View the file

Other files

File Type Posted
19R5017 Amend 0014.pdf PDF
19R5017 Amend 0013.pdf PDF
19R5017 Amend 0012.pdf PDF
19R5017 Amend 0011.pdf PDF
19R5017 Amend 0010.pdf PDF
19R5017 Amend 0009.pdf PDF
19R5017 Amend 0008.pdf PDF
19R5017 Amend 0007.pdf PDF
Att (V) P190003 C-101 DWG-Revised 1216.pdf PDF
19R5017 Amend 0006.pdf PDF
Att (N) 1575253_Reference_dwg2of7.pdf PDF
Att (T) P308 Geotechnical Report Reference 2017.pdf PDF
Att (R) 1575253_Reference_dwg6of7.pdf PDF
Att (M) 1575253_Reference_dwg1of7.pdf PDF
Att (U) P190001 C-101 DWG-Revised 1216.pdf PDF
Att (P) 1575253_Reference_dwg4of7.pdf PDF
Att (Q) 1575253_Reference_dwg5of7.pdf PDF
Att (S) 1575253_Reference_dwg7of7.pdf PDF
Att (O) 1575253_Reference_dwg3of7.pdf PDF
Att (K) Phase II Site Visit Presentation.pdf PDF
Att (L) SITEVISITLOG.pdf PDF
19R5017 Amend 0004.pdf PDF
Att (E) SCHEDULE B.docx DOCX document
Att (G) Site Visit Map.pdf PDF
Att (H) P190001 EDI Airfield Upgrades Apron Expansion Design Build RFP.pdf PDF
Att (I) P190002 EDI Beddown Site Preparation Design Build RFP.pdf PDF
Att (J) P190003 EDI Airfield Upgrades Dangerous Cargo Pad Design Build RFP.pdf PDF
Att (F) ICG Visit Request Form.xlsx XLSX spreadsheet
N6247019R5017_Amendment_03.pdf PDF
N6247019R5017_Amendment_02.pdf PDF
Att_(E)_LRA_Commercial_Vehicle_Inspection_Procedures.doc DOC document
N6247019R5017_Amendment_01.pdf PDF
Att_(D)_Pre_Proposal_Inquiry_(PPI)_Form.xlsx XLSX spreadsheet
Att_(B)_Past_Performance_Questionnaire.docx DOCX document
Att_(C)_One_Day_Pass_Request_Form.xls XLS spreadsheet
Att_(A)_Construction_and_Design_Experience_Project_Data_Sheet.doc DOC document
N62470-19-R-5017_Solicitation.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P19001: Airfield Upgrades, P19002: Beddow n Site Preparation, P19003: Dangerous Cargo Pad Keflavik, Iceland

The due date is unchanged and remains 15 January 2020.

Please see the SF 30 Block 14 continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Dec-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247019R5017

X 9B. DATED (SEE ITEM 11)

29-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Dec-2019

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247019R5017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AMENDMENT 05

Amendment 0005 is issued to accomplish the following:

1. To provide the Site Visit Presentation and Site Visit Log

1. To provide the Site Visit Power Point and Site Visit Log.

The Following attachments are provided with this amendment:

(k) Site Visit Presentation

(L) Site Visit Log

Offerors are reminded to review all documents posted on the Beta.Sam.Gov website.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .