This is a Price Schedule document for the P-720 EDI: Missile Magazines Project at Naval Station Rota, Spain. The document provides a detailed pricing breakdown across five primary line items (CLIN 1A-1F) for base contract work, including construction of multiple missile magazines (No. 3398 and 3399), an Ammunition Rework and Overhaul Shop, a Recycling Material Warehouse, and site demolition work. Three optional line items (CLIN 2-3) are included for additional missile magazine construction (No. 3400 and 3401), and a fourth option (CLIN 4) covers petroleum-contaminated soil handling and disposal at a rate of dollars per cubic meter.

The final line item (CLIN 5) addresses Furniture, Fixtures, and Equipment (FF&E) with a government-estimated price of $281,363.20 and allows for a Hardware (HAR) percentage markup not to exceed 5%. Contractors are required to provide unit prices for each line item, with the total contract value to be calculated by summing all line items. The pricing structure suggests a comprehensive construction project involving multiple facilities and potential environmental remediation at the naval station, with flexibility for optional additional work.

View the file

Other files

File Type Posted
Amendment 0007 Attachment F DWGs.pdf PDF
N6247025R9003 Amend 0007 Block 14 SF30 Continuation Pages.pdf PDF
Attachment H- Site Visit Log.pdf PDF
N6247025R9003 Amend 0007.pdf PDF
Amendment 0007 Attachment F DWG Index.pdf PDF
N6247025R9003 Amend 0006.pdf PDF
Amendment 0006 Attachment F DWGs.pdf PDF
Amendment 0006 Attachment F DWG Index and Specification Changes.pdf PDF
Amendment 0006_Specification 26 41 00.pdf PDF
ATTACHMENT D Price Schedule_Amend 0005.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amendment 0003 Attachment F DWG Index and Civil Exhibit DWGs.pdf PDF
Amendment 0003 Attachment F DWGs.pdf PDF
N6247025R9003 Amend 0002.pdf PDF
N6247025R9003 Amend 0001.pdf PDF
Amend 0001 Attachment G - Certificate Insurance Form.pdf PDF
Amend 0001 Attachment F - Temporary Pass Form.xlsx XLSX spreadsheet
Amend 0001 Attachment D - Work Pass Format.pdf PDF
Amend 0001 Attachment E - Employee Certification Form.pdf PDF
ATTACHMENT A - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
EURAFSWA AMI JA_Redacted.pdf PDF
ATTACHMENT E_P720_DWG_7of9.pdf PDF
ATTACHMENT E_P720_DWG_5of9.pdf PDF
ATTACHMENT E_P720_DWG_8of9.pdf PDF
Final CJA 2409 Redacted.pdf PDF
N6247025R9003.pdf PDF
CJA 2311 NS Rota Redacted.pdf PDF
ATTACHMENT C - Past Performance Questionnaire (PPQ).pdf PDF
ATTACHMENT B - Construction Experience Project Data Sheet.pdf PDF
ATTACHMENT E_P720_DWG_1of9.pdf PDF
ATTACHMENT E_P720_DWG_6of9.pdf PDF
ATTACHMENT E_P720_DWG_4of9.pdf PDF
ATTACHMENT G Classification Certification.pdf PDF
ATTACHMENT E_P720_DWG_2of9.pdf PDF
ATTACHMENT E_P720 SPECS.pdf PDF
ATTACHMENT E_P720_DWG_3of9.pdf PDF
ATTACHMENT F_P720_DWG_9of9.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item

Description Quantity Unit Unit Price Sub- Total

Total Price

1 BASE PRICE: Total Price for the entire work for P-720 EDI:

Missile Magazines Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.

1 EA

1A Subtotal of Base Price for the entire work for Missile Magazine No. 3398 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA

1B Subtotal of Base Price for the entire work for Missile Magazine No. 3399 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA

1C Subtotal of Base Price for the entire work for the Ammunition Rework and Overhaul Shop (AROS) complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA

1D Subtotal of Base Price for the entire work for the Recycling Material Warehouse complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA

1E Subtotal of Base Price for the entire work for demolition of the existing Recycling Facility complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA

1F Subtotal of Base Price for the entire project site work, outside the facility 1.5-meter line, for all supporting facilities, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA

2 Option Item No. 1: Price for entire work for Missile Magazine No. 3400 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item.

3 Option Item No. 2: Price for entire work for Missile Magazine No. 3401 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but another line item.

4 Option Item No. 3: Unit Price for handling, storage, host nation sampling and analysis, treatment and disposal of petroleum contaminated soil media at a permitted licensed facility, within planned excavations, complete in accordance with the drawings and specifications. The volume of contaminated soil removed will be based on approved truck scale measurement and the quantity will be approved by the Contracting Officer. Any work under this CLIN 4 will not proceed without prior written approval and field verification from the Contracting Officer. Removal and disposal of all surplus non-contaminated soil media encountered within the planned excavations is covered under the Base Price.

100 CM $____ / CM

5 Option Item No. 4: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but another Priced line item.

Government Estimated Price:

$281,363.20

HAR

Percent

(NTE

5%)

HAR

Subtotal

Total FF&E Estimated Price

Total All CLINs (CLIN 1 + CLIN 2 + CLIN 3 + CLIN 4 + CLIN 5) =