTION
As Required Maintenance - Option Year 4

FFP

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Unschedule Maintenance - Option Year 4

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8003AA

18,000
Hours
OPTION
Over and Above (O&A) - Option Year 4

FFP

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8003AB

27,000
Hours
OPTION
In-Service Repair (ISR) - Option Year 4

FFP

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8003AC

15,000
Hours
OPTION
Customer Service (CS) - Option Year 4

FFP

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8003AD

600
Hours
OPTION
Aircraft Modification - Option Year 4

FFP

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Parts and Materials - Option Year 4

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8004AA

6
Lot
OPTION
Purchase of Parts - Option Year 4

FFP

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8004AB

6
Lot
OPTION
Manufacture of Material - Option Year 4

FFP

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8004AC

6
Lot
OPTION
Repair of Material - Option Year 4

FFP

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
CDRL Deliverables - Option Year 4

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
600
Hours
OPTION
Accelerated Delivery - Option Year 4

FFP

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
GFM Handling - Option Year 4

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8007AA

6
Lot
OPTION
Preserve & Pack - Option Year 4

FFP

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

8007AB

6
Lot
OPTION
Ship & Transport - Option Year 4

FFP

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot
OPTION
Travel - Option Year 4

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Scheduled Maintenance FAR 52.217-8

The contractor shall perform V-22 Scheduled Maintenance in accordance with the attached Performance Work Statement (PWS).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9001AA

3
Lot
OPTION
Planned Maintenance Interval (PMI)

FFP

The contractor shall perform V-22 Scheduled Maintenance - PMI - 2 in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3
Lot
OPTION
As Required Maintenance - FAR 52.217-8

FFP

The contractor shall perform V-22 As Required Maintenance, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Unschedule Maintenance - FAR 52.217-8

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9003AA

9,000
Hours
OPTION
Over and Above (O&A) - FAR 52.217-8

FFP

The contractor shall perform V-22 Unscheduled Maintenance, O&A, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9003AB

13,500
Hours
OPTION
In-Service Repair (ISR) - FAR 52.217-8

FFP

The contractor shall perform V-22 Unscheduled Maintenance, ISR, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9003AC

7,500
Hours
OPTION
Customer Service (CS) - FAR 52.217-8

FFP

The contractor shall perform V-22 Unscheduled Maintenance, CS, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9003AD

300
Hours
OPTION
Aircraft Modification - FAR 52.217-8

FFP

The contractor shall perform V-22 Unscheduled Maintenance, aircraft modification, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
Parts and Materials - FAR 52.217-8

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9004AA

3
Lot
OPTION
Purchase of Parts - FAR 52.217-8

FFP

The contractor shall purchase V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9004AB

3
Lot
OPTION
Manufacture of Material - FAR 52.217-8

FFP

The contractor shall manufacture V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9004AC

3
Lot
OPTION
Repair of Material - FAR 52.217-8

FFP

The contractor shall repair V-22 parts and materials, in accordance with the attached PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
CDRL Deliverables - FAR 52.217-8

FFP

Data Call (Reporting) identified with Contractor Data Requirement List (CDRL). See Exhibits A001 - L001. This CLIN is Not Separately Priced (NSP).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
300
Hours
OPTION
Accelerated Delivery - FAR 52.217-8

FFP

The contractor shall perform accelerated work in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

UNDEFINED

OPTION
GFM Handling - FAR 52.217-8

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9007AA

3
Lot
OPTION
Preserve & Pack - FAR 52.217-8

FFP

The contractor shall perform Preservation and Packing of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT

9007AB

3
Lot
OPTION
Ship & Transport - FAR 52.217-8

FFP

The contractor shall perform Ship and Transport of GFM in accordance with the PWS.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Lot
OPTION
Travel - FAR 52.217-8

FFP

Additional costs incurred when the Contractor is required to travel for the required services other than the Contractor's facility in accordance with the PWS. All travel will be in accordance with FAR 31.205-46.

MAX

Section C - Descriptions and Specifications

DESCRIPTIONS AND SPECIFICATION

Section C – Descriptions and Specifications

The Contractor shall complete all required work for each CLIN in accordance with the applicable PWS sections, as referenced in the table below:

PWS

ParagraphTitleCLIN
1.INTRODUCTIONNSP
1.1Contract Goals and objectivesNSP
1.2Method of taskingNSP
1.2.1PWS approachNSP
1.2.2SOO approachNSP
1.3Scope of PWSNSP
1.4Background of USMC MV-22 and USN CV-22NSP
1.5Explanation of Government Responsibilities and RelationshipsNSP
2.APPLICABLE AND REFERENCE DOCUMENTSNSP
2.1PMI SpecificationsNSP
2.2Other Applicable PublicationsNSP
2.3Reference DocumentsNSP
3.SCHEDULED AND UNSCHEDULED MAINTENANCE
REQUIREMENTSNSP
3.1Scheduled Maintenance Basic Requirement - Planned Maintenance
Interval (PMI)x001
3.1.1Induction of the Aircraftx001
3.1.2Cleaning/Preservationx001
3.1.3Surface Conditioning of the Aircraft
3.1.4Disassembly of the Aircraftx001
3.1.5Inspection/Evaluation of the Aircraftx001
3.1.6Maintenance, Repair, and Reassembly of Aircraftx001, x002, &
x003
3.1.6.1As-Required Maintenancex001, x002
3.1.6.1.1Other As-Required Maintenancex002
3.1.7Final Processingx001
3.1.7.1Aircraft Weight and Balance (AWB)x001
3.1.7.2Operational Checkx001
3.1.8Functional Flight Check (FCF)x001, x003
3.1.9Government Acceptancex001
3.1.10Scheduled Maintenance Basic Requirement – MiscellaneousNSP
3.1.10.1Fueling/Defuelingx001
3.1.10.2Other Aircraft Servicesx001, x003
3.1.10.3Aircraft Records Managementx001
3.2Unscheduled Maintenance Requirementx001, x002, &
x003
3.2.1Over and Above Related to PMIx001, x002
3.2.1.1Classification of Discrepancies Related to PMIx001
3.2.1.2Correction of Discrepancies Related to PMIx001, x002
3.2.2O&A Not Related to PMIx002, x003
3.2.2.1Technical Directives (TD) and Aircraft Modificationsx003
3.2.2.2Customer Service Request (CSR)x003
3.2.2.3In-Service Repairs (ISR)x003
4.GOVERNMENT PRIORITIESNSP
4.1QualityNSP
4.1.1Contractor’s Quality Control Programx001
4.1.2Work Deck Validation Requirementx001
4.1.3Government Quality Assurance Representative (QAR)NSP
4.1.3.1Government Quality Assurance Plan (QASP)NSP
4.1.3.2Corrective Action Plan (CAP)x001
4.1.4Aircraft Inspection Deficiency Report (AIDR)NSP
4.1.4.1Contractor Correction or Re-performance under WarrantyNSP
4.2ScheduleNSP
4.2.1Turn Around Time (TAT) Expectationx001
4.2.2Workload Expectationx001
4.2.2.1Surge Capacity Expectationx001, x003
4.2.2.2Accelerated Delivery Expectationx006
4.2.2.2.1Accelerated Delivery During FCFx006
4.2.3Schedule Delay Impactsx001
4.2.3.1Delays for SupplyNSP
4.2.3.2Delay for EngineeringNSP
4.3SafetyNSP
4.3.1Contractor Support of U.S. Government Flight Representative
(GFR) Proceduresx001
4.3.2Safety of Flight Release Proceduresx001
4.3.3Occupational Safety, Health and Environmental (OSHE)x001
4.3.4Aircraft Confined Space (Fuel Cells)x001
5.SUPPORTING REQUIREMENTSNSP
5.1Program Managementx001
5.1.1Required MeetingsNSP
5.1.1.1Program Management Review (PMR)x001
5.1.1.2Production Status Reviewsx001
5.1.1.3Other Meetingsx001
5.1.2CDRL Deliverablesx005
5.2Workforce Managementx001
5.2.1Workforce Qualificationsx001
5.2.2Contractor Field Team (CFT)x001, x003, &
x008
5.2.3Support Equipment (SE) Licensingx001
5.2.4Trainingx001
5.2.4.1Government-Provided TrainingNSP
5.2.4.2Training Recordsx001
5.3Logistics Managementx001
5.3.1Tools and Equipmentx001
5.3.2Supply Managementx001
5.3.2.1Parts and Materialsx001
5.3.2.1.1Procurement of Partsx004
5.3.2.1.2Repairable Itemx003
5.3.2.1.3Local Manufacture of Partsx003
5.3.2.1.4Cannibalization of Partsx003
5.3.2.2Government Furnished Property (GFP)x004, x007
5.3.2.3Government Furnished Material (GFM)/Government
Furnished Equipment (GFE)x007
5.3.2.4Government Furnished Equipment (GFE)/Support Equipment (SE)x002, x007
5.3.2.5Contractor Acquired Property0007
5.4Contractor Engineering RequirementsNSP
5.4.1Contractor Education and Qualificationx001
5.4.2Contractor Generated Temporary Engineering Instructionsx001
5.4.3Contractor Engineering Analysis and Decisionsx001
5.4.4Contractor Generated Engineering Drawingsx001
5.5Technical Publications Requirementsx001
5.5.1Proprietary Information Agreement (PIA)/Proprietary Information
Exchange Agreements (PIEA)x001
5.5.2Technical Document/Data Sourcesx001
5.5.2.1Incorporation of Received Technical Documents/Datax001
5.5.2.2Technical Publication Deficiency Reports (TPDRs)x001
5.5.2.3Commercial Standards/Specifications and Related Documentsx001
5.5.3Currency of Technical Publicationsx001
5.5.4Personal Electronic Maintenance Aids (PEMA)x004
5.5.4.1PEMA Software Updatesx001
5.5.5Audits of Contractor Technical Publication Library (TPL)x001
5.5.6Document Obsolescence and Contract Completionx001
5.6Information SecurityNSP
5.6.1Unclassified Contractor-Owned Network Security - Safeguarding
Of Unclassified Controlled Technical Informationx001
5.6.2Transmission of Controlled Unclassified Information (CUI) via
e-mailx001
5.6.3Transmission of Controlled Unclassified Information (CUI) via
SAFEx001
5.6.4Cybersecurity Requirementsx001
5.7Facilitiesx001
5.7.1Government Access during Performance Periodx001
5.7.2Contractor Facilitiesx001
5.7.2.1Government Spaces in Contractor Facilityx001
5.7.3Government Facilitiesx001
5.7.3.1Government Facilities Limitationsx001
5.7.4A204-9400(1-17)x001
6.ADDITIONAL REQUIREMENTSNSP
6.1Transition Requirementsx009
6.1.1Phase-In Transition Planx009
6.1.1.1Phase-In Transition and Unpacking Requirementsx009
6.1.2Phase-Out Transition Planx001
6.2Enterprise Contractor Manpower Reporting Application
(ECMRA)x001

Section D - Packaging and Marking

D-1.0 Packaging and marking requirements, if applicable, shall be cited on each task order.

D-2.0 Condition of Material to be Returned to the Government

D-2.1 The requirements for Preservation, Packaging, Packing, Marking, and Age Control of material being prepared for shipment to U.S. Government activities shall be in accordance with DOD Instruction MIL-STD-2073-1 and -2. Serviceable items and repairable items shall receive Level A protection, packing, and packaging. Locally available materials may be used.

D-2.2 The Contractor shall inspect and determine the condition of material to be returned to the Government following the completion of each task order. After physical inspection, material will be identified by one of the following codes in accordance with the latest COMNAVAIRFORINST 4790.2 series:

(a) RFI - READY FOR ISSUE MATERIAL - Material, equipment, aircraft, and SE, which does not require rework of any type, replacement of overage parts, or other than routine preinstallation and post installation condition verification prior to use. RFI items are not necessarily new or like new, but are functionally reliable and meet applicable performance specifications. Packaging and preservation do not enter into the process of producing an RFI item but are required in order to maintain the item identity and condition and to prevent damage during subsequent shipping, handling, and storage.

(b) Non-RFI - NOT READY FOR ISSUE MATERIAL - Material, equipment, aircraft, and SE, which does not meet the definition of RFI.

D-2.3 The above identification will be attached to the material. External markings on the containers and documents shall describe the condition of the material as "R.F.I." and "Non-R.F.I.".

D-2.4 Disposition of materials to be returned to the Government after Sections D-2.1 - D-2.3 above have been accomplished, shall be as directed by the Ordering Officer.

HAZARDOUS MATERIAL

HAZARDOUS MATERIALS

(a) Packaging, packing, marking and labeling hazardous materials to be shipped by any mode or combination of transportation modes shall be prepared (properly classed, described, packaged, marked, labeled, transport vehicle placarded, etc.) for shipment in accordance with MIL-STD 129 and all applicable government and carrier regulations in effect at time of shipment.

(b) In the event of a conflict between specific requirements in the contract or order and existing applicable regulations, the regulations take precedence. Under no circumstances shall the contractor knowingly use materials, markings or procedures which are not in accordance with laws and regulations applicable to the mode of transportation employed.

TYPE OF SHIPMENT REGULATIONS APPLICABLE

1. Domestic A

2. Domestic Air Commercial A,B,C

3. Domestic Air Military A,F *4. Export Surface A,E,G *5. Export Air Commercial A,D,G *6. Export Air Military (MAC) F,G

LIST OF REGULATIONS

A. Code of Federal Regulation Title: 49 Transportation Parts 100-199.

B. Official Air Transport Restricted Articles Tariff No. 6-D C. A. B. 82.

C. Official Air Transport Restricted Articles Circular No. 6-D.

D. International Air Transport Association Restricted Articles Regulations.

E. International Maritime Dangerous Goods Code.

F. Air Force Regulation 71-4 Preparation of Hazardous Materials for Military Shipment.

*G. Export shipments are also subject to the domestic regulation indicated to the port of embarkation.

CLAUSES INCORPORATED BY FULL TEXT

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)

(a) Definitions. As used in this clause-

Automatic identification device means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.

Concatenated unique item identifier means--

(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or

(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.

Data Matrix means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards Organization (ISO)/International Electrotechnical Commission (IEC) 16022.

Data qualifier means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.

DoD recognized unique identification equivalent means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html.

DoD item unique identification means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .