AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
P19001: Airfield Upgrades, P19002: Beddow n Site Preparation, P19003: Dangerous Cargo Pad Keflavik, Iceland
The due date is unchanged and remains Thursday, February 13, 2020 @ 2:00 PM EST.
Please see the SF 30 Block 14 continuation page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247019R5017
X 9B. DATED (SEE ITEM 11)
29-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Jan-2020
CODE
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247019R5017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The Issued By organization has changed from
NAVAL FACILITIES ENGINEERING COMMAND
ATLANTIC DIVISION
6506 HAMPTON BLVD
NORFOLK VA 23511
to
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
CLIN 0001
The CLIN extended description has changed from:
Price for the entire work for MILCON Project P-19001, EDI: Airfield Upgrades-Apron Expansion, Keflavik, Iceland in accordance with the Design-Build Request for Proposal (RFP), but excluding work described in Contract Line item Numbers (CLINs) 0002, 0003, 0004 and 0005.
To:
Price for the entire work of MILCON Projects P-19001, EDI: Airfield Upgrades-Apron Expansion; P-19002, EDI:
Expeditionary Beddown Site; and P-19003, EDI: Airfield Upgrades-Dangerous Cargo Pad located in Keflavik, Iceland, in accordance with the items described in the Request for Proposal (RFP).
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AMENDMENT 09
P19001 AIRFIELD UPGRADES, P19002: BEDDOWN SITE PREPARATION, P19003: DANGEROUS
CARGO PAD, KEFLAVIK, ICELAND
The purpose of this amendment is provide the following:
1. Revise CLIN structure
2. Pre-Proposal Inquires (PPIs) Response;
3. Revise 190002 RFP; and
4. Revise 190003 RFP;
1. Revise CLIN structure
CLINS 0002 thru 0006 have been removed from the solicitation. The total of Item 0001 is now equal to the base and all options. Details on individual CLINs are provided on the Bid Schedule. Offerors are required to submit the bid schedule in its entirety.
2. Pre-Proposal Inquiries (PPIs) Response
PPI
REFERENCE
QUESTION
GOVERNMENT
RESPONSE
PAGE
SECTION
PARA-
GRAPH
15 9 Part 3 P- 190001
3.2 Site
Developm ent Requirem ents
The paragraph states "Provide joints to match concrete joints". Is it correctly understood that the new concrete joints shall match the concrete joints on the existing adjacent hot cargo apron? This means that paving width will be about 7.5 meters and concrete production will need to be very high, given available plants and access restrictions to site? As the existing and new aprons will be completely separated we don't see the need to match the existing joints from an engineering standpoint.
Will a different joint spacing be accepted, such as around 5x5m matching every other existing joint?
Yes. The joints need to match the existing cargo apron.
16 Att (I) P190002
pg. 494
Part 6 - A Drawing
ES101
Are foundations or plinths/slabs for the PSCs, SDCs and Backup Generators required to be designed and constructed as part of the bid?
No.
17 Att (I) P190002
pg. 494
pg. 187
pg. 223
Part 6 - Drawing
ES101
Part 3 - 3.2 Part 3 - G204090
ES101
Note 2 3.2 G204090
Drawing ES101 Note 2 "Physical layout of equipment shown on this drawing are for conceptual design purposes and are not final nor should bids and final design be based solely on the layout shown.
Design allowing site layout adaptability and flexibility are desired"; however, G204090 requires shelter anchoring system design based on this layout. Also,
3.2 states "the facility layout shall conform to the conceptual site layout plans". Please confirm that the layout and locations of shelters and electrical equipment to be provided by others as shown in the drawings of the RFP part 6 is the layout that the Government expects to be used for bidding purposes.
Drawings should be used for bid purposes with specific emphasis on discipline drawing. Electrical drawings should emphasize electrical portion of bid. The same for Civil drawings, etc.
Purpose of note was to inform the Bidders that information on the drawings should not be the sole basis for their bids and that site adaptability should be considered. Site adaptability should allow as much flexibility for minor adjustments to site layout of the shelters and equipment.
For example, it is expected that ductbank will be in fixed positions, but expect it to be arranged in a way that accommodates minor to moderate shelter and equipment site layout configurations.
18 Att (I) P190002
pg. 210
Part 3 D5030 P1900002: Part 3 D5030 "The Room Requirements Section identifies locations of communications equipment, unless…..". The TOC of Part 3 states that 5.0 Room requirements section is not used. Are there any room requirements for the communications equipment that should have been included in this section? Please provide the details of equipment to be installed in the elec/comms room, locations and the comms requirements for that equipment in better detail?
Telecom/data needs for the site are expected to be minimal. Contractor's designer is expected to design the telecom equipment space based on Customer's needs, which will be determined through detail design phase of the project. At a minimum, fiber optic cable, patch panel, and data equipment rack are expected to be in the 30m2 building. There may or may not be a copper telecom wire connection in the adjacent building 1624.
Site investigation is required.
Refer to UFC UFC 3-580-01 for guidance.
19 Att (H) P190001
pg. 351
Part 6
ATTACH
MENT A
C-101 P190001 Part 6 Drawing C-101:
Scale on the drawing does not correspond to the square metreage noted as being required for the paving. Please confirm that scale is to be ignored?
Ignore scale.
20 Att (H) P190001
- pg. 310 Att (J) P190003
- pg. 314
Part 5 32 12 14.13
2.3.1.2 Please confirm if ASR testing in
accordance with ASTM is required.
Yes it is required.
21 Schedule B and Amendm ent 0004 (page 2)
Schedule B and Amendmen t 0004 (page 2)
The CLIN structure in Amendment 0004 is different that the CLIN structure in Schedule B. Please clarify which schedule is correct.
See revised CLIN Structure mentioned herein.
22 Att (I)
pg. 216
Part 3 G103004 Material that is determined not to be satisfactory fill shall be relocated outside the project limits as directed by the construction manager. For bidding purposes please confirm acceptable location the unsatisfactory material will need to be transported to.
Remove uncontaminated unsatisfactory soil materials off-site in compliance with local waste management procedures.
23 Solicitati on Page
Solicitation submittal requiremen ts
Design/Co nstruction Schedule
Solicitation states “…. and one 11 x 17 or A3 schedule Gantt chart shall be provided to graphically present the contract duration”. Please confirm the number of pages allowed for the Gantt chart(s).
Should each project (i.e., P19001, P19002, and P19003) have a separate Gantt chart? Should there be a separate schedule for design and for construction?
Provide one schedule for all three projects to show concurrent construction, phases, etc.... Multiple 11x17 or A3 pages will be allowed, as they do not count against. The schedule shall include both the Design and Construction phases.
24 Att (H)
pg. 185 Att (J)
pg. 184
Part 3 G10 Please provide the referenced existing topographic survey within G10 with elevations for bidding purposes.
The government will provide spot elevations for approximation purposes only. The contractor must perform their own topographic survey upon award. Base site and utility maps can also be found at http://www.map.is/isavia/
25 Att (j) P190003
General According to UFC 3-260-01 chapter 6-12.2 Hazardous cargo pads require explosive site planning. Will the contractor be required to prepare an Explosive Site Plan (ESP) (using ESS Software) for the Dangerous Cargo pad?
No. The package is being prepared for Preliminary Approval by
NAVFAC/USAF.
26 Att (H), (I), (J)
General Please provide project site limits for each project.
The project locations have been approved and are shown in the RFPs. The RFP concept drawings are provided to show basic layouts/functions. The project limits are subject to the Contractor's final design.
27 Att (H), (I), (J)
General Please provide existing utility surveys.
Base site and utility maps can be found at http://www.map.is/isavia/
28 Att (H)
pg. 10 Att (I)
pg. 9 Att (J)
pg. 9
00 73 05 1.9.1 Should the design include host nation standards in the specifications? RFP part 5 includes ASTM Testing standards. Is it expected that the DOR will edit this specification to the Icelandic applicable standard or is the testing be done in accordance with US standards?
Use whichever is more stringent, Icelandic code or US code.
29 Att (I) P190002
pg. 221
Part 3 G202007 Sufficient sound attenuation is required around the space reserved for the backup generators. What level is the sound required to be attenuated to? The Bare Base Assets in Part 6 include multiple generator types. Which type should be considered for the design?
Noise attenuation levels should be similar to residential areas: 45 to 55 dB. So noise generating equipment should be located in a manner that minimizes dBA exposure to the shelters. USAF personnel to specify what specific type of generators are being used.
Assume it is one of the generators listed in Bare Base Assets manual. Some of those generators have an aural rating of 70dBA at 7 meters. Generator information can be found here:
https://www.marcorsyscom.
marines.mil/Portals/105/pdm eps/docs/MEP/B1016B1021.
30 Att (H)
pg. 192
Part 2 G2020 P190001. In the RFP, part 3 section G2020 it is specified "The Pavement design aircraft, per 3-260- 01, is a C-5A Galaxy. The apron must be striped to accommodate the maximum number of parking spaces allowed; use the Boeing 707 airframe dimensions for spacing design.". UFC 3-260-01 chapter 2-
3.4 describes the definition of design aircrafts. Can we assume that the use of "spacing design" for the Boeing 707 is actually referring to using the B707 as the "geometric" design aircraft according to the
UFC?
Yes.
31 Att (H)
Att (J) P190003
General As the design will have to be checked against the EASA and UFC requirements it is required to know how NAVFAC classifies the Airport. Are the Runways classified as Class A or Class B?
Follow the classification that ISAVIA has designated the runways
32 Att (H) P190001 Att (I) P190002 Att (J) P190003
General Are there any restrictions to a critical path design submittal or phased design submittal approach to allow for earthwork construction to begin in Fall/Autumn, parallel to final design completion? Will NAVFAC allow a phased design approach?
NAVFAC will allow for a phased design approach, since there are three seperate projects. The restrictions are as stated in the RFP, Part 2, Section 01 33 10.05 20 Design Submital Procedures.
The Government prefers to review for Quality Assurance (QA) as few submittal packages as possible. A Critical Path submittal must include all design analyses, drawings, specifications and product data required to fully describe the project element for Government review.
33 Att (H) P190001 Att (I) P190002 Att (J) P190003
General Can design for project P190001, P190002, & P190003 be completed and approved separately to allow for construction to begin early in one area while design continues to completion in the others?
Yes.
34 Att (I) P190002
pg. 235
Part 3 G403001 P190002 G403001, please confirm only 1 telecommunication conduit is required between 30m² electrical building and building 1624.
At a minimum there should be 2 qty 103mm conduits installed - One conduit in use and the other a spare conduit with cable pull strings.
35 Att (I) P190002
pg. 231
pg. 495
Part 3 Part 6
G4010 E-501
P190002 G4010, drawing E-501, please confirm the MV switchgear and the Main Distribution Panelboard shall be located within the new 30 sm power and communication building.
The Designer has the option to use the 30m2 building to place the equipment. Be aware that HS Veitur will be installing a distribution equipment enclosure that may also contain the MV switchgear on the transformer secondary side that feeds the site. It is possible the MV switchgear could be located in the distribution equipment enclosure or the 30m2 building. It is certain that the MDP will be in the 30m2 building. So your bids will include the MV switchgear as either a direct-install by the Contractor or part of the utility service installation cost.
36 Att (I)
pg. 493
Part 6 Drawing C-101
The contours provided on the ISAVIA website when compared to the survey provided in Part 6 Attachment A require a substantial amount of fill to build up to the 41 level required in the drawing. Please confirm that the spot elevations provided in Attachment A are correct for final elevations and what elevation system was used to develop the survey in Attachment A?
Base bids on the contours and elevations shown in Part 6 Attachment A. Elevation system used was established by NAVFAC and shall not to be used for design.
Contractor must perform independent topographic survey.
37 Att (I) P190002
Part 3 G40 P190002, G40, Site Electrical Utility, refers to Part 6 attachment C photo, which shows a UDSE building (shed). However in Section G40, Site Electrical Utilities, the UFGS lists UFGS 261219.10 for Three-Phase Pad-Mounted Transformers and also in G40100 Transformers it says" Provide three phase pad mounted transformers to feed the facility", also in G401002 it says "...Designer of Record must utilize UFGS Section 26 12 19.10, Three-Phase Pad-Mounted Transformers,..." According to Section 26 11 13.00 20, the transformer station needed (which will be 11kV-3,810KV) is defined as primary unit substation, which can be either indoor or outdoor. Is it acceptable to have the primary voltage transformer located inside of the a Utility Distribution Substation (UDS) Building, which is shown on drawing ES101? Shall the UDS be like the Utility Shed shown in Part 6 atthachment C - Photo Sheets, page 501.
HS Veitur installs the distribution transformer. It is likely that the transformer will be inside the utility distribution center (utility shed) as per their typical installations. UFGS Section 26 12 19.10 does not apply in this specific case.
38 Att (I)
Part 6 Drawing E-501
P190002, In note 2. on drawing E501, it says "Under no circumstances shall backup generator power be switched on at the same time while utility power is switched on and vice versa. Ensure that a keyed interlock exists between power source switches for compliance with operational lock out tag out procedures." In G202007 it says "The beddown site equipment will include generators provided by others as a backup power source." Shall the Contractor provide the Primary Switching Centers, 2 each, which are shown on drawing E501, to ensure that a keyed interlock exists between the two power sources (the utility power and the generator power)?
PSC's are Customer-provided equipment and not part of the Contractor's scope of work. The interlocks is part of the operational procedures to be followed by the Customer.
As noted in dwg E-501, all "UE" dashed lines on the drawing are installed by the Contractor to serve as the underground electrical ductbank for connection points up to the Expeditionary Equipment.
39 Att (H) P190001
Part 6 G40 P19001, G40, where is says " install all equipment and cable necessary for the separate new east apron area lighting system", does it mean Apron Perimeter Lights as is defined in UFC 3-535-01 chapter 5-
1.2.6. Is there a requirement for
apron site lighting in addition to the new apron edge lighting?
Yes it refers to apron edge lighting. Apron site lighting not required.
40 Att (H) General P190001. According to paragraph 1-
3.5 in UFC 3-201-01 it is stated that if this would be an FAA controlled civilian airfield, FAA criteria applies for facilities such as runways and taxiways that are jointly used by civilian and military aircraft. The portions that are military only, DOD criteria applies.
Does this also apply to Keflavik, whereas civilian traffic blends with the military traffic, Isavia design criteria will govern, but where only military operations are expected, only DOD criteria applies?
41 Att (H) General P190001. According to paragraph 6-
5.7 in the UFC 3-260-01 "Layout of aircraft parking locations and taxi lanes should consider aircraft taxiing routes when an aircraft is refueled. Refueling operations should not prevent an aircraft from leaving the parking apron" As this is a new construction, should it be considered to locate the drainage at the stands on the apron rather than on the edge to avoid that future fuel spills would flow over to the taxi lanes?.
No.
42 Att (J) P190003
pg. 355
Part 6 Attachme nt A - Site Plan
P190003. Looking at the Drawings provided by the RFP part 6 there has been designed a fillet between the new taxiway and Delta 2. Is this really necessary, and if so what is the design aircraft to be used for geometric purposes? Currently Delta-2 is only 15 meters wide and is therefore too small to fit aircrafts like the C5. Please confirm if the provided conceptual layout of the fillet is going to be used moving forward.
No intended design aircraft.
No fillet is required. Provide adequate transition to the proposed DCP taxiway.
43 Att (J) P- 190003
General What requirement is there of the Icelandic SWAT squad to access the AMMO area in the south west extremity of the airfield, during the project construction phases?
Access to the police/SWAT compound should remain accessible during construction.
44 Att (J) P- 190003
General Does NAVFAC wish for a permanent or temporary road to be built connecting the SWAT/AMMO area to Delta 2 (for example), to allow the existing route to this area to be demolished as part of the works to the dangerous cargo zone.?
The access road along the new taxiway will be demolished where the taxiway will be placed, the rest of the roadway will remain for access to training facility. Temporary access or roadway will be necessary to maintain access.
45 Att (J) P190003
pg. 8
Part 3 3.2 Documents call for Sheet flow stormwater handling, i.e.. No drainage system, is this correct?
Sheet flow is anticipated for the new taxiway/apron. The stormwater management design shall include the necessary features to meet UFC / local code compliance and environmental regulations.
46 Att (H)
Att (I) P190002 Att (J) P190003
General Please provide full details of the plans made by NATO to use the various areas during the construction phases?
NAVFAC does not have knowledge on future NATO exercise dates. Any schedule delays due to NATO exercises during the contract period, will be addressed during construction by the Contracting Officer.
47 Att (H) P190001 Att (I) P190002 Att (J) P190003
General What restrictions are there, to the work areas due to the work being carried out on a live civil and military airport , from the airport management company - ISAVIA?
NAVFAC does not have knowledge on future restrictions. Any schedule delays due to NATO exercises during the contract period, will be addressed during construction by the Contracting Officer.
48 Att (H) P- 190001
Part 3 Section
3.1 and 3.2
Extension to existing apron.
Existing apron is 14'' (356mm) concrete on +762mm crushed stone Part 3 page 6, section 3.1 :
Extension is called up Part 3 section
3.2 page 9 as requiring +406mm of concrete and +305mm crushed stone. Is this correct?
Yes follow Part 3 section 3.2 page 9 as requiring +406mm of concrete and +305mm crushed stone.
49 Att (H) P- 190001
Part 3 Section 3.2
Is an edge drain required around all 3 sides of the extension?
No. As long as there is adequate storm water drainage to the oil water separator system to meet host nation environmental requirements.
50 Att (H) P- 190001
What finish is required to the finished concrete surface?
Burlap drag or broom finish
51 Att (H) P- 190001
Part 3 Section 3.2
If it is not possible to connect into the existing system due to existing invert levels of drainage pipes and channels, will NAVFAC expect the extension drainage to become a 'stand-alone' system to include, oil/water separator, drainage and settlement pond?
Yes.
52 Att (I) P19-
General Drawing C101 note 5 calls for a 40.000sqm Beddown site. Is this the area required WITHIN the fencing or WITHIN extent of all project site works (bank of swale?)?
40,000 SM is the gravel area within the fencing.
53 Att (I) P19-
Part 3 Chapter 6 P190002 - Part 3 chapter 6 page 1 section B1020 calls for the Electrical/Communications enclosure to be steel framed or pre-cast concrete : Will an in-situ concrete solution be acceptable?
Yes.
54 Att (I) P19-
Part 3 B201001 P190002 - Part 3 What are the aesthetic/architectural requirements of the exterior of the electrical building ? Will self-finished insitu concrete be acceptable?
Acceptable finishes for the following materials:
Cast-in-place concrete :
concrete wash with scored lines for architectural interest
• precast concrete: similar to concrete wash
• insulated metal panel:
ribbed finish
55 Att (I) P19-
G302090 P190002 - G302090 OPTION -
What drainage piping is required to the wastewater storage tank from the various locations of the 550 possible personnel and where ?
Drainage piping to the waste water storage tank is not required. Only provide the point of connection as described in Part 3 Chapter 6
ESR G302090
56 Att (I) P19-
G4010 P190002 - G4010 OPTION - The documents call for a concrete encased duct bank system for the ducts EXTERIOR TO THE SITE ELECTRICAL BUILDING. Are all ducts within the perimeter fence AND outside it to have concrete encasement ? Please provide more detailed information on which are to be encased and which are not?
Refer to UFC UFC 3-550-01 Section 3-11. Generally, all service conductors are supposed to be concrete-encased. For this project, we have asked that all circuits above 600V to be concrete-encased. On drawing E-501 these circuits are the "UE" dashed lines.
57 Att (I) P19-
G401007 P190002 - G401007 - The documents associated with the base bid demand CONCRETE ENCASED DUCTBANKS plus handholes and manholes. Please provide clarity on what is required under the base bid?
Refer to UFC UFC 3-550-01 Section 3-11. Generally, concrete manholes are required for power service circuits. Telecom handholes can either be in handholes made of concrete or composite-type material.
58 Att (H) P190001 Att (I) P190002 Att (J) P190003
General P190001, 0002, 0003 - The documents state that 895 days is allowed for the contract completion.
Shall the bidder consider that NONE of the areas are required to be completed prior to this date?
The Contractor shall complete the entire work ready for use shall not exceed 895 days.
59 Att (H)
Att (I) P190002 Att (J) P190003
General P190001,2,3 - Will NAVFAC accept completion and handover of the 3 elements (190001, 190002, 190003) in phases and accept that the defect liability period for that area commences at that time?
Please see Page 5 of the Solicitation.
60 Att (H) P190001
pg. 184 Att (J) P190003
pg. 183
Part 3 3.2 P190001 and P190003, DCP and taxiway. according to UFC 3-260- 01 (Table 5-1 and 6-1) shoulders on the DCP and Taxiway are required to be 15 meters wide, the RFP states
7.62. Which one is to be used for
the estimate? If 7.62 is to be used, please confirm if that is only the surface pavement layer but the shoulder structural pavement layers have to be 15 meters wide.
