V-22 ATTACH 01 PWS DRAFT.docx
DOCX document 262 KB Posted
- Solicitation number
- N6264920R0032
About this file
This document announces a pre-solicitation conference for solicitation number N6264920R0032 to provide maintenance and repair services for V-22 aircraft. Interested parties are asked to register no more than five attendees by 11 February 2020 to receive base access instructions for attending the conference on 3 March 2020 at Naval Air Facility Atsugi. The purpose of the conference is to allow interested parties to provide feedback on draft solicitation documents and ask questions of the government. Vendors must arrange their own lodging and food during the event, and the government will not reimburse attendees.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT Solicitation N62649-20-R-0032
RFP Attachment 1
PERFORMANCE WORK STATEMENT (PWS)
FOR
CV/MV-22
INTEGRATED MAINTENANCE CONCEPT (IMC)
PLANNED MAINTENANCE INTERVAL (PMI) REQUIREMENTS
PREPARED BY:
FLEET READINESS CENTER WESTERN PACIFIC
ATSUGI, JAPAN
4 February 2020
DOCUMENT REVISION HISTORY
Rev. level with description of change Effective Date
| Original RFP PWS |
| 4 February 2020 |
DRAFT RFP
N62649-20-R-0032 Attachment (1) 11 February 2020 ii
Table of Contents
| Paragraph | Title | Page |
| 1. | INTRODUCTION | 1 |
| 1.1 | Contract Goals and objectives | 1 |
| 1.2 | Method of tasking | 1 |
| 1.2.1 | PWS approach | 1 |
| 1.2.2 | SOO approach | 1 |
| 1.3 | Scope of PWS | 2 |
| 1.4 | Background of USMC MV-22 and USN CV-22 | 2 |
| 1.5 | Explanation of Government Responsibilities and Relationships | 2 |
| 2. | APPLICABLE AND REFERENCE DOCUMENTS | 3 |
| 2.1 | PMI Specifications | 3 |
| 2.2 | Other Applicable Publications | 3 |
| 3. | SCHEDULED AND UNSCHEDULED MAINTENANCE REQUIREMENTS | 6 |
| 3.1 | Scheduled Maintenance Basic Requirement - Planned Maintenance Interval (PMI) | 6 |
| 3.1.1 | Induction of the Aircraft | 6 |
| 3.1.2 | Cleaning/Preservation | 7 |
| 3.1.3 | Surface Conditioning of the Aircraft | 8 |
| 3.1.4 | Disassembly of the Aircraft | 8 |
| 3.1.5 | Inspection/Evaluation of the Aircraft | 8 |
| 3.1.6 | Maintenance, Repair, and Reassembly of Aircraft | 8 |
| 3.1.6.1 | As-Required Maintenance | 9 |
| 3.1.6.1.1 | Other As-Required Maintenance | 9 |
| 3.1.7 | Final Processing | 9 |
| 3.1.7.1 | Aircraft Weight and Balance (AWB) | 10 |
| 3.1.7.2 | Operational Checks | 10 |
| 3.1.8 | Functional Flight Check (FCF) | 10 |
| 3.1.9 | Government Acceptance | 11 |
| 3.1.10 | Scheduled Maintenance Basic Requirement - Miscellaneous | 11 |
| 3.1.10.1 | Fueling/Defueling | 11 |
| 3.1.10.2 | Other Aircraft Services | 11 |
| 3.1.10.3 | Aircraft Records Management | 11 |
| 3.2 | Unscheduled Maintenance Requirements | 12 |
| 3.2.1 | Over and Above Related to PMI | 12 |
| 3.2.1.1 | Classification of Discrepancies Related to PMI | 12 |
| 3.2.1.2 | Correction of Discrepancies Related to PMI | 13 |
| 3.2.2 | O&A Not Related to PMI | 13 |
| 3.2.2.1 | Technical Directives (TD) and Aircraft Modifications. | 13 |
| 3.2.2.2 | Customer Service Request (CSR) | 14 |
| 3.2.2.3 | In-Service Repairs (ISR) | 14 |
| 4. | GOVERNMENT PRIORITIES | 15 |
| 4.1 | Quality | 15 |
| 4.1.1 | Contractor’s Quality Control Program | 15 |
| 4.1.2 | Work Deck Validation Requirement | 15 |
| 4.1.3 | Government Quality Assurance Representative (QAR) | 15 |
| 4.1.3.1 | Government Quality Assurance Plan (QASP) | 16 |
| 4.1.3.2 | Corrective Action Plan (CAP) | 16 |
| 4.1.4 | Aircraft Acceptance Inspection Deficiency Report (AIDR) | 16 |
| 4.1.4.1 | Contractor Correction or Re-performance under Warranty | 16 |
| 4.2 | Schedule | 17 |
| 4.2.1 | Turn Around Time (TAT) Expectation | 17 |
| 4.2.2 | Workload Expectation | 18 |
| 4.2.2.1 | Surge Capacity Expectation | 18 |
| 4.2.2.2 | Accelerated Delivery Expectation | 18 |
| 4.2.2.2.1 | Accelerated Delivery during FCF | 19 |
| 4.2.3 | Schedule Delay Impacts | 19 |
| 4.2.3.1 | Delays for Supply | 19 |
| 4.2.3.2 | Delay for Engineering | 19 |
| 4.3 | Safety | 20 |
| 4.3.1 | Contractor Support of U.S. Government Flight Representative (GFR) Procedures | 20 |
| 4.3.2 | Safe for Flight Release Procedures | 20 |
| 4.3.3 | Occupational Safety, Health and Environmental (OSHE) | 20 |
| 4.3.4 | Aircraft Confined Space (Fuel Cells) | 20 |
| 5. | SUPPORTING REQUIREMENTS | 20 |
| 5.1 | Program Management | 21 |
| 5.1.1 | Required Meetings | 21 |
| 5.1.1.1 | Program Management Review (PMR) | 21 |
| 5.1.1.2 | Production Status Reviews | 22 |
| 5.1.1.3 | Other Meetings | 22 |
| 5.1.2 | CDRL Deliverables | 22 |
| 5.2 | Workforce Management | 23 |
| 5.2.1 | Workforce Qualifications | 23 |
| 5.2.2 | Contractor Field Team (CFT) | 25 |
| 5.2.3 | Support Equipment (SE) Licensing | 26 |
| 5.2.4 | Training | 26 |
| 5.2.4.1 | Government-Provided Training | 27 |
| 5.2.4.2 | Training Records | 27 |
| 5.3 | Logistics Management | 28 |
| 5.3.1 | Tools and Equipment | 28 |
| 5.3.2 | Supply Management | 28 |
| 5.3.2.1 | Parts and Materials | 28 |
| 5.3.2.1.1 | Procurement of Parts | 28 |
| 5.3.2.1.2 | Repairable Items | 28 |
