WC130 Chiller and Pump-1.png

PNG image 216 KB Posted

Attached to
FY26 Wallace Creek BEQ Chiller Repairs
Solicitation number
N4008526R9013
Issued by

About this file

This is a mechanical equipment specification and schedule document for HVAC and building systems components, revised September 3, 2009. The document contains four primary equipment schedules detailing design specifications, capacities, and operational parameters.

The Air Handling Unit Schedule specifies a single unit (AHU-C-1) with 850 CFM capacity, featuring a horizontal configuration with chilled water cooling and hot water heating capability. It includes a 15,000 BTU/hr maximum sensible load and control valve sizing details. The Energy Recovery Unit Schedule describes a standard design energy recovery wheel with 80 CFM capacity, 1100 maximum RPM, and variable frequency drive capability. The Boiler Schedule lists two units (B-C-1 and B-C-2) with 125 and 200 output BTU/hr respectively, operating on hot water with standard efficiency ratings and DHW (domestic hot water) capability. The Air-Cooled Chiller Schedule indicates one unit (C-C-1) with 2-ton capacity and air-cooled condensing configuration. The Air Distribution Schedule provides ductwork specifications including supply, return, and exhaust systems with various mounting types, patterns, and damper configurations. The Air-Cooled Chiller Schedule notes capacity based on no less than 95°F ambient temperature with variable frequency drive provisions. All schedules include detailed specifications for CFM ratings, pressure differentials, motor specifications, control types, and integration requirements for coordinated building system operation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .