About this file
This document contains an experience matrix template and information about a related federal contract opportunity. The experience matrix template requires offerors to demonstrate experience on government contracts since January 2015 for key areas of a product family support services statement of work, including engineering, technical, repair and program support services. Offerors must cite at least one past performance reference for the prime contractor and up to one reference per proposed subcontractor, for a maximum of five total references.
The related federal contract opportunity is a solicitation for product family support services at the Southwest Regional Maintenance Center. The services include engineering, technical, repair and program support within 15 miles of Naval Base San Diego. The requirement is a follow-on to a previous contract, and the prospective contract would have a one-year base period and four one-year options. The award will be based on best value. The solicitation is forthcoming, with contract award anticipated in the fourth quarter of fiscal year 2019 out of the Contracting Office in San Diego.
S-2: Experience Matrix
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N55236-19-R-0003 Section J Attachment S-2 Experience Matrix
In accordance with RFP Section L, Volume II (a), complete and submit the following matrix to show the breadth, depth and relevance of organizational experience on Government contracts since 01 January 2015 for the specified Statement of Work (SOW) key areas. Cite at least one reference for work performed by the prime offeror, no more than one reference per proposed subcontractor, and no more than five (5) references total. Cite references in the following order: work performed by the prime, then work performed by the proposed subcontractor(s).
For each SOW key area, the offeror shall indicate experience by placing an “X” in the applicable column(s). The column width and depth may be expanded, as necessary.
Ref #
Contract Number
Name of prime or subcontractor that performed the referenced work
| 3.3.1.3 |
| 3.4.4.3 |
| 3.5.2.3 & 3.5.2.8 |
| 3.5.4.2 |
| 3.4.1.2 |
| 3.11.2.4 |
| N66001-98-R-0069 | Source Selection Information |
| See FAR 3.104 |
N55236-19-R-0003