This is Amendment No. 0004 to Solicitation N40085-26-R-9013 for the FY26 Wallace Creek BEQ Chiller Repairs project (Project 25-0438) issued by NAVFAC Mid-Atlantic. The amendment extends the proposal submission deadline to April 2, 2026 at 2:00 PM EST and provides answers to Requests for Information #002. Offerors must acknowledge receipt of this amendment when submitting proposals, or face potential rejection. The amendment references a continuation sheet containing a question-and-answer response regarding existing chilled water pumps.
The Q&A addresses a request for pump specifications for each existing chilled water pump in the system, requiring either clear photographs of pump nameplates showing manufacturer, model number, serial number, RPM, voltage, phase, and horsepower, or performance data including design flow (GPM), design head (feet of head), motor voltage, and phase. The contracting officer's answer references attached equipment schedules (WC120-2, WC105-1, WC105-2, WC110-1, WC110-2, WC115-1, WC115-2, WC120-1, and chiller and pump schedules for WC130 and WC135) that contain the requested information to confirm proper sizing, electrical requirements, and system compatibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WC120-2.png | PNG image | |
| WC110-1.png | PNG image | |
| WC130 Chiller and Pump-2.png | PNG image | |
| WC135 Chiller and Pump-1.png | PNG image | |
| WC120-1.png | PNG image | |
| WC115-1.png | PNG image | |
| WC 135 Chiller and Pump-2.png | PNG image | |
| WC130 Chiller and Pump-1.png | PNG image | |
| WC105-1.png | PNG image | |
| WC115-2.png | PNG image | |
| WC105-2.png | PNG image | |
| WC110-2.png | PNG image | |
| Amend 0003 N40085-26-R-9013 FY26 BEQ Chillers Proj. 26-0438.pdf | ||
| Amend 0002 - Site Visit Sign In Sheet N4008526R9013 25-0438 FY26 Wallace Creek BEQ Chiller Repairs.pdf | ||
| Amend 0001 250438.pdf | ||
| Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf | ||
| Chiller SOW 2026 - N4008526R9013 Proj 25-0438 FY26 Wallace Creek BEQ Chiller Repairs.pdf | ||
| SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf | ||
| RFP N4008526R9013 Proj 25-0438 FY26 Wallace Creek BEQ Chiller Repairs.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0004 03/31/26 25-0438
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9013
02/27/26
25-0438, FY26 Wallace Creek BEQ Chiller Repairs Amendment 0004, Answer Requests for information #002
The time and date for receipt of proposals is extended to 02 April 2026 at 2:00 pm EST.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
Title: FY26 Wallace Creek BEQ Chiller Repairs N40085-26-R-9013 Project 25-0438 Page 2 of 2
DISTRIBUTION: DoW COMMUNITY ONLY
CONTINUATION SHEET
1. QUESTION: Please provide one of the following for each existing chilled water pump:
1. A clear photograph of the pump nameplate/tag showing manufacturer, model number, serial number, RPM, voltage, phase, and horsepower;
OR
2. The following performance data for each pump:
o Design flow (GPM) o Design head (feet of head) o Motor voltage o Phase
This information is necessary to confirm proper sizing, electrical requirements, and compatibility with the existing system.
ANSWER: See attached equipment schedules that provides the information requested.
Attachments: WC120-2
WC105-1
WC105-2
WC110-1
WC110-2
WC115-1
WC115-2
WC120-1
WC130 Chiller and Pump-1
WC130 Chiller and Pump-2 ` WC135 Chiller and Pump-1
WC135 Chiller and Pump-2
| Amend 0004 - RFI #002 |
| Continuation Sheet 25-0438 RFI #002 |