ATTACHMENT D Price Schedule_Amend 0005.pdf

PDF 241 KB Posted

Attached to
P720 EDI: Missile Magazines, Naval Station Rota, Spain
Solicitation number
N6247025R9003
Issued by

About this file

This document is a Price Schedule for the P-720 EDI: Missile Magazines Project at Naval Station Rota, Spain. The price schedule includes Line Item 1 for the base price of the entire project, with subtotals for specific facilities including Missile Magazine No. 3398, Missile Magazine No. 3399, Ammunition Rework and Overhaul Shop, Recycling Material Warehouse, and Forklift Charging Station. Additional line items include optional work for two additional missile magazines (No. 3400 and 3401), a unit price for handling and disposing of petroleum-contaminated soil, and an option for Furniture, Fixtures, and Equipment (FF&E) with a government-estimated price of $281,363.20. The pricing is structured to cover work completed to the 1.5-meter line outside of buildings, with specific exclusions for work covered in other line items.

The document requires bidders to fill in unit prices for each line item, with the final pricing to be determined by the contractor. Option items allow for potential expansion of the project scope, including additional missile magazines and environmental remediation. The FF&E option includes a maximum allowable HAR (Historically Underutilized Business Zone) percentage of 5%. The total pricing will be calculated by summing all line items (CLIN 1 through CLIN 5), with provisions for detailed measurement and approval by the Contracting Officer, particularly for soil removal and disposal.

View the file

Other files

File Type Posted
Amendment 0007 Attachment F DWGs.pdf PDF
N6247025R9003 Amend 0007 Block 14 SF30 Continuation Pages.pdf PDF
Attachment H- Site Visit Log.pdf PDF
N6247025R9003 Amend 0007.pdf PDF
Amendment 0007 Attachment F DWG Index.pdf PDF
N6247025R9003 Amend 0006.pdf PDF
Amendment 0006 Attachment F DWGs.pdf PDF
Amendment 0006 Attachment F DWG Index and Specification Changes.pdf PDF
Amendment 0006_Specification 26 41 00.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amendment 0003 Attachment F DWG Index and Civil Exhibit DWGs.pdf PDF
Amendment 0003 Attachment F DWGs.pdf PDF
N6247025R9003 Amend 0002.pdf PDF
N6247025R9003 Amend 0001.pdf PDF
Amend 0001 Attachment G - Certificate Insurance Form.pdf PDF
Amend 0001 Attachment F - Temporary Pass Form.xlsx XLSX spreadsheet
Amend 0001 Attachment D - Work Pass Format.pdf PDF
Amend 0001 Attachment E - Employee Certification Form.pdf PDF
ATTACHMENT A - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
EURAFSWA AMI JA_Redacted.pdf PDF
ATTACHMENT E_P720_DWG_7of9.pdf PDF
ATTACHMENT D_Price Schedule.pdf PDF
ATTACHMENT E_P720_DWG_5of9.pdf PDF
ATTACHMENT E_P720_DWG_8of9.pdf PDF
Final CJA 2409 Redacted.pdf PDF
N6247025R9003.pdf PDF
CJA 2311 NS Rota Redacted.pdf PDF
ATTACHMENT C - Past Performance Questionnaire (PPQ).pdf PDF
ATTACHMENT B - Construction Experience Project Data Sheet.pdf PDF
ATTACHMENT E_P720_DWG_1of9.pdf PDF
ATTACHMENT E_P720_DWG_6of9.pdf PDF
ATTACHMENT E_P720_DWG_4of9.pdf PDF
ATTACHMENT G Classification Certification.pdf PDF
ATTACHMENT E_P720_DWG_2of9.pdf PDF
ATTACHMENT E_P720 SPECS.pdf PDF
ATTACHMENT E_P720_DWG_3of9.pdf PDF
ATTACHMENT F_P720_DWG_9of9.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item

Description Quantity Unit Unit Price

Sub-Total Total Price

1 BASE PRICE: Total Price for the entire work for P-720 EDI:

Missile Magazines Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.

1 EA

1A Subtotal of Base Price for the entire work for Missile Magazine No. 3398 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $____________

1B Subtotal of Base Price for the entire work for Missile Magazine No. 3399 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $____________

1C Subtotal of Base Price for the entire work for the Ammunition Rework and Overhaul Shop (AROS) complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $____________

1D Subtotal of Base Price for the entire work for the Recycling Material Warehouse complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $____________

1E Subtotal of Base Price for the entire work for the Forklift Charging Station complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item.

1 EA $____________

1F Subtotal of Base Price for the entire work for demolition of the existing Recycling Facility complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item.

1 EA $____________

1G Subtotal of Base Price for the entire project site work, outside the facility 1.5-meter line, for all supporting facilities, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA $____________

2 Option Item No. 1: Price for entire work for Missile Magazine No. 3400 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, 3 Option Item No. 2: Price for entire work for Missile Magazine No. 3401 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, 4 Option Item No. 3: Unit Price for handling, storage, host nation sampling and analysis, treatment and disposal of petroleum contaminated soil media at a permitted licensed facility, within planned excavations, complete in accordance with the drawings and specifications. The volume of contaminated soil removed will be based on approved truck scale measurement and the quantity will be approved by the Contracting Officer. Any work under this CLIN 4 will not proceed without prior written approval and field verification from the

100 CM $____ /

CM

Contracting Officer. Removal and disposal of all surplus non-contaminated soil media encountered within the planned excavations is covered under the Base Price.

5 Option Item No. 4: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.

Government Estimated Price:

$281,363.20

HAR

Percent

(NTE

5%)

HAR Subtotal

Total FF&E Estimated Price

Total All CLINs (CLIN 1 + CLIN 2 + CLIN 3 + CLIN 4 + CLIN 5) =

File details come from the government source that posted it. Updated .