This is a Bid Price Schedule for Special Project RM25-4593, a Naval construction contract for upgrades and modernization of storage space at NUWC Building 47, Naval Station Newport, Newport, Rhode Island (WON 1814702).
The Base Price (Line Item 0001) encompasses all construction services including hazardous material abatement and disposal, with sub-items for sitework outside the facility 5-foot line (0001A), sitework inside the facility 5-foot line (0001B), and removal/disposal of asbestos-containing materials in floor tile and pipe fitting insulation (0001C–0001D for 560 SF and 33 EA respectively). Additional Base Price line items address lead-based paint and lead-containing paint removal from CMU walls and doors (0001E, 3000 SF), steel columns (0001F, 625 SF), and piping systems (0001G), plus new mechanical, electrical, plumbing, telecommunications, electronic safety/security, and fire suppression systems (0001H–0001M). Supplemental Base Price work includes asbestos and lead paint removal for alternative areas (0001N–0001P). Option Item No. 1 (Line Item 0002) covers material handling equipment and storage racking for Bay A and Bay B; Option Item No. 2 (0003) addresses office space renovation and restroom upgrades; Option Item No. 3 (0004) covers double-deep storage racking for Bay C; Option Items 4A and 4B (0005A–0005B) address server room relocation in Bay D with mobile racking and concrete floor repairs. All prices require firm fixed pricing with no economic price adjustment. The Government reserves the right to award any or all option items within 150 calendar days of contract award, with the base contract completion date of 365 calendar days extendable to 730 days if options are awarded. Estimated quantities marked with asterisks may be subject to equitable adjustment if actual quantities vary more than 15 percent from estimates. Performance bonds must reflect 100 percent of aggregate amounts if options are exercised, and contractors must provide full turnover documentation including as-builts, warranties, and maintenance information upon project completion.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROJECT RM25-4593 – NUWC BUILDING 47
UPGRADES/MODERNIZATION OF STORAGE SPACE WON 1814702
NAVAL STATION NEWPORT, NEWPORT, RI
BID PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line Item Description Quantity Unit Unit Price Sub-Total Total Price
0001 BASE PRICE:
Total Price for (subtotals of Line Items 0001A- 0001P) the entire work for construction services in accordance with the RFP, complete, but excluding work provided in another Priced line Item.
Basis of Bid for Line Item 0001 shall be all Construction services as noted in the scope of work, including Hazardous Material abatement and disposal, and all Construction Phasing, Base Bid
WON 1814702–
Items.
EA
0001A Price for the entire project sitework, OUTSIDE the facility 5-foot line, complete in accordance with the RFP, but excluding work described in another priced line Item.
0001B Price for the entire project sitework, INSIDE the facility 5-foot line, complete in accordance with the RFP, but excluding work described in
Item.
0001C Price for removal and disposal of Asbestos Containing Material floor tile and all associated asbestos containing mastic (ACM) complete in accordance with the RFP, but excluding work provided in item.
560*
SF
0001D Price for removal and disposal of Asbestos Containing Material pipe fitting insulation (ACM) complete in accordance with the RFP, but excluding work provided in
33*
0001E Price for removal items containing Lead Based Paint (LBP) or Lead Containing Paint (LCP) for all CMU walls, stairs, doors, frames, complete in accordance with the RFP, but excluding work provided in
3000*
0001F Price for removal items containing Lead Based Paint (LBP) or Lead Containing Paint (LCP) for all steel columns complete in accordance with
625* the RFP, but excluding work provided in another priced line item.
0001G Price for removal and disposal of items containing Lead Based Paint (LBP) or Lead Containing Paint (LCP) for all piping, sprinkler piping, risers in accordance with the RFP, but excluding work provided in
0001H Price for all new work general mechanical scope, including all TABS, Controls work, Commissioning and Acceptance, as noted in contract documents excluding work provided in another priced line item.
0001I Price for all new electrical scope – switches, power and lighting, including all controls work, Commissioning and Acceptance, as noted in contract documents excluding work
0001J Price for all new plumbing, including all controls work, Commissioning and Acceptance, as noted in contract documents excluding work provided in another priced line item.
0001K Price for all new work general telecommunications including all fiber, controls work, Commissioning and Acceptance, as noted in contract documents excluding work
0001L Price for all new electronic safety and security/physical security including all controls work, Commissioning and Acceptance, as noted in contract documents excluding work
0001M Price for all new work general new work for Fire Suppression system, Fire Detection & Alarm Systems, including testing/Government acceptance, as noted in contract documents excluding work
0001N Price for removal
Asbestos Containing Material floor tile and all associated asbestos containing mastic (ACM) complete in
100* accordance with the RFP, but excluding work provided in another priced line item.
0001O Price for removal and disposal of Asbestos Containing Material pipe fitting insulation (ACM) complete in accordance with the RFP, but excluding work provided in
20*
0001P Price for removal items containing Lead Based Paint (LBP) or Lead Containing Paint (LCP) complete in accordance with the RFP, but excluding work provided in
100*
0002 Option Item No. 1:
Price for providing all work for construction for material handling equipment and storage racking for the Bay A and Bay B disposal, small parts, and receiving operations complete in accordance with the RFP, but excluding work provided in
0003 Option Item No.
2: Price for providing all work for construction to remove the existing office space on the exterior wall of Bay B and construct a new two story office space. The existing office space on the bay b and bay c wall will get renovated to provide additional cooling for the server room and some walls will be removed to improve the office space usage. Bid Option 2 will renovate the existing restroom connected to Bay C.
0004 Option Item No.
3: Price for providing all work for construction for material handling equipment and double deep storage racking for Bay C.
0005A Option Item No.
4A: Price for providing all work for construction relocate the server room in Bay D to allow for the drive lane to be opened.
Bay D will be installed with mobile racking system.
0005B Option Item No.
4B: Price for providing all work for construction Provide existing concrete floor survey, provide and install existing concrete floor repairs as required to receive new floor leveler per mobile racking system requirements.
TOTAL PRICE FOR LINE ITEMS 0001- 0005
GENERAL BID NOTES
a. Award will be evaluated on the total proposed price for Line Items 0001 – 0005, Base Price and the sum of all Option Item prices. The subtotal of Line Item 0001A-0001P is included in Line Item 0001.
b. The Government reserves the unilateral right to award any or all of Line Items 0002 through 0005 to the Contractor at the proposed price within 150 calendar days after the contract award and in accordance with all bid notes. A firm fixed proposed price is required for Line Items 0001-0005. No provision is made for economic price adjustment. The Contract Completion Date (CDD) will be extended an additional 365 calendar days if option work is to be included in the original award, or modified to be included in the contract.
If options are awarded, the overall contract completion date will be 730 calendar days from date of contract award. The Contractor shall submit a preliminary construction schedule with price schedule that logically sequences the project and phasing.
c. Quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities. Contractor shall only be paid for quantities/units of work actually performed. If the estimated quantity used in the bid schedule is not reached, a deductive modification shall be taken at the end of contract for quantities/units not performed. If the estimated quantity is exceeded, an equitable adjustment shall be made to the contract price for work performed over the estimated quantity. If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
d. Evaluations of Options (JUL 1990). Except when it is determined in accordance with FAR 17.202 (b) (DEVIATION 2026-O0027) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for Line Items 0002 through 0005 to the total price for the Base Bid, (Line Item 0001). Evaluation of options will not obligate the Government to exercise the Option(s). (FAR
52.217-5 DEVIATION 2026-O0038).
e. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly understated for some work and prices which are significantly overstated for other work.
f. Failure to enter a price for any Line Item will result in a proposal being rejected.
g. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the extended total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
h. If any or all of Line Item 0002 through 0005 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.
CLOSEOUT AND WARRANTY BID NOTES:
a. The Contractor shall provide full turnover documentation, including as-builts, warranties, and maintenance information, for each completed phase. The Contractor shall provide ongoing support through the warranty period to address any issues that may arise in the newly completed areas.