N6247018R40040002.pdf

PDF 37 KB Posted

Attached to
Design Build P3005 Guardian Angel Operations Facility, Aviano Air Base, Aviano, Italy
Solicitation number
N6247018R4004
Issued by

About this file

N6247018R40040002.pdf

View the file

Other files

File Type Posted
Amend_07_-_6_ESR_E10.pdf PDF
Amend_07_-_6_ESR_E20.pdf PDF
Amend_07_-_00_73_04.pdf PDF
N6247018R40040007.pdf PDF
N6247018R40040006.pdf PDF
Att_(I)_2018_ICEMAP.PDF PDF
N6247018R40040005.pdf PDF
Att_(H)_Amend_05_-_00_73_04.pdf PDF
Att_(E)_SCHEDULE_B.pdf PDF
N6247018R400400004.pdf PDF
N6247018R40040003.pdf PDF
N6247018R40040001.pdf PDF
Attach_C_Visitor_Pass_Request_Form.xlsx XLSX spreadsheet
Guardian_Angel_SF1442.pdf PDF
Attach_B_PPQ.doc DOC document
Attach_A_Construction_and_Design_Experience_Project_Data_Sheet.doc DOC document
N6247018R4004_Pre-Solicitation_N6247018R4004.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0002 is being issued for the follow ing:

1.Revisions to required SOA Certif ication requirements.

2.Response to pre-proposal inquiries

See continuation page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247018R4004

X 9B. DATED (SEE ITEM 11)

20-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jan-2018

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247018R4004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

CONTINUATION PAGE

Amendment 0002 Amendment 0002 is being issued for the following reasons:

1. Revisions to required SOA Certification requirements.

2. Response to pre-proposal inquiries

1. Revisions to required SOA Certification requirements.

From:

4. CERTIFICATE OF CLASSIFICATION

SOCIETÀ ORGANISMI DI ATTESTAZIONE (SOA) CERTIFICATION.

The following SOA Certifications are required, offeror must show that the necessary Certifications are in effect as of the date proposals are due, and must be submitted with the Phase I Proposal:

The Prevailing Work Category: OG-01 VIII

The related classifications (sub-categories) and percentages for this work category:

Classification OS-4

Percentage of Work 1%

Classification OS-28

Percentage of Work 13%

Classification OS-30

Percentage of Work 16%

Companies that are QUALIFIED in the Prevailing Work Category and pertinent Classification, but NOT QUALIFIED also in the Minor Work Category and pertinent Classification, can still bid against the subject solicitation, by forming a Joint-Venture or subcontracting for the execution of the work pertaining to the categories (or alternatives) for which they are not qualified. Offerors must declare their intention of forming the Joint-Venture or awarding a subcontract. A "Teaming Agreement" or "Letter of Commitment" with the subcontractor must be submitted with the proposal and must identify the qualifications of the subcontractor (attaching the pertinent SOA certificate) and what work they will perform (identifying type and percentage of the work covered by specific SOA certificate).

In the case of a JV, at least one member of the JV must have the required SOA Certifications. The JV member who has the SOA Certification must perform the majority of the work pertinent to the certification. In the case of a JV certification submitted by a subcontractor will not be accepted.

To:

4. CERTIFICATE OF CLASSIFICATION

SOCIETÀ ORGANISMI DI ATTESTAZIONE (SOA) CERTIFICATION.

The following SOA Certifications are required, offeror must show that the necessary Certifications are in effect as of the date proposals are due, and must be submitted with the Phase I Proposal:

The Prevailing Work Category: OG-01 VIII

The related classifications (sub-categories) and percentages for this work category:

Classification OS-4

Percentage of Work 1%

Classification OS-28

Percentage of Work 13%

Classification OS-30

Percentage of Work 16%

Companies that are QUALIFIED in the Prevailing Work Category and pertinent Classification, but NOT QUALIFIED also in the Minor Work Category and pertinent Classification, can still bid against the subject solicitation, by forming a Joint-Venture or subcontracting for the execution of the work pertaining to the categories (or alternatives) for which they are not qualified. Offerors must declare their intention of forming the Joint-Venture or awarding a subcontract. A "Teaming Agreement" or "Letter of Commitment" with the subcontractor must be submitted with the proposal and must identify the qualifications of the subcontractor (attaching the pertinent SOA certificate) and what work they will perform (identifying type and percentage of the work covered by specific SOA certificate).

In the case of a JV, at least one member of the JV must have the required SOA Certifications. The JV member who has the SOA Certification must perform the majority of the work pertinent to the certification. In the case of a JV certification submitted by a subcontractor will not be accepted.

2. Response to pre-proposal inquiries

Questions: Answers:

11 RFP states, “In the case of a JV, at least one member of the JV must have the required SOA Certifications. The JV member who has the SOA Certification must perform the majority of the work pertinent to the certification. In the case of a JV certification submitted by a subcontractor will not be accepted." Would the Government consider deleting the OS4 requirement because it has only a 1% value and is such a small percentage to make a formal commitment during the proposal phases?

Refer to revised solicitation.

The following have been deleted:

CONTINUATION PAGE

(End of Summary of Changes)

File details come from the government source that posted it.