Use 15 meter width on shoulders.
61 Att (H) P190003 pg.183
Part 3 3.2 P190001, Apron Shoulder. Please confirm if the paved part of the shoulder is only 7.62 meters but the rest of the shoulder pavement structure has to be 15 meters wide as specified by the UFC 3-260-01
Use 15 meter width on shoulders.
62 Att (J) P190003 pg.183
Part 3 3.2 Are bidders required to use the soft metric dimensions proposed in the RFPs Part 3 (Like 7.62 meters wide shoulders) or will the project emphasize on hard metrics?
Hard metrics
63 Att (J) P190003
pg. 355
Part 6 Attachme nt A
P190003, Is it required to construct an intersection with a connection to Delta-2 which is a closed taxiway?
Also if so please confirm if the C-5 is required to be the geometric design aircraft for that turn. If not please propose a different geometric design aircraft.
No. an intersection to delta-2 is not required.
64 Att (J) P190003 pg.183
Part 3 3.2 P190003 - RFP Part 3 specifies a minimum asphalt thickness of 22.86 and 30.5 cm as minimum asphalt stone base thickness. Is this correct and are bidders expected to propose a total of approximately 50cm thick asphalt layer (surface layers and asphalt stabilized base course layers)?
65 Att (J) P190003 pg.187
Part 3 6, G102006
P190003 - RFP Part 3, section G102006 specifies that there is no fencing relocation. by looking at the aerial photograph of the airport there is a fence and a gate located within the expected security clearance area of the Taxiway.
Please confirm if the relocations of this fence and gate is to be included in the bid
Based on the Contractor's final design, the fence line and gate may require relocation outside taxiway clear zones.
66 Att (H) P190001
pg. 184 Att (J) P190003
pg. 183
Part 3 3.2 P190001 and P190003. Please clarify or give any direction on the quantities of the mooring eye/grounding rod required. Is the layout supposed to be similar to the existing apron, providing a grid structure or should a certain amount of mooring eyes/grounding rods be provided at each stand?
Refer to UFC 3-575-01 Section 2-3.3 for guidance.
Provide grid pattern similar to existing apron
67 Att (H) P190001 Att (I) P190002 Att (J) P190003
General Can European equivalent materials be installed (e.g., European norms for Schedule 40 conduit)? Can we use PEH conduit instead of PVC conduits?
Contractor must submit the conduit data sheets for approval as an alternate to PVC. Data sheets must prove that the material is an acceptable alternative the PVC Schedule 40.
68 Att (H) P190001
pg. 9 Att (I) P190002
pg. 8 Att (J) P190003
pg. 9
00 73 05 1.8 What is the process for obtaining NATO security clearance?
The process to obtain access through the Keflavik Airport Authority will satisfy the NATO "Restricted" clearance.
69 Att (H) P190001 Att (I) P190002 Att (J) P190003
General What is the process for escorting subcontractor personnel, equipment, and materials on and off site?
The Contractor shall follow the Keflavik airport access requirements and procedures.
70 Att (H) P190001 Att (I) P190002 Att (J) P190003
General Do designs need to be stamped by a US Registered PE?
No. However, the design of all disciplines must comply with the applicable U.S. & Host Nation norms, regulations and all applicable U.S. Military criteria.
71 Solicitati on
pg. 17
In the site visit it was conveyed that NAVFAC intended to award as soon as possible after proposal submissions. What date should the bidders assume for an award date to develop the project schedule for the proposal?
For schedule development purposes, please use 1 JUL 2020 as the award date.
72 Solicitati on
pg. 31
pg. 1
pg. 5
pg. 35
Page 31 of the solicitation states that LDs will begin to run 800 days from notice to proceed (NTP).
Page 1 no. 11 states performance completion within 895 days after
NTP.
Page 5 states contract completion 895 calendar days after NTP.
FAR 52.211-10 pg. 35 allow 895 for construction from award date.
When do LD's begin (calendar days) and from which point is it measured, NTP or Award?
Will NTP be considered the same date as award?
The Contractor shall complete the entire work ready for use shall not exceed 895 days. Please see the revised clause 52.211-12 included with this amendment
73 Att (H)
P190001
pg. 184
Part 3 G401006 Can European equivalent materials be used for the airfield lighting cables? Existing cables used on the Keflavik airfield are type FLYCY 1x6/6 5kV, which is made by for example Prysmian and Draka. This cable is in accordance with IEC 61000.
Contractor must submit the cable data sheets for approval as an alternate equivalent.
74 Solicitati on Amendm ent 4
pg. 5
Due to the holidays many suppliers and subcontractors are closed and there is not adequate time to develop a best value proposal for the Government. Will the Government please consider granting a three (3) week extension to 5 February 2020 for submittal of the Phase II proposal?
See Block 14 of this Amendment.
75 Att (I) P19002
AFH10-
4.7.2 Secondary Distributi on Center
(SDC)
Each SDC is rated 150 KVA. What will the power demand factor be?
Or shall we assume the power demand factor is 1, for each SDC?
Information on final electrical loads is premature at this point and the amount of inductive loads is currently unknown. Assume a pf of 0.8.
76 Page 2 PART 3 -
CHAPTER
6 / ESR
G40
G401002
TRANSF
ORMERS
(P190002 EDI: Beddown Site Preparation) To be able to decide size (kVA) of transformer (11kV/3810V), which size of power distribution panels (SDCs) should we assume will be used, 15, 25, 30, 60 or 100kW?
SDC's are rated for 150kVA.
Visit this site for more information:
https://www.pd-sys.net/pd-power-system-products/?&SingleProduct=8
77 Page 1 PART 3 -
CHAPTER
6 / ESR
G40
G4010
ELECTRI
CAL
DISTRIB
UTION
(P190002 EDI: Beddown Site Preparation) According to HS- Veitur (power company) they only deliver one outgoing 11kV feeder from the new substation. Should we then provide 11kV/3810V (kVA?)
transformer instead of 20kV/3810V and 11kV/0,4kV instead of 20kV/0,4kV?
Yes. It was unkown at the time of drafting the RFP what specific voltage HS Veitur delivers power at and it was assumed to be European 20kV. So accept the 11kV voltage that they are delivering on the high-side of the distribution transformer (11kV - 3810V, 50Hz delta-wye configuration)
78 Page 1 PART 3 -
CHAPTER
6 / ESR
G40
G4010
ELECTRI
CAL
DISTRIB
UTION
(P190002 EDI: Beddown Site Preparation) CLIN 0004 description in Schedule B states "Price for the entire .... construction of the electrical concrete encased duct bank for the underground site distribution system". A concrete ductbank is required for all underground power wiring, which includes power for lighting. We understand, however, that the scope of CLIN 0004 shall only include the work outside the revision cloud on drawing E-501, i.e. ductbanks marked UGE (>600V or not) as well as concrete pads, bollards, markers etc., but other concrete ductbanks in P190002 shall remain int CLIN0002. Is this the correct understanding?
Ductbanks are required for power circuits >600V. This means that it should not include the direct circuits for site lighting. Site lighting is supposed to be fed off the electrical distribution system inside the 30m2 building and not from the expeditionary equipment sources. It is correct that all "UE" circuits shown on drawing E-501 are for the underground ductbanks and part of the Contractor's scope of work.
79 Page 2 PART 3 -
CHAPTER
6 / ESR
G40
First paragraph
Drawing attachment E-101 is referenced. This drawing is not included in attachments. Please provide.
"E-101" is a typo error and the reference is actually to drawing ES101.
80 29 P190001 Part 5 Prescriptiv e Specificati ons
2.11.1.1 A location for a batching plant is
said to be indicated on drawings.
Please provide this drawing.
The batch plant location will be within the Airfield boundary. Exact location shall be determined after contract award with coordination/approval by the Host Nation.
81 29 P190001 Part 5 Prescriptiv e Specificati ons
2.11.1.2 Minimum capacity of 250 CY/hr is
required conforming to NRMCA QC 3. A plant with this capacity does not exist within a workable range from the site. A plant with 120 m3/hr capacity is what we intend to use. We intend to lay concrete in 5 meter strips requiring 90 m3/hr. Can this requirement be waived?
Yes, requirement can be waived.
82 29 P190001 Part 5 Prescriptiv e Specificati ons
2.11.2.4 Provide truck mixers ….. that
conform to ASTM. This does not exist in Iceland. Can this requirement be waived.
Yes, requirement can be waived.
83 9 P190001 Part 5 Prescriptiv e Specificati ons
1.4.3 Laboratory accreditation requires
USACE validation by MTC. All certification is under European standards. Can USA based requirements be substituted by European Norms?
Yes.
84 9 P190001 Part 5 Prescriptiv e Specificati ons
1.4.2 Batch Plant Operator requires
NEMCA certification. Petrographer shall be trained in ASTM testing.
All certification required in Iceland is under European standards.
European standards are acceptable.
85 In general, can USA based requirements be replaced with comparable European requirements.
European requirements and standards may or may not exceed or be directly comparable.
European standards are acceptable.
86 In view of the fact that no PPIs have been replied to and Euopean suppliers will be shut down at least until 6 January 2020, we request an 8 week extension of time to turn our proposal in.
See Block 14 of this Amendment.
87 Att (J) P190003 Pg. 187 to 188
Part 3 G102003 Section G102003 Underground site demolition tells the bidder to account for relocation or removal of existing utilities within 10 feet (3.0m) of any new facilities or building additions. Is the new taxiway leading to DCP categorized as a new facility? and are the bidders expected to include in their pricing relocation and demolition of all water pipes, electricity and comm cables and ductbanks? along with the relocation of the fence, gate and control point structure to a new location acceptable to the final layout of the taxiway?
Utilities crossing under the new taxiway shall be minimized as much a practicle to reduce voids.
Relocation of existing utilities and utility access points (manholes, handholes, hydrants, valve, etc...) is required within the path of the new taxiway, based on final design. The Contractor shall ensure that any utilites to remain under the new taxiway shall have the proper material and depth of cover required by UFCs.
88 Att (J) P190003
pg. 354
Part 6 Aerial Photo
The intersection of the roads near the Dangerous Cargo Pad show an Access Control Point, does this need to remain operational and manned during construction?
The access roads shall remain accessable as much as practical during construction. The Contractor shall provide alternate temporary roads during construction to maintain access. The existing access control point and existing fence line shall be relocated outside the new taxiway clear zone.
89 Att (J) P190003 Pg. 186
Part 3 G1020 Section G1020 only specifies site demolition to include large rocks or boulders and excess fill. By looking at a aerial photograph there is a existing road running along the new taxiway. There is no mention on demolition of this existing road. Is that to be done by others? or should demolition be considered a part of the bid? And if so what quantities should bidders assume for bidding purposes?
