ATTACHMENT D Price Schedule_Amend 0005.pdf
PDF 241 KB Posted
- Solicitation number
- N6247025R9003
About this file
This document is a Price Schedule for the P-720 EDI: Missile Magazines Project at Naval Station Rota, Spain. The price schedule includes Line Item 1 for the base price of the entire project, with subtotals for specific facilities including Missile Magazine No. 3398, Missile Magazine No. 3399, Ammunition Rework and Overhaul Shop, Recycling Material Warehouse, and Forklift Charging Station. Additional line items include optional work for two additional missile magazines (No. 3400 and 3401), a unit price for handling and disposing of petroleum-contaminated soil, and an option for Furniture, Fixtures, and Equipment (FF&E) with a government-estimated price of $281,363.20. The pricing is structured to cover work completed to the 1.5-meter line outside of buildings, with specific exclusions for work covered in other line items.
The document requires bidders to fill in unit prices for each line item, with the final pricing to be determined by the contractor. Option items allow for potential expansion of the project scope, including additional missile magazines and environmental remediation. The FF&E option includes a maximum allowable HAR (Historically Underutilized Business Zone) percentage of 5%. The total pricing will be calculated by summing all line items (CLIN 1 through CLIN 5), with provisions for detailed measurement and approval by the Contracting Officer, particularly for soil removal and disposal.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line Item
Description Quantity Unit Unit Price
Sub-Total Total Price
1 BASE PRICE: Total Price for the entire work for P-720 EDI:
Missile Magazines Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA
1A Subtotal of Base Price for the entire work for Missile Magazine No. 3398 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $____________
1B Subtotal of Base Price for the entire work for Missile Magazine No. 3399 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $____________
1C Subtotal of Base Price for the entire work for the Ammunition Rework and Overhaul Shop (AROS) complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $____________
1D Subtotal of Base Price for the entire work for the Recycling Material Warehouse complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $____________
1E Subtotal of Base Price for the entire work for the Forklift Charging Station complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $____________
1F Subtotal of Base Price for the entire work for demolition of the existing Recycling Facility complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $____________
1G Subtotal of Base Price for the entire project site work, outside the facility 1.5-meter line, for all supporting facilities, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $____________
2 Option Item No. 1: Price for entire work for Missile Magazine No. 3400 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, 3 Option Item No. 2: Price for entire work for Missile Magazine No. 3401 complete to the 1.5-meter line outside of the building in accordance with the drawings and specifications, 4 Option Item No. 3: Unit Price for handling, storage, host nation sampling and analysis, treatment and disposal of petroleum contaminated soil media at a permitted licensed facility, within planned excavations, complete in accordance with the drawings and specifications. The volume of contaminated soil removed will be based on approved truck scale measurement and the quantity will be approved by the Contracting Officer. Any work under this CLIN 4 will not proceed without prior written approval and field verification from the
100 CM $____ /
CM
Contracting Officer. Removal and disposal of all surplus non-contaminated soil media encountered within the planned excavations is covered under the Base Price.
5 Option Item No. 4: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Government Estimated Price:
$281,363.20
HAR
Percent
(NTE
5%)
HAR Subtotal
Total FF&E Estimated Price
Total All CLINs (CLIN 1 + CLIN 2 + CLIN 3 + CLIN 4 + CLIN 5) =