This document is an Amendment (Amendment 0006) to a federal solicitation for a military construction project at Naval Station Rota, Spain. The amendment extends the proposal submission deadline from June 20, 2025, to July 2, 2025, and provides responses to 132 contractor inquiries covering various technical, logistical, and contractual details of the P-720 EDI Missile Magazines project.
Key modifications include clarifications on site work limits, construction phasing, special inspections, electrical and architectural drawings, material specifications, and project requirements. Notable points include mandatory US manufacturers for specific components like blast doors, requirements for chameleon relocation, specification of concrete and asphalt depths, and detailed responses about site access, security background checks, and landscape maintenance. The project involves constructing missile magazines and associated infrastructure, with specific technical requirements for materials, construction methods, and specialized equipment.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6069766
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MILCON PROJECT P-720 EDI: MISSILE MAGAZINES, NAVAL STATION (NAVSTA) ROTA, SPAIN
See Block 14 SF30 Continuation Page.
Kathleen Delashmitt, kathleen.a.delashmitt.civ@us.navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jun-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6247025R9003
X 9B. DATED (SEE ITEM 11)
28-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jun-2025
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247025R9003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0006
AMENDMENT 0006
The purpose of this amendment is to disseminate the below information.
1. Solicitation revisions are made to Section 00 21 00, 4.3.
2. The due date for proposal submission is extended currently to July 2, 2025.
3. Responses to Pre-Proposal Inquiries and associated replacement attachment (F) Drawings and
Specification 26 41 00 are provided via attachment.
Section 00 21 00
PREVIOUS:
4.3 PRE-PROPOSAL INQUIRIES (PPIs):
All inquiries regarding the Request for Proposal shall be submitted electronically to Brittany Briggs by e-mail at brittany.d.briggs2.civ@us.navy.mil AND Kathleen Delashmitt at kathleen.a.delashmitt.civ@us.navy.mil. Offerors are requested to use the Pre-Proposal Inquiries Submittal Form (Attachment A). Responses will be published as an amendment to the solicitation.
The Government does not intend to respond to any pre-proposal inquiries submitted less than 15 calendar days before the solicitation closing date in order to permit adequate time to reply to the inquiries.
CURRENT:
4.3 PRE-PROPOSAL INQUIRIES (PPIs):
All inquiries regarding the Request for Proposal shall be submitted electronically to Brittany Briggs by e-mail at brittany.d.briggs2.civ@us.navy.mil AND Kathleen Delashmitt at kathleen.a.delashmitt.civ@us.navy.mil. Offerors are requested to use the Pre-Proposal Inquiries Submittal Form (Attachment A). Responses will be published as an amendment to the solicitation.
The Government does not intend to respond to any pre-proposal inquiries submitted after June 5, 2025.
Responses to PPIs:
51. Inquiry: According to the four (4) Statements of Special Inspections, the SIOR is required ONLY for the Earth Covered Magazine. The SIOR is NOT required for the AROS, Recycling Center nor Forklift Charging Station.
The Schedule of Special Inspections, however, does not specify if the tasks listed are applicable to all the four locations, or only the Earth Covered Magazine (where the SIOR is required).
Please, clarify.
Response: The Schedule of Special Inspections is applicable to all buildings/ locations in the project.
52. Inquiry: According to the paragraph 4.2. Proposal Submission Instructions, the proposal must be delivery in Naval Facilities Engineering Systems Command, Atlantic, Norfolk, VA 23508-1278. Hand delivery or mailed via postal services take up time for the proposal preparation. We kindly request the Government to considerer the option of electronic submission proposal by email or Procurement Integrated Enterprise Environment (PIEE).
Response: Proposal submission instructions are unchanged.
53. Inquiry: Section 02 82 00 ASBESTOS REMEDIATION is included in the project SPECS. However, we find no reference in the contract drawings nor the project documentation about presence of asbestos or potential areas/existing materials containing asbestos.
Is there any report available providing more information about this topic? If not, can you please details the assumptions that we should implement for bidding purposes?
Response: A site investigation conducted in April 2023 did not detect the presence of asbestos in the collected samples. However, please refer to Specification 01 35 26 Section 3.1.4 for instructions regarding encountering unforeseen hazardous materials.
54. Inquiry: Division 03 CONCRETE contains two sections. The first one (03 3 00 CAST-IN-PLACE CONCRETE) is adapted to EU/Spanish standards. The second one (03 30 00.02 CAST-IN-PLACE CONCRETE MAGAZINES) is mostly referred to american standards.
Please, confirm that European/Spanish standards are acceptable under Division 03 Concrete.
Response: Specification 03 30 00.02 applies to magazines only, and US reinforcing and properties are required. Under this specification, quality control may be per European standards. Specification 03 30 00 applies to every other structure in the project, and European standards are acceptable.
55. Inquiry: According to drawing S-701, in the building there is a door type 'A'. However, the contractor could not find the located and use of this door in the documentation provided. Please clarify the location and use of the door.
Response: Please see replacement drawings issued via attachment to Amendment 0003.
56. Inquiry: For greater speed, could you consider submitting the documentation via email instead of messaging?
Response: No, email submission is not supported. Proposal submission instructions are unchanged.
57. Inquiry: Qualifications. There are some qualifications related to the Fire Protection and Electrical sections that can only be obtained in the USA. QUESTION: Would a similar or equivalent European Host Nation certification be acceptable as an alternative? - SECTION 21 13 13. 1.4.2 The sprinkler system designer must be certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Water-Based Systems Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7, or equivalent. Since the design will be reviewed by a Fire Protection Engineer, please confirm if the designer can hold a similar title in the Host Nation and/or demonstrate years of experience.
Response: Per the specification, an equivalent certification is acceptable.
58. Inquiry: Qualifications. There are some qualifications related to the Fire Protection and Electrical sections that can only be obtained in the USA. QUESTION: Would a similar or equivalent European Host Nation certification be acceptable as an alternative? - SECTION 28 31 70 1.8.2.1 The fire alarm system designer must be certified as a Level III (minimum) Technician by National Institute for Certification in Engineering Technologies (NICET) in the Fire Alarm Systems subfield of Fire Protection Engineering Technology or meet the qualifications for a QFPE. Since the design will be reviewed by a Fire Protection Engineer, please confirm if the designer can hold a similar title in the Host Nation and/or demonstrate years of experience.
Response: Per the specification, an equivalent certification is acceptable.
59. Inquiry: The Note D-1 indicate that no demolition on this Sheet, but Is it possible that there are several tree to remove? Please confirm that.
Response: Please see revised drawing provided via Amendment 0006.
60. Inquiry: Paragraph 4.2 PROPOSAL SUBMISSION INSTRUCTIONS mentions that PROPOSALS
MAY NOT BE HAND DELIVERED. ALL PROPOSALS MUST BE MAILED VIA POSTAL
SERVICES OR COMMERCIAL COURIERS SUCH AS FEDEX OR UPS.
We kindly request to Government Representative to reconsider this instruction in order to authorize to offerors to emailing the proposal. Emailing bid proposal guarantees that all documents are delivered on time before due date.
61. Inquiry: We are greatly interested to bid on the subject project, we would like to address our concern of unduly restrictive requirements as below:
Reference to evaluation criteria in pages 17 and 18 of 24 of the solicitation, the RFP requires that the bidder to be registered and classified by the MOF in Spain at the time of submitting a bid. :
1- This is unduly restrictive as the requirements would result in substantial resources, investment and efforts without a guarantee of award.
2- This condition violates the principle of fair full and open competition whereas the RFP makes only bidders with existing registration and classification are eligible for award.
3- The requirement is unreasonable whereas the registration and classification may take from 90 to 160 days considering that 1322 days of the contract duration is more than enough to register and perform in compliance with Spanish laws. Taking in consideration the long lead items supply period of approximately 300-500 days. So the contractor can still register and almost complete the superstructures prior to the arrival of the long lead items whiles the site utilities and development works can be concurrent with the structure/s construction with no impact to the critical path within the 1322 days.
4- The certification and classification is part of performance requirements rather than bidding whereas the cost of such registration and certification is not reimbursed if the bidder is unsuccessful. This is unfair competition provided that the local and other bidders with existing certification would not bear this upfront cost. This is unfair competition criteria. Additionally, this requirement favors local contractors or contractors with existing registration over qualified contractors that are not yet registered and willing to expand for overseas business. Such requirements will consistently favor the growth of those contractors over bringing new qualified contractors to the international growth.
Response: The U.S. Navy is required to comply with instructions implementing international agreements. Therefore, the requirement will remain unchanged.
62. Inquiry: The design level for the recycling center is +27,40m, which is significatively higher than the existing terrain (+25,75m), so backfilling would be necessary to reach those elevations. Could you please confirm this point?
As for the Forklift Charging building, ground levels are not available. Could you provide them and together with the tests conducted in that area?
Response: Refer to grading sheets for existing surface grades and contours. Design finish floor elevations are as indicated on the drawings. Earthwork fill/cuts will be required as necessary to reach finish subgrade elevations.
Boring C-5 is the closest sampling point to Forklift Charging building, refer to drawings B-101 and B-
603. Boring records provide surface elevations at the boring location, existing and design spot elevations are provided on the grading sheets.
63. Inquiry: In Note 3 of plan S002A, it is stated that “ground improvement is necessary to provide adequate support for the foundations and concrete slab. The ground improvement shall consist of excavation of the existing clay subsoil within the building limits, extending 1.5 m horizontally beyond the exterior perimeter walls. The fill shall be done with mass concrete.”
However, in Zone 7 of plan S101A, it is indicated that the minimum depth of improvement is 1.2 m below the finished ground level, and the slab is to be backfilled with selected material.
Yet, in Note 8 of the same plan, it is stated that the foundation for walls and columns shall be improved using mass concrete.
However, in plan S502A, it is indicated that the concrete fill must reach at least 3 m below the top face of the slab.
Clarification is requested.
Response: Refer to Detail C3/S502A. Undercut to start minimum 1.2m below FFE and have a minimum overall depth of 3m below FFE. The undercut must extend 1.5m beyond perimeter wall. Backfill must be lean concrete with minimum compressive stress of 3.5MPa.
64. Inquiry: This Note 7: Civil Earthworks Notes- Construction Phasing Requirements: indicates that the
Magazines must be built before any other element for the project. Does this mean that AROS and the Recycling Center cannot be started before the Magazines are finished?
Response: Note 7 on drawing C-001 refers to the magazine area only.
65. Inquiry: “This Note 7: Civil Earthworks Notes-indicates that magazines must be phased such that magazine buildings 3401 and 3400 are constructed prior to magazines buildings 3399 and 3398. This note 7 conflicts with base bid CLIN1A and CLIN1B, and options #1 and #2. Please, clarify.
Response: Note 7 on drawing C-001 applies only to work on the awarded contract.
66. Inquiry: Please, clarify the following statement: "the placement of concrete pavements for the magazine structures must be delayed a minimum 90 calendar days after the successful placement and compaction of the earthen embankment and earth cover for the magazines structures.”
Response: “[T]he placement of concrete pavements for the magazine structures” refers to the concrete apron in front of the referenced magazine.
67. Inquiry: Solicitation Submittal Requirements: Is it acceptable to provide references for projects that are currently under construction but substantially completed?
Response: Please propose in accordance with the Solicitation. As stated under Section 00 21 00 Factor 1
– Experience, “Projects submitted for the Offeror shall be completed within the past ten (10) years of the date of issuance of this RFP.”
68. Inquiry: Solicitation Submittal Requirements: Would industrial buildings with cast-in-place reinforced concrete foundations and metal or prefabricated structures be considered valid?
Response: Please refer to solicitation section 00 21 00, 3.2.
69. Inquiry: Solicitation Submittal Requirements: Under these same conditions, would references for non-industrial buildings with cast-in-place reinforced concrete structures also be acceptable?
Response:
Please refer to solicitation section 00 21 00, 3.2.
70. Inquiry: Note 5 indicates 225A Panelboard, but sheet E-601C indicates Panel MD 400A and ES601 indicates Panel MD 400A. Please, clarification is requested.
Response: Please see replacement drawings provided via attachment to Amendment 0006. Note 5 on drawing sheet ES106 has been corrected to show 400A PNL.
71. Inquiry: Note 3 indicates 150A Panel MDP but sheet E-601C indicates 100A.Please, clarification is requested.
Response: Please see replacement drawings ES101C & E-602C provided via attachment to Amendment 0006.
72. Inquiry: E-101C: Notes 2 indicates wall mounted transformed and Note 4 60A panel PNL, but E-601C indicates integrated transformer and 30A panel Please, clarification is requested.
Response: PNL is intended to be integrated XFMR and PNL within same enclosure.
73. Inquiry: Door D2 with GL1 glazing does not mention dimensions and location of GL1 glazing. Please, clarification is requested.
Response: Please see replacement drawing A607A provided via attachment to Amendment 0006.
74. Inquiry: Reference to section detail C2/S505B does not exist. Potentially should be referencing
A2/S507A? Please, clarification is requested.
Response: Please see replacement drawing S507A provided via attachment to Amendment 0006.
75. Inquiry: Reference to detail A4/S505B does not exist. Potentially should be referencing A4/S507A?
Please, clarification is requested.
Response: Please see replacement drawing S507A provided via attachment to Amendment 0006.
76. Inquiry: Please, provide the dimension of gap between CMU and P8 interior partition for clarification.
Response: Please see replacement drawing A606A provided via attachment to Amendment 0006.
77. Inquiry: Doors 105 and 106B do not indicate head or jamb details. Please clarify.
Response: Please see replacement drawings provided via attachment to Amendment 0006. Refer to drawings A106B, A3/A608A, C4/A608A, B4/A608A, A105, B5/A608A.
78. Inquiry: Note 1: Translation does not correspond with the Spanish text. please clarify.
Response: Please see replacement drawing S102A provided via attachment to Amendment 0006.
79. Inquiry: What is the difference between lighting fixtures types D, F, G and H?
Response: Differences are shown on Luminaire Schedule on E-604A.
80. Inquiry: Note 15 refers to detail B1/P501B. Shouldn't it be C3/P501A?
Response: Concur. Yes, Note 15 should read “C3/P501A.”
81. Inquiry: No definition for note 21, Is it included in this tender?
Response: Please see replacement drawing A101B provided via attachment to Amendment 0006. It provides the definition.
82. Inquiry: Interior partition P-1 and P-2 seem to be exactly the same. Please, clarify.
Response: The difference is that P-1 has a ceiling on one side of the wall, while P-2 has a ceiling on both sides. Other than that, they are the same wall.
83. Inquiry: Note 23 on sheet A301B says 100mm metal stud framing every 400mm max. This note 23 is shown in wall sections on sheet A309B, but in Division Type F-1 in A605B, indicates metal studs at 600mm on center. Please clarify.
Response: Please see replacement drawing A301B provided via attachment to Amendment 0006.
84. Inquiry: There is not grounding plan for Recycling Center buildings. Please provide.
Response: Ground in accordance with the specification 26 20 00.01.
85. Inquiry: In English the text says reinforcing bars are placed 75mm below top of slab and in Spanish it says 100mm. Please clarify.
Response: Please see replacement drawing A101C provided via attachment to Amendment 0006.
86. Inquiry: Structural Steel Notes characteristics in English notes indicates type S355JR/S355 in S001C, but S275JR/S275 in S002C. Same situation in all General Notes pages. Please clarify.
Response: Please see replacement drawings S002B and S002C provided via attachment to Amendment
87. Inquiry: Note 10, A301C, Stud spacing is not specified. Please clarify.
Response: Please see replacement drawing A301C provided via attachment to Amendment 0006.
88. Inquiry: Note 15, A501C, Stud spacing is not specified. Please clarify.
Response: Please see replacement drawing A501C provided via attachment to Amendment 0006.
89. Inquiry: There is not grounding plan for Forklift building. Please provide.
Response: Ground in accordance with the specification 26 20 00.01.
90. Inquiry: Note 6 indicates to see building plan on sheet EG101A for high lightning protection masts, but we think it should refer to E-104A. Please, clarify.
Response: Please see replacement drawing ES102 provided via attachment to Amendment 0006.
91. Inquiry: Note 1 indicates "No demolition on this sheet" however trees have a "1" tag note which suggests removal of 8 trees is required as tag note 1 is sheet CD109. Please clarify.
Response: See response to question #48 provided in Amendment 0005.
92. Inquiry: Gravity ventilator and damper mechanisms and characteristics for magazines are not clearly defined, also details say "ONLY IF REQUIRED BY USING AGENCY" which makes it more unclear.
Please provide additional information and define what is required or not.
Response: Fire Dampers are required. Ventilators must be designed by contractor per note 5 on S-708.
93. Inquiry: Magazines interior Trench drain are not defined in drawings nor in section 22 00 00. Please, provide material characteristics and if are required to be traffic rated and minimum load.
Response: Please refer to “PLUMBING MATERIALS” on sheet S-002.
94. Inquiry: The construction keynote 15 of the drawing CG102 says: “LID BMP #2, A2/C508”. This detail corresponds with Water Quality Basin that has a Manhole Structure with Weir. However, the contractor does not identify it in drawing CG102, unless it refers to “CO” (Clean Out). Please clarify the nomenclature.
Response: The 'Manhole Structure with Weir' indicated on Detail A2 of drawing C-508 for LID BMP #2 is identified by key note 9 (DI A6) on drawing CG102.
95. Inquiry: The keynotes 4, 6, 8, 10 and 12 of drawing CG109 say: “Grate Inlet”. Please clarify which detail corresponds to drawings CG500.
Response: Use Details C1 and C2 on drawing C-504.
96. Inquiry: The Keynote 5 of drawing A101B says: “DRAIN WELL, REFER TO PLUMBING DRAWINGS”. However, in Plumbing drawings, P001B/P702B, we do not find any details about it and neither a Sanitary Sewer Exit of these drain wells. Please clarify.
Response: Please see replacement drawing A101B provided via attachment to Amendment 0006.
97. Inquiry: Drawing S-705 details C1, C2 and C3 indicate the doors to have an internal structure with IPE wood in the panels. This is a design that many specialized suppliers do not manufacture.
Please, confirm if replacing the wood for aluminum or steel would be acceptable. The characteristics of the doors would be maintained or improved.
Response: The blast doors must be fabricated by a US manufacturer and aluminum or steel is not permitted. It is not permitted to modify the blast doors in any way without prior submission and approval via the contracting officer.
98. Inquiry: Drawing S-701 C1 shows the doors legend. This legend does not match with the doors shown in drawing S-201 C1, as the doors of the Earth Covered Magazine are sliding doors. Please, confirm that this is just a typo and the five doors identified in dwg S-201 C1 are blast sliding doors.
Response: Please see revised drawings provided in Amendment 0003.
99. Inquiry: “Each Earth Covered Magazine contains five sliding blast doors, but we do not observe any peatonal access door in the available drawings. Please, check and confirm if these five sliding blast doors are the only accesses to each Earth Covered Magazine.”
Response: Please see revised drawings provided in Amendment 0003.
100. Inquiry: Please confirm whether electronic copies can be sent on USB flash drives instead of CDs.
Response: Proposal submission instructions are unchanged.
101. Inquiry: Due to potential difficulties at U.S. Customs with electronic storage devices in CD format (or USB flash drives) shipped from Spain (Europe), please confirm whether electronic documentation can be sent via email.
102. Inquiry: Please confirm that the three electronic copies in CD format (or USB flash drive) sent by commercial courier from Spain (Europe) can be included in a separate package, and that the five printed documentation folders can be included in another separate package.
Response: Proposal submission instructions are unchanged. There is no limit set on the number of packages used to submit proposals.
103. Inquiry: Please clarify what you mean by the documentation “Completed Solicitation Section 00 45 00 – Representations and Certifications” to be included in the Price Folder.
Response: Please see Amendment 0005.
104. Inquiry: “Please clarify if the project schedule required in Factor 2 – Technical Solution must to be developed using working days or calendar days. In case of working days, please provide an approximate start date for the project schedule.”
Response: Project schedule must be developed using calendar days.
105. Inquiry: We have contacted several companies that meet the requirements of experience required in SECTION 08 39 55.00 20 NAVY STANDARD EARTH-COVERED MAGAZINE DOORS for the manufacture, supply and installation of the “Sliding Blast Door Magazine”. All of them inform us that their usual manufacturers do not manufacture this design of door.
We would be grateful if the Government would provide the name of the designer who has designed this type of door for the project.”
Response: US manufacturers are required for the blast door fabrication. We cannot provide manufacturer names.
106. Inquiry: Please clarify if the schedule narrative must be counted in the page limitations (4 single-sided pages) for the narrative of the Factor 2 - Technical Solution.
Response: The schedule Gantt chart is not included in the page limitation for the Factor 2 narrative.
“Narrative shall not exceed two (2) double-sided pages or four (4) single-sided pages. In addition, provide schedule Gantt chart to graphically present the contract duration. The Gantt chart may be submitted on 11” X 17” or A3 page(s) that will not count against the page limitations for the narrative but is limited to two (2) double-sided pages or four (4) single-sided pages.”
107. Inquiry: In Drawing S-304, it is not correspondence "SEE NOTE 9 ON SHEET S-104", about the note 9 in sheet s-104. Question: Please, Could the Government clarify it?
Response: Please see replacement drawing A-304 provided via attachment to Amendment 0006.
108. Inquiry: On 16th April, it was update a new presolicitation, with a different type of Magazine Building.
Question: Please, could the Government confirm this change?
Response: Magazines are Box H, as detailed in Amendment 0004 and the contract documents.
109. Inquiry: The contractor usually purchases the proximity switches that go with the ILD boltworks.
Sometimes its left out of the contract. Question: Could the Government clarify if the switches are required in the application by the end-user.
Response: Switches are required. Please refer to sheet E-505.
110. Inquiry: The actual Internal Locking Device (ILD) that is installed inside the ILD boltworks, will be Government Furnished Equipment (GFE). Question: Please, could the Government confirm it?
Response: The Internal Locking Device (ILD) is furnished by the government.
111. Inquiry: Question: Is the Bridge Crane within scope of this project?
Response: The bridge crane is not within the scope of this project.
112. Inquiry: A305A, There are notes wrong. Question: Please, could the Government Clarify that?
Response: Please see replacement drawing A301A provided via attachment to Amendment 0006.
113. Inquiry: A306A, The note 13 is empty but indicate something. Question: Please, could the Government Clarify that?
Response: Please see replacement drawing A301A provided via attachment to Amendment 0006.
114. Inquiry: A307A, The note 2 indicates two different DFOW. Question: Please, could the Government
Response: Please see replacement drawing A307A provided via attachment to Amendment 0006.
115. Inquiry: A405A, Keynote 2 in A3/A307A changed to 23 (EIFS).
Response: Please see replacement drawing A405A provided via attachment to Amendment 0006.
116. Inquiry: A505A, The note 1 indicates two different DFOW. Question: Please, could the Government
Response: Please see replacement drawing A505A provided via attachment to Amendment 0006.
117. Inquiry: Finish of FORKLIFT CHARGE BUILDING, MATERIAL SORTING BUILDING AND MATERIAL STORAGE BUILDING do not have any sheet drawing. Question: Please, could the Government Clarify that?
Response: Please see replacement drawings A201B and A201C provided via attachment to Amendment
118. Inquiry: According to the English keynote 4 of drawing ES102 there is a 150 kVa transformer, however, the same keynote in Spanish says that there is a 225 kVa transformer. Please clarify.
Response: Please see replacement drawing ES102 provided via attachment to Amendment 0006.
119. Inquiry: Please, confirm if manufacturer and installer have to be the same company or on the contrary can be independent entities as long as each one of them perform its completed package (all blast-resistant door system procurement package and all blast-resistant door system installation).
Response: The blast door manufacturer must also be responsible for the installation.
120. Inquiry: Regarding to responses 1 and 2 of amendment 003, it is not clear what it is included in “Option 1 – Item 2” and “Option 2 – Item 3” in relation to the Site Work of the “Base Bid – Item 1F”. The Amendment+0003+Attachment+F+DWG+Index+and+Civil+Exhibit+DWGs, indicates “SITE WORK LIMITS FOR ITEM NO 1 & 2”. Please clarify if everything of this limit is part of the Options 1&2.
Response: The limits shown on Amendment 0003 Attachment F, pages 2 and 3 represent the entire area of work for Option Item No. 1 and Option Item No. 2 respectively, including the site work for each Option Item.
121. Inquiry: According to paragraph 1.4. Security Requirements: “Security background checks are required to access the magazine area. Allow 3 months from time of submittal to access acceptance. The government is not responsible for any de-lays as a result of failed background checks”. Our understanding is that the Mobilization and the in-situ special works could not start until 3 months after the approval of the Submittal Preconstructions, the List of Contract Personal, etc. If that is the case, we kindly request the Government extend the project execution period.
Response: Refer to Amendment 0006 Attachment F DWG Index and Specification Changes. The requirements for entry are specified in Specification 01 14 00 WORK RESTRICTIONS section 1.3.1.3.1.
“The government is not responsible for any delays as a result of failed magazine area access.”
122. Inquiry: According to keynote 1 of the drawing E-104A, there are lighting protection masts. However, the documentation provided does not content the characteristics of them. Please provide the details of the masts.
Response: Please bid per replacement specification 26 41 00 provided via Amendment 0006.
123. Inquiry: In the documentation provided is not clear the interior finishing of the floor, walls and roofs of Magazines. Please clarify if the contractor can leave the interiors in exposed concrete or it is necessary to apply any kind of coating and/or paint.
Response: Liquid chemical floor hardeners and sealers are required on floor slab between back of pilasters and magazine walls. Walls and roofs of magazines are exposed concrete. Refer to specification 03 30 00.02 for all surface finish requirements.
124. Inquiry: 2. The response to Question 21 in Amendment 0005 states that "For the BLAST-RESISTANT
WAREHOUSE DOOR SYSTEM: Materials, standards, and a U.S. manufacturer are required." Please clarify whether the manufacturer must be U.S. or European.
Response: The manufacturer must be U.S.
125. Inquiry: According to response #10 in Amendment 5: Chameleons were found during the project Design Effort. Question 1: Has the Government consider the time for its relocations?
It is depend of season, from Summer to Winter is the reproduction time for Chameleons. The contractor must wait to April to can relocate all specimenents. Question 2: Is this time part of project duration?, or must we to consider stop the project time until April 2026?
Response: Chameleon relocation should take place in the summer months and must be completed by the end of August, and is part of the project duration. Although chameleons were only observed at the new Recycling Center, a site investigation should be conducted at all sites to confirm potential presence, in accordance with Specification 01 57 19.
126. Inquiry: According to response #23 in Amendment 5: "… project was not designed for this UFC".
Question: Must the contractor consider these UFCs uploaded in the proposal?
Response: No.
127. Inquiry: According to response #30 in Amendment 5: " This note applies to awarded scope only.
Question: Could the Contractor start magazine buildings, AROS building and Recycling building to same time?. or must the contractor finish the magazine buildings prior to start other buildings?
Question: If the magazine buildings #3401 & #3400 are options, and must to be awarded prior to magazine buildings #3399 and #3398, that are base bid; Will be it awarded base bid and the two options to the same time?
Response: Q1: Construction in the magazine area can occur at the same time as construction outside the magazine area.
Q2: The Base bid and Options are separate awards, it is not known if or when the Options may be awarded.
128. Inquiry: According to response #31 in Amendment 5: "Use 110mm Asphalt, 200 Aggregate Base for bidding purposes" Question: The second part of original question was: What is the depth of concrete slab to be demolish?
Response: Use 200mm for bidding purposes.
129. Inquiry: According to requirements of Blast-Resistant Magazine Door System, it is very complicated obtain the quotation by USA Manufacturer. There are some manufacturers that don´t want to offer in Spain (VSI & Electrical Power) Question: We need more time in order to look for a USA manufacturer company that want to work in Spain, or that the Manufacturer could be European company, like the Blast Doors of the last Magazine buildings project
Response: The magazine doors must be a US standard. The voltage for the magazines is standard US power and frequency.
130. Inquiry: In the project it is indicated a Contractor Laydown Area. This area is on the interior of weapons area, with restringed access, and in a zone that is forest area at present.
Question: Is it possible that the Government asing other/others Laydown Area, with free access and with utilities and pavements?
Response: Use the location indicated on the drawings for bidding purposes. The Final Construction laydown area will be determined by the local NS Rota Contracting Officer's representative.
131. Inquiry: Question: Where is the water line for landscape maintenance during 365 days by Contractor in Magazine Area?
Response: There are no existing water lines in or near the limits of construction of the magazines. The Contractor is responsible for providing water for landscape maintenance.
132. Inquiry: The locking system for a Type H magazine requires an Internal Locking Device (ILD) and ILD boltworks for each door (5 doors per magazine). The ILD's are Government furnished and Government installed, but the ILD boltworks are to be furnished and installed by the Contractor.
Firm pricing of the boltworks is not currently available, as there is still some design development ongoing (attending to the contract documents (08 39 55.00 20 p.2.8.1)). The actual purchase price of these items is too significant not to be able to have a firm price. Once the design is complete and a certain boltworks design is approved, these boltworks will be available for purchase from one of the approved boltworks manufacturers.
Could the Government provide a list of approved boltworks manufacturers and/or the main characteristics of these boltworks, so we can get reliable quotations? If not, could the Government specify which assumptions should the Contractor do when asking for quotations for these boltworks?
Response: The Government cannot provide manufacturer names or give instructions on how firms should conduct business.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 20-Jun-2025 02:00 PM to 02-Jul-2025 02:00 PM.
(End of Summary of Changes)