The access road adjacent to the new taxiway shall be demolished in this project.
The remaining access road shall remain for access to police training facility.
Access road Improvements are required in order to tie-into the new taxiway elevation.
90 Att (I) P190002 various various see below and also D509006 Energy Management Control System. What is intended by this energy control and monitoring system? Is this a "service entrance meter" with no requirement for remote monitoring?
Or is this a Power Monitoring and Control System with remote headend and local HMI?
Electrical energy control system is by the local utility for their typical installation.
The Customer does not have a requirement for a SCADA-type system for their energy control requirements and only requires an electric meter. Icelandic Coastguard should also be consulted as to their requirements for an energy management system in coordination with
ISAVIA and HS Veitur.
91 Att (I) P190002
pg. 184
Part 3 2.3.7 Design, acquire and execute all control systems (including systems separate from management utility monitoring and control system) in accordance with UFC 4- 010-06 Cybersecurity of Facility-Related Control Systems and as required by individual Facilities Engineering Command (FEC) or Installation implementation policy.
Incorporate ICS Security Controls located in NIST 800-82, Appendix G, Table G-1. Design the project using UFGS 25 05 11 Cybersecurity of Facility-Related Control Systems. Incorporate elements of the NAVFAC Cybersecurity Hygiene Checklist into contract specifications by using
SECTION 25 05 11,
CYBERSECURITY OF
FACILITY-RELATED CONTROL
SYSTEMS. Submit Cybersecurity Plan and Cybersecurity Hygiene Report in accordance with SECTION 25 05 11." what is required for Cyber security? this is based on power monitoring and control system requirements. see question above regarding Energy Management Control System.
See response for #90.
Specific Cybersecurity Requirements is outlined by US Air Force in coordination with Icelandic Coast Guard.
92 Att (I) P190002
pg. 234
Part 3 G402002 Provide perimeter fence area lighting as noted in G402001 and at the site entrance gates. Refer to UFC 3-530-01 Chapter 6 Security Lighting. What is the perimeter fence lighting spacing?
Contractor will design the lighting spacing in accordance with UFC 3-530-
01. See chapter 4 for lighting zones and chapter 6 for security lighting.
93 Att (I)
pg. 231
Part 3 G4010 In terms of power "Possible nearby connection points have been identified on the attached drawings and must be field verified by the Contractor.
Refer to Part 6 attachment C photo of the utility distribution substation enclosure (UDSE) that may or may not contain the necessary utility distribution transformers and circuit breakers.
Verify to what extent the local utility equipment provides according to the single line diagram and provide the remainder of the necessary electrical infrastructure. Ensure that there is appropriate overcurrent and fault protection installed on the secondary side of the utility transformer connection serving the beddown area." CONFIRM THE UDSE has the two additional breakers, if so size of the breakers, also size of incoming power breakers.
The contents of the utility distribution enclosure is proprietary information and a design by HS Veitur because they install the equipment. The Contractor has the option to let HS Veitur install the switchgear in their equipment enclosure or install one in the 30sm building. The Contractor's designer must work with HS Veitur to convey the site connection requirements for the site electrical distribution system and make sure those needs are met.
94 Att (I) P190002
pg. 232
Part 3 G4010 The end-user voltage system at the site electrical building will match the Host Nation voltage system of 230V, 50Hz.The available fault current at the point of connection is presently unknown and is initially assumed to be connected on an infinite bus. It is the expectation that the Contractor will investigate during detail design and prior to installation, the available fault current at the service connection to the electrical enclosure for appropriate fault current limiting measures and sizing of equipment. CONFIRM a fault current study is needed.
The impedance and available fault current at the utility point of connection should be provided by HS Veitur.
A fault study for the site is not necessary since there are no existing electrical loads.
But load calculations for the site must be provided along with the electrical drawings.
95 Att (I) P190002
General Please confirm no energy models are needed for this project (30sm building).
Confirmed, not needed for the 30sm building.
96 Att (I) P190002
General Please confirm the project will not be LEED certified.
Confirmed, not needed for the 30sm building.
97 Att (I) P190002
General Please confirm Life Cycle cost analysis is not needed.
Life Cycle cost analysis will not be required.
98 Att (I)
pg. 202
Part 3 D30 Please confirm that air conditioning is not required and that only ventilation and heating is required for the 30sm electrical/comms building.
Yes confirmed. There is a need for humidity control inside the 30sm building to protect the electrical equipment.
99 Att (H) P19001
pg. 195
Part 3 G40 Will the contractor be required to install new underground conduit if they are required to run the circuits back to vault 2? If so, will it need to be concrete encased?
Contractors bidding on this project should assume that they are providing new underground conduit. The cost must be clearly seperately identifiable in their estimate. With that said, it is possible with other current ongoing construction projects that ISAVIA has already installed spare conduit available for use and may want the Contractor to use that conduit instead.
This requires coordination with ISAVIA. If existing spare conduit can be utilized and with ISAVIA's approval, the Customer must be notified and a cost reduction credit should be provided back to the Customer.
