N6247018R40040007.pdf
PDF 253 KB Posted
- Solicitation number
- N6247018R4004
About this file
N6247018R40040007.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_07_-_6_ESR_E10.pdf | ||
| Amend_07_-_6_ESR_E20.pdf | ||
| Amend_07_-_00_73_04.pdf | ||
| N6247018R40040006.pdf | ||
| Att_(I)_2018_ICEMAP.PDF | ||
| N6247018R40040005.pdf | ||
| Att_(H)_Amend_05_-_00_73_04.pdf | ||
| Att_(E)_SCHEDULE_B.pdf | ||
| N6247018R400400004.pdf | ||
| N6247018R40040003.pdf | ||
| N6247018R40040002.pdf | ||
| N6247018R40040001.pdf | ||
| Attach_C_Visitor_Pass_Request_Form.xlsx | XLSX spreadsheet | |
| Guardian_Angel_SF1442.pdf | ||
| Attach_B_PPQ.doc | DOC document | |
| Attach_A_Construction_and_Design_Experience_Project_Data_Sheet.doc | DOC document | |
| N6247018R4004_Pre-Solicitation_N6247018R4004.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0007 is issued to provide the follow ing:
1. Provide revised sections of the RFP
2. Provide response to the pre-proposal inquiries
3. Provide revised draw ings and specifications (separate attachment. Refer to additional documents feature on NECO w ebsite for all uploaded documents).
Refer to continuation page and Amendment 0007 attachments
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247018R4004
X 9B. DATED (SEE ITEM 11)
20-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jul-2018
CODE
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247018R4004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0007
Amendment 0007 is issued for the following reasons:
1. Provide revised sections of the RFP
2. Provide response to the pre-proposal inquiries
3. Provide revised drawings and specifications (separate attachment. Refer to additional documents feature on
NECO website for all uploaded documents).
ALL SUBMITTED AND OUTSTANDING PRE-PROPOSAL INQUIRIES HAVE BEEN ANSWERED BY
THIS AMENDMENT. THE GOVERNMENT DOES NOT INTEND TO ANSWER ANY ADDITIONAL
SUBMITTED INQUIRIES OR POST ANY OTHER AMENDMENTS.
1. The technical RPF is revised as follows:
DOCUMENT RFP PART 2 General Requirements, Section 00 73 04
Delete Section 00 73 04 in its entirety and replace with attached Section 00 73 04, Amendment 07.
Section 01_33_00.05_20 Construction Submittal Procedures, Paragraph 1.4.2, Sub-Paragraph f
Delete sub-paragraph f in its entirety and replace with the following:
“Submit telecommunications shop drawing, as described in Part 4, D50 ELECTRICAL.”
DOCUMENT RFP PART 3 CHAPTER 6 ESR – Section E10
Delete Section E10 in its entirety and replace with attached Section E10, Amendment 07.
DOCUMENT RFP PART 3 CHAPTER 6 ESR – Section E20
Delete Section E20 in its entirety and replace with attached Section E20, Amendment 07.
DOCUMENT RFP PART 3 Chapter 6 ESR – Section C30, Paragraph C304004.3 Pool Finishes
Add the following sentence at the end of the paragraph.
“Provide appropriate floor, lane and wall target markings.”
DOCUMENT RFP PART 3 Chapter 6 ESR – Section D10, Paragraph D102001 Overhead Cranes
Delete the last sentence in the first paragraph in its entirety and replace with the following:
“The crane span shall be approximately 11m and the runway length approximately 9m. See Part 6, Drawings, Sheet A-101, for approximate location of overhead crane and extent of coverage.”
DOCUMENT RFP PART 3 Chapter 6 ESR – Section D20, Paragraph D203003 Floor Drains
Delete the second paragraph in its entirety and replace with the following:
“Floor drains shall not be located in rooms, bays, canopies, or any other area used for production, maintenance, or any other industrial activity. Technical rooms (i.e. boiler rooms, mechanical rooms, equipment rooms) are included in this category. If a floor drain is essential to the operation of a room, the drain shall be connected to an above ground collection tank. Collection tanks shall be located and sized in accordance with the requirements of Part 6, Chapter 19, Aviano Air Base Design Guide, paragraph 14.3.3 Holding Tanks.”
DOCUMENT RFP PART 3 Chapter 6 ESR – Section D50, Paragraph D503001 Telecommunications Systems
Seventh paragraph – Delete the second sentence, “Provide a Protected Distribution System (PDS) as required.”
DOCUMENT RFP PART 3 CHAPTER 6 ESR – Section F10, Paragraph F1040001 Interior Swimming Pools
Delete paragraph in its entirety and replace with the following:
Provide a six (6) lane, 12.8m wide x 25m long swimming and exercise pool for use in special training and regular physical training activities. Pool depth shall be 3m deep (10’) for the north 33% length, with a sharply sloped drop to 6m (20’) for the south 67% length across the full width. Standard public pool accessories are not required. Four (4) ladders are required. Reference PART 6.3 Drawings; b.
Architectural Sheet A-101.
DOCUMENT RFP PART 3 CHAPTER 6 ESR – Section G10, Paragraph G103006 Soil Stabilization
Delete sentence beginning with “Cement, asphalt and pressure grouting are ….” and replace with the following:
“Not Used.”
DOCUMENT RFP PART 4
DOCUMENT RFP PART 4 PTS Section D20, Paragraph D201005 1.6 Dunk Tank
Delete second paragraph in its entirety and replace with the following:
“Drying tower shall have preassembled and welded stainless steel tank above ground as well as three dunk tanks recessed into the slab and constructed of concrete. Tank shall have shower diverter control with extension hose to provide filling operation. Provide drain in the bottom of the pit.”
DOCUMENT RFP PART 4 PTS Section D50, Paragraph D501.2.1 Government Publications
UNIFIED FACILITIES CRITERIA (UFC)
Delete reference to UFC 3-580-10 Navy and Marine Corps Intranet (NMCI) Standard Construction Practices
DOCUMENT RFP PART 4 PTS Section D50, Paragraph D502001 Branch Wiring
Delete the third paragraph beginning with “All cables shall conform….” In its entirety and replace with the following:
“All cables shall conform to EN 50575 Standard for Power, control, and Communications Cable.”
DOCUMENT RFP PART 4 PTS Section D50, Paragraph D503001 1.2 Protected Distribution Systems (PDS)
Delete paragraph beginning with “Protected Distribution Systems shall…..” in its entirety and replace with the following:
“Not Used.”
DOCUMENT RFP PART 4 PTS Section G40, Paragraph G403001 Telecommunications Systems
Delete the last sentence in paragraph beginning with “Design shall be in accordance with UFC 3-580-10…” in its entirety.
DOCUMENT RFP PART 4 PTS Section G40, Paragraph G403001 Telecommunications Systems
Delete paragraph beginning with “Design grounding systems for telecommunications…” in its entirety and replace with the following:
“Design grounding systems for telecommunications systems in accordance with UFC 3-501-01 Electrical Engineering.”
DOCUMENT RFP PART 6
DOCUMENT RFP PART 6 CHAPTER 3 Drawings – Sheet C-102
Delete Sheet C-102 and replace with attached C-102 (Amendment 0007).
DOCUMENT RFP PART 6 CHAPTER 3 Drawings – Sheet C-103
Delete Sheet C-103 and replace with attached C-103 (Amendment 0007).
DOCUMENT RFP PART 6 CHAPTER 3 Drawings – Sheet A-101
SHEET KEYNOTES:
Delete Keynote 9 in its entirety and replace with the following:
9. High Density Filing (HDF) Shelving
DOCUMENT RFP PART 6 CHAPTER 3 Drawings – Sheet E-103A
Delete Sheet E-103A and replace with attached E-103A (Amendment 0007).
DOCUMENT RFP PART 6 CHAPTER 3 Drawings – Sheet E-103B
Delete Sheet E-103B and replace with attached E-103B (Amendment 0007).
ATTACHMENTS
Part 2, Section 00 73 04 (Amendment 0007) Part 3, Chapter 6 ESR, Section E10 (Amendment 0007) Part 3, Chapter 6 ESR, Section E20 (Amendment 0007) Part 6, Chapter 3, Sheet C-102 (Amendment 0007) Part 6, Chapter 3, Sheet C-103 (Amendment 0007) Part 6, Chapter 3, Sheet E-103A (Amendment 0007) Part 6, Chapter 3, Sheet E-103B (Amendment 0007)
2. Provide response to pre-proposal inquiries
PPI # Question Answer
29 Section C301001.3, Pool Finishes states "Provide a premium blend of crushed quartz, white cement and mineral based pigments for a high performance pool finish. Apply using methods and sequence selected to produce the most uniform finish. Include all manufacturer's standard color options. Rubber matting to wrap nosing of pool deck. Provide accent mosaic tile band below."
Please clarify how much tile is to be included in the mosaic tile band.
Extent of mosaic tile band is to be at the discretion of the Interior Designer, based on the specified mosaic tile size and design and layout of the pool.
30 Section C301001.3, Pool Finishes states "Provide a premium blend of crushed quartz, white cement and mineral based pigments for a high performance pool finish. Apply using methods and sequence selected to produce the most uniform finish. Include all manufacturer's standard color options. Rubber matting to wrap nosing of pool deck. Provide accent mosaic tile band below."
Please clarify if the markings in the floor (as well as the end wall targets) be required for each lane?
Part 6 ESR C304.004.3 Pool Finishes are modified to include marking requirements.
Refer to changes to the RFP provided with this amendment.
31 Section D209002, 1.4 Turnover/Filtration states "Filtration system shall be capable of filtering full pool volume turnover with 6 hours.
Package system is to include, but is not limited to, pool main drains, skimmer drains, overflow gutter system capable of handling displaced pool water, pump inlet strainer, sand filter, backwash tank, and pool water re-entry inlets. Pool system velocity shall be in accordance with International Pool and Spa Code. Sand filter shall be capable of filtering full flow of pool turnover pump. Emergency shut-off switch for recirculation and jet systems shall be located outside of pool equipment room. Filter backwash shall be filtered with sodium thiosulphate (chlorine neutralizer) dosing and shall discharge to sanitary via air gap. Pool drainage to site sanitary shall be in accordance with D. Lgs 152/06. Pool system shall be provided with make-up water connection with usage meter." Does the RFP give consideration to any national or local codes regarding turnover rate? If there are Italian national or local codes that request a turnover rate greater than 6 hours, will the D/B Team be required to meet these requirements?
Per Design and Construction Italian Compliance, found in Part 6, if there is a conflict between U.S. and Italian norms, the policy of USCMC is that Italian norms will be met.
32 Section D209002, 1.4 Turnover/Filtration states "Filtration system shall be capable of filtering full pool volume turnover with 6 hours.
Package system is to include, but is not limited to, pool main drains, skimmer drains, overflow gutter system capable of handling displaced pool water, pump inlet strainer, sand filter, backwash tank, and pool water re-entry inlets. Pool system velocity shall be in accordance with International Pool and Spa Code. Sand filter shall be capable of filtering full flow of pool turnover pump. Emergency shut-off switch for recirculation and jet systems shall be located outside of pool equipment room. Filter backwash shall be filtered with sodium thiosulphate (chlorine neutralizer) dosing and shall discharge to sanitary via air gap. Pool drainage to site sanitary shall be in accordance with D. Lgs 152/06. Pool system shall be provided with make-up water connection with usage meter." The RFP implies that both skimmers and an overflow gutter system will be included as part of the pool. Does the Government have a preferred solution?
There is no preferred solution per Government criteria.
33 Section D209002, 1.4 Turnover/Filtration states "Filtration system shall be capable of filtering full pool volume turnover with 6 hours.
Package system is to include, but is not limited to, pool main drains, skimmer drains, overflow gutter system capable of handling displaced pool water, pump inlet strainer, sand filter, backwash tank, and pool water re-entry inlets. Pool system velocity shall be in accordance with International Pool and Spa Code. Sand filter shall be capable of filtering full flow of pool turnover pump. Emergency shut-off switch for recirculation and jet systems shall be located outside of pool equipment room. Filter backwash shall be filtered with sodium thiosulphate (chlorine neutralizer) dosing and shall discharge to sanitary via air gap. Pool drainage to site sanitary shall be in accordance with D. Lgs 152/06. Pool system shall be provided with make-up water connection with usage meter." Due to the quantity of water as a result of the 20-meter pool depth, the recirculation rate will require a substantial amount of sand filter tanks, as well as a large volume of backwash water. Due to these considerations, we do not believe the total area allocated for pool mechanical equipment is sufficient when using hi-rate sand and the waste water from filtration will place a heavy burden to the ongoing operations. Has the Government given consideration to the use of regenerative media filters?
Section F1040001 is revised to a correct pool depth of 6 meters at the deepest point.
Refer to changes to the RFP provided with this amendment.
34 Section D209002, Pool Water Systems mentions " A central disinfection system shall be provided to monitor and automatically produce uv ozone treatment and dose the pool with chlorine. The pool monitoring system shall include, but is not limited to, uv ozone treatment, chlorination, chlorine neutralization, pH level control and total alkalinity control. Adjustments to pool pH shall be by the use of pressurized carbon dioxide or muriatic acid. Pool treatment and monitoring shall be connected to the building DDC system.
Provide all additional pool monitoring parameters as dictated in AFI48-114." The inclusion of chlorine, Ozone and UV would provide a level of redundancy that is not common. Can the Owner clarify if all systems are required as part of the project?
The Aviano Treatment Plant allowable biocides on base is
0. The Government's desired system is an ozone system with minor chlorine supplementation.
35 Section F1040001, Interior Swimming Pools states " Provide a six
(6) lane, 18.6 m wide x 25m long swimming and exercise pool for use in special training and regular physical training activities. Pool depth shall be 3m deep (10’) for the north 33% length, with a sharply sloped drop to 20m (65’) for the south 67% length across the full width. Standard public pool accessories are not required.
One ladder is required. Reference PART 6.3 DRAWINGS; b.
Architectural Sheet A-101)." The drawings that were supplied as part of the RFP indicate a pool width of 12.8 meters, which is different from the 18.6-meter width indicated in the written specifications. Please clarify the appropriate width of the pool.
Section F1040001 is revised to a correct pool depth of 6 meters at the deepest point.
Refer to changes to the RFP provided with this amendment.
36 Section F1040001, Interior Swimming Pools states " Provide a six
(6) lane, 18.6 m wide x 25m long swimming and exercise pool for use in special training and regular physical training activities. Pool depth shall be 3m deep (10’) for the north 33% length, with a sharply sloped drop to 20m (65’) for the south 67% length across the full width. Standard public pool accessories are not required.
One ladder is required. Reference PART 6.3 DRAWINGS; b.
Architectural Sheet A-101)." If a 18.6 meter wide pool is required, would the Government prefer to have 8 lanes in lieu of the specified 6 lanes?
Section F1040001 is revised to a correct pool depth of 6 meters at the deepest point.
Refer to changes to the RFP provided with this amendment.
37 Please confirm the 20 meter deep pool for 67% of the length will be required.
Section F1040001 is revised to a correct pool depth of 6 meters at the deepest point.
Refer to changes to the RFP provided with this amendment.
38 Please confirm a dehumidifier is required for the parachute dryer tower. Please indicate the inside design requirements for the parachute drying tower
Dehumidier Unit is not required. Provide HVAC System capable of drying the number of parachutes within the tower.
39 The RFP does not indicate inside design requirements for the following spaces: 124 maintenance staging (warehouse), 125 supply receiving (warehouse), 118 parachute packing storage, 170 vehicle maintenance area, 172 spare parts storage. Please provide inside design conditions for the aforementioned spaces.
Refer to RRS 124, 125,118, 170 & 172 in Part 3, Chapter 5, Room Requirements Sheets for the rooms finishes and other requirements for the space.
Follow Chart on page 550 labeled "Inside Conditions" for Room 118 Parachute Packing Storage and 125 Supply Receiving. Follow chart "Heating and Ventilating Inside Conditions" for 124 Maintenance Staging and 170 Vehicle Maintenance area, 172 Spare Parts Storage.
40 Are translations required for documents other than the eOMSI?
Who will be responsible for the translations?
Part 2 Section 01 78 24.00 20, Facility Electronic Operation and Maintenance Support Information is the only required translation for the US Government .
41 Part 3, Section 1.1 - References an Open Storage Area with Secure Room requirements on the first floor - the drawings do not show this room on the first floor. Confirm room location.
This refers to Room 212:
Storage.
42 Section 01 33 29.05 20, paragraph 1.6.6, indicates 30% solar thermal for domestic hot water heating with no mention of a requirement for solar thermal for the pool. Part 3, Section D20, paragraph D202003 indicates 50% solar thermal for domestic hot water heating and paragraph D209002 indicates 50% solar thermal for pool water heating. Per Section 01 33 10.05 20, paragraph 3.3.2.b, Part 2 – General Requirements takes precedence over Part 3
– Project Program. Please confirm which requirement is to be adhered to.
50% solar domestic water and pool heating is required per D.
lgs. N 28-2011.
43 Part 3, Para 1.1, third paragraph indicates that" concrete driveway and apron surfaces are required at forklift service entries, concrete stoops are designated at all service room entries". Para 2.3, third paragraph indicates that "much of the paved site area must be thickened concrete to carry...forklift traffic and the K loader". Para
2.6 mentions vehicle access requirements. Para 3.2.5 indicates rigid concrete paving must be provided for the loading area. Please confirm that concrete aprons and pavement are not required on the west side of the proposed building where bituminous pavement is indicated on Sheet C-102.
DB Contractor is advised to refer to "Layout and Site Plan, sheet C-102" for the site finish surface. The west side area of the proposed building is bituminous pavement as shown on C-102
44 Part 3, Para 1.1: Please provide information on airfield clear zones and primary surfaces; please confirm that 30.5 m parachute drying tower does not violate applicable airfield criteria (UFC, NATO, etc.) regarding these clear zones and primary surfaces.
The clear zone does not violate the applicable airfield criteria.
45 Sheet C-101, Keynote 1 indicates removal of stormwater retention pond and stone. Sheet C-104, Keynote 1 indicates connection to existing 200mm PVC drain and to verify location of existing pipe.
Sheet C-104 also indicates location of existing underground storm storage in the vicinity of the new underground storm water infiltration in the southwestern part of the site. Request as built drawings of existing underground storm storage. Assume the intent is not to replace or connect to it with this project; please confirm.
Request information on existing, offsite stormwater flow in order to accommodate it in proposed oil water separator and underground storm water infiltration. Request as built drawings of existing stormwater retention pond.
No existing storm system will be connected to the proposed storm drainage system. The existing underground stormwater infiltration shall be remain and install the new stormwater infiltration system as indicated on sheet C-104.
46 Part 3, Para 3.1.1: A proposed building grounding grid is indicated.
Is there an existing grounding grid? If so, please provide information.
Part 3, Chapter 3, paragraph
3.1.1 contains a requirement for the DB Contractor to obtain all soils resistivity tests required to design the building grounding grid and cathodic protection for the project.
There is no indication in this paragraph of an existing building ground grid.
47 Request fire hydrant flow test results for hydrants at project site. Refer to Sheet GI001 (pg. 953 of 1878). Item 8.3 for flow and pressure results. The test hydrant was located at the north end of the parking lot of Bldg. 7300 (approximately 91 m north of the flow hydrant).
The flow hydrant was located just south of Bldg. 7300 (just north of the project site, shown on Sheet C-103 (pg. 960 of 1878) near the top-left corner).
48 Request copy of Aviano Air Base SWPPP to confirm requirements. Refer to the Aviano Design Guide - 2017 provided in Part
49 Part 3, 3.2.21: Request copy of Aviano Air Base Dept. of Environment Standards and Specifications for Soil Erosion and Sediment Control
Use Aviano Air Base Design Guide and Environmental Final Governing Standards - Italy. These documents are available publicly at the Base Public Work and Utility Department.
50 Part 3, ESR G103006 indicates that cement stabilization is not allowed. ESR G201001 also indicates that cement stabilized base or subbase course is not allowed. However, geotech report indicates in para. 7.11 mixing of soils with cement. Please advise.
Refer to changes to the RPF paragraph Part 3, ESR G103006 and paragraph ESR G201001provided with this amendment.
51 Please confirm no fuel lines within project site. DB Contractor shall refer to sheet C-100, "General Civil Notes".
52 Please confirm no aboveground or underground fuel storage tanks within project site.
DB Contractor shall refer to sheet C-100, "General Civil Notes".
53 Part 3, ESR G204001: Sheet C-102 indicates chain link fence with 3 strands of barbed wire (item 7) and reinforced chain link fence per EUCOM OPORD 16-03 and UFC 4-020-01 (item 23). Please clarify extent of reinforced chain link fence on project. Are active barriers required for gate (item 17)?
The northeast side of the building at the taxiway and fire lane route side shall be new chain link fence to match existing adjacent fence construction. These areas are identified with Keynote 23.
The gate "keynote 17" shall be chain link fence gate to match adjacent fence construction.
See revised sheet C-102 for site layout provided with this amendment.
54 Part 4, PTS G10, G20 and G30 reference State Highway Specs and standards and MUTCD.
Country host nation equivalent for highways and signage standards are allowed.
55 Part 4, G30 1.3.7 references a wastewater pump station. Please confirm a wastewater pump station is not required for this project.
The DB Contractor is responsible to determine whether Wastewater Pump Station is required based on their design analysis and calculations
56 Part 4, G301007 references booster pump stations. Please confirm a booster pump station is not required for this project.
The DB Contractor is responsible to determine whether a Booster Pump Station is required based on their design analysis and calculations
57 Request available NEPA or Italian Environmental documentation for project. If not available, please provide available NEPA or Italian Environmental documentation of recent project in the vicinity of this one. Please advise of known contaminated areas within the project site.
No evidence of contamination was found in the area. Please refer to Geotechnical and Environmental Report.
58 Can wastewater from Exterior Scuba Wash Area (Item 7) be discharged into the existing sanitary sewer system? Are any additional treatment measures required?
Drainage to the site sanitary system must not exceed the limitations established in D.
Lgs 152/06.
59 Provide nearest benchmark indicating horizontal and vertical control required for topographic survey.
Design Build Contractor shall refer to sheet C-100, "General Survey Notes".
60 The water flow information was provided in D40 Fire Protection.
Provide site information as to test hydrant elevation relative to our building floor height. Provide a site map showing the water feed system routing and size around the building site. The volume of water appears to be sufficient, however, the pressure is not sufficient for the 30 m tower and a fire pump will be required.
The test hydrant was located at the north end of the parking lot of Bldg. 7300 (approximately 91 m north of the flow hydrant). The flow hydrant was located just south of Bldg.
7300 (just north of the project site, shown on Sheet C-103
(pg. 960 of 1878) near the top-left corner). Proposed water service lines and other utilities are shown on sheet C-103 "Utility Plan". A fire pump is assumed to be necessary, and a fire pump room is provided on the Ground Floor (see Sheet FX101 (pg. 980 of 1878)).
61 The sprinkler design in the Packing and Cargo Areas are to be based on the “specific storage type”. We did not find this information in the RFP. We will need to know the materials stored, how stored, storage arrangement, height of storage, aisle width for these “specific storage types".
The storage areas shall be protected as Class IV, non-encapsulated (see Sheet FX101 (pg.980 of 1878)). The sprinkler demand requirements will depend on the configuration of storage in the final design, as well as the method of sprinkler protection chosen (control mode design/area; control mode specific application (CMSA);
early suppression fast-response (ESFR)) as allowed by UFC 3- 600-01 and NFPA 13.
62 Please confirm if sprinklers are required over the pool. The bottom of the pool will be 75+/- ft. below the ceiling and sprinklers are only tested up to 55 ft.
Refer to changes to the RPF provided with this amendment.
63 The RPF calls for the bridge crane to be 20m span and 18m runway. However, the space is not large enough to accommodate these dimensions. Please clarify the location and expected operating area for the bridge crane.
Part 3, Chapter 6 ESR, paragraph C102001 Overhead Cranes has been modified to address the area of coverage requirements for the overhead crane. Refer to RPF changes provided with this amendment.
64 Section 2.3.1, Sustainable Design and Construction states " “The project must be registered with GBCI by completing the Interest Form (https://fs25.formsite.com/USGBC/GPC_Interest_Form/index.html) and paying applicable fees for registration and subsequent submittals to GBCI for certification compliance. See Section 01 33 29.05 20 for further instructions.”
Please confirm this project is required to be LEED certified.
Follow UFC 1-200-02, 4-2.1 Compliance HPSB Checklists for Air Force requirements.
Use either the GP version or latest LEED version scoresheet.
65 Offerors request a two week proposal extension to allow sufficient time to provide the Government with an accurate technical and price proposal.
Phase II proposal due date was extended to 7/20/18 via a previously issued amendment.
66 Section E102009 Audio/Visual states "AV equipment will not be funded as part of the Furniture, Fixtures, & Equipment (FF&E) Package. A/V Equipment will be purchased using separate funding.
The A/V Equipment will be identified as a separate line item, and priced separately from the FF&E. A/V Equipment will be awarded as a planned modification." The price schedule provided with Phase II does not provide a separate line item for A/V equipment.
Please provide Offerors with an updated price schedule including this line item or verify where Offerors should price A/V equipment?
Section E10 is revised by this amendment. Please refer to changes to the RFP and provided attachments.
67 Section E20, Furnishings mentions "The design and documentation of both will be funded as part of the construction contract. The purchase and installation of the FF&E Package will be funded separately as part of Collateral Equipment.
FF&E is estimated in the following amount of USD $1,005,000 and the A/V budget is USD $95,000. This estimate does not include the Contractor's Handling and Administration Rate (HAR). The Audio Visual (A/V) Equipment Package will be identified as a separate line item, and priced separately from the FF&E. The A/V Package must include shipping, freight, handling, installation, applicable state sales tax, and the Prime Contractor's A/V Handling and Administration Rate (HAR) percentage as applied to the final A/V total cost. Refer to Part 3 Section E10 of this RFP. The FF&E and A/V package must be fully integrated into the design and construction schedule for the building." The provided price schedule does not include a line item for the HAR %. Offerors request a revised price schedule to include a line item for HAR%.
Section E20 is revised by this amendment. Please refer to changes to the RFP and provided attachments.
68 Section E2010, Fixed Furnishings (SID) states "Fixed furnishings (SID) are funded as part of the construction project and are not funded as part of FF&E. Each submittal must demonstrate complete coordination with the facility design and with the package for movable furnishings." Offerors assume that the Fixed furnishing have to be included in CLIN 0001AA. Can the Government confirm whether this assumption is correct? In addition, RFP Part 6 attachment 9 lists all the furnishing for the Facility to include Government Furniture Government Installation (GFGI), Contractor Furniture Contractor Installation (CFCI) and FF&E. We assume that the fixed furnishing (SID) as per E2010 is the one marked CFCI. Can the Government confirm whether this assumption is correct?
