Att_(A)_Construction_and_Design_Experience_Project_Data_Sheet.doc

DOC document 86 KB Posted

Attached to
P19001: Airfield Upgrades, P19002: Beddown Site Preparation, P19003: Dangerous Cargo Pad Keflavik, Iceland
Solicitation number
N6247019R5017
Issued by

About this file

Att (A) Construction and Design Experience Project Data Sheet

View the file

Other files

File Type Posted
19R5017 Amend 0014.pdf PDF
19R5017 Amend 0013.pdf PDF
19R5017 Amend 0012.pdf PDF
19R5017 Amend 0011.pdf PDF
19R5017 Amend 0010.pdf PDF
19R5017 Amend 0009.pdf PDF
19R5017 Amend 0008.pdf PDF
19R5017 Amend 0007.pdf PDF
Att (V) P190003 C-101 DWG-Revised 1216.pdf PDF
19R5017 Amend 0006.pdf PDF
Att (N) 1575253_Reference_dwg2of7.pdf PDF
Att (T) P308 Geotechnical Report Reference 2017.pdf PDF
Att (R) 1575253_Reference_dwg6of7.pdf PDF
Att (M) 1575253_Reference_dwg1of7.pdf PDF
Att (U) P190001 C-101 DWG-Revised 1216.pdf PDF
Att (P) 1575253_Reference_dwg4of7.pdf PDF
Att (Q) 1575253_Reference_dwg5of7.pdf PDF
Att (S) 1575253_Reference_dwg7of7.pdf PDF
Att (O) 1575253_Reference_dwg3of7.pdf PDF
19R5017 Amend 0005.pdf PDF
Att (K) Phase II Site Visit Presentation.pdf PDF
Att (L) SITEVISITLOG.pdf PDF
19R5017 Amend 0004.pdf PDF
Att (E) SCHEDULE B.docx DOCX document
Att (G) Site Visit Map.pdf PDF
Att (H) P190001 EDI Airfield Upgrades Apron Expansion Design Build RFP.pdf PDF
Att (I) P190002 EDI Beddown Site Preparation Design Build RFP.pdf PDF
Att (J) P190003 EDI Airfield Upgrades Dangerous Cargo Pad Design Build RFP.pdf PDF
Att (F) ICG Visit Request Form.xlsx XLSX spreadsheet
N6247019R5017_Amendment_03.pdf PDF
N6247019R5017_Amendment_02.pdf PDF
Att_(E)_LRA_Commercial_Vehicle_Inspection_Procedures.doc DOC document
N6247019R5017_Amendment_01.pdf PDF
Att_(D)_Pre_Proposal_Inquiry_(PPI)_Form.xlsx XLSX spreadsheet
Att_(B)_Past_Performance_Questionnaire.docx DOCX document
Att_(C)_One_Day_Pass_Request_Form.xls XLS spreadsheet
N62470-19-R-5017_Solicitation.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : FORMCHECKBOX

CON #1 FORMCHECKBOX

CON #2 FORMCHECKBOX

CON #3 FORMCHECKBOX

CON #4 FORMCHECKBOX

CON #5

FORMCHECKBOX

DESIGN #1 FORMCHECKBOX

DESIGN #2 FORMCHECKBOX

DESIGN #3 FORMCHECKBOX

DESIGN #4 FORMCHECKBOX

DESIGN #5

1. Experience for: FORMCHECKBOX Offeror FORMCHECKBOX Joint-Venture FORMCHECKBOX Other (Explain) Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: FORMCHECKBOX Prime Contractor FORMCHECKBOX Sub Contractor FORMCHECKBOX Joint Venture FORMCHECKBOX Other (Explain) Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

FORMCHECKBOX

New Construction FORMCHECKBOX Renovation FORMCHECKBOX Repair FORMCHECKBOX Alteration FORMCHECKBOX Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price FORMCHECKBOX Cost/Time and Material FORMCHECKBOX

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

FORMCHECKBOX

Design-Build FORMCHECKBOX Design-Bid-Build FORMCHECKBOX Delivery/Task Order (IDIQ) FORMCHECKBOX

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

FORMCHECKBOX

Design-Build FORMCHECKBOX RFP Development FORMCHECKBOX Designer of Record FORMCHECKBOX Engineering Services FORMCHECKBOX Full Plans & Specs

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information:

PAGE

Attachment A (10-02-12)

File details come from the government source that posted it.