| 5.3.2.1.3 | Local Manufacture of Parts | 29 |
| 5.3.2.1.4 | Cannibalization of Parts | 29 |
| 5.3.2.2 | Government Furnished Property (GFP) | 30 |
| 5.3.2.3 | Government Furnished Material (GFM)/ Government Furnished Equipment (GFE) | 30 |
| 5.3.2.4 | Government Furnished Equipment (GFE)/Support Equipment (SE) | 32 |
| 5.3.2.5 | Contractor Acquired Property | 32 |
| 5.4 | Contractor Engineering Requirements | 33 |
| 5.4.1 | Contractor Education and Qualification | 33 |
| 5.4.2 | Contractor Generated Temporary Engineering Instructions | 33 |
| 5.4.3 | Contractor Engineering Analysis and Decisions | 33 |
| 5.4.4 | Contractor Generated Engineering Drawings | 33 |
| 5.5 | Technical Publications Requirements | 34 |
| 5.5.1 | Proprietary Information Agreement (PIA)/Proprietary Information Exchange Agreements (PIEA) | 34 |
| 5.5.2 | Technical Document/Data Sources | 34 |
| 5.5.2.1 | Incorporation of Received Technical Documents/Data | 35 |
| 5.5.2.2 | Technical Publication Deficiency Reports (TPDRs) | 35 |
| 5.5.2.3 | Commercial Standards/Specifications and Related Documents | 35 |
| 5.5.3 | Currency of Technical Publications | 35 |
| 5.5.4 | Personal Electronic Maintenance Aids (PEMA) | 36 |
| 5.5.4.1 | PEMA Software Updates | 36 |
| 5.5.5 | Audits of Contractor Technical Publication Library (TPL) | 36 |
| 5.5.6 | Document Obsolescence and Contract Completion | 36 |
| 5.6 | Information Security | 36 |
| 5.6.1 | Unclassified Contractor-Owned Network Security - Safeguarding of Unclassified Controlled Technical Information | 36 |
| 5.6.2 | Transmission of Controlled Unclassified Information (CUI) via e-mail | 37 |
| 5.6.3 | Transmission of Controlled Unclassified Information (CUI) via SAFE | 37 |
| 5.6.4 | Cybersecurity Requirements | 37 |
| 5.7 | Facilities | 37 |
| 5.7.1 | Government Access during Performance Period | 37 |
| 5.7.2 | Contractor Facilities | 37 |
| 5.7.2.1 | Government Spaces in Contractor Facility | 37 |
| 5.7.3 | Government Facilities | 38 |
| 5.7.3.1 | Government Facilities Limitations | 38 |
| 5.7.4 | A204-9400(1-17) Contractor Unclassified Access to Federally Controlled Facilities, Sensitive Information, Information Technology (IT) Systems or Protected Health Information (Jan 2017) | 39 |
| 6. | ADDITIONAL REQUIREMENTS | 43 |
| 6.1 | Transition Requirements | 43 |
| 6.1.1 | Phase-In Transition Plan | 43 |
| 6.1.1.1 | Phase-In Transition and Unpacking Requirements | 44 |
| 6.1.2 | Phase-Out Transition Plan | 44 |
| 6.2 | Enterprise Contractor Manpower Reporting Application (ECMRA) | 44 |
APPENDIX
| Appendix | Title | Page |
| A | Acronyms | 46 |
vi Performance Work Statement For
CV/MV-22
Integrated Maintenance Concept (IMC) Planned Maintenance Interval (PMI)
INTRODUCTION
This Performance Work Statement (PWS) defines the scope and provides the framework of basic requirements of the general tasks to be performed under the CV/MV-22 Integrated Maintenance Concept (IMC) Planned Maintenance Interval (PMI) Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract. The Fleet Readiness Center Western Pacific (FRC WESTPAC) will procure both planned and unplanned depot-level maintenance, repair, and overhaul (MRO) products and services within the scope of this contract through Task Orders (TOs) placed under this ID/IQ contract. The tasks and detailed requirements for each aircraft will be defined in the Performance Work Statement (PWS), Statement of Objectives (SOO), NAVAIR CV/MV-22 IMC PMI Requirements Specification and related documents for each TO. Appendix A contains a list of acronyms used in this PWS and their meanings. For the purposes of this document, CV/MV-22 and V-22 are considered equivalent.
Contract Goals and objectives FRC WESTPAC goals and objectives are to acquire the capability to provide depot-level aircraft MRO products and services for forward-deployed CV/MV-22 Type/Model/Series (T/M/S) aircraft. FRC WESTPAC intent is to award contracts to a pool of highly qualified Contractors possessing required business practices and technical capabilities in order to increase responsiveness and flexibility in meeting customer needs.
Method of tasking Government requirements issued under the basic ID/IQ contract will be met through individual TO. Individual TO will be issued based on two different approaches: 1) the PWS approach, and 2) the SOO approach. These two approaches are described in 1.2.1 and 1.2.2 below.
PWS approach In instances where the Government objectives are clearly defined, the Government will issue a TO based on a PWS approach. Under a PWS approach, the Government will prepare a TO utilizing this PWS to specify the work to be accomplished. Under a PWS approach, the NAVAIR CV/MV-22 IMC PMI Requirements Specification and related Depot Level Maintenance (DLM) Specification Interim Change Notices (SICNs) and the Contract Data Requirements List (CDRL) items (DD Forms 1423) referenced in this PWS specify the measurable results and outcomes. The Government will also provide other required TO documentation to the Contractor as appropriate.
SOO approach Under the SOO approach, the request for proposals will include a Government-prepared SOO that is within the broad scope of this PWS but does not directly required by the NAVAIR CV/MV-22 IMC PMI Requirements Specification. The SOO approach is most likely to be used for urgent, emergent, or unscheduled aircraft maintenance needs. The SOO will describe the basic, top-level objectives of the individual TO from which the Contractor may propose innovative alternatives. In addition to the SOO, the Government may include separate product performance requirements. The Government may also include a set of minimum data item requirements for the TO in the form of CDRL items (DD Forms 1423). The SOO approach provides the Contractor with flexibility to propose innovative approaches to satisfy the Government's requirements. The Contractor's response to the SOO also demonstrates the Contractor's understanding of the effort to be performed. When the TO is awarded, a PWS or Statement of Work (SOW) based on the Contractor prepared-documentation shall replace the Government-prepared SOO.
Scope of PWS This PWS defines the requirement for Contractor performance of CV/MV-22 PMI, as well as other CV/MV-22 MRO tasks for both inducted and non-inducted aircraft. In general, requirements include inspections, maintenance and repair in accordance with the Naval Air Systems Command (NAVAIR) CV/MV-22 IMC PMI specification, and associated MRO requirements. Additional requirements outside the scope of the IMC specification include in-service repairs (ISR)/drop-in repairs (DIR), decontamination after operations in radioactive environments, customer service (squadron funded requirements), aircraft modification, airframe change, and management, maintenance & repair of Government-Furnished Equipment (GFE). The NAVAIR manual for performing CV/MV-22 IMC PMI Requirements Specification and associated documentation, is herein referred to as the NAVAIR V-22 PMI Specification.
Background of USMC MV-22 and USN CV-22 United States Marine Corps (USMC) MV-22 and United States Navy (USN) CV-22 aircraft supported under this contract are forward deployed and perform a variety of missions throughout the U.S. Indo-Pacific Command (USINDOPACOM) Area of Responsibility (AOR). The MV-22 are assigned to First Marine Aircraft Wing (1stMAW) squadrons VMM-262 and VMM-265 aboard Marine Corps Air Station (MCAS) Futenma, in Okinawa, Japan. These squadrons provide combat operational support to the armed forces of the United States and its allies, and provide Humanitarian Assistance and Disaster Relief (HADR) wherever required. These aircraft operate in all weather conditions during expeditionary, joint, and combined operations. Routine operation in harsh environments result in the need for significant upkeep to maintain the aircraft in a state of operational readiness, Operations in radioactive environments have also occurred in this AOR.
V-22 aircraft from other USMC and USN components and other Department of Defense Services may also utilize this ID/IQ contract.
Explanation of Government Responsibilities and Relationships Several Government entities are authorized to guide and/or direct the Contractor in the management and execution of the ID/IQ or TO requirements. The Fleet Logistics Center Yokosuka (FLCY), FRC WESTPAC, and the Defense Contract Management Agency (DCMA) are authorized to guide and/or direct the Contractor in the management and execution of the ID/IQ and/or TOs. See Attachment (2) for a detailed explanation of Government responsibilities and relationships to include authority references. Other Government entities not included herein are not authorized to direct the Contractor in any way.
APPLICABLE AND REFERENCE DOCUMENTS
The following documents of the issue listed form a part of this PWS to the extent specified herein. In the event of a conflict between documents referenced herein and the contents of this PWS, the contents of the PWS take precedence. Nothing in this PWS, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained. The following documents may be updated to the latest applicable revision at each individual TO.
PMI Specifications Naval Air Systems Command (NAVAIR)
| NAVAIR CV/MV-22-PMI |
| – |
| Integrated Maintenance Concept (IMC) Planned Maintenance Interval (PMI) Requirements Specification, Models CV/MV-22 Aircraft |
Dated TBD 2019, or later
(Document available to authorized personnel at https://www.jtdi.mil/. All other requests may be submitted to FRC WESTPAC for adjudication.)
Other Applicable Publications United States Code
| Title 10, Section 2451 - 2456 |
| – |
| Defense Supply Management |
(Document available at http://uscode.house.gov/search/criteria.shtml) Code of Federal Regulations (CFR)
| 29 CFR 1910.146 |
| – |
| Permit-Required Confined Spaces |
(Document available at https://www.osha.gov/) Defense Federal Acquisition Regulations Supplement (DFARS)
| DFARS 252.204-7012 |
| – |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| DFARS 252.211-7003 |
| – |
| Item Unique Identification and Valuation |
(Document available at https://www.acq.osd.mil/dpap/dars/dfars/html/current/252204.htm) Defense Contract Management Agency (DCMA)
| DCMA INST 309 Change 1 |
| – |
| Government Contract Quality Assurance (GCQA) Surveillance Planning |
Dated 13 April 2018, or later
| DCMA MAN 8201-2 |
| – |
| Aircraft Operations |
Dated 5 November 2018, or later
| DCMA INST 8210.1C Change 1 |
| – |
| Contractor’s Flight and Ground Operations |
dated 5 April 2017, or later
(Documents available at http://www.dcma.mil/Portals/31/Documents/Policy/) Department of Defense (DOD)
| DOD 4145.19-R-1 |
| _ |
| Storage and Material Handling |
Dated September 1979
| DODI 8500.01 |
| – |
| Cyber Security |
Dated 14 Mar 2014
| DODI 8560.01 |
| – |
| Communications Security (COMSEC) Monitoring |
Dated 22 August 2018
| UFC 4-211-01, Change 1 |
| – |
| Unified Facilities Criteria (UFC) Aircraft Maintenance Hangars |
Dated November 2017, or later
| UFC 4-211-02 |
| – |
| Unified Facilities Criteria (UFC) Aircraft Corrosion Control and Paint Facilities |
Dated 1 December 2012, or later
(Documents available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/850001_2014.pdf, https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/856001p.pdf?ver=2018-08-22-082328-107, https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc?page=1)
Military Standards
MIL-HDBK-728/1
MIL-HDBK-728/2
MIL-HDBK-728/3
MIL-HDBK-728/4
MIL-HDBK-728/5
MIL-HDBK-728/6
| – |
| Nondestructive Testing, 16 December 1985 |
Eddy Current Testing, 16 December 1985 Liquid Penetrant Testing, 16 December 1985 Magnetic Particle Testing, 28 December 1993 Radiographic Testing, 3 May 1994 Ultrasonic Testing, 16 December 1985
| MIL-STD-865D (USAF) |
| – |
| Selective, Brush Plating, Electro-Deposition |
Dated 01 March 2007
| MIL-STD-882E |
| – |
| DoD Standard Practice for System Safety |
Dated 11 May 2012, or later
(Documents available at http://quicksearch.dla.mil/) Department of the Navy
| OPNAVINST 3750.6S |
| – |
| Naval Aviation Safety Management System |
Dated 13 May 2014, or later
| OPNAVINST 5442.4M |
| - |
| Aircraft and Training Devices Material Condition Definitions, Mission Essential Subsystems, Matrices and Mission Descriptions |
| OPNAVINST 8023.24C |
| - |
| Navy Personnel Conventional Ammunition and Explosives Handling Qualification and Certification Program |
Dated 17 Oct 2017, or later
(Document available at https://www.public.navy.mil/NAVSAFECEN/Pages/instructions/instructions.aspx)
Commander, Naval Air Forces (CNAF)
| COMNAVAIRFORINST 4790.2C |
| – |
| Naval Aviation Maintenance Program (NAMP) |
Dated 15 January 2017, or later
COMNAVAIRFORINST 4790.2A Chg 1
V-22 Mission Essential Subsystems Matrix (MESM) Dated 18 March 2009, or later
(Document available at http://www.navair.navy.mil/logistics/4790 (CAC required). All other requests may be submitted to FRC WESTPAC for adjudication.)
Naval Air Systems Command (NAVAIR)
| NAVAIR 00-25-100/300 |
| – |
| Naval Air Systems Command Technical Publications Library Management Program |
dated 01 April 2016, or later
| NAVAIR 00-80-T-109 |
| – |
| Aircraft Refueling NATOPS Manual |
Dated 15 January 2018, or later
| NA-01-1A-16-01 |
| – |
| Nondestructive Inspection Methods, Basic Theory |
Dated 15 May 2014, or later
| NA-01-1A-16-02 |
| – |
| Nondestructive Inspection General Procedures and Process Controls |
Dated 1 March 2018, or later
| NAVAIR 01-1A-35 |
| – |
| Aircraft Fuel Cells and Tanks |
Dated 01 September 2012, or later
| NAVAIR 01-1B-50 |
| – |
| Aircraft Weight and Balance |
Dated 01 August 2015, or later
| NAVAIRINST 4200.56 |
| – |
| Critical Item Management, AIR-4.1.9 |
Dated 24 April 2013
| NAVAIRINST 13023.3 |
| – |
| Establishment of Procedures for Depot Planner and Estimator Services |
Dated 21 November 2005
(Documents available at http://mynatec.navair.navy.mil (CAC required). All other requests may be submitted to FRC WESTPAC for adjudication.)
Naval Supply Systems Command
| NAVSUP P-700 |
| – |
| Common Naval Packaging (CNP) |
Dated 16 October 2004, or later
(Document available to authorized personnel as a website at https://tarp.navsup.navy.mil/p700.nsf. All other requests may be submitted to FRC WESTPAC for adjudication.)
Fleet Readiness Center Western Pacific (FRC WESTPAC)
| NAPRA P4000 |
| – |
| Naval Air Pacific Repair Activity (now FRC WESTPAC) Supply Handbook |
(Requests may be submitted to FRC WESTPAC for adjudication).
Aerospace Industries Association (AIA)
| NAS410 4th Edition |
| – |
| NAS Certification and Qualification of Nondestructive Test Personnel |
Dated 19 December 2014
(Document available at https://www.astm.org/Standards/E1742.htm) American Society for Quality (ASQ)/American National Standards Institute (ANSI)/ International Organization for Standardization (ISO)
| ASQ/ANSI/ISO 9001:2015 |
| – |
| Quality Management Systems - Requirements |
(Documents available at https://asq.org/quality-press/display-item?item=T1040) ASTM International
| ASTM E1742/E1742M |
| – |
| Standard Practice for Radiographic Examination |
(Document available at https://www.astm.org/Standards/E1742.htm)
SCHEDULED AND UNSCHEDULED MAINTENANCE REQUIREMENTS
The requirements defined herein form the basis for depot-level MRO work performed for the Government as a part of this V-22 IMC PMI contract. These requirements are categorized as “scheduled maintenance basic requirement” which is the PMI task, and “unscheduled maintenance” associated with the PMI discrepancies, correction of discrepancies, and non-PMI tasks. The Contractor shall accept scheduled and unscheduled maintenance as required by the Government.
Scheduled Maintenance Basic Requirement - Planned Maintenance Interval (PMI) The Contractor shall perform the basic requirement of PMI scheduled maintenance for airframe and component inspection, defect correction, preventative maintenance, and technical directive compliance in accordance with the NAVAIR V-22 PMI Specification and released Depot Level Maintenance (DLM) Specification Interim Change Notices (SICN). PMI activities are broadly divided into the following phases: induction; surface conditioning; disassembly; inspection/evaluation; maintenance, repair and reassembly; final processing; functional flight check (FCF); and Government acceptance.
Induction of the Aircraft Induction occurs when the Government has delivered the aircraft, completed its reporting custodian responsibilities, and has made the aircraft available for the Contractor to begin work. The date of induction will be recorded as the day immediately following the Government’s delivery of the aircraft, unless otherwise established in the task order. V-22 inductions for aircraft configurations outside the NAVAIR V-22 PMI Specification will be coordinated by DCMA at least five (5) calendar days prior to the induction date.
The Government will make reasonable efforts to deliver aircraft no later than 1600, Monday through Friday. However, the Contractor shall receive aircraft at any time required by the Government.
Declassification of the aircraft will be completed by the Government prior to induction. The Contractor shall not perform operational checks on mission related systems that require classified equipment to perform such checks. If an aircraft is inducted with classified equipment installed, the Contractor shall immediately stop work on the aircraft and notify DCMA and Program Manager Technical Representative (PMTR). The PMTR will ensure that the classified equipment is removed by qualified Government personnel, then notify DCMA when the aircraft is ready for the Contractor to recommence work.