Correct, Fixed Furnishings are to be included in CLIN 0001AA. Fixed furnishings are part of the Structural Interior Design (SID).
69 Paragraph 2.6, indicates a requirement for rinse basins and drain tanks in the Parachute Drying Tower. The basins and tanks are not indicated in Part 6 – Drawings. Please confirm the basins and tanks are required and their respective dimensions.
Refer to Part 6 Chapter 3, Drawings, Sheet A-101 for locations of dunk tanks and basin in Room 116 Drying Tower/ Dunk Area. They are keynoted as numbers 5 & 6.
70 D203003 Floor Drains, second paragraph, second sentence states, “Floor drains for essential operations shall be connected to an aboveground storage tank located outside the respective room.”
Please define what falls under “essential operations.”
Part 3, Chapter 6 ESR – Section D20, paragraph D203003 revised to clarify storage tank requirements and provide reference to Part 6, Chapter 19, Aviano Air Base Design Guide for holding tank requirements. Refer to changes to the RPF provided with this amendment.
71 Dunk Tank, indicates the drying tower is to be provided with one aboveground dunk tank and two dunk tanks recessed into the slab, constructed of concrete. Part 3 – Chapter 5 – Page 31, Room 116 – Drying Tower/Dunk Area, indicates four dunk tanks. Part 6 – Drawings – Drawing IF101A, indicates four dunk tanks. Please confirm the quantity of dunk tanks and whether they are aboveground or recessed in the slab.
Replace D201005 1.6 Dunk Tank second paragraph with revised paragraph “Drying tower shall have preassembled and welded stainless steel tank as well as three dunk tanks recessed into the slab and constructed of concrete. Tank shall have shower diverter control with extension hose to provide filling operation.
Provide drain in the bottom of the pit.” Refer to changes to the RPF provided with this amendment.
72 Is any chemical treatment performed on the water in the rinse basins and drain tanks in the Parachute Drying Tower or the scuba gear dunk tanks? If so, please provide a list of chemicals and concentrations or chemical Safety Data Sheets.
There will be no treatment of the water in the rinse basins and drain tanks or scuba gear dunk tanks.
73 Paragraph D501004 last sentence requires 200 percent neutrals for panelboards in telecom rooms and Part 4 - Section D50 - Page 8, Paragraph D501004 requires 200 percent rated neutrals for panelboards servien non-linear loads. 200 percent neutral panelboards are not available in Italy. All neutrals are required to be switched, including main circuit breakers, which negates the need for 200 percent rated neutrals. Please confirm that the requirement for 200 percent rated neutrals can be removed.
See Part 6, Chapter 08, Design and Construction Italian Compliance, paragraph 1. In the case of a conflict between U.S. and Italian norms, the design shall meet the Italian norms.
74 There is no mention of power factor correction in the RFP. Power factor correction to 0.95 is mandatory in Italy. Please confirm that power factor correction shall be included for this project.
The electrical distribution system shall be designed and constructed in compliance with Italian and U.S. construction norms such that, to the extent possible, both building codes are satisfied per Design and Construction Italian Compliance found in Part 6.
Italian norms requiring power factor correction shall be met.
75 System Description, last paragraph states that the interior distribution system shall consist of insulated conductors in conduit and that non-metallic conduit is not permitted. A typical interior distribution system in Italy utilizes multi-conductor cable routed in closed dedicated power cable trays, not individual conductors in conduit. This is also consistent with the Aviano Base Design Guide, part 15.5.3. Please confirm if using multi-conductor cables in cable trays for feeders is acceptable in lieu of individual conductors in metal conduit.
It is confirmed, multi-conductor cables and cable tray may be utilized in lieu of individual insulated conductors in conduit per the Aviano Base Design Guide, parts 15.3.0 and 15.5.3.
76 System Description, last paragraph states that all branch circuits shall be insulated conductors in conduit. Branch circuits in Italy are normally multi-conductor cables routed through closed dedicated power cable trays and not individual insulated conductors in conduit. This is also consistent with the Aviano Base Design Guide, part 15.5.3. Please confirm if using multi-conductor cables in cable trays for branch circuits is acceptable in lieu of individual conductors in metal conduit.
It is confirmed, multi-conductor cables and cable tray may be utilized in lieu of individual insulated conductors in conduit per the Aviano Base Design Guide, parts 15.3.0 and 15.5.3.
77 Requires multimode backbone cable. Please confirm that single mode backbone cable is not required.
Backbone cable shall be multimode as indicated.
78 Third to last paragraph states that the Government will provide Taclanes for classified network and cables will not be required to be in a protected distribution system (PDS). The following two paragraphs state to provide a protected distribution system and Red and Black separation which conflict with the previous paragraph which states a PDS is not required. Please confirm that a PDS and Red and Black separation is not required because Taclanes encryption devices are being provided by the Government.
Red and Black separation is required between classifications; however, the Protected Distribution System requirements are to be deleted throughout the documents.
Delete D503001 paragraph 7 second sentence “Provide a Protected Distribution System (PDS) as required.”
Section D50, Page 10, Part 4.
Delete “D503005 1.2 Protected Distribution Systems (PDS)”.
Refer to changes to the RPF provided with this
Amendment.
79 G4010 states that the available fault current at the point of connection shall be assumed to be an infinite bus. This cannot be the case because the point of connection is on the secondary side of a substation transformer. Assuming an infinite source on the secondary side of the transformer will result in excessively high short circuit current ratings for electrical equipment in the facility.
Please provide the actual available fault current at the existing switchgear in Substation 25 based on the impedance of the 2500 kVA substation transformer.
An infinite bus shall be assumed on the primary side of Substation 25. Impedance of the 2500 kVA substation transformer shall be requested from the Aviano Air Base during design.
80 G4010 states to provide a compatible circuit breaker in the existing substation switchgear to serve the new facility. Please confirm that there is space available to install the new circuit breaker and that additional switchgear sections are not required.
It is confirmed that space to install the new circuit breaker indicated in Chapter 6 Section G4010 was available during the development of this RFP and no additional switchgear sections were required.
81 Please confirm if automatic transfer switches utilizing circuit breakers which is common practice in Italy and the rest of Europe is acceptable in lieu of power contactor type transfer switches commonly used in the U.S.
Per Design and Construction Italian Compliance, found in Part 6, if there is a conflict between U.S. and Italian norms, the policy of USCMC is that Italian norms will be met.
82 ELECTRICAL TESTING - This paragraph and others in the RFP require testing of electrical equipment in accordance with NETA testing specifications. NETA is not recognized in Italy. Please provide appropriate testing criteria to be used in Italy.
See Part 6, Chapter 08, Design and Construction Italian Compliance, paragraph 1. In the case of a conflict between U.S. and Italian norms, the design shall meet the Italian norms.
83 D509004 requires a UL Lightning Protection System Inspection Certificate certified to UL 96A. UL lightning protection certification is not possible in Italy. Please confirm that the lightning protection system should be certified to CEI EN 62305 in lieu of UL 96A.
See Part 6, Chapter 08, Design and Construction Italian Compliance, paragraph 1. In the case of a conflict between U.S. and Italian norms, the design shall meet the Italian norms.
84 D501004 requires panelboards to comply with various UL standards. There are many other references to UL in this RFP.
Procuring equipment that is listed per UL that also complies with Italian norms is not practical. Please confirm that electrical equipment should comply with Italian norms and not UL standards.
See Part 6, Chapter 08, Design and Construction Italian Compliance, paragraph 1. In the case of a conflict between U.S. and Italian norms, the design shall meet the Italian norms.
85 Part 4 - Section D50 - Page 9, D502001 states that all cables shall conform to BS EN 50575. BS EN 50575 is a British Standard.
Please confirm that cables shall conform to Italian norms and not to a British Standard.
Part 4 - Section D50 - Page 9, D502001 reference to BS EN 50575 shall be changed to EN 50575. All cables shall conform to EN 50575. Refer to changes to the RPF provided with this Amendment.
86 G402004 requires aluminum poles for site lighting. Aluminum poles are not commonly used in Italy and are not used on the Aviano Air Base. Please confirm that light poles can be galvanized steel type commonly used in Italy in lieu of Aluminum.
See Part 6, Chapter 08, Design and Construction Italian Compliance, paragraph 1. In the case of a conflict between U.S. and Italian norms, the design shall meet the Italian norms.
87 Please confirm if the Public Address functions can be part of a combined system with the mass notification system as allowed by UFC 4-021-01 in lieu of providing a separate public address system.
The Public Address system described in D503002 can be an integral part of the mass notification system.
88 CLIN 0002 - Option Item 1 requires a price to provide complete Electronic Security System to include Access Control System, among other systems. The Room Requirements in Part 3, Chapter 5 only specifically list two rooms that require access controls.
However, many of the rooms include a requirement for cypher locks and many doors are identified to require cypher locks on drawings A-101 and A-102. Please confirm that only two locations require access control and that cypher locks are sufficient in other locations where indicated or if access control should be provided for doors in lieu of identified cypher locks.
Contractor to provide access control to those doors as indicated in the RFP.
89 Section 01 33 00.05 20, Page 5, Part 4 - Section D050 - Page 2, Part 4 - Section G40 - Page 7 G403001, and Part 4 - Section G40 - Page 8 G403009 include requirements for Navy and Marine Corps Internet (NMCI). Please confirm that there is no requirement for NMCI for this project.
Section 01 33 00.05 20, Page 5, paragraph 1.4.2.f. Delete “for coordination with NMCI Contractor”.
Part 4, Section D050, Page 2, paragraph 1.2.1 Government Publications. Delete “UFC 3- 580-10 Navy and Marine Corps Internet (NMCI) Standard construction Practices”.
Part 4, Section G040, Page 7, G403001 Telecommunications Systems. Delete “Design shall be in accordance with UFC 3- 580-10 Navy and Marine Corps Intranet (NMCI) Standard Construction practices.”
Part 4, Section G040, Page 8, G403009 Grounding Systems.
Delete “UFC 3-580-10 Navy and Marine Corps Internet (NMCI) Standard construction practices and”. Refer to changes to the RFP provided with this amendment.
90 Phase II submission mentions “12-point font". For Graphics, conceptual drawings, and the Gantt Chart, Offerors request to use a font less than 12pt to ensure sufficient space for accompanying graphic/schedule text is provided.
Government will allow the Offerors to use 10-point font for their smallest font. All documentation must be readable without the use of any magnification.
91 Do Offerors need to provide copies of SOA certifications, teaming agreements and/or letters of commitment that were submitted in the Phase I proposal?
Offerors do not need to resubmit SOA Certifications, teaming arrangements, and letters of commitment that were submitted with their Phase I proposal.
92 Please confirm if a preliminary analysis of the current design was performed, identifying the activities included in this design, and considering the Italian fire protection requirements for all activities, even those not classified as a category A, B or C, which have specific building code requirements for emergency exit widths, emergency exit doors, fire rated wall construction, layout, etc.?
All potential activities with specific building code requirements for emergency exit widths, emergency exit doors, fire rated wall construction, layout were examined considering Italian fire protection requirements.
93 Please confirm the one deep boring depth is 30m. Offerors' analysis of the technical specifications and drawings consider the one deep boring to reach a depth of at least 50m.
Per RFP Section A10 provide one deep boring to a minimum depth of 30m.
94 Factor 5- Technical Solution on Page 8 of 45 mentions "narrative shall not exceed seven (7) 8 1/2 X 11 double-sided pages (or 14 single-sided pages)." We respectfully requests an additional 6 pages (20 single-sided pages) to improve the clarity of our technical solution.
Narrative shall not exceed seven (7) 8 1/2 X 11 double-sided pages (or 14 single-sided pages).
95 Remove concrete helipad What is the thickness of the concrete floor slab?
No information on the thickness of the existing concrete helipad is available.
96 Remove fence and mowing strip. Is this a security fence with strip foundations?
No information on the foundation on the security fence is available.
97 The drawing shows small hatched circles described as "traffic rated top". We do not understand what is depicted. Please explain.
Existing top of Electrical MH shall be adjusted to match finish grade and replace existing MH cover with a new traffic rated MH cover.
98 Dumpster / Trash Bin. What services shall the contractor perform here, if any. Please explain.
DB Contactor shall provide a concrete dumpster/Trash Bin pad at location shown on sheet C-102. Pad shall be enclosed with the three double leaf gates as indicated on Drawing C102.
Construction shall be similar to other trash bin enclosures on the base.
99 ISU Storage Yard GFGI - does this mean these will be Government furnished and Government installed? Please clarify.
DB Contractor shall provide two concrete pads for the storage of government furnished and installed ISU containers. DB contractor shall coordinate with
NAVFAC for the required pad dimensions.
100 POTFF Turf Equipment Storage Yard Which services are to be performed by the contractor here?
DB Contractor shall only provide the concrete pad for the storage container to be located on. Coordinate with NAVFAV for the required pad dimensions.
101 FW Fire Protection Line The drawing depicts a fire protection line running along the North/South axis. Is this line already existent, or shall it be furnished by the contractor? In case this needs to be installed by the contractor, we need details about where it shall begin and where it shall end.
Revised Part 6, Chapter 3 Sheets C103, E-103A and E- 103B are provided with this amendment.
102 Internal Airlift Slingable Container Unit Since there is no detailed information on this we assume this is GFGI. Please confirm.
Keynote 8: Internal Airlift Slingable Container Unit (ISU) is NIC (Not in Scope) these are part of the GFGI items.
103 Keynote 9 describes this as a manually operated high density storage system, whereas on page 6 of Part 3 it is stated "high density mobilized storage system must include multiple synchronized motors for proper carriage alignment, cross bracing and aisle entry sensors." Please clarify whether this system shall be manually operated or motor driven.
Part 6, Chapter 3 Drawings, Sheet 1-101, Keynote 9 revised with this amendment. Refer to changes to the RFP provided with this amendment.
104 Tall wire mesh partition and storage cages (Type 63 cage locations) Are the partitions to be furnished by the contractor? If so, please provide us with a detailed description. We only found the following information in Part 4, Section C10, page 5 :
"C101002 WIRE MESH PARTITIONS
C101002. 1.1 Materials
a. Steel shapes, plates and bars - ASTM A36 / A36M
b. Cold-formed steel - AISI SG-673
c. Wire mesh - Provide carbon steel wire with woven diamond mesh and intermediate crimping. Wire must be 10 gauge mesh for seasonal storage, 6 gage mesh for protection of equipment and tools..."
Could you please provide metric dimensions?
Metal Partition Cage Walls are to be provided by contractor.
For more information, please refer to Part 3, Chapter 5 Room Requirements Sheets 144-149 and Part 3 Chapter 4
ESR C10 - C101002.
105 Overhead Hoist Crane Dimension shown on drawing is 9.00 X 11.00 m (w x l) Stated in Part 3, Chapter 5, Page 39 you require " Provide (1) bridge hoist crane with single lift point capable of 1,815 Kg (4,000 lb.) approx. 18m x 20m plan dimension."
Which dimensions are correct?
Part 3, Chapter 6 ESR, paragraph C102001 Overhead Cranes has been modified to address the area of coverage requirements for the overhead crane. Refer to changes to the RFP provided with this amendment.
106 The RFP states "Provide a six (6) lane, 18.6m wide x 25m long swimming and exercise pool for use in special training and regular physical training activities. Pool depth shall be 3m deep (10') for the north 33% length, with a sharply sloped drop to 20m (65') for the south 67% length across the full width. Standard public pool accessories are not required. One ladder is required."
Drawing A101 shows a pool with dimensions 12.8m x 25.00m with 4 pool ladders. What shall be calculated? Please clarify.
Part 3, Chapter 6, paragraph F1040001 has been changed.
Refer to changes to the RFP provided with this amendment.
107 The RFP covers a rather large scope of various trades. We will need to inquire prices on the market for various trades and this is quite time consuming until all the single items are priced by different suppliers and subcontractors.