WC110-1.png

PNG image 271 KB Posted

Attached to
FY26 Wallace Creek BEQ Chiller Repairs
Solicitation number
N4008526R9013
Issued by

About this file

This document is a technical specification sheet containing equipment schedules for HVAC systems, revised September 3, 2009. The document details five primary system schedules: Air Handling Units, Energy Recovery Units, Boilers, Split System Air Conditioning Units, and Air-Cooled Chillers.

The Air Handling Unit schedule specifies a unit with 85 CFM capacity, 25,000 BTU/h maximum output, 1,000 RPM fan speed, double-width/double-inlet configuration, and airfoil wheel design. The Energy Recovery Unit schedule includes summer design conditions at 90°F, 79% relative humidity, with supply and exhaust fans each rated at 5,460 CFM, utilizing merv 7 filters and variable frequency drives. The Boiler Schedule lists two units: model C-H with 500 MBH output at 125 PSI maximum pressure and 93% efficiency, and model C-H with 600 MBH output at 140 PSI maximum pressure and 125 efficiency rating. The Split System Air Conditioning Unit Schedule covers six indoor/outdoor unit combinations ranging from 12.8 to 63.3 kW cooling capacity with corresponding heating capabilities and variable frequency drive options. The Air-Cooled Chiller Schedule specifies a unit with 85-ton capacity, 100 kW power input, featuring variable frequency drive capability and heat recovery option capabilities. Additional notes throughout emphasize requirements for variable frequency drives on select units, electrical grounding compliance, filter specifications (MERV 7-13), and maximum static pressure limitations to ensure proper system operation and efficiency.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .