Attachment_J-1503050-15-ELINS.xlsx

XLSX spreadsheet 222 KB Posted

Attached to
Grounds Maintenance Federal contract opportunity
Solicitation number
N6247319Q4606
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Attachment 1503050-15 - ELINs

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

SUMMARY SCHEDULE FOR GROUNDS MAINTENANCE AT NWS SEAL BEACH & NWSSB DETACHMENTS NORCO & FALLBROOK
BASE PERIOD (SEPTEMBER 27, 2019 - MARCH 31, 2020)BaseOption Year 1Option Year 2Option Year 3Total
SEAL BEACH - FFP - BASE PERIOD - (ELINS A001 - A007)$0.00(NWSSB Only)(All Locations)(All Locations)(All Locations)
SEAL BEACH - IDIQ - BASE PERIOD - (ELINS A701 - A735)$10,000.00Anticipated PoP09/27/19–03/31/2004/01/20–03/31/2104/01/21– 03/31/2204/01/22– 03/31/23
FFP$0.00$0.00$0.00$0.00$0.00
TOTAL FFP FOR BASE PERIOD$0.00IDIQ$10,000.00$30,000.00$30,000.00$30,000.00$100,000.00
TOTAL IDIQ FOR BASE PERIOD$10,000.00TOTAL$10,000.00$30,000.00$30,000.00$30,000.00$100,000.00
TOTAL PRICE FOR BASE PERIOD (EXHIBIT A)$10,000.00
OPTION 1 PERIOD (APRIL 1, 2019 - MARCH 31, 2020)
SEAL BEACH - FFP - OPTION PERIOD 1 - (ELINS B001 - B007)$0.00
SEAL BEACH - IDIQ - OPTION PERIOD 1 - (ELINS B701 - B735)$20,000.00
NORCO - FFP - OPTION PERIOD 1 - (ELINS E001 - E004)$0.00
NORCO - IDIQ - OPTION PERIOD 1 - (ELINS E701 - E733)$10,000.00
FALLBROOK - FFP - OPTION PERIOD 1 - (ELINS H001 - H004)$0.00
FALLBROOK - IDIQ - OPTION PERIOD 1 - (ELINS H701 - H735)$0.00
TOTAL FFP FOR OPTION 1 PERIOD$0.00
TOTAL IDIQ FOR OPTION 1 PERIOD$30,000.00
TOTAL PRICE FOR OPTION PERIOD 1$30,000.00
OPTION 2 PERIOD (APRIL 1, 2020 - MARCH 31, 2021)
SEAL BEACH - FFP - OPTION PERIOD 2 - (ELINS C001 - C007)$0.00
SEAL BEACH - IDIQ - OPTION PERIOD 2 IDIQ - (ELINS C701 - C735)$20,000.00
NORCO - FFP - OPTION PERIOD 2 (ELINS F001 - F004)$0.00
NORCO - IDIQ - OPTION PERIOD 2 - (ELINS F701 - F733)$10,000.00
FALLBROOK - FFP - OPTION PERIOD 2 - (ELINS J001 - J004)$0.00
FALLBROOK - IDIQ - OPTION PERIOD 2 - (ELINS J701 - J735)$0.00
TOTAL FFP FOR OPTION 2 PERIOD$0.00
TOTAL IDIQ FOR OPTION 2 PERIOD$30,000.00
TOTAL PRICE FOR OPTION PERIOD 2$30,000.00
OPTION 3 PERIOD (APRIL 1, 2021 - MARCH 31, 2022)
SEAL BEACH - FFP - OPTION PERIOD 3 - (ELINS D001 - D007)$0.00
SEAL BEACH - IDIQ - OPTION PERIOD 3 IDIQ - (ELINS D701 - D735)$20,000.00
NORCO - FFP - OPTION PERIOD 3 (ELINS G001 - G004)$0.00
NORCO - IDIQ - OPTION PERIOD 3 - (ELINS G701 - G733)$10,000.00
FALLBROOK - FFP - OPTION PERIOD 3 - (ELINS K001 - K004)$0.00
FALLBROOK - IDIQ - OPTION PERIOD 3 - (ELINS K701 - K735)$0.00
TOTAL FFP FOR OPTION 3 PERIOD$0.00
TOTAL IDIQ FOR OPTION 3 PERIOD$30,000.00
TOTAL PRICE FOR OPTION PERIOD 3$30,000.00
TOTALS ALL YEARS (OCTOBER 1, 2017 - JUNE 30, 2022)
SEAL BEACH TOTAL FFP FOR CONTRACT (ELINS A001 - D007)$0.00
SEAL BEACH TOTAL IDIQ FOR CONTRACT (A701 - D735)$70,000.00
SEAL BEACH - TOTAL PRICE (ALL YEARS)$70,000.00
NORCO TOTAL FFP FOR CONTRACT (ELINS E001 - G004)$0.00
NORCO TOTAL IDIQ FOR CONTRACT (E701 - G733)$30,000.00
NORCO - TOTAL PRICE (ALL YEARS)$30,000.00
FALLBROOKTOTAL FFP FOR CONTRACT (ELINS H001 - K004)$0.00
FALLBROOKTOTAL IDIQ FOR CONTRACT (H701 - K735)$0.00
FALLBROOK - TOTAL PRICE (ALL YEARS)$0.00
TOTAL FFP FOR CONTRACT$0.00
TOTAL IDIQ FOR CONTRACT$100,000.00
CONSOLIDATED TOTAL PRICE FOR GROUNDS MAINTENANCE SERVICES$100,000.00

SB_BaseFFP

ATTACHMENT J-B-01
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-19-Q-4606
EXHIBIT A - FFP
Seal Beach NWS Grounds Maintenance Service Period of Performance Starts: September 27, 2019 End: March 31, 2020
The Contractor will price the specified services at COL3 . In total, these sum to Line Item 001 trough 007 and represent the minimum FFP award for the Base Option Period of performance.

For each Option Period, the Contractor shall price ELINs in the same manner as explained above for the Base Option Period of performance.

Line Item 0001 Firm Fixed Price - Base Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A007.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
A001 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.6MO$0.00
A002 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Street Sweeping - Using a regenerative (closed loop) street sweeper, provide street and parking lot sweeping in delineated areas to ensure paved surfaces are clean and free of debris and metal dust particles. The Contractor shall properly dispose of all waste collected at no additional cost to the Government. Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.6per year$0.00
A003 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Complete Tree Pruning
Large - above 15' Complete Tree Pruning20EA$0.00
CNIC Subtotal$0.00
A004 -NSWC - 1503050 Grounds Maintenance and Landscaping - COL 2
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.6MO$0.00
A005 -NSWC - 1503050 Grounds Maintenance and Landscaping - COL 2
Complete Tree Pruning
Large - above 15' Complete Tree Pruning7EA$0.00

NSWC Subtotal $0.00

A006 -BUMED - 1503050 Grounds Maintenance and Landscaping - COL 3
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.6MO$0.00

BUMED Subtotal $0.00

A007 - MARINES SEAL BEACH - 1503050 Grounds Maintenance and Landscaping - COL 3
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.6MO$0.00

Marines Subtotal $0.00

TOTAL FFP WORK $0.00

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

SB_BaseIDIQ

ATTACHMENT J-B-01
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-19-Q-4606
EXHIBIT A - IDIQ
Indefinite Delivery / Indefinite Quantity Price - Base Period
PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4

ELIN Product Name (120 Characters) Description Extended Estimated Quantity Qty Unit of Issue Unit Price IMAP CAC(s)

A7019410 7420Special Event Grass CuttingGrass shall be mowed and trimmed to a uniform height of 2 inches. All clippings and debris shall be removed. Work to be completed in 3 calendar days.13AC$0.00
A7029410 7420Special Event EdgingEdging to provide a uniform edged cut. All clippings shall be removed. Work to be completed in 3 calendar days.1,250LF$0.00
A7039410 7420Special Event RakingThis work includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days.25AC$0.00
A7049410 9430 9440 7420Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.38EA$0.00
A7059410 9430 9440 7420Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.38EA$0.00
A7069410 9430 9440 7420Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.63EA$0.00
A7079410 9430 9440 7420Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.38EA$0.00
A7089410 9430 9440 7420Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.38EA$0.00
A7099410 9430 9440 7420Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.38EA$0.00
A7109410 9430 9440 7420Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.25EA$0.00
A7119410 9430 9440 7420Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.25EA$0.00
A7129410 9430 7420Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.3EA$0.00
A7139410 9430 7420GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.1,000SF$0.00
A7149410 9430 7420Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.8EA$0.00
A7159410 9430 7420Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.25EA$0.00
A7169410 9430 7420Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.25EA$0.00
A7179410 7420Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.38EA$0.00
A7189410 9430 7420SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.125SF$0.00
A7199410 9430 7420FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.10AC$0.00
A7209410 9430 7420Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be over seeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.50AC$0.00
A7219410 9430 7420AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.16AC$0.00
A7229410 9430 9440 7420Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.20EA$0.00
A7239410 9430 9440 7420Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.50LF$0.00
A7249410 9430 9440 7420Erosion ControlSoil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days.125CY$0.00
A7259430 9440 7420Under brushingAll brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days.10AC$0.00
A7269430 9440 7420Field MowingVegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days.100AC$0.00
A7279410 9430 9440 7420Control Undesired VegetationRemove vegetation along fence lines and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.25,000LF$0.00
A7289410 9430 9440 7420Control of Undesired Vegetation with herbicidesTreating vegetation using hericides to control vegetation growth. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.100AC$0.00
A7299410 9430 9440 7420Debris RemovalRemove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris.
Work shall be completed within 10 calendar days.125CY$0.00
A7309410 9430 9440 7420Aquatic Weed ControlRemoval of Aquatic Weeds may be accomplish by using mechanically whenever possible and/or approved herbicides may be applied to designated areas. Control shall be obtain three weeks after initial application of herbicides.1AC$0.00
A731Street SweepingProvide street and parking lot sweeping to ensure paved surface are clean and free of debris.50,000SF$0.00
A732Unit Price LaborProvide labor to perform all Unit Priced Labor work subject per the scope and delivery schedule specified in the order.125HR$0.00
A733Materials and Equipment CostsProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.10,000EANegotiated$10,000.00
A734Pest ControlProvide labor hours for pest control of pest vertebrate animals.75HR$0.00
A735MOWING MAGAZINE Clear Zones and RoadsidesMagazine and clear zone areas shall be mowed to an average uniform finished height of 3 inches as measured from the soil. Magazines and barricaded siding shal be mowed/hand cut on 3 sides and top. Blast shields shall be mowed/hand cut on all 3 sides, top and back. The contractor shall not cut any closer than 5 feet around any ventilators on magazines with gas powered equipment. The contractor shall hancut the remaining vegetation around the ventilators. Total weight restrictions of any piece of equipment shall not exceed 3,000 lbs evenly distributed at least 4 wheels with the center of any wheel not closer than 3 feet 6 inches to any other wheel. This restriction only applies to magazines only. Roadside clear zones shall be mowed from edge of asphalt to the width specified.25AC$0.00
TOTAL IQ LINE ITEMS$10,000.00

SB_FFP-OY1

ATTACHMENT J-B-01
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-19-Q-4606
EXHIBIT A - FFP
Seal Beach NWS Grounds Maintenance Service Period of Performance Starts: April 1, 2020 End: March 31, 2021
The Contractor will price the specified services at COL3 . In total, these sum to Line Item 001 trough 007 and represent the minimum FFP award for the 1st Option Period of performance.

For each Option Period, the Contractor shall price ELINs in the same manner as explained above for the 1st Option Period of performance.

Line Item 0001 Firm Fixed Price - 1st Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B007.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
B001 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12MO$0.00
B002 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Street Sweeping - Using a regenerative (closed loop) street sweeper, provide street and parking lot sweeping in delineated areas to ensure paved surfaces are clean and free of debris and metal dust particles. The Contractor shall properly dispose of all waste collected at no additional cost to the Government. Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12per year$0.00
B003 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Complete Tree Pruning
Large - above 15' Complete Tree Pruning20EA$0.00

CNIC Subtotal $0.00

B004 -NSWC - 1503050 Grounds Maintenance and Landscaping - COL 2$0.00
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12MO
B005 -NSWC - 1503050 Grounds Maintenance and Landscaping - COL 2$0.00
Complete Tree Pruning
Large - above 15' Complete Tree Pruning7EA
NSWC Subtotal$0.00
B006 -BUMED - 1503050 Grounds Maintenance and Landscaping - COL 3$0.00
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12MO
BUMED Subtotal$0.00
B007 - MARINES SEAL BEACH - 1503050 Grounds Maintenance and Landscaping - COL 3$0.00
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12MO
Marines Subtotal$0.00

TOTAL FFP WORK $0.00

SB_IDIQ-OY1

ATTACHMENT J-B-01
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-19-Q-4606
EXHIBIT A - IDIQ
Indefinite Delivery / Indefinite Quantity Price - Base Period
PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B008 through B042.

ELIN Product Name (120 Characters) Description Extended Estimated Quantity Qty Unit of Issue Unit Price IMAP CAC(s)

B7019410 7420Special Event Grass CuttingGrass shall be mowed and trimmed to a uniform height of 2 inches. All clippings and debris shall be removed. Work to be completed in 3 calendar days.25AC$0.00
B7029410 7420Special Event EdgingEdging to provide a uniform edged cut. All clippings shall be removed. Work to be completed in 3 calendar days.2,500LF$0.00
B7039410 7420Special Event RakingThis work includes the raking and removal of leaves, pine straw and pinecones, limbs, and other debris from the raked area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days.50AC$0.00
B7049410 9430 9440 7420Tree and Stump Removal
Large 18.1” DBH and above Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 10 calendar days.75EA$0.00
B7059410 9430 9440 7420Tree and Stump Removal
Medium 6.1" DBH up to 18" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 7 calendar days.75EA$0.00
B7069410 9430 9440 7420Tree and Stump Removal
Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.

Work shall be completed within 5 calendar days.125EA$0.00
B7079410 9430 9440 7420Shrub and Stump Removal
Large 15-gallon and above, 48.1” and above Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.75EA$0.00
B7089410 9430 9440 7420Shrub and Stump Removal
Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 5 calendar days.75EA$0.00
B7099410 9430 9440 7420Shrub and Stump Removal
Small Up to 5-gallon, up to 18” Shrub and Stump RemovalRemove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area.

Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.

Work shall be completed within 3 calendar days.75EA$0.00
B7109410 9430 9440 7420Complete Tree Pruning
Small - below and including 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 1 calendar day.50EA$0.00
B7119410 9430 9440 7420Complete Tree Pruning
Large - above 15' Complete Tree PruningThe Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 2 calendar days.50EA$0.00
B7129410 9430 7420Soil AnalysisPerform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations.5EA$0.00
B7139410 9430 7420GrassingAreas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days.
Seed species will be identified in the task order.2,000SF$0.00
B7149410 9430 7420Tree PlantingAll trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.15EA$0.00
B7159410 9430 7420Shrub Planting (1-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.50EA$0.00
B7169410 9430 7420Shrub Planting (5-gallon)All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.
Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.50EA$0.00
B7179410 7420Bedding/Ornamental Plants (4" pot size)All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days.75EA$0.00
B7189410 9430 7420SoddingSod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government.
Work shall be completed within 20 calendar days.250SF$0.00
B7199410 9430 7420FertilizeVegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days.20AC$0.00
B7209410 9430 7420Dethatch & AerateServices shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be over seeded to provide a healthy appearance.
Work shall be completed within 14 calendar days.100AC$0.00
B7219410 9430 7420AerateGrass shall be aerated to promote health and growth.
Work shall be completed within 10 calendar days.32AC$0.00
B7229410 9430 9440 7420Shrub Pruning (Stand-alone plants)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.40EA$0.00
B7239410 9430 9440 7420Hedge Pruning (Continuous Hedging)The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist.
Work shall be completed within 3 calendar days.100LF$0.00
B7249410 9430 9440 7420Erosion ControlSoil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days.250CY$0.00
B7259430 9440 7420Under brushingAll brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days.20AC$0.00
B7269430 9440 7420Field MowingVegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days.200AC$0.00
B7279410 9430 9440 7420Control Undesired VegetationRemove vegetation along fence lines and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.50,000LF$0.00
B7289410 9430 9440 7420Control of Undesired Vegetation with herbicidesTreating vegetation using hericides to control vegetation growth. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP).
Work shall be completed within 10 calendar days.200AC$0.00
B7299410 9430 9440 7420Debris RemovalRemove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris.
Work shall be completed within 10 calendar days.125CY$0.00
B7309410 9430 9440 7420Aquatic Weed ControlRemoval of Aquatic Weeds may be accomplish by using mechanically whenever possible and/or approved herbicides may be applied to designated areas. Control shall be obtain three weeks after initial application of herbicides.1AC$0.00
B731Street SweepingProvide street and parking lot sweeping to ensure paved surface are clean and free of debris.100,000SF$0.00
B732Unit Price LaborProvide labor to perform all Unit Priced Labor work subject per the scope and delivery schedule specified in the order.250HR$0.00
B733Materials and Equipment CostsProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.20,000EANegotiated$20,000.00
B734Pest ControlProvide labor hours for pest control of pest vertebrate animals.150HR$0.00
B735MOWING MAGAZINE Clear Zones and RoadsidesMagazine and clear zone areas shall be mowed to an average uniform finished height of 3 inches as measured from the soil. Magazines and barricaded siding shal be mowed/hand cut on 3 sides and top. Blast shields shall be mowed/hand cut on all 3 sides, top and back. The contractor shall not cut any closer than 5 feet around any ventilators on magazines with gas powered equipment. The contractor shall hancut the remaining vegetation around the ventilators. Total weight restrictions of any piece of equipment shall not exceed 3,000 lbs evenly distributed at least 4 wheels with the center of any wheel not closer than 3 feet 6 inches to any other wheel. This restriction only applies to magazines only. Roadside clear zones shall be mowed from edge of asphalt to the width specified.50AC$0.00
TOTAL IQ LINE ITEMS$20,000.00

SB_FFP-OY2

ATTACHMENT J-B-01
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-19-Q-4606
EXHIBIT A - FFP
Seal Beach NWS Grounds Maintenance Service Period of Performance Starts: April 1, 2021 End: March 31, 2022
The Contractor will price the specified services at COL3 . In total, these sum to Line Item 001 trough 007 and represent the minimum FFP award for the 2nd Option Period of performance.

For each Option Period, the Contractor shall price ELINs in the same manner as explained above for the 2nd Option Period of performance.

Line Item 0001 Firm Fixed Price - 2nd Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C007.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalCAC
C001 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12MO$0.00
C002 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Street Sweeping - Using a regenerative (closed loop) street sweeper, provide street and parking lot sweeping in delineated areas to ensure paved surfaces are clean and free of debris and metal dust particles. The Contractor shall properly dispose of all waste collected at no additional cost to the Government. Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12per year$0.00
C003 - CNIC- 1503050 Grounds Maintenance and Landscaping - COL 3
Complete Tree Pruning
Large - above 15' Complete Tree Pruning20EA$0.00

CNIC Subtotal $0.00

C004 -NSWC - 1503050 Grounds Maintenance and Landscaping - COL 2
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12MO$0.00
C005 -NSWC - 1503050 Grounds Maintenance and Landscaping - COL 2
Complete Tree Pruning
Large - above 15' Complete Tree Pruning7EA$0.00

NSWC Subtotal $0.00

C006 -BUMED - 1503050 Grounds Maintenance and Landscaping - COL 3
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12MO$0.00
BUMED Subtotal$0.00
C007 - MARINES SEAL BEACH - 1503050 Grounds Maintenance and Landscaping - COL 3
Services for Region areas/acreage indicated in the Site Maps provided in J-1503050-10 performed as specified for COL 3 per the Common Output Level Standards listed in J-1503050-04.12MO$0.00

Marines Subtotal $0.00

TOTAL FFP WORK $0.00

SB_IDIQ-OY2

ATTACHMENT J-B-01
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-19-Q-4606
EXHIBIT A - IDIQ
Indefinite Delivery / Indefinite Quantity Price - Base Period

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.