WC120-2.png
PNG image 274 KB Posted
- Attached to
- FY26 Wallace Creek BEQ Chiller Repairs
- Solicitation number
- N4008526R9013
About this file
This is a technical specification document containing four equipment schedule tables for HVAC systems and related components, revised September 3, 2009.
The document specifies four categories of equipment: Air Handling Units, Energy Recovery Units, Boiler Systems, and Split System Air Conditioning Units, along with an Air-Cooled Chiller schedule. The Air Handling Unit (AHU-D-1) serves 8,160 square feet with a maximum airflow of 25,000 CFM, includes a 1,000 CFM bypass, and features DXCF-AF cooling with a 4.5-ton capacity and 5460 CFM chilled water cooling capacity. The Energy Recovery Unit (ERU-E-1) operates at 90-79 efficiency with a 5460 CFM maximum motor capacity and includes both supply and exhaust fans. The Boiler Schedule specifies two units: B-B-1 with 750 MBH output and B-B-2 with 500 MBH output, both operating at 125 PSI with varying efficiency ratings. The Split System Air Conditioning schedule lists five units (CSAC-1 through CSAC-5) serving multiple rooms with capacities ranging from 12.8 to 26.1 total capacity and maximum sensible capacity between 12.8 and 34.2. All schedules include detailed technical parameters such as CFM ratings, pressure specifications, filter types, and control valve configurations. Notes reference electrical drawings for equipment characteristics, variable frequency drive provisions, and compliance with North Carolina energy conservation codes.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .