Amendment 02

View the file

Other files

File Type Posted
19R5017 Amend 0014.pdf PDF
19R5017 Amend 0013.pdf PDF
19R5017 Amend 0012.pdf PDF
19R5017 Amend 0011.pdf PDF
19R5017 Amend 0010.pdf PDF
19R5017 Amend 0009.pdf PDF
19R5017 Amend 0008.pdf PDF
19R5017 Amend 0007.pdf PDF
Att (V) P190003 C-101 DWG-Revised 1216.pdf PDF
19R5017 Amend 0006.pdf PDF
Att (N) 1575253_Reference_dwg2of7.pdf PDF
Att (T) P308 Geotechnical Report Reference 2017.pdf PDF
Att (R) 1575253_Reference_dwg6of7.pdf PDF
Att (M) 1575253_Reference_dwg1of7.pdf PDF
Att (U) P190001 C-101 DWG-Revised 1216.pdf PDF
Att (P) 1575253_Reference_dwg4of7.pdf PDF
Att (Q) 1575253_Reference_dwg5of7.pdf PDF
Att (S) 1575253_Reference_dwg7of7.pdf PDF
Att (O) 1575253_Reference_dwg3of7.pdf PDF
19R5017 Amend 0005.pdf PDF
Att (K) Phase II Site Visit Presentation.pdf PDF
Att (L) SITEVISITLOG.pdf PDF
19R5017 Amend 0004.pdf PDF
Att (E) SCHEDULE B.docx DOCX document
Att (G) Site Visit Map.pdf PDF
Att (H) P190001 EDI Airfield Upgrades Apron Expansion Design Build RFP.pdf PDF
Att (I) P190002 EDI Beddown Site Preparation Design Build RFP.pdf PDF
Att (J) P190003 EDI Airfield Upgrades Dangerous Cargo Pad Design Build RFP.pdf PDF
Att (F) ICG Visit Request Form.xlsx XLSX spreadsheet
N6247019R5017_Amendment_03.pdf PDF
Att_(E)_LRA_Commercial_Vehicle_Inspection_Procedures.doc DOC document
N6247019R5017_Amendment_01.pdf PDF
Att_(D)_Pre_Proposal_Inquiry_(PPI)_Form.xlsx XLSX spreadsheet
Att_(B)_Past_Performance_Questionnaire.docx DOCX document
Att_(C)_One_Day_Pass_Request_Form.xls XLS spreadsheet
Att_(A)_Construction_and_Design_Experience_Project_Data_Sheet.doc DOC document
N62470-19-R-5017_Solicitation.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P19001: Airfield Upgrades, P19002: Beddow n Site Preparation, P19003: Dangerous Cargo Pad Keflavik, Iceland

The due date is unchanged and remains 30 September 2019.

Please see the SF 30 Block 14 continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247019R5017

X 9B. DATED (SEE ITEM 11)

29-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Sep-2019

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247019R5017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AMENDMENT 02

Amendment 0002 is issued to provide the following:

1. PPI Responses

2. Attachment (E) Lafayette River Annex Commercial Vehicle Inspection Procedures (Separate Attachment)

1. Pre-proposal inquiries and responses:

PPI

REFERENCE

QUESTION

GOVERNMENT

RESPONSE

PAGE

SECTION

PARA-

GRAPH

1 9 of 53 Solicitation Solicitation states proposal cannot be hand delivered but it also includes instructions for accessing the base to deliver the proposal.

Please clarify if we can hand deliver our proposal if we have a CAC and base access.

Proposals may not be hand delivered. All proposals must be mailed via postal services or commercial couriers such as FedEx, DHL or UPS.

2 7 of 53 and

Solicitation Page 7 states “1 original, 4 copies and 2 CDs shall be submitted for Phase I”, Page 11 states “1 original, 1 copy, and 1 CD shall be submitted”. Please clarify the number of copies to be submitted

Page 7 includes the following instructions for the Phase I submission, “Phase I Submission: Non-Price Factors: Offeror shall submit one (1) marked “original,” and four (4) marked “Copies,” each in a separate binder, and two (2) electronic copies on CD.”

Page 11 includes the following instructions for the Phase II Price Proposal, “Offerors shall submit one

(1) marked “original”, one

(1) marked “copy”, each in separate three-ring (or four-ring) binder, and one (1) electronic copy (CD format)”

Please follow the instructions on Page 7 for

N6247019R5017 the Phase I submission requirement.

3 10 of 53 Solicitation Commercial couriers must also have their vehicle inspected at location listed in the attached LRA commercial vehicle inspection procedures prior to accessing the LRA. Please provide referenced procedures.

Please see Attachment (E) Lafayette River Annex Commercial Vehicle Inspection Procedures, included with this amendment.

(End of Summary of Changes)