100 Amendmen t 6
PPI 7 With reference to Addendum 6, PPI
nr. 7 Government response, we point out that according to exploratory hole E-13 some rock excavation will be required. Just as bedrock mapping is needed for a quality design, so is it vital in order to give the best price to the Government. In order to give a firm fixed price the contractor must be able to reasonably estimate the amount of rock excavation. The P308 Geotechnical Report Reference 2017 is for a different project location and does not help estimate bedrock topography for quantity estimation. Contractor wishes to perform this survey at own expense before award. As the other potential bidder is already on site with excavators we feel that by denying us the opportunity to explore, we will be at a disadvantage. We therefore reiterate our requests for permission and a further extension of time.
Base bids on the geotechnical information that was provided in the Design-Build RFPs and previous Amendments.
101 Solicitati on Page
6.
Evaluation Factors for Award
3 Basis of Evaluatio n and Submittal Requirem ents for Each Factor
(a) Price:
(1) Solicitatio n Submittal Requirem ents
Offerors shall submit one (1) marked “original”, one (1) marked “copy”, each in separate three-ring (or four-ring) binder, and one (1) electronic copy (CD format) of the solicitation submittal requirements identified below.
-SF-1442, signed -Amendments (SF30s) Acknowledged -Completed Schedule B, Pricing Form -Bid Bond -Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact and their phone and email address.
-Required Contractor Responsibility documentation
Please confirm that a bid bond is not required
Bid Bonds are not required.
102 Solicitation FAR 52.211 – 13 is not listed in the Solicitation as a clause to be incorporated into the contract either by reference or by full text. FAR 11.503(c) states that Clause 52.211 – 13 is to be used in solicitations and contracts that use the Liquidated Damages clause (52.211 – 12). Was FAR 52.211 – 13 omitted intentionally or should it be included?
FAR Clause 52.211-13 is included with this amendment.
103 12 of 425 Att (H)
EDI
Airfield Upgrades Apron Expansion Design Build RFP
1/1/2001 This section states as follows:
"There are references to the Icelandic Government and the U.S.
Government. If neither is specified, the reference is to the Icelandic Government." In many places in the contract documents it says "Government", but based on the context, I doubt that the intent is to mean the Icelandic Government.
For example, see the very next paragraph, 1.2, regarding submittals where it says "Government approval is required for submittals with a "G" designation…". Is the intent really to mean the Icelandic Government and not the U.S. Government? For another example, see pages 6 and 7 of Amendment 004 where Acceptance/Inspection of the CLINs is by the "Government". Is the intent really to mean the Icelandic Government and not the U.S.
Government? This problem is evident throughout the contract documents. Please clarify.
The construction contract will be between NAVFAC (U.S. Government) and the contractor. The "G" designations in the contract refer to the U.S. Government (NAVFAC). NAVFAC will coordinate approvals, as needed, with input from the Host Nation.
104 2 Att (E) Schedule B
Note 5 It is presumed that the performance bond should be only for the value of CLINs awarded and not all CLINs regardless of award or not. Please confirm.
Refer to Attachment (E) Schedule B – Bid Notes.
3. Revise 190002 RFP
DOCUMENT RFP PART 3 PROJECT PROGRAM
6.0 ENGINEERING SYSTEM REQUIREMENTS
B1020 SUPERSTRUCTURE
Replace Part 3 B1020 Superstructure in its entirety with the following text:
ELECTRICAL/COMMUNICATIONS ENCLOSURE
The electrical/communications enclosure may be steel framed, precast concrete, or cast-in-place concrete.
The roof construction may include a pre-engineered metal building system, steel roof deck on steel beams, steel roof deck on light-gage metal framing, precast concrete slab, or cast-in-place concrete slabs on removable forms.
The roof deck may be supported on cast-in place concrete walls, pre-cast concrete walls, steel columns and steel beams, steel columns and joist girders, concrete column and concrete beams, or cold-formed steel stud walls.
B201001 EXTERIOR CLOSURE
Replace the first sentence in its entirety with the following text:
“Provide a precast concrete or cast-in-place concrete exterior closure with exterior wall backup construction as indicated below.”
4. Revise 190003 RFP
DOCUMENT RFP PART 3 PROJECT PROGRAM
3.2 SITE DEVELOPMENT REQUIREMENTS
Add the following text
“Site will require the relocation of surface utilities, such as manholes, handholds, and hydrants to outside the taxiway pavement. Fences and other obstructions need to be relocated to outside of the taxiway clear zone.
Adequate transitions from the existing roads and taxiways to the taxiway constructed in P190003 must be constructed”
G1020 SITE DEMOLITION & RELOCATIONS
Add the following text
“Site will require the relocation of surface utilities, such as manholes, handholds, and hydrants to outside the taxiway pavement. Fences and other obstructions need to be relocated to outside of the taxiway clear zone.
Adequate transitions from the existing roads and taxiways to the taxiway constructed in P190003 must be constructed”
G102005 UTILITY RELOCATION
Remove “Not Used.”
Add the following text.
“Site will require relocation of surface utilities, such as manholes, handholds, and hydrants to outside of the taxiway pavement.”
G102006 FENCING RELOCATION
Remove “Not Used.”
Add the following text
“Relocation of adjacent fence is required to adhere to taxiway clear zones.”
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount identified below for each calendar day of delay until the work is completed or accepted.
CLIN 0001 $2,578.10
CLIN 0002 $565.70
CLIN 0005 $1,451.34
*The Liquidated Damages rate for CLIN 0003 and CLIN 0004 will be assessed under the CLIN 0002 rate if awarded
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)