N6247018R40040003.pdf
PDF 22 KB Posted
- Solicitation number
- N6247018R4004
About this file
N6247018R40040003.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_07_-_6_ESR_E10.pdf | ||
| Amend_07_-_6_ESR_E20.pdf | ||
| Amend_07_-_00_73_04.pdf | ||
| N6247018R40040007.pdf | ||
| N6247018R40040006.pdf | ||
| Att_(I)_2018_ICEMAP.PDF | ||
| N6247018R40040005.pdf | ||
| Att_(H)_Amend_05_-_00_73_04.pdf | ||
| Att_(E)_SCHEDULE_B.pdf | ||
| N6247018R400400004.pdf | ||
| N6247018R40040002.pdf | ||
| N6247018R40040001.pdf | ||
| Attach_C_Visitor_Pass_Request_Form.xlsx | XLSX spreadsheet | |
| Guardian_Angel_SF1442.pdf | ||
| Attach_B_PPQ.doc | DOC document | |
| Attach_A_Construction_and_Design_Experience_Project_Data_Sheet.doc | DOC document | |
| N6247018R4004_Pre-Solicitation_N6247018R4004.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003 is being issued for the follow ing:
1. To respond to pre-proposal inquiries.
Please see continuation page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247018R4004
X 9B. DATED (SEE ITEM 11)
20-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2018
CODE
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247018R4004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
CONTINUATION PAGE
Amendment 0003 Amendment 0003 is being issued for the following reasons:
1. To respond to pre-proposal inquiries
1. Pre-Proposal Inquiries:
Questions: Answers:
12 In Amendment 01 it is stated that: as a minimum requirement, at least two
(2) relevant construction projects shall demonstrate experience with construction for the United States Department of Defense. Please confirm if a Construction Experience had for NATO could be allowed as equivalent to a construction for the United States Department of Defense.
Please refer to submission requirements for Factor 2.
13 Please confirm that using standard A4 sheets (21 x 29,7 cm) is acceptable instead of 8 1/2 x 11 format.
Size A4 is acceptable.
14 Please confirm that the following three sections: 3. Eligibility for award, 4.
Certificate of classification, 5. Anti-mafia law documents are not required at phase I submission. The solicitation states "this documentation is to be included in your price proposal".
On the contrary, if these three sections must be included in submittal for phase I please state in which factors we should include them.
As written in the solicitation, Certificate of Classifications is to be submitted with Phase 1 and Phase 2 proposals. Eligibility for Award and Anti-Mafia Law Documents are to be submitted with Phase 2 Proposals.
15 1) Amendment changed to: "Submit a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your this evaluation, a relevant project is further defined as project which includes a new building with a minimum building size of 1,400-Square Meters (15,000-Square Feet)." 2) However, two paragraphs later the RFP still states, "As an additional minimum requirement, at least two (2) relevant construction projects shall include a new building with a minimum building size of 5,000-Square Meters (53,800-Square Feet)." Does this sentence in item 2) above need to be changed to reflect the 1,400 meters, or do you want buildings that are 1,400 square meters up to 5,000 square meters?
Can you please clarify the square meter size you want for the building size?
Refer to Amendment 0001 for submission requirements for Factor 2. There is no maximum size limitation.
(End of Summary of Changes)
N6247018R4004