During the aircraft induction, the Contractor and Government shall complete a joint aircraft inventory check, conduct a screening analysis of the logbook and aircraft records, and verify any recorded defects. The contractor shall perform induction screening of aircraft logbooks per COMNAVAIRFORINST 4790.2C to identify high time components and unincorporated Technical Directives (TDs). The contractor shall notify DCMA and PMTR of any high time components discovered, and any outstanding TDs.
The Contractor shall complete the engine and propeller inspection and preservation no later than three (3) working days after aircraft induction or removal of the engine from a shipping container. The Contractor shall immediately notify DCMA and PMTR of unserviceable engines or of engines with major discrepancies. Unserviceable engines shall be removed from the aircraft and replaced in accordance with normal maintenance procedures by the Contractor. If an unserviceable engine can be made serviceable by use of organizational-level repair procedures, DCMA may negotiate with the Contractor to perform this task. The Contractor shall perform minor maintenance of aircraft engines (blending, removing and replacing engines, etc.) in accordance with applicable maintenance instructions.
The Government may conduct additional oversight for the first PMI aircraft inducted to ensure the Contractor performance is in accordance with the NAVAIR V-22 PMI Specification and this PWS. This oversight may include a formal pre-induction meeting, post-induction meeting during the repair phase, or other activities deemed necessary.
The Contractor shall submit the following reports as required:
· Technical Directives Requirement 10 Day Report (CDRL A001)
· Discrepant Part on Induction Report (CDRL A004)
Cleaning/Preservation The Contractor shall perform aircraft washing and preservation in accordance with the NAVAIR V-22 PMI Specification and any applicable instructions.
Surface Conditioning of the Aircraft Surface conditioning consists of cleaning the aircraft, stripping the painted surfaces, removing corrosion, then painting the aircraft. The Contractor shall perform disassembly as required to complete this task. The Contractor shall provide the required facilities for the clean, strip and paint processes and shall comply with hazardous material handling requirements during this phase.
Disassembly of the Aircraft The goal for disassembly is to gain access to the portions of the aircraft that require inspection. The Contractor shall remove removal parts, components, structures, and substructures necessary to complete the requirements of the V-22 PMI inspection and evaluation. This includes the removal of additional components needed to investigate suspected damage. Disassembly shall normally be limited to the removal of bolts and screws. However, removal of rivets or high strength fasteners may be required to determine the extent of corrosion or permit inspection for suspected damage. Discrepancies discovered during disassembly shall be recorded and reported to DCMA and PMTR.
Inspection/Evaluation of the Aircraft The Contractor shall perform a thorough and comprehensive inspection of selected aircraft structures and flight critical components by visual and appropriate non-destructive inspection (NDI) methods. This includes zones as defined in the NAVAIR V-22 PMI Specification as well as systems, components, and structures. The Contractor shall complete the mandatory non-destructive inspections and the flight hour dependent non-destructive inspections. All discrepancies discovered during this phase shall be reported to DCMA and PMTR.
The Contractor shall identify and requisition all required repair parts and materials using the Government supply system no later than submission of CDRL A007. Requests for Government engineering support shall be submitted periodically as the need for such requests are discovered and developed in accordance with paragraph 5.4 below.
The Contractor shall submit the following reports as required:
· Production Plan (CDRL A005)
· Scheduled Removal Cards (CDRL A007)
· Examiner and Evaluator (E&E) Discrepancy Report (CDRL A009)
· Non-Destructive Inspection (NDI) Report (CDRL A013)
Maintenance, Repair, and Reassembly of Aircraft The Contractor shall perform repairs of systems, components, and structures during this phase in accordance with the NAVAIR V-22 PMI Specification and authorized Authoritative Engineering Documents (AED). The Contractor shall complete adjustments, checks, tests, repairs, component rework, preventative maintenance, and coincidental rework procedures per the applicable directives and publications.
After aircraft repairs have been accomplished, the Contractor shall reassemble the aircraft in accordance with the NAVAIR V-22 PMI Specification and other applicable documents. Such reassembly includes installation of parts or components and reinstallation of non-operational parts or components that were reported as ‘noted but not corrected” (see paragraph 3.2.1) as directed by DCMA.
The Contractor shall ensure that parts and components either provided by or purchased by the Government are installed on the aircraft for which they were procured, unless otherwise permitted by the PMTR.
As-Required Maintenance Normally, maintenance tasks that have occurred at least three times within the scope of this contract will be considered “as-required” maintenance. The Government will then negotiate additional fixed prices for these frequently occurring maintenance tasks. The Contractor shall complete as required maintenance upon receipt of a task order issued by DCMA. There are no pre-defined as-required maintenance on this contract. All as-required maintenance items will be documented in this paragraph and negotiated into the contract as the repetitive tasks are identified.
Other As-Required Maintenance Other as-required maintenance tasks may include typical maintenance tasks that are outside the NAVAIR V-22 PMI Specification. Other as-required maintenance tasks may be incorporated by negotiated modifications to the contract. Such modifications will be initiated when the Government determines that a task is severable from the routine requirements of the NAVAIR V-22 PMI Specification, is anticipated to occur frequently in the future, and has an established price history (usually two to three occurrences under the current contract). These changes will be negotiated by DCMA with the Contractor prior to allocating costs against a reserved sub line item number (SLIN).
Final Processing During final processing, the Contractor shall perform weight and balance of the aircraft, update the logbooks and ensure the inventory recorded at induction is returned to the aircraft (e.g. de-preservation of engines, servicing fluids, lubrication, etc.).
The Contractor shall furnish the Government with two (2) paper copies of aircraft sell package, one (1) copy on disk, and one (1) electronic copy emailed to DCMA and the PMTR.
The Contractor shall submit the following reports as required:
· Technical Directives Report (CDRL A002)
· Scheduled Removal Cards Report (CDRL A007)
· Noted but Not Corrected (NBNC) Report (CDRL A010)
· Maintenance History Summary Report (CDRL A012)
· Noted and Corrected (NAC) Report (CDRL A014)
· Special Work Request Report (CDRL A015)
· PMI Man-hour/Material Cost Report (CDRL A016)
Aircraft Weight and Balance (AWB) The Contractor shall perform Aircraft Weight and Balance (AWB) in accordance with the COMNAVAIRFORINST 4790.2C_series and NAVAIR 01-1B-50_series instructions. The Contractor shall perform aircraft weighing using only approved platform scales. The Contractor shall verify platform scales used for AWB are certified and calibrated at time of use. The Contractor shall use the Automated Weight and Balance System (AWBS) approved by the Government (PMTR or DCMA) for recording the AWB, including updates to Chart A, Form B, Chart C, and Form F in support of FCF. The Contractor shall update the Aircraft Custodian’s Weight and Balance Binder, including provision of an updated computer disk.
Prior to assigning new technicians to participate in AWB duties on a Government aircraft, the Contractor shall notify the Government Ground Representative (GGR) in writing and provide copies of training and certification documents.
The Contractor shall submit the following reports as required:
· Weight and Balance Reports (CDRL A011)
Operational Checks The Contractor shall perform all flight critical systems checks, operational checks, alignment, and rigging as required by the NAVAIR V-22 PMI Specification and for systems disturbed during contract performance regardless of system status upon induction. This phase also includes updating logs and records, inventorying equipment, hydraulic system sampling, compass calibration and aircraft servicing. Any inspections required for flight, such as the daily inspection, shall be completed based on the timeline for FCF crew arrival. This includes preflight and prestart checks, but does not include engine start, taxi or run-up. The Contractor is NOT authorized to start the engines, taxi the aircraft, or conduct any form of flight. All engine turn, taxi, and flight operations will be conducted by US Government Aircrew.
Functional Flight Check (FCF) V-22 FCFs will be performed at the Contractor’s facility at the completion of PMI scheduled maintenance and prior to Government acceptance of the aircraft. The Government will provide the qualified aircrew to perform FCF. Contractor support during FCF shall include, but is not limited to, the following:
a. Provide appropriate takeoff, landing, and forward flight operating areas
b. All inspections required for flight
c. All repairs required for safety of flight
d. All required aircraft servicing
e. Firefighting and other airfield services
f. Post-flight inspections
g. Repairs to correct discrepancies discovered during FCF (the first 150 hours of repairs during FCF are chargeable to the Scheduled Maintenance-Basic Requirement; repairs beyond 150 hours are chargeable to Unscheduled Maintenance) The Contractor shall support FCF for each day that FCF is scheduled without interruption by weekends or designated holidays. On‐going FCF activities that extend outside normal business hours, including overtime, weekends, and holidays, regardless of responsible party, shall be supported by the Contractor when requested by DCMA or PMTR.
Government Acceptance Upon successful completion of PMI scheduled maintenance and FCF, the Contractor shall submit the DD250 to DCMA with the completed inspection cards for review and acceptance. Government personnel will reinstall classified, confidential and sensitive equipment.
Scheduled Maintenance Basic Requirement - Miscellaneous Fueling/Defueling The Contractor shall defuel all V-22 aircraft brought to its facility for PMI in accordance with the NAVAIR V-22 PMI Specification and any other applicable instructions (i.e., NAVAIR 01-1A-35). The Contractor shall provide fuel for V-22 FCFs, V-22 return flights after completion of PMI, and return flights of other military aircraft flown to the Contractor's facility for the purpose of supporting and administering the contract.
The Contractor shall only use JP-5 or JP-8 fuel in support of the V-22. The Contractor shall credit the value of fuel removed from PMI aircraft at induction against the fuel provided to the Government under the same task order. The Contractor shall not bill the Government for fuel disposal costs.
The Contractor shall test all fuel removed from inducted PMI aircraft to ensure proper storage or disposition. The Contractor shall follow a certified commercial standard for fuel testing that either meets or exceeds the requirements of NAVAIR 00-80-T-109 and shall ensure that all fuel provided to the Government meets the required quality standards. The Contractor shall not hold the Government liable for cross-contamination between fuel removed from an inducted PMI aircraft and any fuel stored in bulk at either the Contractor's or a sub-contractor facility.
The Government will not provide fueling/defueling vehicles nor oil vehicles under this contract.
Other Aircraft Services The Contractor shall provide support for the Government to procure other general aircraft services for aircraft visiting the Contractor’s facility, to include procurement of liquid oxygen (LOX) and nitrogen. These other aircraft services will be requested and negotiated by DCMA on an as-needed basis.
Aircraft Records Management The Contractor shall screen, maintain, and update the aircraft logbook and records throughout all the PMI phases in accordance with the NAVAIR V-22 PMI Specification and COMNAVAIRFORINST 4790.2C. The Contractor shall provide to the PMTR and DCMA the information required for compliance with Event History Record (EHR) and Scheduled Removal Component (SRC) card recording, consolidation, purging, and forwarding to Configuration Management Information System (CMIS) Repository.
Unscheduled Maintenance Requirements Unscheduled maintenance requirements are those which are not specifically delineated as scheduled maintenance requirement as described in the NAVAIR V-22 PMI Specification. Unscheduled maintenance can be initiated in several ways such as discovery during the PMI phase, request from the operational fleet, or an emergent, urgent need. Unscheduled maintenance items are further divided into five (5) subcategories:
a. Over and Above (O&A) Related to PMI
b. Over and Above (O&A) Not Related to PMI
c. Technical Directives (TDs) and Modifications
d. Customer Service Requests (CSR)
e. In-Service Repairs (ISR) Over and Above Related to PMI Unscheduled maintenance discovered in conjunction with PMI are typically called “discrepancies.” O&A discrepancies are typically related to PMI requirements but are not specifically required by the NAVAIR V-22 PMI Specification. O&A discrepancies are typically those that are repairable within published tolerance thresholds. O&A related to PMI are restricted to discrepancies related to inspection requirements in NAVAIR V-22 PMI Specification Sections 2-5, 2-6 and 2-7.
O&A discrepancies can be discovered during any phase of the PMI scheduled maintenance by both the Government and Contractor personnel. The following are some examples of activities that can be used to identify unscheduled maintenance requirements:
a. Review of aircraft logbooks and records
b. Operational and functional testing of systems
c. Examination of the aircraft and its associated components during PMI
d. Failure during fleet operational activities where the repair is outside of organic capabilities including crash damaged/battle damaged aircraft
The Contractor shall promptly notify DCMA and PMTR when O&A discrepancies are discovered on an inducted aircraft. All O&A discrepancies will be adjudicated on a case-by-case basis with DCMA and the PMTR. Discrepancies that result from the Contractor’s negligence shall be corrected at the Contractor’s expense.
Classification of Discrepancies Related to PMI Upon identification of a discrepancy related to PMI, the Contractor shall classify each discrepancy as depot-level, intermediate-level (I-level), or organizational-level (O-level) using the definitions in the NAVAIR V-22 PMI Specification. The Contractor’s defect classification shall be subject to review by DCMA. The correction criteria for each discrepancy are in the NAVAIR V-22 PMI Specification. The Contractor shall correct any and all discrepancies that affect Safety of Flight or Personnel, regardless of classification.
The discrepancies classified as intermediate- or organizational-level may be further classified as “noted but not corrected” (NBNC) using the guidelines in the NAVAIR V-22 PMI Specification. The Government may elect to have Contractor correct the O or I level discrepancies; this will be negotiated by DCMA for each TO. The Government’s goal is to minimize the NBNC discrepancies on the accepted aircraft.
The Contractor shall submit the following report as required:
· Noted But Not Corrected (NBNC) Report (CDRL A010) Correction of Discrepancies Related to PMI O&A discrepancies related to PMI are included in the Scheduled Maintenance Basic Requirement. The Contractor shall negotiate an O&A repair process with DCMA with emphasis on rapidly processing the modification in order to start work as soon as possible. Upon identification of an O&A discrepancy, the Contractor shall initiate the written requests to DCMA for authority to perform O&A repairs related to PMI. DCMA will negotiate these requests on a case-by-case basis prior to authorizing the Contractor to commence work. All O&A tasks requiring fewer than 200 man-hours for completion will be authorized by DCMA prior to the Contractor commencing work. O&A tasks requiring over 200 man-hours to complete shall be routed to the PMTR for concurrence before the Contractor submits the written request to DCMA.
O&A Not Related to PMI Some O&A discrepancies may not be related to the PMI or may be outside the bounds of the specification, however the task order modification and repair process will be the same. Zero (0) man-hours to correct O&A discrepancies not related to the PMI are included in the Scheduled Maintenance Basic Requirement. In addition, discrepancies discovered within the 18” radius defined in V-22 PMI Specification 2-5 in the performance of the Scheduled Maintenance Basic Requirement will be considered O&A Not Related to PMI.
The Contractor shall negotiate an O&A repair process with DCMA with emphasis on rapidly processing the modification in order to start work as soon as possible. Upon identification of an O&A discrepancy, the Contractor shall initiate the written requests to DCMA for authority to perform O&A repairs not related to PMI. DCMA will negotiate these requests on a case-by-case basis prior to authorizing the Contractor to commence work.
Requests for unscheduled maintenance can come from a variety of sources to include any US military service component or ally who fly a V-22 T/M/S aircraft. These aircraft include all V-22 aircraft in the Government inventory, crash and battle damaged aircraft, and Foreign Military Sales (FMS) aircraft. Unscheduled maintenance requests come in the form of Technical Directives (TD) or Aircraft Modifications, Customer Service Requests (CSR), and In Service Repairs (ISR). The Contractor shall perform modifications and repairs in support of unscheduled maintenance requests.
Technical Directives (TD) and Aircraft Modifications.
It is common to incorporate TDs and approved aircraft modifications concurrent with PMI scheduled maintenance. The Contractor shall incorporate authorized TDs and aircraft modifications as negotiated in the associated task order. Place of performance may be at either the Contractor’s facility or at other locations as identified in the task order. The Contractor shall notify DCMA and PMTR when an extended contract delivery date (CDD) is required in order to complete a TD or aircraft modification, or if the CDD of a PMI aircraft will be delayed by Contractor performance required to complete a TD or aircraft modification.
The Government will normally provide modification kits, special materials, and special support equipment listed in the TD or aircraft modification instruction. In the event that the Government cannot provide such items, DCMA may negotiate with the Contractor to procure or manufacture the items.
The Contractor shall submit the following reports as required:
· Technical Directives Requirement 10 Day Report (CDRL A001)
· Technical Directives Report (CDRL A002)
· TDC Kit Receipt and Report of Kit Discrepancy (CDRL A003)
Customer Service Request (CSR) Customer Service Requests typically come from the operational fleet or the V-22 T/M/S program office for work that either supplements or is beyond the capability of the component requesting the service. CSRs include, but are not limited to, task similar to the following:
a. Special and phase inspections
b. Organizational and intermediate level services (including minor aircraft repairs and repair or manufacturing of parts and components)
c. Support equipment repair
d. Application of non-standard paint finishes and color schemes The Contractor shall support CSRs as negotiated with DCMA. Task orders for CSR work can be issued for both inducted and non-inducted aircraft. If the Contractor receives a CSR directly from a component other than DCMA or PMO, the Contractor shall respond by forwarding the request to DCMA and PMTR for adjudication. DCMA will negotiate with the Contractor to incorporate CSRs into the task order prior to any work being performed.
In-Service Repairs (ISR) In-Service Repair requests typically come from the operational fleet or the V-22 T/M/S program office for work that either supplements or is beyond the capability of the component requesting the service. ISRs include, but are not limited to, tasks similar to the following:
a. Miscellaneous aircraft services
b. Aircraft component or part repair
c. Corrosion control; rework
d. Drop-in repair; parts manufacturing
e. Management of radioactive materials and radioactive decontamination of aircraft The Contractor shall perform ISRs as negotiated with DCMA. Task orders for ISR work can be issued for both inducted and non-inducted aircraft. If the Contractor receives an ISR request directly from a component other than DCMA or PMO, the Contractor shall respond by forwarding the request to DCMA and PMTR for adjudication. DCMA will negotiate with the Contractor to incorporate ISR tasks into the task order.
It is common for ISR requests to require support at a forward-deployed location. See CFT support requirement at paragraph 5.2.2.
GOVERNMENT PRIORITIES
Quality, schedule, and safety are the Government priorities. The Contractor shall reflect these priorities in its execution of the contract requirements.
Quality Contractor’s Quality Control Program The Contractor shall comply with ISO 9001:2015 or equivalent requirements applicable to this ID/IQ. The Contractor shall implement a Quality Control Program establishing effective and efficient procedures for ensuring the quality of work performed under this contract. At a minimum, the Program shall specify the area(s) to be inspected on both a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s). The Program shall also provide a description of the methods to be used for identifying, correcting, and preventing unacceptable performance. The Contractor shall generate and keep records documenting inspections and corrective or preventative actions taken. Records of inspections shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
Work Deck Validation Requirement Upon request from DCMA, the Contractor shall allow for the V-22 FST to review and concur with initial work decks prior to the induction of the first PMI aircraft.
Ten (10) days prior to the scheduled start of FCF, the Contractor shall provide work decks to the Government QAR for validation that all items were correctly stamped and certified as work complete.
Government Quality Assurance Representative (QAR) The Government will assign a QAR who will be responsible for implementing DCMA INST 309 and performing quality assurance surveillance of the Contractor. The QAR will evaluate the Contractor’s Quality Control Program including an annual assessment of the effectiveness of Contractor’s Quality Control processes. The QAR will provide oversight and approve the inspection and verification of safety of flight, critical safety items, and select additional areas as identified by the Government pertinent to DCMA MAN 8201-2 and DCMA INST 8210.1C Change 1.
Government Quality Assurance Plan (QASP) The Government will monitor the Contractor’s performance in accordance with the QASP in Attachment (3). The QASP is the primary process for the COR to perform contract surveillance functions and is distinct from the function performed by the Government’s QAR. A Surveillance Matrix is part of the Contract QASP and identifies performance objectives, performance standards, and surveillance methods that the Government will apply in its surveillance. The contents of the QASP and Surveillance Matrix are subject to revision at any time deemed appropriate by the Government. The Government reserves the right to survey all services called for in the contract and task orders. The absence of any contract requirement from the Surveillance Matrix shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract.
Corrective Action Plan (CAP) Within 10 days of receipt of a Corrective Action Request (CAR) from the GFR or GGR, the Contractor shall submit a CAP in accordance with DCMA MAN 8201-2 and DCMA INST 8210.1C Change 1. The CAP shall include the cause of the defect and the preventative measure(s) implemented to prevent any future occurrence.
If the Contractor fails to take necessary action to ensure future performance of the contract requirements, the Government may negotiate adequate consideration or enact other remedies as allowed by the contract and Government regulations.
Aircraft Acceptance Inspection Deficiency Report (AIDR) COMNAVAIRFORINST 4790.2C states the reporting custodian of the aircraft will submit the initial AIDR within five (5) calendar days after completion of the Government acceptance of FCF, then submit a supplemental AIDR 30 calendar days after Government acceptance of FCF, if required. The AIDR is used to document any deficiencies discovered after acceptance that may indicate faulty workmanship. The COR will review all AIDR findings to verify whether the deficiencies identified are indicative of faulty workmanship or nonconformance to the requirements of the contract which may result in Contractor correction or re-performance.
Contractor Correction or Re-performance under Warranty The Contractor shall correct, at no additional cost to the Government, all discrepancies identified in the AIDR and verified by the COR to be Contractor responsibility. The corrections or re-performance associated with the final AIDR disposition report shall be completed within ten (10) calendar days of receipt of notice. This may require the Contractor to travel to aircraft custodian’s location if the Government determines that it is unsafe or uneconomical to return the aircraft to the Government’s maintenance facility. If the Contractor corrects a deficiency and it is later determined that the Contractor was not at fault, DCMA will modify the task order to provide adequate consideration reimbursing the Contractor for its efforts. If the Contractor is unable to perform the work (e.g., due to the location of the aircraft) DCMA may take appropriate action, including modification of the task order to seek adequate consideration or seeking actual damages against the Contractor.
Schedule Turn Around Time (TAT) Expectation Turn Around Time (TAT) is one of the Government’s Key Performance Parameters (KPP) and is the most objective indication of the Contractor’s ability to successfully perform the requirements of this contract. The TAT is expressed in terms of threshold and objective. The threshold value is the minimum acceptable TAT, however the objective TAT, or lower, is the goal. The Contractor bears the full responsibility and accountability for achieving the threshold TAT. The Contractor shall plan, perform and manage its work to accomplish all scheduled and unscheduled services within the following TAT:
Threshold TAT:
| Aircraft |
| Event |
| PMI Days |
| FCF Days |
| Total Contract TAT |
| V-22 |
| PMI-2 |
| 472 Calendar Days |
| 10 Calendar Days |
| 482 Calendar Days |
Objective TAT:
| Aircraft |
| Event |
| PMI Days |
| FCF Days |
| Total Contract TAT |
| V-22 |
| PMI-2 |
| 355 Calendar Days |
| 10 Calendar Days |
| 365 Calendar Days |
A “calendar day” is defined as the 24-hour period beginning at one second after midnight (00:00:01 a.m.) and ending on the following midnight (00:00:00). Calendar days include all weekdays (Sunday through Saturday), regardless of any other categorization such as holiday, weekday, weekend, workday, etc.
TAT shall begin on the day the aircraft is inducted and end after the completion of a FCF when the Government accepts the aircraft as recorded on the signed DD250. The date of induction will be recorded as the day immediately following the Government’s delivery of the aircraft, unless otherwise established in the task order.
When DCMA requests the Contractor perform additional work beyond the basic requirement that cannot reasonably be accomplished within the TAT, the Contractor may negotiate an increase to TAT. DCMA may grant TAT extensions to accommodate delays related to completion of FCF that are caused by circumstances beyond the Contractor’s control. The Contractor shall ensure that any other work requested on non-inducted aircraft (e.g., CSR or ISR requirements) will not affect the TAT of an inducted PMI aircraft.
If the Contractor has not previously performed PMI on the V-22 aircraft, the first induction will be considered a prototype with emphasis on validating processes, developing workforce capability and identifying efficiency opportunities. Up to 25% variance from the threshold TAT shall be allowable without incurring liquidated damages. Additional variance may be established at DCMA discretion where the Contractor is clearly performing all tasks in good faith.
Workload…
This is the start of the file's text. The full file is on GovTribe.