Amend_07_-_6_ESR_E10.pdf

PDF 480 KB Posted

Attached to
Design Build P3005 Guardian Angel Operations Facility, Aviano Air Base, Aviano, Italy
Solicitation number
N6247018R4004
Issued by

About this file

Amend_07_-_6_ESR_E10.pdf

View the file

Other files

File Type Posted
Amend_07_-_6_ESR_E20.pdf PDF
Amend_07_-_00_73_04.pdf PDF
N6247018R40040007.pdf PDF
N6247018R40040006.pdf PDF
Att_(I)_2018_ICEMAP.PDF PDF
N6247018R40040005.pdf PDF
Att_(H)_Amend_05_-_00_73_04.pdf PDF
Att_(E)_SCHEDULE_B.pdf PDF
N6247018R400400004.pdf PDF
N6247018R40040003.pdf PDF
N6247018R40040002.pdf PDF
N6247018R40040001.pdf PDF
Attach_C_Visitor_Pass_Request_Form.xlsx XLSX spreadsheet
Guardian_Angel_SF1442.pdf PDF
Attach_B_PPQ.doc DOC document
Attach_A_Construction_and_Design_Experience_Project_Data_Sheet.doc DOC document
N6247018R4004_Pre-Solicitation_N6247018R4004.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY18 MILCON Project P-3005, Guardian Angels Operations Facility 1552891 Aviano AFB; Aviano, Italy

PART 3 - CHAPTER 6 / ESR E10 - Page 1

6. ENGINEERING SYSTEMS REQUIREMENTS

E10 EQUIPMENT

GENERAL SYSTEMS REQUIREMENTS

See Part 6 Attachment 9b, "Ground and First Floor Furniture Plans" for specific requirements on "Equipment."

E1010 COMMERCIAL EQUIPMENT

The Contractor must obtain the services of equipment specialists to specify audiovisual, or any other specialty equipment. Equipment specialists must not have any affiliation with the product specified.

All specialty equipment must be installed by qualified installers regularly engaged in installing the specialty equipment.

Provide energy using equipment in accordance with criteria listed in Part 2 Section 01 33 29.05 20, Sustainability Reporting for Design Build.

E101003 VENDING EQUIPMENT

Not Used.

E101004 LAUNDRY EQUIPMENT

Contractor must furnish and install laundry equipment as indicated within Part 6 Attachment 9b, "Ground and First Floor Furniture Plans" portion of this RFP. A major factor in the equipment selection will be the Contractor's and his Vendor's ability to provide quick and convenient service and repair in the project location. Equipment must be easily and quickly repaired/serviced by local personnel, and a reasonable quantity of repair parts must be stocked and readily available on short notice. The Contractor must provide all work necessary to support laundry equipment including utility services and structural support. The Contractor is responsible for a complete dryer ventilation system.

E101005 SECURITY AND VAULT EQUIPMENT

Design the Weapons Storage Area (WSA) or Armory space in accordance with criteria in Military Handbook (MIL-HDBK) 1013/1A to provide at least 10 minutes of delay time against medium threat severity levels of forced entry.

Amendment 07

PART 3 - CHAPTER 6 / ESR E10 - Page 2

E1020 INSTITUTIONAL EQUIPMENT

E102003 LABORATORY EQUIPMENT

Not Used.

E102009 AUDIOVISUAL EQUIPMENT

Under the construction contract, the general contractor must be responsible for coordinating design requirements with the end user/Command IT personnel, providing equipment specifications, and procurement and installation of the Audiovisual (A/V) equipment. As required, the contractor must obtain services of an audiovisual Certified Technology Specialist (CTS) to design and specify the audiovisual equipment.

A/V Equipment including electronics potentially connected to data/IT must be coordinated with design and construction but planned for and funded by the user or Budget Submitting Office sponsoring the user. A/V equipment must include, but is not limited to:

intercom/sound systems, projectors, video teleconferencing, and CCTVs. Utilize the latest generation technology available at time of procurement.

AV equipment will not be funded as part of the Furniture, Fixtures, & Equipment (FF&E) Package. A/V Equipment will be purchased using separate funding. The A/V Equipment will be identified as a separate line item, and priced separately from the FF&E. A/V Equipment will be awarded as a planned modification.

Flat screen televisions brackets are considered (SID) part of construction. Provide brackets that are adjustable, articulating, securely mounted to walls and have appropriate blocking to properly secure to walls.

See Part 3, Section E20 for A/V deliverable requirements. Coordinate with D503095 Audio Visual Systems.

E1030 VEHICULAR EQUIPMENT

Provide warehouse equipment including reversible roller track, bay end scissor lift table(s), hoist crane and vehicle storage lift(s)

Base the minimum performance characteristics for the scissor lift on the following:

a. Service Period:

(1) Number of shift operations of 3.

(2) Maximum number of loads per shift opening of 3.

(3) Maximum number of days per week of 7.

PART 3 - CHAPTER 6 / ESR E10 - Page 3

b. K-loader and Fork Lift Loads;

(1) Design scissor lift table to accommodate 4 wheel fork trucks.

(2) Design levelers to handle 11,800 kg (26,000 lb) gross dynamic load.

(3) Base load leveler design on number of cycles per loading/unloading operation per load of 10.

Base the minimum performance characteristics for the Hoist crane on the following:

(1) Design hoist crane to minimum load 2,200 kg or next greater manufacturer minimum;

(2) Provide Single cell free standing rail and trolley one point hoist motor and hook.

Base the minimum performance characteristics for the Vehicle Lift on the following:

(1) Provide 4 post hydraulic vehicle lift, load capacity 6,350 kg (14,000 lb);

(2) Minimum 70” rise, floor area 6.01M x 6.01M (20’ x 20’);

Base the minimum performance characteristics for Roller Bed track conveyors on the following:

(1) Two row continuous recessed floor reversible roller track gravity conveyor system;

(2) 63mm (2 1/2”) minimum diameter rollers, 305mm (12”) wide track;

(3) Load Capacity 772 kg (1700 lb) per foot

E1040 GOVERNMENT FURNISHED EQUIPMENT

Rough-in and provide connections for Government-furnished equipment such that equipment will operate as intended, including providing miscellaneous items such as plugs, receptacles, wire, cable, conduit, flexible conduit and outlet boxes or fittings.

Equipment will remain under the control of the Government until such time as the Contractor is ready to install. Provide 30 days advance notice of expected installation date and pick up equipment and transfer to site for installation.

Testing requirements of Government Furnished equipment is the responsibility of the Contractor and must follow the same guidelines as though the Contractor had provided the equipment. Install and test the Government furnished items listed on the drawings.

E1090 OTHER EQUIPMENT

E109002 FOOD SERVICE EQUIPMENT

Not Used.

PART 3 - CHAPTER 6 / ESR E10 - Page 4

E109007 ATHLETIC, RECREATIONAL & THERAPEUTIC EQUIPMENT

Contractor must provide the following athletic equipment and accessories as noted in Part 6 Attachment 9b, "Ground and First Floor Furniture Plans."

Pull up bars

Punching Bag and Speed Bag

E109090 OTHER SPECIALIZED FIXED AND MOVEABLE EQUIPMENT

Contractor must provide automatic external defibrillators (AED) as noted in Part 3, Chapter 5 "Room Requirements." Provide signage for AED locations.

--End of Section--